HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 116 OGUNQUIT ROAD 2/3/2021 PEG�'v�G • sti .,�. . �3�p1ti FE8 o0\XR OF NEE PR MEND .gyp NEP�'�N O North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 116 Ogunquit Road MAP: 90.A LOT: 0073 INSTALLER: Robert Innis — Innis Brothers — 978-663-6006, 508-572-8224 DESIGNER: John Morin — Morin-Cameron — 978-777-8586 Ben Osgood — 978-435-1324 PLAN DATE: 01.12.2021 revised 04.09.2021 BOH APPROVAL DATE ON PLAN: 05.11.2021 INSPECTIONS TANK INSPECTION: 10.18.2021 — S. Casey DATE OF BED BOTTOM INSPECTION- 11/3/2021 S.Casey DATE OF FINAL CONSTRUCTION INSPECTION: 11-23-21 DATE OF FINAL GRADE INSPECTION:12/1/2021 12/06/2021 S. Casey SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ® Bottom of tank hole has 6" stone base ❑ Weep hole plugged ® 1500 gallon tank has been installed H-20 loading ® Monolithic tank construction ® Water tightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port (gas baffle) ❑ inch cover to within 6" of finish grade installed over one access port ® Rubber boots around inlet & outlet Comments: 10.18.2021 S. Casey — 6" + stone. 11-23-21 — Riser over tank to within 6" of finished grade needed DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: 11-23-21 — Riser over d-box to within 6" of finished grade needed SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ❑ 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header and vented ® Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments: 11-23-21 — Inspection port to within 3" of finished grade needed FINAL GRADE ® Loamed ❑ Seeded ® Cover per plan — covers Win 6" final grade need letter no seed finishing grade in spring (see attached) Comments: DOCUMENTS NEEDED ® Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer ® As-Built Plan BM = 123.81 HR = 6.51 HI = 130.32 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 3.76 125.74 Septic Tank IN 4.10 125.54 Septic Tank OUT 4.30 125.29 Distribution Box IN 4.66 125.14 Distribution Box OUT 4.86 124.96 Lateral 1 BEG 4.94 124.90 Lateral 1 END 5.28 124.60 Lateral 2 BEG 4.86 124.90 Lateral 2 END 5.27 124.60 Lateral 3 BEG 4.94 124.90 Lateral 3 END 5.26 124.60 SKETCH PLAN 12/15/2021 LRC Builders LLC 475 Boston Road Billerica,MA 01821 To: The Town of North Andover Board of Health, LRC Builders agrees to complete the landscaping of 116 Ogunquit Road North Andover MA in the spring of 2022 when the weather permits.This includes hydroseeding and bark mulching all disturbed areas. -LRC Builders rN A CC Signed: d a NORTH AN DOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 116 Ogunquit Road Construction Inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Tue, Nov 23, 2021 at 2:24 PM To: "Brian Lagrasse (blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni- All went well at the inspection today at 116 Ogunquit Road. Three small items need attention. They will stay in touch with Steve about these-tank needs riser to within 6" of finished grade, d-box needs riser to within 6" of finished grade and inspection port needs to be within 3"of finished grade. Any questions please do let me know. Dan Daniel Ottenheimer, PE President 0 ti MILL RIVER CONSULTING Creative S(Anticros for tattd Ikvelopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com Construction Notes -116 Ogunquit Road.doc 372K