HomeMy WebLinkAbout242-1835, 328 Campbell Road OOC - Permits #242-1835 - 328 CAMPBELL ROAD 3/2/2022 4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1835
V�-- 1-1 —1 11--l-1-1-Ir
ssDEP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
------------------------------- -------------------
A. General Information
Please note: North Andover
this form has 1. From.
been modified Conservation Commission
with added 2. This issuance is for
spaceto a.M Order of Conditions b. Amended Order of Conditions
accommodate (check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
William & Heidi
a. First Name b. Last Name
Important:
Whenfilling ............ ................................................. ........... ............... ......................................................................
out forms on c.Organization
the 328 Campbell Road
computer, -a7mwifing---A—ddress
use only the
tab key to North Andover MA 01845
move your e.City/Town f.State g.Zip Code
cursor-do
not use the 4. Property Owner(if different from applicant):
return key.
VQ a. First Name b.Last Name
c.Organization
d.Mailing Address
............................................. ------------- ................... .......................
e. own f.State g.Zip Code
5. Project Location:
328 Campbell Road North Andover
a.Street Address b.City/Town
Map 106D Lot 24
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: 42d63m8421 s 71d06m5629s
.J Latitude e. Longitude
vvpaforrn5.doc-rev 5/1812020 Page 1 of 13
4
Massachusetts Department mf Environmental Protection Provided uyMoemep
Bureau of Resource Protection - Wetlands 242-1835
����� � � ���� � o� �^*^
��n �� Form ~� —~ Order K�n ���������u�ons
Massachusetts Wetlands Protection Act K8.G.[. c. 131' A40 noepTmnouowunx
North Andover
A. General Information /coDf.\
G. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
Northern Essex
a.County b.Certificate Number(if registered land)
3754 301
c.Book d.Page
J 24 2022 F b 23 �O�2 March2 2022
7. Dates: a.bateNoric��__of Intent Filed b.Date Public Hearing Closed c. Date of Issuance
---
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Subsurface Sewage Dis is 28 Campbell Road -2 sheets
a.Plan Title
Hancock Associates Charles Wear
b. Prepared By c.Signed and Stamped by
Au uq24 2021 111=20'
T—Ad j ii I io-n"a"I Plan or Document Title g. Date
B. Findings
1. Findings pursuant tm the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
o �� Prevention of
Public h | Land �
� �|� Pollution
d. Private Water Supply o. Z Fisheries t E Protection of
Habitat
� g. Groundwater Supply k� 0 Storm Damage Prevention i. M Flood Control
z. This Commission hereby finds the project, aspropoaed. ie: (nhookoneofthefo||mwingboxee)
Approved subject to:
a. 0 the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Cnnd|t|nns, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
°r°m,mao^o^rev 51,mzmn Page um1n
4
Massachusetts Department of Environmental Protection Provided byMuosDEP:
Bureau of Resource Protection - Wetlands 242'1835
����� � � ���� � ^� �~�.
mmn x� Form � �� ~�o ��� �u �������Uons
Massachusetts Wetlands Protection Act K8.G.L. c. 131. §40 eocP Transaction*
North Andover
B. Findings /cnOt.\
Denied because:
b, 0 the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Thenafore, work on this project may not go hznwond unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet |s attached tmthis
Order.
c. Fl the information submitted by the applicant is not sufficient b/describe the site, the work,
� or the effect of the work on the interests identified in the Wetlands Protection Act.
Thenefore, work on this project may not goforward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate hu protect the Aota interests, and a final Order of Conditions is issued. &
description oYthe specific information which islacking and why itis necessary ia
attached tn this Order as per 31OCK8R!10.O5(6)(o\.
3� �� 8u�erZone Impacts: Shortest distance between |inoitofproject 52
disturbance 10.02(1)(a) a.linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. 171 Bank ��nnea,feet
-- 7b.linear feet — 'c.linear feet-- d]me6Ffe,t�—
*. 171 Bordering
Vegetated Wetland a.square feet u.square xea/ c.square feet u,mgoum mot
8. [l Land Under
VVaherbodieoand a.square feet b.square feet o.square feet u,square feet
Waterways
7. Fl Bordering Land
Subject b` Flooding a.square feet b.square feet c square feet n.square feet
Cubic Feet Flood Storage ,e.cubic feet —' f.cubic feet g,Cubic feet-- ,i'cubic feet
--
8. 171 Isolated Land
Subject to Flooding a.square feat ».square feet
Cubic Feet Flood Storage c.cubic feet-- d.cubic feet-- v.cubic feet-- f.cubic feet
9� 0 R|verknn1Area
a.total sq.feet b.total sq.feet
Sqft within 1$Oh
c.square feet d.square feet e.square feet f.square feet
Bq0 between i8O-
2OUK Q.square feet x.square feet /,square feet }.square feet
,*mwmn.o""'rev m/000m Page uofw
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1835
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 6DEP Transaction#
North Andover
City/Town
B. Findings (cont.)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
lo. [] Designated Port Indicate size under Land Under the Ocean, below
Areas
11. F] Land Under the
Ocean a.square feet b.square feet
-a.-c/y dredged -d-.c/y dredged
12. E] Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ❑ Coastal Beaches cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
14, ❑ Coastal Dunes -- --'---........... cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
15. El Coastal Banks
a.linear feet b. linear feet
16. F1 Rocky Intertidal
Shores a,square feet b.square feet
17. El Salt Marshes ...........
a.square feet b.square feet c.square feet d,square feet
18. 11 Land Under Salt
Ponds a.square feet b.square feet
-c.--c/y dredged d.c/y dredged
ig. n Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. 1771 Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.c/y dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
22. 171 Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft .............-
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
wpaformB.doc-rev 511812020 Page 4 of 13
4
Massachusetts Department of Environmental Protection Provided byM» smeP:
Bureau Of Resource Protection - Wetlands 242-1835
����� � � ���� � �� �.�.
mmu �� Form .� ~~ Order K�n ��K���^�U�Uons
Massachusetts Wetlands Protection Act M.[}.L. o. 131. G40 eoEpTmnommmn#
---
NorthAndovnr
B. Findings (cont.)
°#23. |fthe 23 �l Restoration/Enhancement
pn�octiofor
� ��
the purpose uf
restoring or
enhancing —square feet- -''' —square feet of salt ma
rsh
wetland
resource area 24. 0 ShgomCrnnsing(w):
in addition hn
the square
footage that u�"""'°= "' '=�="="'°""=''y~ ~.^~'''~~' ~'~p~~`'''~''^-stream~~~~^=
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
8octiooB,5.o
VB««» »r The foUovvioBconditions are only applicable to �pr�vad �projects.
817.u(Go|t �4
Marsh)above, 1� Failure to comply with aUuondibnnestated herein, and with aUn�atedsba�hasand other
enterplease n*8u|aborym�asune�. aho|lbed�ennedo�u�atorevokeornnod|fvthin [)nder.
the additional '
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury bmphvatapropertyor|nvaninncfphvatehghbs.
3. This Order does not relieve the parmitbaeor any other person of the necessity ofcomplying
with all other applicable fedena|, ataba, or local n(otUtgs, ordinanoas, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. The work is o maintenance dredging project as provided for in the Act; or
b. The time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. |f this Order isintended tobevalid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth aem special condition in this Order.
n. |f the work in for a Test Project, thiuO[de[nfCondiUomeeha|| bevm|idfO[nomorethon
one year.
5� This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order. An Order of Conditions for a Test Project rnaybeexbanUedforone
additional year only upon written application by the applicant, subject to the provisions of 310
CW1R 10.05(11)(0.
0. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any fill used |n connection with this project ohaUbeo|eonfiU. AnyhUshoUoonba|nnotnash.
mufuae, rubbish, or debris, including but not limited to |unnber, brioke, p|eabar. vvive. lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
°r°w,m,o='rev m1oo02o Page nw10
4
Massachusetts Department mf Environmental Protection Provided uymamnoEp:
Bureau of Resource Protection - Wetlands 242-1835
����� � � ���� � Conditions
��u v� Form � �� v�" ���� ��n `����v���Uons
Massachusetts Wetlands Protection Act K8.G.L. c. 131. 840 nDep Transaction#
North Andover
C. General Conditions Under Massachusetts Wetlands Protection Act
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
orifsuch an appeal has been taken, until all proceedings before the Department have been
onrnp|ebad.
g. No work shall be undertaken until the Order has become final and then has been recorded
� in the Registry of Deeds or the Land Court for the district in which the land in located, within
� the chain of title of the affected property. In the case of recorded land, the Final Order shall
�
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final {}0dV[
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped bv the Registry of Deeds, prior tn the commencement ufwork.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 242-1835 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before W1ossDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate nf Compliance (VVPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area Subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
"p"n"mo.uv^'rev e1mcmu Page sof 13
4
Massachusetts Department mf Environmental Protection Provided myMosomBr
Bureau of Resource PFOfe{ti0D - Wefl@Ods 242-1835
����� � � ���� � Conditions
��" rn Form ~� �� ��xv*��� ��n �~����v�U�Uons
Massachusetts Wetlands Protection Act K8.G.L. c. 131, 04O eoEpTmnnaonon#
North Andover
Cityrrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
17. Prior to the start ofwork, and if the project invo|vanworkadiecenttoo Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
19. The work associated with this Order(the"Project")
/1\ 171 ie subject b)the Massachusetts Sb)rmvveherStandards
(2) M ia NOT subject bo the Massachusetts Stornnv«aterStandards
if the work is subject to the Stmrrnxvater Standards,then the project immuhlmcttmtha
hn||mxxing conditions:
o\ All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit ae required byStormvvabar Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BK8Ps) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Rmg|nhmnad Professional Engineer provides o Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified |D the Certification. For any construction period BW1Ps intended tuboconverted
to post construction operation for etorrnvveharattenuation, naoharga, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and Outlet control structures;
ii. as-built final construction 8KOPplans are included, signed and stamped byaRegistered
Professional Engineer, certifying the site iu fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements Vf SturmwaberStondord 10;
,v"mrm*.doo'rev anmoom Page'w13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242'1835
����� �� � Order � Conditions
mmn �� Form .� ~� ���v���� ��x ��K���v����ons
Massachusetts Wetlands Protection Act &8.G.[. n. 131. §4Q eoEpnmnommion�
North Andover
C. General Co ditions Under Massachusetts Wetlands Protection Act (cont.)
iv. all post-construction stornnvvmte[BK8Ps are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
n\ The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
port (defined in General Condition 18(e)) shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement("O&M Statement) for the
GtnrrnvvabarBK8Ps identifying the party responsible for implementing the ehormvvaterBK8P
Operation and Maintenance Plan ("O&M Plan") and certifying the following:
i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of
Comp|ianne, and
ii.) the future responsible parties shall be notified in writing of their ongoing legal
responsibility and maintain the abormwmbar management 8W1Paand
implement the Shornlwator Pollution Prevention Plan.
d\ Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BK8P. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement ofrecord, acceptable to the issuing outhnhty, evidencing that another
entity has accepted responsibility for maintaining the BK8P. and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements nf Conditions 18(f) through 18(k)with respect to that BK8P. Any failure nfthe
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. |n the case ofatormvvotorBK8Ps that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the otornnwmter
BN1Pa. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
D The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
StormvvmbarHundbook
vv"m,xm.o""`rev 611ummo Page vm1a
4
Massachusetts Department of Environmental Protection Provided hyMaaooEp:
242-1835
Bureau Of Resource Protection - Wetlands
����� �� � Order � Conditions
��m �� Form � �� v���u�� ��n "������U�Uons
Massachusetts Wetlands Protection Act K8.G.L. C. 131. §4O eoepTmuoaounnw
NodhAndovar
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g\ The responsible party shall:
1� Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement ofthe
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal |ona1inn);
2. Make the maintenance log available hoPWaosDEP and the Conservation
Commission ("CommissiVn") upon request; and
3. Allow members and agents nf the K8aowDEP and the Commission ho enter and
inspect the site toevaluate and ensure that the responsible party inincompliance
with the requirements for each BK8Pemtob|iehed in the O&M Plan approved by the
issuing authority.
h\ All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state. and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
') The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval Of the issuing authority.
N Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) nhuU not he altered without the prior written
approval of the issuing authority.
|) Acoaao for mainhananma, napair, and/or replacement ofBVNPs shall not bawithheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
ad least six inches above grade tn allow for wildlife passage.
Special Conditions (if you need more space for additional onndiUone, p|aoue attach a text
document):
20� For Test Projects oubinnttn31OCK8Ri0.O5(11). thgoppUcantsha|| a|onimp|amanttha
monitoring plan and the restoration plan submitted with the Notice of Intent. If the
conservation commission nr Department determines that the Test Project thpeohenethe
public health, safety or the environment, the applicant shall implernent the removal plan
submitted with the Notice of Intent or modify the project asdireutadbyiheoonmgrvation
commission or the Department.
"p"mr(Yr5.u""'rev m1un02o Page o"r1a
4
Massachusetts Department of Environmental Protection Provided byMm oDEp:
Bureau of Resource Protection - Wetlands 242-1835
����� � � Order � Conditions
��" x� Form � — �������� ��u `����v�U^Uons
k4agsachVsettaVVet|andaProtection Act K4.(�.L. n. 131, §40 voePTmneomion#
North Andover
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1, |ea municipal wetlands bylaw or ordinance applicable? N Yes [l Nn
2. The North Andover hereby finds (check one that app|iou):
Conservation" Com mission
m. El that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
2.Citation _
Therefore, work oD this project noaynntgofonwarduniaonaOdWUU| arevisedNoUoeof
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions iaissued.
b. Z that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
North A d Wetlands Protection Bylaw & Regulations Chap. 190
1.Municipal Ordinance urBylaw et.|eq[____
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice mf Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
North Andover Conservation Commission Findings & Special Conditions (see attached
vvpam'mzmm'rev 5/1no02o Page mww
4
Massachusetts Department of Environmental Protection Provided uyMuaeosp:
Bureau of Resource Protection - Wetlands 342-1835
�����J� �� �� ���^� � Conditions
----- F—'
��o �� Form =^ -- �*uv�K�� ��u �~����^uU�U������
Massachusetts Wetlands Protection Act K8.G.L. c. 131` 840 "D-F-PTmno*xion#
NorthAndover
E. Signatures
This Order iu valid for three years, unless otherwise specified ammspecial
condition pursuant ho General Conditions#4.from the date ofissuance. 1 Date Of IPSUance
Please indicate the number of members who will sign thle/nnn.
This Order must bo signed hym majority of the Conservation Commission. 2. Numbe/o[3ignnrs
The Order Must be mailed by certified mail(return receipt requested)or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
gn ture Printed Name
Signature Printed Name
n re Printed Name
Signature Printed Name
Signature Printed Name
Signature Printed Name
iA-
El bv hand delivery on 'Vby certified mail, returnreturnreceipt
requested, on _/1�
`�*�
==m.ma.uvc'rev e1ms02u Page//o/m
4
Massachusetts Department mf Environmental Protection Provided uyNmmDEP:
2421835
��UFe@UOfFJ8SOU[O8 Protection - V�etl@DdS -
����� � � ���� � �� �~�~
�m" �� Form ~, -- ��nv���� ��m ����K�^�U^U��K���
Massachusetts Wetlands Protection Act M.G.L. c. 131, G40 eoEpTn000ection#
NorthAndnver
cityfrown
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified nf their right ho request the appropriate K8assOEP Regional Office to issue o
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request for Departmental
Action Fee Transmittal Form, as provided in 310 CIVIR 10.03(7) within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review ofthis project. Previous
participation in the permit proceeding means the Submission of written information to the
Conservation Commission prior to the close nfthe public hnmring, requesting a Superseding
Order, or providing written information bo the Department prior tn issuance ofoSuperseding
Order.
The request shall state clearly and concisely the objections ho the Order which iobeing
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
4
Massachusetts Department of Environmental Protection Provided uymo»aoEp
Bureau Of Resource Protection - Wetlands 242'1835
����� � � ���� � o� ^�^�~
wmu u� Form � — ~�x��� ��u �~�����Nons
Massachusetts Wetlands Protection Act K8.G.Lc. 131' §4O enEp Transaction#
North Andover
G~ Recording Information
Prior to commencement 0f work, this Order of Conditions must be recorded )O the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case ofrecorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject ho the Order. |nthe
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted ho the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
OnnVVVi��iVr�.--_'—''— ' --' '_--.-'--'---_--''--'-'-''-' — -- —'--'-----'—'—' -------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project ot
� 328 Campbell R d 242-1835
Project Location Mamoosp File Number
` Has been recorded et the Registry of Deeds of:
Northern
� 6�um���� Book Page
� for: WilliamWilliam & Heidi Hickey�
and has been noted |n the chain Vf title of the affected property in:
3754 301
Book Page
|n accordance with the Order ofConditions issued on:
O3-O2-22
Date
|f recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
328 Campbell Road DEP FILE #242 -1,835
Findings of Fact
Current Project Site Conditions: The 2.43-acre project site currently consists of an existing
single-family house constructed in 1973, associated septic system (cesspool), driveway, rear
porch, lawn,landscaping and utilities.
There are no previous files or permits on record with the North Andover Conservation
Department for the project site.
The NACC agrees with the delineation of the following wetland resource areas as reviewed
in the field by Conservation Department staff and as reflected
on the approved plan. These resource areas are significant to the interests of the Act and
Town Bylaw as noted above and therein. The applicant has not attempted to overcome
the presumption of significance of these resource areas to the identified interests in the
Act and Bylaw.
a. Bordering Vegetated Wetland (BVW) - Wetland Flags A100-A104;
b. Inland Bank - Wetland Flags BA100-BA105
c. 100-Foot Buffer Zone to BVW and Inland Bank
d. The property is not within 200-Foot Riverfront Area
e. A rear portion of the property lies within NFIESP Priority Habitat but the area
of work permitted under this Order of Conditions is outside this resource
f. The property does not lie within the 100-year floodplain
g. The on-site resource areas do not contain certified or potential vernal pools
Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those
interests noted above. The NACC orders that all work shall be performed in accordance with
said conditions and with the Notice of Intent referenced below. To the extent that the
following conditions modify or differ frorn the plans, specifications
pecifications or other proposal
submitted with the Notice of Intent, the conditions shall control.
GENERAL CONDITIONS
21. The proposed work includes: upgrade existing septic system (cesspool), and install a
new gravity system with leaching field, septic tank and D-box. Work and system
components are within buffer zone to bordering vegetated wetland but outside the 50-
Foot No Build Zone. The system has received approval from the North Andover
Board of Health.
22. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
32,1("wq)bdf Road OFT Fi�e Y242 8 5 NACC Fnndinp&' Spe6a�( omfiOons
Pago q o q 2
328 Campbell Road DEP FILE # 242 -1835
Notice of Intent filed by: William &Heidi Hickey
328 Campbell Road
North Andover, MA 01845
Site Plans prepared by: Hancock Associates
"Subsurface Sewage Disposal System Upgrade Design'
2 Sheets (Site Plan &Legend, Site Details) - scale 1"=20' and as
noted
Final Revision dated August 24, 2021
Other Documents: Board of Health approval letter, dated September 20, 2021
23. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
24. The conditions of this decision shall apply to, and be binding upon, the applicant,
owner, its employees and all successors and assigns in interest or control of the subject
property. These obligations shall be expressed in covenants in all deeds to succeeding
owners of portions of the property.
25. Failure to comply with all conditions stated herein, and with all related statutes and
other regulatory measures, shall be deemed cause to revoke or modify this Order.
26. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of
Conditions, the Act (310 CMR 1.0,00), the North Andover Welland Bylaw and
Regulations, and may require any information, measurements, photographs,
observations, and/or materials, or may require the submittal of any data or
information deemed necessary by the NACC for that evaluation. Further, work shall
be halted on the site if the NACC, agent or DEP determines that any of the work is not
in compliance with this Order of Conditions. Work shall not resume until the NACC
is satisfied that the work will comply and has so notified the applicant in writing.
27. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws
or regulations.
329 amphvfll Road I M Al Fdc f1242-8 93 5 NACC Fimfin,gs �, 4inpe6al( on(Wions
Pa ;2 of q 2
328 Campbell Road DEP FILE #242 -1835
28. The work authorized hereunder shall be completed within three years from the date of
this order.
29. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least thirty
days (30) prior to the expiration date of the Order (Refer to Section 83) of the North
Andover Welland Regi.dations).
30. The NACC reserves the right to amend this Order of Conditions after a legally
advertised public hearing if plans or circumstances are changed or if new conditions
or information so warrant.
31. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall
be a party to all agency proceedings and hearings before the Department.
32. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause f urther alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot (25') No-
Disturbance Zone and a fifty foot (50') No-Construction Zone shall be established from
the edge of the adjacent wetland resource area, The Conservation Administrator
and/or other agents of the NACC do not have the authority to waive these setbacks as
established under the local bylaw. No disturbance of existing grade, soils or
vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &Appendix F of the
local RegnIations),
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. "I I he applicant shall assure that all contractors, subcontractors,
and other personnel performing the fie permitting work are fully aware of the permits
terms and cond
itions. Thereafter, the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
34. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure.
By acceptance of this Order, the owners agree to indenu-tify and hold harmless to the
Town and its residents for any damage attributable to alterations undertaken on this
property pursuant to the Order. Issuance of these Conditions does not in any way
imply or certify that the site or downstream areas will not be subject to flooding, storm
damage or any other form of water damage. Maintenance of the drainage system, if
accepted by the Town as part of a public way, becomes the responsibility of the Town.
,M. ("ampbeH Road UFT h1c 8242-B35 Findings&t hq)ecio Comfik roams
Page 3 of U
328 Campbell Road DEP FILE # 242 -1835
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
37. This Order, in its entirety, shall be recorded by the applicant at the Registry of Deeds
immediately after the expiration of all appeal periods. No work shall be undertaken
until the final Order has been recorded in the Registry of Deeds or the Land Court for
the district in which the land is located, within the chain of title of the affected
property. In the case of recorded land, the final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done. In the case of registered land, the final Order shall also
be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposed work is to be done. The recording information shall be submitted to the
North Andover Conservation Commission on the form at the end of this Order prior
to con-miencement of the work. Any Order not recorded by the applicant before work
commences may be recorded by the NACC at the applicant's expense.
38. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP, File Number 242-1835."
39. No changes to the approved plan shall be implemented in the field until written
approval has been granted by the NACC. Any changes in the submitted plans caused
by the applicant, another Board's decision or resulting from this Order of Conditions
must be submitted to the NACC for approval prior to implementation. If the NACC
finds said changes to be significant, the NACC will call for another public hearing (at
the expense of the applicant), Within 21 days of the close of said public hearing the
NACC will issue an amended or new Order of Conditions. Any errors found in the
plans or information submitted by the applicant shall be considered as changes.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
41. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval, a detailed sequence of construction, including the construction of
328 Camph,H Road Dh P Ffle fl?42 H835 N/\(,,'( hmfings&, Speda�ConditGons
P112e 4 of 0 2'
328 Cainpbell Road DEP FILE #242 -1835
compensation and retention areas, installation of sedimentation/erosion control
devices and re-vegetation to be completed before other work begins on-site.
42. Wetland flagging shall be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and enumerated
per the approved plan(s) throughout the life of the project and until a Certificate of
Compliance is issued so that erosion control measures can be properly placed and
wetland impacts can be monitored. The proposed limit of work shall be shall be
clearly marked with erosion controls or temporary fencing and shall be confirmed by
the NACC. Such barriers shall be checked and replaced as necessary and shall be
maintained until all construction is complete. Workers should be informed that no use
of machinery, storage of machinery or materials, stockpiling of soil, or construction
activity is to occur beyond this line at any time.
43. A row of staked 12" minimum compost Filtrexx Si1tSox (or eguivalent mulch sock)
shall be placed between all construction areas and wetlands. This requirement differs
from that as noted on the approved plan. Erosion controls are necessary to protect
the wetland resources and buffer zones from negative impacts due to soil disturbance
and other facets of work. The erosion control barrier shall be properly installed and
placed as shown on the plans approved and referenced herein and shall be inspected
and approved by the NACC or its agent prior to the start of construction and shall
remain intact until all disturbed areas have been permanently stabilized to prevent
erosion. All erosion prevention and sedimentation protection measures found
necessary during construction shall be implemented at the direction of the NACC or
its agent. The NACC reserves the right to impose additional conditions on portions of
this project to mitigate any impacts which could result from site erosion, or any
noticeable degradation of surface water quality discharging from the site. For
example, installation of additional erosion control measures may be required in areas
not shown on the plan(s) referenced in this Order of Conditions. Should such
installation be required by the NACC, they shall be installed within 48 hours of the
Commissions request.
44. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, additional 50 feet of silt sock and sufficient stakes for staking. Said bales
shall be used only for the control of emergency erosion problems and shall not be used
for the normal control of erosion.
45. A check payable to the Town of North Andover shall be provided in the amount of
$1,500 (one thousand five hundred dollars) which shall be in all respects satisfactory to
Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North
Andover Town Treasurer through the NACC before commencement of work. Said
deposit of money shall be conditioned on the completion of all conditions hereof., shall
be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall
be released after completion of the project, provided that provisions, satisfactory to the
328 Campl!A Road NJ)he f,12,12 M5 NACC p inding�'&specH Comfitiuw�
Va�e 5 of p2
328 Cainpbell Road DEP FILE # 242 -1835
NACC, have been made for performance of any conditions which are of continuing
nature. The applicant may propose a monetary release schedule keyed to completion
of specific portions of the project for the NACCs review and approval. This condition
is issued under the authority of the local Bylaw.
46. The applicant shall designate a Wetland Scientist (or other environmental professional
as approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee
any emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be
contacted, due to an emergency at the site, during any 24-hour period, including
weekends. Proof of the retained monitor must be submitted to the Conservation
Department on letterhead by the retained consulting firm. This person shall be given
the authority to stop construction for the purposes of correcting problems with
erosion control. The Environmental Professional will immediately notify the
Conservation agent of any matter that requires attention by the Commission or the
agent. The erosion control monitor will be required to inspect all such devices and
oversee cleaning and the proper disposal of waste products. Cleaning shall include
removal of any entrapped silt.
47. At least once during each week in which construction activities occurs on-site and for
as long thereafter as ground remains unstabilized, the applicant shall submit a written
report with photographs from the "Erosion Control Monitor" to the NACC certifying
that, to the best of his/her knowledge and belief based on a careful site inspection, all
work is being performed in compliance with this Order of Conditions and that
approved setbacks are being adhered to. The erosion control monitor must visually
inspect all sedimentation/erosion control measures and assume responsibility for their
maintenance on a weekly basis and that they are functioning as intended. In addition,
all wetland resource areas must be visually inspected for siltation, turbidity, and/or
other water quality impacts. The Erosion Control Monitor shall be on site during
and/or following a major storm event of 1/2" inch of rain or greater (24 hour event) to
ensure that soils remain stable, and erosion controls are adequate and secure
48. Prior to construction, and in consultation with the Conservation Administrator or
Field Inspector, the applicant shall permanently mark the edge of vegetated areas
along the
wetland resources and/or 25' No Disturb Zone (as conditions allow) with
eight (8) signs or markers placed on weather resistant monuments (i.e. 4x4 pressure
treated posts, three feet below grade and top of post at least two feet above grade)
spaced evenly roughly every 30 feet incorporating the following text: "Protected
Wetland Resource Area". This will designate their sensitivity and assure no further
inadvertent encroaclunent into the wetland. Prior to installation in the field, the
placement of these permanent markers shall be subject to review and approval by the
Conservation Administrator. The applicant/homeowner shall instruct all agents to
explain these markers to buyers/lessees/l.andscapers and all persons taking over the
328 CampbeH Rwid I)I T Fk Q42- 835 N"'WC Hmfin,,m&,,Special( mt(fifions
Page 6 or p2
328 Campbell Road DEP FILE 9 242 -1835
property from the applicant. These markers shall remain posted and be replaced as
necessary in perpetuity.
49. The approved plan and this Order of Conditions shall be kept on site, protected from
the elements, and in an area easily accessible to contractor and Conservation
Department staff.
50. The applicant and/or the legal owner of that portion of land upon which these Orders
of Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of
Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix
A" signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days prior
to the closing of said land transaction.
51, Once these above-mentioned pre-construction requirements are complete, the
applicant shall contact the Conservation Office prior to site preparation or
construction and shall arrange an on-site conference with an NACC representative,
the contractor,the engineer, erosion control monitor and the applicant to ensure that
all of the Conditions of this Order are understood. This Order shall be included in all
construction contracts, subcontracts, and specifications dealing with the work
proposed and shall supersede any conflicting contract requirements. The applicant
shall assure that all contractors, subcontractors and other personnel performing the
permitted work are fully aware of the permit's terms and conditions. Thereafter, the
contractor will be held jointly liable for any violation of this Order of Conditions
resulting from failure to comply with its conditions. The applicant or contractor shall
notify the NACC in writing of the identity of the on-site construction supervisor hired
to coordinate construction and to ensure compliance with this Order. A reasonable
period of time shall be provided as notice of the pre-construction meeting (e.g. 72
hours).
STORMWATER MANAGEMENT CONDITIONS
52. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently exist, unless specifically approved in
writing by the Commission.
53. Water quality in down gradient BVW`s shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
328 Campkdl Road D I°11 kle U 7,42-1835 NLACC H11(fing"& SpeciaN Colikh ions
F%qx 7 a r p'12
328 Canipbell Road DEP FILE #242 -1835
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
[:DURING CONSTRUCTION
54. Upon beginning work, the applicant shall submit written progress reports every
month detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction
sequence and can be a part of the weekly erosion control reports.
55. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse, rubbish or debris, including but not limited to lumber, bricks, plaster,wire,
lath, paper, cardboard, pipe, glass, processed glass aggregate, concrete, recycled
concrete aggregate, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing. Any fill imported to the site must be accompanied by a certificate of
origin or an analysis certifying cleanliness -whichever is most applicable as
determined by the Conservation Commission or its staff.
56. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized,
or loaned, seeded and mulched,with a layer of mulch hay. All disturbed areas must
be graded, loaned and seeded prior to November 1st of each year. Outside of the
growing season, exposed soil finish grade surfaces shall be stabilized with a layer of
mulch hay until climate conditions allow for seeding. During construction, any area of
exposed soils that will be left idle for more than 30 days shall.be stabilized with a layer
of mulch hay or other means approved by the NACC.
57. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal:
vertical). Slopes of steeper grade shall be rip-rapped to provide permanent
stabilization.
58. The construction access for the project shall be swept daily to remove sediment
deposited by construction vehicles accessing the site.
59. No fuel shall be stockpiled within the 100-Foot Buffer Zone and refueling of
construction equipment shall be conducted outside the 100-Foot Buffer Zone.
60. There shall be no stockpiling of soil or other materials within [twenty-five (25) feet] of
any resource area.
61. All waste generated by, or associated with, the construction activity shall be contained
within the limit of work, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site
328(%unilwfMcmd DFPFHefl,)42-N35 NW V Hmfinli.s&Spv6n Con difions
Pope 8 o: 12
328 Campbell Road DEP FILE #242 -1835
for the storage and removal of such spent construction materials off-site. However, no
trash dumpsters will be allowed within 50' of areas subject to protection under the Act
or local Bylaw.
62, Accepted engineering and construction standards and procedures shall be followed in
the completion of the project.
63. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the
applicant within one (1) business day. No construction vehicles are to be stored within
100 feet of wetland resource areas, and no vehicle refueling., equipment lubrication, or
maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
I J
64, No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100) feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property, This condition is issued under
the authority of the Town's Wetland protection Bylaw.
65. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides, and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection Bylaw and
shall remain in perpetuity.
66. 'Mere shall be no dumping of leaves, grass clippings, brush, or other debris into a
wetland resource areas or the 25-foot No-Disturb Zone, This condition shall remain in
perpetuity.
67. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved,
68, Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
69. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WTA Form 8A - "'Request for a Certificate of Compliance."
329 Cannpbefll Road MT V do P242 H,35 NA(V I11 in dings ComMkms,
Pag��9 of 12
328 Campbell Road DEP FILE #242 -1835
b. A letter from the applicant requesting a Certificate of Compliance.
c, The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An"'As-Built"' plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth,for the public record. This plan will include:
"As-Built" post-development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area.
"As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions,fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes anv disturbance of soils or vegetation.
Location of all subsurface utilities entering the property.
87. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
25' No-Disturbance Zone and a 50' No-Construction Zone. Future work
within 100' of existing wetland resource areas will require a separate filing
with the NACC of the Regulations for performance standards within these
zones) The Conservation Administrator and/or other agents of the NACC
do not have the authority to waive these setbacks as established under the
local Bylaw (Condition #32);
328 CmnpheH Road IAT FHe U242 B35 NACC Findlin,L�ls X�spccial p omh6ons
Nuoe g D of 8 2
328 Campbell Road DEP FILE # 242 -1835
Resource Area Markers (Condition #48);
Discharge or spillage of pollutants (Condition #64);
Prohibition of underground fuels (Condition #65);
Limitations on the use of fertilizers, herbicides, and pesticides (Condition
#66);
No dumping of leaves, grass clippings, brush, or other debris into a wetland
resource areas or the 25-foot No-Disturb Zone (Condition#67).
32%Campkfll Road DF111 Ffle h24?.HS35 NAC( kmfings bow SpcckO Ckmdt fimv;
Pne V� of V 2
328 Campbell Road DEP FILE #242 -1835
APPENDIX A- AFFIDAVIT
1,. on oatli do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
I am the
(position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC numbet)
the North Andover Conservation Commission.
&/or
2.1 1 am the of
(position with owner) (owner name)
the owner upon whose land Order of Conditions_-_ -----------
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. 1 hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
in said Order of Conditions.
4. 1 hereby affirm and acknowledge that on this—day of. 19
1 inspected said property together with any and,all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions . are presently in compliance.
(DEP File #)
5. 1 hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File#)
Signed under the pains and penalties of perjury this day of 19
(Signature-authorized agent of applicant or owner)
32 au�topfiq�W°aV Ro d DEP hse U242-�835 NM I 1 Speeia; OwvhOoi�s
Page, E2 uA E2