Loading...
HomeMy WebLinkAbout2022-02-15 Planning Board Minutes Town of North Andover CiU CiC..,r PLANNING BOARD Eitan Goldberg, Chair • • Johir Sinuous Peter Boynton ICelly Cormier Alissa Koeiiig Tiresrla Febiwai 15 2022 7 xim, 120 Maur Street Torun Hall North Andover MA 01845 Present: E. Goldberg,J. Simons, A. Koenig, P. Boynton-Remote, K. Cormier-Remote Absent: Staff Present: J. Enright, Suzanne Egan, Town Counsel E. Goldberg, Chairman: The Planning Board meeting for Tuesday, February 15,2022, was called to order at 7 p.m. (Read Governor's Order into the record. This meeting is considered a hybrid meeting; both remote and in- person. Votes will be recorded as roll call this evening.) Pursuant to Chapter 20 of the Acts of 2021,this meeting of the North Andover Planning Board will be conducted in person and via remote ineans,in accordance with applicable law.Specific inforination and the general guidelines for remote participation by inembers of the pubtie andlor parties Ivith a right anllor requirement to attend this ineeting can be found oil the Toom's rvebsite, (it rvivrv.irorillaiitlovertiia.gov. For this ineeting,in person attendance of lnenlbers of the public and Board inenibers will be permitted.Members of the public ivilo wish to watch the meeting live imry do so oil their televisions by tuning to Conicast Channel or Verizon Channel26 or online at iv►vrv.11orilialitlovercaiii.org. Every effort will be made to ensure that the public can adequately access the proceedings ill real time, via technological inealls. In the event that Ive are unable to do so, despite best efforts, ive ivill post on the Toivn of North Alldol er ivebsite all audio or video recording,transcript, or other comprehensive record ofproceedillgs as soon as possible after the iueetiug.If the public would like to participate in public hearings,but not attend the ineeting in-person please email your question/connilent prior to or during the ineeling to letirigliojloi-tllailtlol,el'i11a.goi The question/continent hill be read during the proceedings and responded to accordingly. BOND RELEASES Regency Place Carol Carroll North Andover Realty Corp.: Request for partial release of Roadway Bond in the amount of$11,000, leaving a remaining balance of$74,000. J. Enright: This 9-lot subdivision has been constructed and stabilized. Tim Willett,DPW provided a spreadsheet detailing what the retraining bonds are being held for. Items include maintenance of the sewer,water main, storm drains,pavement topping, street trees,topping,conveyance procedures and an as-built drawing. Original roadway bond was$85K;Tim recommends a reduction of$1 IK. MOTION: J. Simons made a motion to release$11 K in bond funds for Regency Place, leaving$74K plus interest A. Koenig seconded the motion. Roll call vote: P. Boynton voted yes. K. Cormier voted yes. A. Koenig voted yes. J. Simons voted yes. E. Goldberg voted yes. The vote was 5-0, unanimous in favor. Autumn Chase, Carol Carroll North Andover Realty Corp.: Request for partial release of Roadway Bond for 3 phases of construction; Phase I (Lots 1-5) $11,200, Phase II (Lots 6-11) $10,000, and Phase Ill (Lots 12-16) $18,760. The respective remaining balances are $19,900, $31,310 and $23,700, J. Enright: Constructed by the sarne developer,this is a PRD and a definitive subdivision comprised of Molly Town Rd. and Abby Lane.All Iots are fully constructed and stabilized. The Subdivision was built out in 3 phases. All remaining fiends are being held for maintenance, street trees,topping, conveyance procedures and as-built drawings. MOTION: J. Simons made a motion to release $11,200-Phase 1, $10,000-Phase II, & $18,760-Phase 111,with the respect of remaining balances plus interest remaining for Autumn Chase Subdivision(Molly Towne Rd.) A. Koenig seconded the motion. Roll call vote: P. Boynton voted yes. K. Cormier voted yes. A. Koenig voted yes. J. Simons voted yes. E. Goldberg voted yes. The vote was 5-0,unanimous in favor. 1 Town of Nordi Andover PLANNING BOARD Eitan Goldbe►g, Clrai►• Johst Sinro►rs Peter Boy►►to►► •' N '• Kelly Co►•nrie►- Alissa Koenig _. y ..._ _._ 1.2_0Mahi St►•eet Torn► Hall,Nortli Andover,MA 01845 r►es�a Feb►•rra►y I5, 2022� 7 u.►n„ r, , NEW PUBLIC HEARINGS Eitan Goldberg: Pursuant to Chapter 20 of the Acts of 2021,this meeting of the North Andover Planning Board will be conducted in person and via remote means, in accordance with applicable law. Specific information and the general guidelines for remote participation by members of the public and/or parties with a right and/or requirement to attend this meeting can be found on the Town's website,at www,nortliandovernia.gov. For this meeting, in-person attendance of members of the public and Board members will be permitted. Members of the public who wish to watch the meeting live may do so on their televisions by tuning to Comeast Channel 8 or Verizon Channel 26 or online at www.northandovercarn.org.Every effort will be made to ensure that the public can adequately access the proceedings in real time,via technological means. In the event that we are unable to do so,despite best efforts,we will post on the Town of North Andover website an audio or video recording,transcript,or other comprehensive record of proceedings as soon as possible after the meeting, If the public would like to participate in public hearings,but not attend the meeting in-person please email your question/comment prior to or during the meeting to ienri0it@noa-thandoverma.gov.The question/comment will be read during the proceedings and responded to accordingly. E.Goldberrs: Opened the public hearing. Provided an overview of how the public hearing will be conducted. Annual Town Meeting Zoning Bylaw Amendment Articles: i .19 Mixed Use Overlay District: The purpose of Article X: Amend the Zoning Bylaw to establish Article which is to enable the redevelopment of ail existing multifamily residential development under a Master Development Plan to create a mixed-use development that provides goods, services,and a variety of housing opportunities; encourage preservation of open space, and create a sustainably built, vibrant, walkable, pedestrian- and bicycle-friendly environment within the district. James, Keefe,Principal, Trinity Financial: Provided introduction. John Martin, FAIR, Principal, Elkus Manfredi: Presented still images explaining proposal. Site comprises of 4 distinct districts, each with their own architectural characteristics. {Described existing Royal Crest site characteristics: closest building 54 ft. from edge of Rt. 1 l4 screened by mature pine, oak, and maple trees that become lush in summer; site today is 76 acres, 588 apartments.)New design focuses more on the pedestrian v. automobile, enhancing community cohesion,walkable and provides more amenities for the town and college. Master Plan is the result of 18 months of refinement and evolution, plan contains more community open space than exists on site today. Buildings are set back 70 ft. from Rt. 114 to accommodate 100+mature trees screening the site which are to rernain. Buildings are currently 70 ft, in this area,except for one building. Plan is anchored by the Town Green in the middle. Site is buffered by over 23 acres of preserved existing woodlands and wetlands enhanced and constructed to manage stormwater. Over 800 new trees will be planted on site. Four districts characterize the plan: Mill District Town Center District Cam us District and Village District. Mill District is at the eastern quadrant of the site. Mill prototype is easily readapted for residential use. Showed rendering of path along front in both summer and winter. Town Center anchored by Green,has classic New England, colonial, red brick architecture and is anchored to the north by a hotel and to the east by a multi-family residential apartment building with small scale retail shops at its base. Showed view looking east along Town Green. Entry to site is vertically marked by a clock tower. The street is animated by small scale shops with apartments above. Coming across the Town Green,the hotel draws inspiration from hotels that anchor many New England villages. Campus District comprises of 3 buildings housing 824 student beds centered around a preserved wetland courtyard.Neo- Georgian colonial architecture with sloped roofs, double chimneys at each end characterizes the motif that occurs throughout. Showed view from Town Green and during winter; dormitory leg that parallels Rt. 114 is set back over 140 ft. The Village District is comprised of 199 attached townhomes overlooking linear greenspace anchored by the clubhouse. Architecture is informed by New England saltbox architecture;attached townhomes, clapboard, 2 Town of North Andover PLANNING BOARD Eitan Goldberg, Cltais• John Simons Peter Boynton •, .belly Cormier Alissa Koenig Tuesilay febiwai-y 15 2022 7 .m. 120 Main Sit•eet Town Hall North Ant/over MA 01845 and shingle siding, sloping roofs. Showed image of linear park with open space, playgrounds, strolling,dog walking,townhomes lining edge to north,summer and winter view. Showed video presentation walk-through of site. Michael Lozano V.P. Development,Trinfty Financial: Summarized current proposed program and timeline. Masterplan was introduced in September 2020. Public outreach played a large role in project's development. Program includes replacement of existing 588 outdated apartment units with new modern apartments including an additional 439 market rate apartments, 199 new townhouse style units, 35 apartment units dedicated to senior living,the equivalent of 206 student housing dedicated units and 97 affordable apartments. Program includes a new 102 key boutique hotel, 108,500 sq. ft. office building and approx. 70K sq. ft. of neighborhood-based retail. Submitted Phasing Plan in October 2021 detailing how existing residents would be accommodated during construction,timing and order of build-out and how utilities,access and construction mitigation would occur. Also submitted a sample construction management plan;how impacts would be minimized over time. In July 2021, submitted a preliminary stormwater analysis detailing stormwater management,wetland preservation and expansion,and drainage. Existing site has been plagued by poor drainage and inadequate stormwater infrastructure. State of the art stormwater management system will accommodate all stormwater drainage on site and will not over burden the downstream infrastructure. Plans were peer reviewed and confirmed by town's consultant. A detailed Traffic Analysis report submitted in October of 2020 was peer reviewed by the town's consultant. Several follow up peer review reports have been submitted. Project generates more traffic than exists today. Currently an average 4,500 vehicle trips are generated daily; at full build-out 10 years from now, studies estimate 13,800 vehicle trips daily to and from the site. Rt. 114 will be completely different than exists today based on MassDOT's Rt. 114 Improvement Project; at frill build-out 7 of 9 intersections will perform better than today. In September 2021 submitted an Access,Circulation&Parking Report detailing beyond traffic,how people will access the site by car, on foot, and bike. Also, in September of 2021 submitted Utilities&Infrastructure Report studying the project's impact on existing infrastructure confirming that the impact is minimal. Sufficient capacity exists concerning water, sewer, electricity, and other utility services. Existing buildings at Royal Crest, now 50 years old are energy inefficient and outdated.New buildings will be built to new standards in sustainability and energy efficiency. Presented open space and recreation plan to the Board. Plans include a 3-acre Town Green at the center of the plan and a 1.5-mile walking/bike path that connects to new infrastructure planned by the town and MassDOT. Over 46 acres of the site remains open space. As compared to other current projects recently built by the town this project is less dense. Several Fiscal Impact Reports were submitted and reviewed by town's consultant. Project is strongly positive to the town generating a net benefit of$2.1-4.3 million tax dollars annually. J. Keefe: Concluded presentation listing benefits; creates more housing,town will exceed the 10% affordable housing rninirnuin required by state protecting the town in the future from 40B incursions, provides 35 units of senior independent housing, retains 46 acres open space,construct 1.5 miles of walking trails, 70 ft. buffer zone along Rt 114 and provides needed revenue. Existing Royal Crest costs town$500K-$1.5 million. Project eliminates greenhouse gases with electrical heating and cooling systems. Establishes new link to MVRTA bus lines. E. Goldberg: Part of the record for this hearing is a significant file of all documents submitted since 9.15.2020 available for review in the Clerk's Office and Planning Dept. ("RecordDocs_MUOD Compilrttion as of 2-1- 2022') We will put together an overview list of page numbers highlighting important documents and numbers. J. Enright: Other files include a file called ("Mist. Record Does. As of Feb. 1, 2022') containing raise. emails to Board from staff,responses to those emails, and a separate file for the abutter/resident comments submitted throughout the process. 3 Town of North Andover PLANNING BOARD Eitmr Goldberg, Chair •- Jolt►i Si►ito►ts PeterBoynto►t •' ' KellyCor►rtier Alissa Koe►rig Trrestlay February 15, 2022 a, 7p.m., 120 Main Street_T_owiz Hall,North Andover,MA 01845 E Goldberg: We discussed an overall town-wide traffic Study that has been approved for funding. J. Enrijzht: A quote was solicited and funded; estimated completion is 8 weeks once the analysis begins. E. Goldberg: Read two resident comments into the record: K.K. Flipg, 517 Rea St.: Expressed support for all aspects of the mixed-use development,affordable housing, architecture, etc. N. Sarro,44 Equestrian Dr.: Expressed support of the project and inquired about increased student enrollment, water supply sufficient for increased residents, and phasing of current residents living at Royal Crest. E. Goldbcr : Current estimates for enrolled students can be found in our documents. Let's have this ready for our next meeting. M. Lozano: We did extensive studies on impacts to the school system. Our consultant did a study and the town engaged multiple consultants for peer reviews.That information is included in the packet called ("Record Does MUOD Compilation as of 2-1-2022'). Will follow up with specific information. J. Enright: TBA Architects was the town's peer review consultant. The memo dated November 10, 2021 was sent to N. Sarro. TBA's projection was an additional 89 students to the existing 213 students at Royal Crest today. J. Simons: Expressed concern that the incremental number of students would be the catalyst to drive us over capacity through the whole system and Trinity's financial numbers don't calculate that. We may need to spend $30-40 million to build a new school which should be put on the table as one of the consequences. E. Goldberg: Agreed. It would be nice to hear from the School Dept. and/or Town Manager as to how numbers would be addressed, whether we hire more teachers, build a new school, rearrange the facilities master plan to address how we renovate the schools. We need to know what the possibilities are and how to deal with them. The other part is discussion of a development agreement that speaks to the effects and potential funds available to address the issues. Secondly, is the water study sufficient?The consultant spoke to the Board and concluded that there is sufficient water capacity for 10 years. Referenced third question regarding relocation of existing residents. M. Lozano: We submitted a detailed phasing plan in section 2.2 of the large packet of documents detailing what buildings would be brought online,what time, which existing buildings would be emptied out and reaccommodated in the new buildings. All existing residents will be reaccommodated in the process. E. Goldberg: Read third resident comment into the record: J. Bloise, 106 Berkeley Rd.: Expressed objection to project. Communicated that this project cannot be taken in isolation and that the Amazon distribution and the two other major housing/retail projects under construction (across from Butcher Boy and behind China Blossom)will bring this town to its downfall with all public set-vices and flow of traffic along Rt. 125. J. Enright: Read two emails received during the hearing into the record: L. Rudnicki, 32 Marblehead St.: Communicated that at the Dec. 9, 2020 Conservation Commission meeting the developer stated the grade of the property needed to be elevated in order for the storm water to function properly. Questioned what increased grade elevations is required with the latest revised plans. Asked what guarantees are built into the proposed zoning bylaw that would cap the building height based on the current grade not off the new grade. Cautioned that diverting the water and changing the grade would likely have an impact to the mature tree long term viability. Questioned whether and independent arborist has been consulted on whether these trees will survive with grade changes,wetland and storm water modifications. L. Rudnicki 32 Marblehead St.: Questioned whether the setback distances proposed along Rt. 114 are based on current property lines and, if so, what are the proposed setback distance after the land taking by MasDOT. M. Lozano: Doesn't anticipate any significant grade changes over existing and doesn't expect to significantly affect the ultimate height of the buildings;new drainage and stormwater infrastructure is state of the art below ground; proposed setback is to the property line. It is significantly larger than existing, no diminishment. 4 Town of No►•th Andover PLANNING BOARD Eita►t Goldbe►g, Chair • • Jolur sin:oals Petet•Boynfoii Kelly Cormier Alissa Koenig Tuesday February 15 2022 k 7 .►tt. 120 Main Street Towit Hall North A►tdove►• MA 01845 The state is not doing any"taking"of property. Plans to engage a professional arborist to do an assessment of the existing mature trees to ensure survivability and that they are protected dining construction. Michael Lis, 30 Leanne Dr.: (Speaking as a citizen, not as a member of any Board) Member of the School Capacity Subcommittee. Historically, over the past 30 years we have averaged about 30 additional students per year and will for next ten years; doesn't see a major change in this, including this development and all recent projects. Described short comings in existing structures: Middle School and elementary schools are overcrowded, students are in old temporary structures,Atkinson's roof is failing,Franklin has rotting gym floors,Kittredge has original wiring, Atkinson& Franklin lack fire sprinkler systems,those schools are not ADA compliant. Plan is in place to address the Middle School & Kittredge within a few years; Atkinson &Franklin to follow. Franklin overhaul is expected in 10+years. Capacity was an issue prior to our developments. Our ability to fix the issues is based on available finds, both capital expenditures and revenue to provide new teachers. Revenue created by this project would allow us to address school issues. This development is a substantial net positive for our school system. Expressed positivity over town's intergenerational nature; stressed need to "preserve the town for its people". Ryan Schruender, 60 Fhlllrps Ct.: ('AI1nnni of Merrimack) Concern for lack of community's familiarity with project. J. Enright: Described public hearing Legal Notice requirements. E. Goldberg: The Bylaw is structured as a proposed overhaul of the zoning for the property. This clearly doesn't fit into the existing zoning for this property. The zoning we have been discussing for the Iast year at meetings has all the components to that proposed zoning, building locations,heights, qty. of units, etc. The town will vote on that, if approved,the bylaw is structured for a Plan Approval process. We anticipate notices to abutters would go out for the plan approvals. R. Schruender: Communicated that there is misinformation out there; many meetings have occurred with several iterations of plans. Expressed concern for residents at Town Meeting not knowing what this project is about. Questioned whether the school entertain "forced triples"?In 5-10 years,what is the max number of beds Merrimack College will have? Can they force the Dover-Amendment?Can Merrimack continue to rent apartments at the new apartment complex? M. Lozano: Confirmed 824 beds. Doesn't expect rentals to occur because the student housing needs are accommodated with the new development. E. Goldberg: That's fair; we should continue outreach outside of the public hearings. It's been difficult to try to do that where the plan kept changing.Number of dorm beds is not up to Merrimack;they would have to come before the Board or Town Meeting for any proposed changes. It is worth discussing your point regarding the Dover Amendment. There's nothing in the bylaw to prevent students from renting; you can't prevent that from happening. We could entertain an agreement with Merrimack to consider that. R. Schruender: Questioned whether there has been any discussion of a dormitory building becoming an acadernic building?Heard townhouses would be sold off to another developer. Will there be something in the bylaw stipulating that the townhouses cannot be rented; expressed preference for owner occupied. Jeff Doggett, 84 Johnson St., Merrimack College E.V.F., CFO: Explained that the College must seek town approval when adding students. The review includes safety, fixture counts, sq. ft.,etc. Expects a cap on number of student beds. We could still build on our corner, however the only reason to be part of this project was the vision as an institution to leverage our growth to help produce an economically viable project for our community that will do everything Trinity has proposed, provide affordable housing, retail, hotel,etc. Housing produces more revenue which we can then use to help diffract the cost of developing it ourselves. Communicated that the goal was to gain 5 Town of North Andover PLANNING BOARD Eitatt Golrlbetg, Chair •' JOltlt Srfnons Peter,I3oyittott Kelly Cor•miet- Alissa Koettig Tttesrla Februat 15 2022 7 .tit. 120 Mrtitt Sh-eet Towtt Hall North Attrlover MA 01845 beds, not land or space for other purposes. We have plenty of land to do more academic housing or buildings if we need to and if this project weren't to come to fruition,we can still do what we need to do on our existing land. E. Goldberg: I don't think there will be anything in the bylaw stating the townhomes will not be rented. They are planned for ownership and required to have management agreements. That would be an internal item that could be raised and addressed during the plan approval process. Barbara Suhr, 148 Main St.: Questioned what is considered affordable housing in North Andover. Is it in between luxury and 40B or are you talking affordable as being 4013?The apartments we are building now are unaffordable, $1,800 for a studio. Read her letter written prior to meeting;too large and dense,empty retail,empty apartments, increased traffic,taxing on services-police and fire, development is tax free for college,concerns regarding water supply and sewer outflow to Merrimack. J. Enright: In context of this review,we are referring to affordable as a 40B development. This is considered a "friendly"40B meaning the developers will work with us; low to moderate income up to 80%of the annual median income. J. Simons: Expressed that it is important to put this in context. Most apartments are market rate which is reasonably expensive. The townhomes are not inexpensive.Not many people in their 20's will afford these. You will need a good income to live in all the housing in this development aside from a few affordable units. This project helps the overall Merrimack Valley housing situation,with very limited impact for North Andover. E. Goldberg: It's"affordable"and falls under the 40B statute; briefly explained Inclusionary Zoning bylaw. J. Enright: Explained that all of the 385 units 40B units count toward our Subsidized Housing Inventory list and will be counted toward the 10% affordable housing requirement. J. Doggett: Provided brief explanation as to how Merrimack got to this point. Dorms are only non-taxable structures; institution pays for water and sewer,own police force. We really like this project; improvements and reconfigurations are positive. Explained that if this project doesn't go forward, likely we'll build 800 beds on campus pulling 800 students from Royal Crest freeing up 150+units of housing, mostly 3-bedroom units which will have an impact on the schools. I am as concerned about that as everyone. Best thing for the college to do is use our growth as leverage. We remain very excited and supportive about this project. Mike Consoli,35 Meadowood Rd.: (Ahnnni ofMejrimack) Voiced safety concern for students constantly crossing Rt. 114 to visit convenience store,friends, park, parents staying at hotel, etc. Feels North Andover is not a college town. Questioned whether Merrimack needs to be part of project. Posed issue of young children and parents coexisting with college students on the Town Green. Suggests college needs to invest more time with community outreach to include educational activities, student athletic programs,etc. Lyne Jackobek, 105 & 57 Berkeley Rd.: Communicated that the project was brought to the college by the previous Town Mgr. and Select Board members; college is the driving force behind this project. Referenced "scare tactics" used by Merrimack putting Aimco in a difficult place. If we don't let them build,they'll use the Dover Amendment. Expressed a lack of integrity. If a piece of property is sold to Merrimack—Merrimack will maintain their own piece. Will the rest of the property be maintained by Aimco? Dismayed with Aimco for not removing fallen tree lirnbs on her property in the buffer zone for 30 years. Inquired whether Aimco would hire an arborist to assess the falling trecs; was told they hired an arborist and just heard tonight they didn't. Will this border area be assessed?Doubts they can be trusted to maintain this large development, if they can't address or maintain a property in the buffer zone? Max Butterbrodt, 118 Brookview Dr.: (Member of Housing Authority in Town but here as a private citizen) Expressed, as a 26-year-old,young,professional attorney, lie cannot afford to live in this town that he grew up in. Friends have moved away due to this. Supports the project that will allow residents to stay in town. 6 Town of North Andover PLANNING BOARD Mimi Goldberg, Chair •• Johit Simms • Ifelly Corr1tier Peter BOyittDlt • Alissa Koenig Tiresda Febmai-y 15 2022 k 7 .m. 120 Maul Street Twit Hall North Andover MA 01845 Laura Craig-Comin, 58 Fernwood St.: Grew up in Andover, under 40 years old,just moved back to area. Had friends who lived in Royal Crest growing up. Very interested in project concept. Moved away from Malden, unaffordable to buy there; loved the diversity,access to amenities; similar things this project would bring to North Andover. Surprised by tension that seemingly exists between Merrimack and the town. After living in Amherst, MA. Students will find ways to live amongst us if there is a good enough college to attract them to an area. We are fortunate that the college is growing in reputation and stature. It's difficult to keep a lid on things forever if people have the money and means. Expressed that an incredible effort has been made by these developers that we have this much personal access to. Excited to see the direction of this forward-thinking project; incorporating wetlands is innovative, LEEDS certification, criteria for meeting sustainable design and development,etc. Expressed support for the project. E. Goldberg,: Thanked the public for their thoughtful responses. There are more public hearings before us, after the hearings and informational public process,this Board will take a vote to represent the warrant article favorably or not,which is simply a recommendation for Town Meeting; Select Board and Finance Committee will do the same. This project goes to Town Meeting for a vote. Encouraged residents to register to vote and attend Town Meeting. Planning Board will have an advisory role as to our vote and we'll talk about it at Town Meeting. There will be opportunity to talk and ask questions at Town Meeting. M. Consoli: Defined the state of MA 40B as having an income restriction of 1-person liorusehold-$56, 800, 2- person household-$64,900, 3-person household$73K,4-person $81,100. People are saying it's great, I can move back to this town. If you make too much money or have too much in your bank account,you can't. In real estate it's very difficult to acquire a 40B house, it's a very small margin;you're either over or under qualified. E. Goldberg: Clarified those are state numbers, but we are in a region category. We will obtain those exact numbers and have thern for the next meeting. M. Lozano: Today at Royal Crest there's 588 apartments;they are market rate with no affordability. We have maintained the exact same level of affordability(97 permanently affordable apts.)affordable under the definitions of state law throughout the several program iterations. George Koehler, 41 Quail Run Rd.: Expressed that there is a dearth of 40B housing, less than 10%. Roughly 25- 30% of the people in this town make no more than 80% of the area median income which is the threshold and legal definition for affordable housing. That statistic is in the Master PIan, based on the census, it also appears in the housing production plan. We are at 8%but if you count the actual units that are affordable to someone making 80%, it's closer to 7%. Stressed the need for affordable housing. The 40B component has 395 apartments of which 97 are affordable.The remaining apartments are going to be modestly priced. A developer won't build apartments that are$3K per month with apartments renting for under$1K. In addition to the affordable component there will be moderately priced apartments,which is another benefit of this project. A greater range of rental or housing prices is being provided. Housing costs are rising faster than incomes; people are getting priced out. This project will help accomplish that. J. Simons: Respectfully disagreed. They couldn't subsidize that many units without charging market rates as high as they can; speculates cost$3K per month. Questioned in aggregate what the total number of housing units today are and the total number of housing units are going to be in the future? M. Lozano: Today 588 units are all rental-market rate,as proposed in housing equivalent units we propose 1,264 units(includes 385 apartments under 40B,439 multi-family units; within those numbers are the 97 affordable apartment units, 35 senior-active living or age-restricted apartments, 199 townhomes, 206 student housing units housing 824 students). J. Simons: Confirmed project size is roughly 2.5 x denser. (2.1 million square feet)There will be more traffic; Rt. 114 project will mitigate that; however,we don't know when the MassDOT project will occur?Traffic redo 7 Town of North Andover E PLANNING BOARD I Eitan Goldberg, Chaff► •' John Si►►ro►ts Peter Boynton •. Belly Co►•►sties Alissa Koenig Tuesday Febritai-P 15 2022 OD 7 P.►n. 120 Maht Street Tower Hall North Andover MA 01845 involves intersection changes, adaptive signaling will happen at the end of the project; there's uncertainty about the tinning of roadway improvements. Clarified location of over 55 units to east away frorn downs. (Building G-1) 35 units 4-story building. heels there are too many townhouses; that component hasn't quite come together yet. M. Lozano: There is a timeline. MassDOT would have to confirm a start date. Travel lanes will increase there'll be turning lanes introduced and new signalized intersections introduced at Hillside. Within the corridor there are significant improvements, travel tun lanes and changes. Reviewed heights and numbers of stories in different sub- districts. J. Enright:Next public hearing is March 1, 2022 and March 15`r' is targeted for the Board's recommendation. Questioned whether the Board would like to consider a joint meeting with the Select Board on March 14,2022. This meeting would be in addition to this Board's regular calendar. Board seemed agreeable to a joint meeting on March 14. (Continued to the March 1, 2022, Planning Board Meeting) Article X: Amend the Zoning Ma of the Town of North Andover by including approximately 76 acres of land located at 1 and 28 Royal Crest Drive, known as Royal Crest Estates Town Assessor Map 25, Parcels 66 and 35, into a Mixed-Use Overlay District. (Continued to the March 1, 2022, Planning Board Meeting) DISCUSSION ITEMS Planning Board: Vote to request an advisory opinion from the Department of Housing and Community Development regarding whether a zoning proposal affects an eligible location. Suzanne Egan,Town Counsel: Explained that the discussion item before the Board is whether the Planning Board wants to take a vote to request the DHCD for an advisory opinion as to whether or not this affects an eligible location under the Housing Choice Act. Amendments to the zoning act create a different quantum of vote for town meeting. (2/3 or a simple majority vote) Housing Choice Act allows for a simple majority vote providing you rneet certain criteria. One of which is whether or not a project's housing is allowed in an eligible location. The stature allows you to get an advisory opinion from DHCD as to whether this would be an eligible location. The definition of an eligible location is a town, a commercial center or a town center, or an area of commercial activity. The developer proposes the quantum of vote which is then presented in the Town Meeting warrant. DHCD is part of the regulatory authority that looks at the zoning and that opinion is submitted to the Atty. General for approval. E. Goldberg: Expressed that it's clear this meets the definition: this project is near transit, with housing. f don't view pursuing an opinion can hurt; they're coming up with the guidance for the housing choice. E. Goldberg: The Governor's office is urging every town to start adding housing and this is one of their ways of doing it. Clearly this is an eligible location. We will have to go back and look at the other criteria in the bylaw which are a little more nuanced as to whether it meets all the criteria for the 50% or whether it's for the 2/3's. Board: agreed to pursue the opinion. MOTION: J. Simons made a motion to request an advisory opinion from DHCD regarding whether a zoning proposal affects an eligible location. A. Koenig seconded the motion. Roll call vote: K. Cormier voted yes. A. Koenig voted yes. J. Simons voted yes. E. Goldberg voted yes. P. Boynton voted yes. The vote was 5-0, unanirnous in favor. 8 Town of North Andover PLANNING BOARD Eita►r Goldberg, Chah- • • John Si►►ro►is Peter Boynton Kelly Cor►vier • Alissa Koenig Titestlay Febriiary 15 2022 7 pjnt, 120 Main Street Toivn Hall North Andover MA 01845 Article X: Amend the Zonina Bylaw to establish an Inclusionar Housin Re uirements b lary and thereby amend Article 8, Supplementary Regulations, by adding Part 13 Inclusionary Housing Requirements. J. Enright: No comments have been received. Michael Lis: Adding a bit more housing does not"solve"the problem but the cause of unaffordability of housing is a lack of supply of both market rate and affordable housing. We can't solve that 100%by ourselves but we can choose to be part of the solution or part of the problem. This amendment is an important piece of that. P. Benton: Summarized locations of several recent multi-family residential developments. Expressed that the town has consistently done its part in adding housing units over a long period of time. Consequence to our schools is important; are we adding 96 students or are we having to build a$30-million dollar school?Another consequence is that this would be our single largest development. Once there's one development of this size and density are we welcoming more of these developments? E. GoIdber : The town has done well at addressing housing but not at providing affordable units. Most recent proposals have been market rate. We are in a better place than a lot of towns, but we still have the need. If we want to increase our per pupil spending to address our needs, we need more tax growth. (Con inued to the March 1, 202Z Planning Board Meeting) MEETING MINUTES: MOTION: J. Simons made a motion to approve the February 1,2022, meeting minutes. A. Koenig seconded the motion. Roll call vote: K. Cormier voted yes. P. Boynton voted yes. A. Koenig voted yes. J. Simons voted yes. E. Goldberg voted yes. The vote was 5-0, unanimous in favor. ADJOURNMENT MOTION: J. Simons made a motion to adjourn the meeting. The motion was seconded by A. Koenig. Roll call vote: K. Cormier voted yes. P. Boynton voted yes. A. Koenig voted yes.J. Simons voted yes. E. Goldberg voted yes. The vote was 5-0, unanimous in favor. Meeting adjourned @ 9:58 p.m. MEETING MATERIALS: Planning Board Meeting Agenda February 15,2022, DRAFT Planning Board Meeting Minutes February 1,2022; Staff Report: 220215 Staff Report;Regency Place, Carol Carroll,,North Andover Realty—Corp: 210203 DPW release recommendation memo, Carroll—SOS report, Recorded PRD Staff Report; Modification Decision;Autumn Chase Carol Carroll North Andover Rea-Ity Corp.: 220207 DPW recommended release—Autumn Chase, Definitive Subdivision Decision,PRD Decision;Article X: Amend the Zoning Bylaw to establish Article 19 Mixed Use Mixed -Use Overlay District: 220215 Presentations: 22_0215_Town Mceting_V2, RC-Project Walk-Through—22-0215 (Video), Draft MUOD Warrant Article and Plans: 220201 Building Heights, 220211 Royal Crest—Master Development Plan, 220215 Draft Article-MUOD Article 19_redline; Record Documents: Misc. Record Does. As of Feb. 1, 2022,Record Abutter-Resident Comments-Royal Crest, Record does_MUOD Compilation as of 2-1-22; Resident Comment: 220211 Resident Comment—Fuog,220214 Resident—Sarro, 220215 Resident Comment Rudnicki, 220215 Resident Comment Rudnicki (2); Traffic Follow-up: 220104 Board traffic request, 220131 VHB resp. memo to Ja. 4 Board req.; 220215 REV Mixed Use Parking Ratios TFI; Article X: Amend the Zoning Map: 220211 Royal Crest—Mixed Use Overlay Map,220211 Warrant Article Mixed Use Overlay District Map; Article X: Amend the Zoning Bylaw to establish an Inclusionai Housing Requirements bylaw: 210215 Warrant Article Part 13 Inclusionary Housing Req, Inclusionary Zoning Comparison, Inclusionary Zoning PB Presentation 9.2Updatc, 9 Town of North Andover PLANNING BOARD Eitan Goldberg, Chair •' John Simons Peter Boynton •. Kelly Cor►nie►' • Alissa Koenig Tues(lay Februar J 15 2022 7 pxt., 120 Main Street Toiprr Hall North Anrlover, MA 01845 Local Inclusionary Bylaw_Map; Planning Board: DHCD guidance re threshold for vote to adopt zoning bylaw, Request an Advisory Opinion ou Ch. 40A Eligible TLocations Mass.gov(1). 10