HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 45 SUGARCANE LANE 2/17/2022 `�1 LED
•
•
yr•`fix ++
P�4A'►Ep AC¢�v
North Andover Health Department
Community and Economic Development Division
February 17, 2022
Nick DiNatale
45 Sugarcane Lane
North Andover, MA 01845
Re: Subsurface Sewage Disposal System Plan for 45 Sugarcane Lane (Mal) 106A, Lot 241)
Dear Mr. DiNatale:
The proposed wastewater system design plan for the above site with a final revision date of
February 15,2022 has been approved.
The design plan has been approved for use in the construction of an upgrade on-site septic
system for a 5-bedroom home utilizing a leaching field. This design plan approval is valid until
February 17, 2025.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover. In the event an imminent health problem, such as sewage backup into the dwelling is
occurring,the North Andover Board of Health may reduce the time period for which this plan is
valid.
This approval is also subject to the following conditions:
1. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation, the originally issued Disposal System Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit(310 CMR 15.020(1)).
Page 1 of 2
North Andover Health Department, Town Hall, 120 Main Street
North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542
2. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Commission,Zoning Board, Planning Board, Building Inspector,Plumbing Inspector
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincere,
B 'an J. LaGrasse, CEHT
Director of Public Health
Encl. Installers list
cc: Benjamin Osgood,P.E.
File
Page 2 of 2
North Andover Health Department, Town Hall, 120 Main Street,
North Andover,MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542