Loading...
HomeMy WebLinkAbout- Correspondence - 544 JOHNSON STREET 3/23/2022 NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Revised plan review, 544 Johnson Street 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Fri, Apr 9, 2021 at 4:02 PM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> We have completed our review of the revised plan at this address. There is one small typographic error that is not consequential so not worth having the plan revised. This design is predicated on their request for a Local Upgrade Approval. Should you choose to grant that approval then the attached letter can be issued. Please do let me know if you have any questions. Dan Daniel Ottenheimer, PE President V�MZLL RIVER CONSULTING Creative Soluti ms for land Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com Member: National Society of Professional Engineers, New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association 544 Johnson Street Approval Letter.docx 77K NORMOVER Massachu Stephen Casey<scasey@northandoverma.gov> RE: redesign 544 Johnson Street 2 messages Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Jun 24, 2021 at 2:18 PM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@ north andoverma.gov> Please provide the DEP approval letter and whatever other supporting documents might go along with the particular type of disposal system being proposed in this instance. Sometimes DEP has kind of blanket approvals for groups of different types of systems (such as an STU)and then often also has an approval letter for a particular technology. We need to review the usage conditions in those documents against what was proposed and if we need to spend time to find these documents and figure out which is the correct one you are proposing to implement it might take a while. Thanks much, Dan Daniel Ottenheimer, PE President NX MILL RIVER CONSULTING Caza6vc Salutitns for Land Develapnunt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com From: James Morin [mailto:jim@neclassicengineering.com] Sent: Wednesday, June 23, 2021 9:47 AM To: Daniel Ottenheimer Subject: redesign 544 Johnson Street Good Morning Dan, Here is the redesign for 544 Johnson Street. Please let me know what you think? Thanks, Jim Morin Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Jun 24, 2021 at 5:34 PM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Thanks Jim. The use of this technology also needs to comply with DEP's Standard Conditions for General and Remedial Use Approval of Alternative Soil Absorption Systems according to their approval letter. If I could trouble you for that as well it would be appreciated. Dan Daniel Ottenheimer, PE President r:1 T MILL RIVER CONSULTING C matme'3tatutiwu for Land Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsuIting.com From: James Morin [mailto:jim@neclassicengineering.com] Sent: Thursday, June 24, 2021 4:58 PM To: Daniel Ottenheimer Subject: RE: redesign 544 Johnson Street Hi Dan , Attached please find the approval letter and the design manual. This technology has been around since 2017 and is pretty straight forward. Thanks, Jim Morin [Quoted text hidden] No j0VERStephen Casey<scasey@northandoverma.gov> Massachus� 544 Johnson Street, North Andover 8 messages Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Jun 28, 2021 at 10:54 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov>, 'Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@northandoverma.gov>, "Toni Wolfenden (tolfenden@north andoverma.gov)" <twolfenden@northandoverma.gov> Jim, We pushed aside other matters to take a look at the revised submission which came in at the end of last week for 544 Johnson Street since the project is in mid-construction. If any of the comments below do not make sense or are not clear I apologize in advance but we wanted to get this looked at as quickly as possible. Our review found the following items that appear to need to be resolved or explained. These are organized by the origin or location of the material: DEP Standard Conditions (this allows for the usage of this type of disposal system with treatment and provides the conditions for their usage) o A deed notice will need to be provided and recorded, please provide a draft o The designer needs to certify the plans to be in compliance with the Standard Conditions and the approval o The system owner needs to acknowledge ownership responsibilities (section 18 d) o The plans need to show the maximum area needed for a conventional system o The plans need to show a best feasible replacement system o The designer needs to submit proof of any training by the manufacturer which is required prior to design (if any) Remedial Use Approval (this provides specific conditions for the GeoMat Leaching System being proposed) o Pressure distribution is required when GeoMat is installed directly into native soil o Inspection access is required at the end of each run of pipe GeoMat Leaching System design manual o When installed in native soils GeoMat shall be separated by 2 times the width of the GeoMat used. This is not provided on the design plan. o No 5 foot overdig is demonstrated on the plan and is indicated to not be required in the design manual. This is not indicated in either of the above documents issued by DEP. Please obtain clarification or provide for an overdig. Design plan dated 6/22/21 o Remove reference to Cultec design certification as that is not the soil absorption system being proposed. o Clarify why there is the"Maximum Feasible" note requesting less than 4' of natural soil below the soil absorption system as the design plan shows test pits with adequate soil depth. o With a breakout elevation of 93.32 it does not appear the required 15' horizontal distance of that elevation is met. o Explain why the breakout elevation should not be at the top of the GeoMat at elevation 93.57 or adjust the design plan to reflect this. o General note 12 references a reserve area though none is apparent on the design plan. Lastly, please note the following future requirements so they can be planned accordingly: o The installer needs to demonstrate that he is certified or has received appropriate training by the manufacturer. o Prior to issuance of a Certificate of Compliance the installer and designer must certify compliance with the Standard Conditions, and the deed notice needs to be recorded at the Registry and a copy provided to the Health Department. Dan Daniel Ottenheimer, PE President `1~. qk . MILL RIVER CONSULTING Cm-adve&Autions for[mitt Develapuwnt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com James Morin <jim@neclassicengineering.com> Mon, Jun 28, 2021 at 2:31 PM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov>, "Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@northandoverma.gov>, "Toni Wolfenden (tolfenden@north andoverma.gov)" <tolfenden@northandoverma.gov> Dan, Thank you for your timely review and making this a top priority. Please see below my explanations for the following items. DEP Standard Conditions (this allows for the usage of this type of disposal system with treatment and provides the conditions for their usage) o A deed notice will need to be provided and recorded, please provide a draft Will Complete o The designer needs to certify the plans to be in compliance with the Standard Conditions and the approval Completed o The system owner needs to acknowledge ownership responsibilities (section 18 d) Will complete o The plans need to show the maximum area needed for a conventional system Existing on the plan o The plans need to show a best feasible replacement system o Existing on the plan o The designer needs to submit proof of any training by the manufacturer which is required prior to design (if any) No training Required Remedial Use Approval (this provides specific conditions for the GeoMat Leaching System being proposed) o Pressure distribution is required when GeoMat is installed directly into native soil Proposed with 6" c-33 sand. o Inspection access is required at the end of each run of pipe Not required on gravity distribution. GeoMat Leaching System design manual o When installed in native soils GeoMat shall be separated by 2 times the width of the GeoMat used. This is not provided on the design plan. Proposed with 6"c-33 sand o No 5 foot overdig is demonstrated on the plan and is indicated to not be required in the design manual. This is not indicated in either of the above documents issued by DEP. Please obtain clarification or provide for an overdig. No Over dig is required with proposed system. Design plan dated 6/22/21 o Remove reference to Cultec design certification as that is not the soil absorption system being proposed. Completed o Clarify why there is the "Maximum Feasible" note requesting less than 4' of natural soil below the soil absorption system as the design plan shows test pits with adequate soil depth. There is some ledge near the new proposed system and I would like to use the B Horizon if I need to. o With a breakout elevation of 93.32 it does not appear the required 15' horizontal distance of that elevation is met. 40 Mil Barrier Added. o Explain why the breakout elevation should not be at the top of the GeoMat at elevation 93.57 or adjust the design plan to reflect this. Breakout Elevation adjusted to 93.57 o General note 12 references a reserve area though none is apparent on the design plan. Completed Lastly, please note the following future requirements so they can be planned accordingly: o The installer needs to demonstrate that he is certified or has received appropriate training by the manufacturer. No training and certification needed by the installer. o Prior to issuance of a Certificate of Compliance the installer and designer must certify compliance with the Standard Conditions, and the deed notice needs to be recorded at the Registry and a copy provided to the Health Department. Will Complete Kind Regards, Jim Morin From: Daniel Ottenheimer<dano@millriverconsulting.com> Sent: Monday, June 28, 2021 10:54 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov>; Brian Lagrasse (blagrasse@northandoverma.gov) <blagrasse@northandoverma.gov>; Toni Wolfenden (twolfenden@northandoverma.gov) <tolfenden@northandoverma.gov> Subject: 544 Johnson Street, North Andover Jim, We pushed aside other matters to take a look at the revised submission which came in at the end of last week for 544 Johnson Street since the project is in mid-construction. If any of the comments below do not make sense or are not clear I apologize in advance but we wanted to get this looked at as quickly as possible. Our review found the following items that appear to need to be resolved or explained. These are organized by the origin or location of the material: DEP Standard Conditions (this allows for the usage of this type of disposal system with treatment and provides the conditions for their usage) o A deed notice will need to be provided and recorded, please provide a draft o The designer needs to certify the plans to be in compliance with the Standard Conditions and the approval o The system owner needs to acknowledge ownership responsibilities (section 18 d) o The plans need to show the maximum area needed for a conventional system o The plans need to show a best feasible replacement system o The designer needs to submit proof of any training by the manufacturer which is required prior to design (if any) Remedial Use Approval (this provides specific conditions for the GeoMat Leaching System being proposed) o Pressure distribution is required when GeoMat is installed directly into native soil c Inspection access is required at the end of each run of pipe GeoMat Leaching System design manual o When installed in native soils GeoMat shall be separated by 2 times the width of the GeoMat used. This is not provided on the design plan. o No 5 foot overdig is demonstrated on the plan and is indicated to not be required in the design manual. This is not indicated in either of the above documents issued by DEP. Please obtain clarification or provide for an overdig. Design plan dated 6/22/21 o Remove reference to Cultec design certification as that is not the soil absorption system being proposed. o Clarify why there is the"Maximum Feasible" note requesting less than 4'of natural soil below the soil absorption system as the design plan shows test pits with adequate soil depth. o With a breakout elevation of 93.32 it does not appear the required 15' horizontal distance of that elevation is met. o Explain why the breakout elevation should not be at the top of the GeoMat at elevation 93.57 or adjust the design plan to reflect this. o General note 12 references a reserve area though none is apparent on the design plan. Lastly, please note the following future requirements so they can be planned accordingly: o The installer needs to demonstrate that he is certified or has received appropriate training by the manufacturer. o Prior to issuance of a Certificate of Compliance the installer and designer must certify compliance with the Standard Conditions, and the deed notice needs to be recorded at the Registry and a copy provided to the Health Department. [Quoted text hidden] 2 attachments .� Alternative System Notice deed form.pdf 128K .� 544 JOHNSONamendedtechnologyrevised6282021FINAL.pdf 1675K James Morin <jim@neclassicengineering.com> Mon, Jun 28, 2021 at 4:53 PM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov>, "Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@ north andoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Good afternoon Dan, I was wondering and trying to schedule work for tomorrow. Can we move forward at 544 Johnson Street the issues seem to be all addressable. Please let me know. Thanks for all your help. Jim Morin From: Daniel Ottenheimer<dano@millriverconsulting.com> Sent: Monday, June 28, 2021 10:54 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov>; Brian Lagrasse (blagrasse@northandoverma.gov) <blagrasse@northandoverma.gov>; Toni Wolfenden (twolfenden@northandoverma.gov) <twolfenden@northandoverma.gov> Subject: 544 Johnson Street, North Andover Jim, We pushed aside other matters to take a look at the revised submission which came in at the end of last week for 544 Johnson Street since the project is in mid-construction. If any of the comments below do not make sense or are not clear I apologize in advance but we wanted to get this looked at as quickly as possible. Our review found the following items that appear to need to be resolved or explained. These are organized by the origin or location of the material: DEP Standard Conditions (this allows for the usage of this type of disposal system with treatment and provides the conditions for their usage) o A deed notice will need to be provided and recorded, please provide a draft o The designer needs to certify the plans to be in compliance with the Standard Conditions and the approval o The system owner needs to acknowledge ownership responsibilities (section 18 d) o The plans need to show the maximum area needed for a conventional system o The plans need to show a best feasible replacement system o The designer needs to submit proof of any training by the manufacturer which is required prior to design (if any) Remedial Use Approval (this provides specific conditions for the GeoMat Leaching System being proposed) o Pressure distribution is required when GeoMat is installed directly into native soil o Inspection access is required at the end of each run of pipe GeoMat Leaching System design manual o When installed in native soils GeoMat shall be separated by 2 times the width of the GeoMat used. This is not provided on the design plan. o No 5 foot overdig is demonstrated on the plan and is indicated to not be required in the design manual. This is not indicated in either of the above documents issued by DEP. Please obtain clarification or provide for an overdig. Design plan dated 6/22/21 o Remove reference to Cultec design certification as that is not the soil absorption system being proposed. o Clarify why there is the"Maximum Feasible" note requesting less than 4'of natural soil below the soil absorption system as the design plan shows test pits with adequate soil depth. o With a breakout elevation of 93.32 it does not appear the required 15' horizontal distance of that elevation is met. o Explain why the breakout elevation should not be at the top of the GeoMat at elevation 93.57 or adjust the design plan to reflect this. o General note 12 references a reserve area though none is apparent on the design plan. Lastly, please note the following future requirements so they can be planned accordingly: o The installer needs to demonstrate that he is certified or has received appropriate training by the manufacturer. o Prior to issuance of a Certificate of Compliance the installer and designer must certify compliance with the Standard Conditions, and the deed notice needs to be recorded at the Registry and a copy provided to the Health Department. [Quoted text hidden] Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Jun 28, 2021 at 7:21 PM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@ north and overma.gov>, "Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@northandoverma.gov>, "Toni Wolfenden (twolfen den @northandoverma.gov)" <twolfenden@northandoverma.gov> Sorry, but no. We still looking to understand the DEP approvals and your responses to our inquiries. Also the health department will need to issue a new DSCP before work can occur again. Thanks, Dan Dan Ottenheimer [Quoted text hidden] James Morin <jim@neclassicengineering.com> Mon, Jun 28, 2021 at 8:29 PM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov>, "Brian Lagrasse (b lag rasse@northandoverma.gov)" <blagrasse@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Ok, thank you. Sent from my Verizon, Samsung Galaxy smartphone Get Outlook for Android From: Daniel Ottenheimer<dano@millriverconsulting.com> Sent: Monday,June 28, 2021 7:21:45 PM To:James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov>; Brian Lagrasse (blagrasse@northandoverma.gov) <blagrasse@northandoverma.gov>; Toni Wolfenden (twolfenden@northandoverma.gov) <twolfenden@northandoverma.gov> [Quoted text hidden] [Quoted text hidden] Daniel Ottenheimer<dano@millriverconsulting.com> Tue, Jun 29, 2021 at 6:51 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Jim, [note that I have removed 2 people on this thread that are with the Town as they do not need the details of our technical conversation] We have a fundamental disagreement on a few items which need to be addressed. I think the core of it is that we are reviewing your submissions primarily in light of the 2 approvals issued by DEP which allows this system to be used in Massachusetts, and you are completing your design plan based on the manual produced by the manufacturer. I could be wrong, but I am not sure they are in sync. Our lens for a review is Title 5 and whatever technology approval letters exist and not so much a manual produced by a manufacturer so you will need to make sure this design is in compliance with the Standards Conditions and the GeoMat approval. To that end what I see as large unresolved questions are: A. The GeoMat has different design standards when placed in native soil and in sand fill. One uses gravity distribution and the other uses pressure distribution. The sand fill meeting C-33 specifications immediately below and above the GeoMat product is an integral part of their system and is part of what the product relies on for treatment to occur. That layer, in our mind, is not"sand fill"as it is a required part of their system. In the case of this address, it appears the GeoMat product(C-33 sand and the distribution mat and piping) is going to be installed in native soil and thus would need to be designed in accordance with the native soil requirements in the product approval. You claim this is not needed. Provide documentation to demonstrate this as our read of the approvals does not concur, or else re-design to provide compliance. B. When used in native soil the approvals indicate the need to have the lines of GeoMat separated by at least twice their width. You claim this is not needed. Provide documentation to demonstrate this as our read of the approvals does not concur, or else re-design to provide compliance. C. The approvals do not appear to waive the requirement for a 5' overdig around the system. You claim this is not needed. Provide documentation to demonstrate this as our read of the approvals does not concur, or else re-design to provide compliance. That said, as you know, a 5'overdig is only required when the breakout elevation is above the existing grade so at this particular address it is possible that no overdig is required or perhaps only part of the system needs an overdig. D. Inspection ports are required at the end of each run per the DEP approval. You claim this is not needed. Provide documentation to demonstrate this as our read of the approvals does not concur or else re-design to provide compliance. E. Provide documentation from the manufacturer that no designer or installer training is required as indicated below, or else provide proof of completion of required training. If I am off the mark with anything please do let me know. As a courtesy I am attaching the Standard Conditions and the GeoMat approval which are being used as the basis for our review. I will be in the field much of the day today but will check email at the end of the day. Thanks, [Quoted text hidden] 2 attachments .� Geomat Approval.pdf 107K DEP stdconda.pdf 159K Stephen Casey <scasey@northandoverma.gov> Tue, Jun 29, 2021 at 5:13 PM To: Daniel Ottenheimer<dano@millriverconsulting.com> Thank you again for handling this Dan. I was, once the plan is approved and all details are finalized, going to reject the old permit(citing ledge encountered/site conditions)and issue a new DWC permit for the new system, a new approval letter for the new plans and obtain 3 hard copies like we usually do. Once Jim squares everything away with you I will contact him for these items. [Quoted text hidden] Stephen Casey Jr. Health Inspector Town of North Andover Daniel Ottenheimer<dano@millriverconsulting.com> Tue, Jun 29, 2021 at 6:18 PM To: Stephen Casey<scasey@northandoverma.gov> Great. [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Noun 60VER Massachu Stephen Casey <scasey@northandoverma.gov> 544 Johnson Street revised plan dated 6-28-21 6 messages Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Jun 30, 2021 at 11:36 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Jim, Thanks for sending along the revised plan, draft deed notice and critically the most recent approval letter for the type of disposal system with treatment you are proposing to use at 644 Johnson Street. Many of our unanswered questions have been resolved. Understanding you were burning the midnight oil in some of the plan edits we did notice a few items in need of attention before moving forward. It is important to have the plan correctly noted for future reference and to avoid problems during installation so please review the following and make adjustments as might be needed: 1. The site plan indicates a different building sewer elevation from the Design Elevations table 2. The 16' x 25' rectangle for the proposed soil absorption system you are using along with 1' of sand around it should be labeled on the site plan 3. The top and bottom elevations of the proposed barrier should be indicated 4. There is no Local Upgrade Approval needed to meet the breakout requirements in Title 5 as you are proposing the use of a barrier. Remove that notation to avoid confusion 5. You are requesting a Local Upgrade Approval for less than 4'of naturally occurring soil beneath the soil absorption system. Such an approval cannot be granted pursuant to Title 5. Remove that notation to avoid confusion. As a side note, the approval for the disposal system with treatment which you are proposing to use allows there to be less than 4'of naturally occurring soil beneath the leaching facility 6. The profile should depict a riser to grade over the effluent filter in the tank, and risers as needed over the d-box to bring the cover within 9" of finished grade 7. The distance between the tank and distribution box in the profile is not correct 8. The citation for note#23 in the profile is not correct and should reference note#21 or some other note as you think appropriate 9. The maximum area needed for a conventional system and the best feasible replacement system on the site plan are not acceptable in the location proposed due to the presence of shallow depth to ledge Dan Daniel Ottenheimer, PE President KOA qkK MILL RIVER CONSULTING Ctveative Solutiom for Lurid De%,elapnw"t 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com James Morin <jim@neclassicengineering.com> Wed, Jun 30, 2021 at 3:29 PM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov> Good Afternoon Dan, The final revisions are now complete. Items 1-9 below were addressed. Attached please find the final revised plan and let me know what you think. As always, thanks for all your help getting me through this project. Regards, Jim Morin From: Daniel Ottenheimer<dano@m ill riverconsulting.com> Sent: Wednesday, June 30, 2021 11:37 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Subject: 544 Johnson Street revised plan dated 6-28-21 Jim, Thanks for sending along the revised plan, draft deed notice and critically the most recent approval letter for the type of disposal system with treatment you are proposing to use at 644 Johnson Street. Many of our unanswered questions have been resolved. Understanding you were burning the midnight oil in some of the plan edits we did notice a few items in need of attention before moving forward. It is important to have the plan correctly noted for future reference and to avoid problems during installation so please review the following and make adjustments as might be needed: 1. The site plan indicates a different building sewer elevation from the Design Elevations table 2. The 16'x 25' rectangle for the proposed soil absorption system you are using along with 1' of sand around it should be labeled on the site plan 3. The top and bottom elevations of the proposed barrier should be indicated 4. There is no Local Upgrade Approval needed to meet the breakout requirements in Title 5 as you are proposing the use of a barrier. Remove that notation to avoid confusion 5.You are requesting a Local Upgrade Approval for less than 4' of naturally occurring soil beneath the soil absorption system. Such an approval cannot be granted pursuant to Title 5. Remove that notation to avoid confusion. As a side note, the approval for the disposal system with treatment which you are proposing to use allows there to be less than 4' of naturally occurring soil beneath the leaching facility 6. The profile should depict a riser to grade over the effluent filter in the tank, and risers as needed over the d-box to bring the cover within 9" of finished grade 7. The distance between the tank and distribution box in the profile is not correct 8. The citation for note#23 in the profile is not correct and should reference note#21 or some other note as you think appropriate 9. The maximum area needed for a conventional system and the best feasible replacement system on the site plan are not acceptable in the location proposed due to the presence of shallow depth to ledge [Quoted text hidden] 544 JOHNSO Name ndedtechnologyrevised6302021 Layout1 (1).pdf 1674K Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Jul 1, 2021 at 10:37 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Jim, I do not see that items 1, 6 and 9 in the review email below have been addressed on your revised design plan. Also, related to item 2, thank you for labeling the 16'x 25' area of the proposed soil absorption system but the label should please also state"with 1' sand placed on 4 sides", or something to that effect. [Quoted text hidden] James Morin <jim@neclassicengineering.com> Thu, Jul 1, 2021 at 11:50 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov> Hi Dan, Please check agian for 1,6and 9 they are on the plan. 16 x 25 includes the 1' on all sides. That is bed size. Thanks, Jim Morin Sent from my Verizon, Samsung Galaxy smartphone Get Outlook for Android From: Daniel Ottenheimer<dano@millriverconsulting.com> Sent:Thursday,July 1, 2021 10:37:40 AM To:James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> [Quoted text hidden] [Quoted text hidden] Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Jul 1, 2021 at 3:17 PM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> I am leaving now and will be back in again on Tuesday. Perhaps in the interim you can circle or somehow depict where these items are on your most recent design plan or otherwise show us. Happy Independence Day. [Quoted text hidden] Daniel Ottenheimer<dano@miliriverconsulting.com> Tue, Jul 6, 2021 at 9:00 AM To: James Morin <jim@neclassicengineering.com> Cc: Stephen Casey<scasey@northandoverma.gov> Thanks Jim. Very helpful for you to have highlighted the plan details we are trying to get nailed down. A copy with three red circles is attached. 1. 1 was envisioning the risers on tank and d-box on the scaled profile but I only called it the "profile" in my email to you so that might have been a source of confusion. I see where you call for them, but please also depict them on the scaled profile for clarity 2. The theoretical conventional system area should be located where there are test pits which demonstrate the suitability of that area. No test pits are present where it is currently depicted. Please move to an acceptable location. 3. The note on the site plan which is circled does not seem in consort with the other elevations specified for the building sewer pipe. Please clarify. Thanks, Dan Daniel Ottenheimer, PE President MILL RIVER CONSULTING Cazativc Solutions for[.anti rkvdapment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com From: James Morin [mailto:jim@neclassicengineering.com] Sent: Saturday, July 3, 2021 11:09 AM To: Daniel Ottenheimer Subject: RE: 544 Johnson Street revised plan dated 6-28-21 Good Morning Dan, Attached please find the highlighted revisions. I hope you enjoy your vacation. Thanks, [Quoted text hidden] DGO notation -544 JOHNSONamendedtechnologyrevised6302021 Layout1 (1) HIGHLIGHTED 1,6 &9 In ISSUES.pdf 3566K -171 NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Revised plan review - 544 Johnson Street 2 messages Daniel Ottenheimer<dano@millriverconsulting.com> Fri, Jul 9, 2021 at 10:39 AM To: "Brian Lagrasse (blagrasse@north and overma.gov)"<b lag rasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni- We have completed our review of the most recent design plan iteration completed for 544 Johnson Street. It is dated July 6, 2021. We believe it is complete and ready for endorsement and issuance of a DSCP. As such we have prepared a draft approval letter for your consideration. Note that items 2, 3 and 4 are unique to the type of disposal system being used. Item 2 and 3 are required in the approval letter for the type of system being used and I chose to repeat them here for emphasis, you can delete if you think it is not needed. Item 4 is something that I wrote to bring clarity to the special sand fill that is an integral part of the GeoMat Leaching System, however feel free to edit if that reimbursement process is not something that is feasible. Any questions please do let me know. Best, Dan Daniel Ottenheimer, PE President yy AVOWKMILL RIVER CONSULTING Creative Solutions for Land I evetcq)mtnt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com 544 Johnson Street Approval Letter v2 7-9-21.docx 78K Toni Wolfenden <tolfenden@northandoverma.gov> Fri, Jul 9, 2021 at 11:27 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: "Brian Lagrasse(blagrasse@northandoverma.gov)" <baagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov> Received, thank you. Toni K. Wolfenden Health Department Assistant 978-688-9540 [;�-cid:image002.jpg@O1 CD02A1.85A49B40 [Quoted text hidden] image001.jpg 4K NORTH ANDOVER Stephen Casey <scasey@northandoverma.gov> Massachusetts Bottom bed inspection 544 Johnson Street 1 message Stephen Casey <scasey@northandoverma.gov> Mon, Jul 19, 2021 at 9:45 AM To:jim@neclassicengineering.com Jim, I got your voicemail on Friday regarding a potential bottom bed inspection today at 544 Johnson Street. I tried giving you a couple calls this morning but your voicemail was full. I have availability today to do the inspection once ready. Please let me know when you are ready. Best, Stephen Casey Jr. Health Inspector Town of North Andover No 4 OVER Massachu _ 3 Stephen Casey<scasey@northandoverma.gov> 544 Johnson Street sieve analysis results 3 messages Stephen Casey <scasey@northandoverma.gov> Tue, Jul 27, 2021 at 4:50 PM To: Dan Ottenheimer<dano@millriverconsulting.com>, Brian LaGrasse <blagrasse@northandoverma.gov> Hi Dan, Attached is the Sieve Analysis for 544 Johnson street. It did not pass the specs for C-33 Sand according to the sieve done by Yankee Engineering. I haven't had a chance to reach out to Jim Morin yet as we have been a bit busy, but wanted to loop you in. Best, Stephen Casey Jr. Health Inspector Town of North Andover 2021-59 -L30292 grade 7-27-21 N Andover-544 Johnson St -C33 fail (1).pdf 103K Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Jul 28, 2021 at 8:25 AM To: Stephen Casey<scasey@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov> Never a dull moment..... It seems like the sand complies with Title 5 standards but is too fine to be considered C-33 sand. If this is the material he used to bring the system up to final grade then it seems like it can remain, but the material immediately below, above and to the sides of the GeoMat will need to be removed and replaced with sand that meets the C-33 specification. Please let me know how I can assist further. Dan Daniel Ottenheimer, PE President - %L'L RIMER CONSULTING Ci tivc Solutirnts for L-Al l I3eveloptntntt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www rnillriverconsulting.com [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Stephen Casey <scasey@northandoverma.gov> Wed, Jul 28, 2021 at 8:32 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Brian LaGrasse<blagrasse@northandoverma.gov> You're telling us g� no down days here... I'll call Jim and let him know the sieve we got back didn't meet the C-33 specs. I had told him if it didn't he would have to remove it so that will unfortunately be the case. At least its only a limited amount underneath/around the system this time! Thanks again, Steve [Quoted text hidden] J XeT No R� o Massachu `_ Stephen Casey<scasey@northandoverma.gov> 544 Johnson Street - Sieve Analysis results 1 message Stephen Casey <scasey@northandoverma.gov> Wed, Jul 28, 2021 at 8:42 AM To:jim@neclassicengineering.com Cc: Dan Ottenheimer<dano@millriverconsulting.com>, Brian LaGrasse <blagrasse@northandoverma.gov> Jim, Please find attached the sieve analysis results from the sample you and I took at 544 Johnson Street. Unfortunately it did not meet the C-33 Specifications called for under the geomat noted on the plan. The sand immediately below, above and to the sides of the geomat system will need to be removed and replaced with sand meeting the specifications of C-33 sand. Since it does meet the Title 5 requirements, anything under the system past the 6 inches of C-33 can be kept. If you have any questions, please do not hesitate to contact me. Best, Stephen Casey Jr. Health Inspector Town of North Andover .n 2021-59 - L30292 grade 7-27-21 N Andover-544 Johnson St-C33 fail (1).pdf 103K NORTH AN LOVER Massaousetts Stephen Casey<scasey@northandoverma.gov> ..� 544 Johnson St - C33 sand 5 messages Scott Mensen <scott@yankeeengineering.com> Wed, Aug 4, 2021 at 9:16 AM To: "scasey@ north andoverma.gov" <scasey@ north andoverma.gov> This one met Regards, Scott M. Mensen, P.E., P.G. President =fr* T+tF..(ninepTin� Tiow-rA=, . RIP. 10 Mason Street Worcester, MA 01609 (508)831-7404 scott@yankeeengineering.com www.yankeeengineering.com •� 2021-59 -L30327 grade 8-3-21 N Andover 544 Johnson St-C33 sand.pdf 102K Stephen Casey<scasey@northandoverma.gov> Wed, Aug 4, 2021 at 9:18 AM To: Scott Mensen <scott@yankeeengineering.com> Best news I've heard all day. Thanks again for the help Scott, really appreciate it. [Quoted text hidden] Stephen Casey Jr. Health Inspector Town of North Andover Scott Mensen <scott@yankeeengineering.com> Wed, Aug 4, 2021 at 9:20 AM To: Stephen Casey <scasey@northandoverma.gov> Anytime [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Stephen Casey <scasey@northandoverma.gov> Wed, Aug 4, 2021 at 9:21 AM To: Toni Wolfenden <tolfenden@northandoverma.gov> 544 Johnson Street [Quoted text hidden] [Quoted text hidden] .� 2021-59 -L30327 grade 8-3-21 N Andover 544 Johnson St-C33 sand.pdf 102K Toni Wolfenden <tolfenden@northandoverma.gov> Wed, Aug 4, 2021 at 9:30 AM To: Stephen Casey<scasey@northandoverma.gov> received. Thank you, Toni K. Wolfenden Health Department Assistant 978-688-9540 cid:image002.jpg@O1 CD02A1.85A49B40 [Quoted text hidden] image001.jpg 4K Particle Size Distribution Report 000 c c c c CO 0 0 00 o v o CO N 100 I I I I I I I I I I I I ASTM C-33 Conc.Fine A 2018 90 I I I I I I I I \ \ I I I I I I 80 I I I I I I I I \ \ I I I I I I I I I I I I I I I I I I I I 70 W 60 I I I I I I I I I 1 1 1 Z 50 U I I I I I I I I Y I I I I W 40 30 I I I I I I I I I I I I 20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE-mm. %+3" %Gravel %Sand %Silt %Clay 0.0 0.2 98.3 1.5 SIEVE PERCENT SPEC.' PASS? Material Description SIZE FINER PERCENT (X=NO) Brown m/f sand trace silt trace gravel 3/8" 100.0 100.0 #4 99.8 95.0- 100.0 #8 93.2 80.0- 100.0 416 75.5 50.0-85.0 Atterberg Limits #30 37.7 25.0-60.0 PL= NP LL= NV P1= NP #50 13.8 5.0-30.0 Coefficients #100 3.4 0.0- 10.0 D85= 1.5395 D60= 0.8827 D50= 0.7467 #200 1.5 0.0-3.0 D30= 0.5075 D1 5= 0.3156 D1 0= 0.2489 Cu= 3.55 Cc= 1.17 Classification USCS= SP AASHTO= A-1-b Remarks Sample submitted by client on 07/30/21 Met ASTM C-33"Concrete Sand"gradation limits ASTM C-33 Conc.Fine Agg.(2018) Sample No.: L-30327 Source of Sample: 544 Johnson Street-N.Andover MA Date: 08/03/21 Location: Concrete Sand Elev./Depth: submitted Client: Town of North Andover YANKEE ENGINEERING Project: Town of North Andover j Various Projects/Sites & TESTING, INC. Project No: 2021-59 Tested By: AK Checked By: SMM NORTH ANDOVER Massachase#ts Stephen Casey<scasey@northandoverma.gov> 544 Johnson Street - Final Construction Inspection 3 messages Toni Wolfenden <twolfenden@northandoverma.gov> Wed, Aug 4, 2021 at 9:38 AM To: Dan Ottenheimer<dano@millriverconsulting.com>, Stephen Casey<scasey@northandoverma.gov>, Brian LaGrasse <Mgrant@northandoverma.gov> Hi Dan, 544 Johnson Street is ready for final construction inspection. The sand passed!! James Morin is the engineer and installer-774-696-2246 Please find the sand analysis and construction notes attached. Thanks and have a nice day. Toni Toni K. Wolfenden Health Department Assistant 978-688-9540 'cid:image002.jpg@01 CD02Al.85A49B40 3 attachments image001.jpg 4K . 2021-59 -L30327 grade 8-3-21 N Andover 544 Johnson St-C33 sand.pdf 102K Construction Notes -544 Johnson Street.doc 393K Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Aug 5, 2021 at 4:01 PM To: Toni Wolfenden <twolfenden@northandoverma.gov>, Stephen Casey<scasey@northandoverma.gov>, Brian LaGrasse <Mgrant@northandoverma.gov> This is set to occur at completion of 8:30 inspection tomorrow morning Daniel Ottenheimer, PE President �LL RIVER CONSULTING 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Toni Wolfenden <tolfenden@northandoverma.gov> Fri, Aug 6, 2021 at 8:34 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov>, Brian LaGrasse <Mgrant@northandoverma.gov> Great, thanks for the update. Toni K. Wolfenden Health Department Assistant 978-688-9540 „�cid:image002.jpg@01 CD02A1.85A49B40 [Quoted text hidden] image001.Jpg 4K Stephen Casey<scasey@northandoverma.gov> 544 Johnson Street construction inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 4:02 PM To: 'Brian Lag rasse (blagrasse@northandoverma.gov)" <b lag rasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni- Attached please find the construction inspection report for the project located at 544 Johnson Street. You will note that a deficiency was identified during the installation of the soil absorption system in that one arm of the piping was higher in elevation than the distribution box outlet. This was corrected and then re-examined. Also, the contractor did not have tools to open the manhole covers so I was never able to examine the tank for proper tees. He did eventually have workers come over to fix the problem with the soil absorption system and it was likely they had the proper tools however with the issues identified and being corrected at the soil absorption system it frankly fell through the cracks to check the tees on the tank. I have no reason to think the contractor did not build these, but perhaps if the final grade inspection has not been completed yet you might wish to have him open one or all of the manholes to confirm. Any questions, please do let me know. Dan Daniel Ottenheimer, PE President RIVER CONSULTING Crept ve}f'Autiow for Lxid Dim,*piilem 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com tm Construction Notes -544 Johnson Street.doc 374K NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 544 Johnson Street construction inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Mon, Aug 9, 2021 at 4:02 PM To: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni - Attached please find the construction inspection report for the project located at 544 Johnson Street. You will note that a deficiency was identified during the installation of the soil absorption system in that one arm of the piping was higher in elevation than the distribution box outlet. This was corrected and then re-examined. Also,the contractor did not have tools to open the manhole covers so I was never able to examine the tank for proper tees. He did eventually have workers come over to fix the problem with the soil absorption system and it was likely they had the proper tools however with the issues identified and being corrected at the soil absorption system it frankly fell through the cracks to check the tees on the tank. I have no reason to think the contractor did not build these, but perhaps if the final grade inspection has not been completed yet you might wish to have him open one or all of the manholes to confirm. Any questions, please do let me know. Dan Daniel Ottenheimer, PE President 41 MILL RIVER CONSULTING Cleativc Solutions for l amd Development 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com Construction Notes -544 Johnson Street.doc 374K No � lov Stephen Casey<scasey@northandoverma.gov> Ma56achu , Final Grade inspection 1 message Stephen Casey <scasey@northandoverma.gov> Tue, Aug 10, 2021 at 9:57 AM To:jim@neclassicengineering.com Cc: Brian LaGrasse<blagrasse@ north andoverma.gov>, Dan Ottenheimer<dano@m ill riverconsulting.com> Jim, I wanted to follow up before the final grade inspection was ready. At this inspection I will need to view the inlet and outlet tees in the tank as they were not able to be inspected during the final construction inspection. Please give me at least a days notice for the inspection and ensure whatever tools are required to open the tank are present. Best, Stephen Casey Jr. Health Inspector Town of North Andover NOR AVER Stephen Casey<scasey@northandoverma.gov> Mas�chus � ����'�....■�. Final Grade Inspections 5 messages Stephen Casey <scasey@northandoverma.gov> Wed, Aug 18, 2021 at 12:53 PM To:jim@neclassicengineering.com Jim, Have the loam and seed been placed for 125 Boston or 544 Johnson? We need to conduct the final grade inspections after the area has been graded, loomed and seeded. As a reminder, I will need someone to accompany me to 544 Johnson to open the tank and ensure the inlet and outlet tees are in compliance. Sincerely, Stephen Casey Jr. Health Inspector Town of North Andover James Morin <jim@neclassicengineering.com> Wed, Aug 18, 2021 at 3:43 PM To: Stephen Casey<scasey@northandoverma.gov> Hi Stephen, Yes the loam and seed has been placed on the both jobs. I can meet you tomorrow some time. Please let me know what works for you? Thanks, Jim Morin [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Stephen Casey <scasey@northandoverma.gov> Wed, Aug 18, 2021 at 3:51 PM To: James Morin <jim@neclassicengineering.com> Pending weather, I could do the inspections at 12:30 or 3pm. If you do not wish to be present for 125 Boston Street that is not an issue as I don't need to view the tees at that location. Let me know if one of those times works better. If it is raining, we can reschedule 544 Johnson Street. [Quoted text hidden] James Morin <jim@neclassicengineering.com> Wed, Aug 18, 2021 at 3:52 PM To: Stephen Casey<scasey@northandoverma.gov> Ok I like 12:30 for 544 Johnson. [Quoted text hidden] Stephen Casey<scasey@northandoverma.gov> Thu, Aug 19, 2021 at 9:19 AM To: James Morin <jim@neclassicengineering.com> Hi Jim, Recapping our phone conversation this morning, lets do 10am on Monday for 544 johnson Street. Sincerely, Stephen [Quoted text hidden] Nouft ANDOVER fvtassachusetis Stephen Casey<scasey@northandoverma.gov> As-Built Checklist 1 message Stephen Casey <scasey@northandoverma.gov> Tue, Aug 24, 2021 at 3:12 PM To: James Morin <jim@neclassicengineering.com> Jim, Please find attached the checklist for the as-built plan. Ensure all applicable areas are addressed on the 3 hard copies that will be submitted to us. Additionally, please ensure that Section 16a (Statement on Plan NA 5.3) is written word for word on the plan. Best, Stephen Casey Jr. Health Inspector Town of North Andover As-built Checklist 3-17-15.pdf 145K No OVER ssachu �« Stephen Casey<scasey@northandoverma.gov> As Built Plans 1 message Stephen Casey <scasey@northandoverma.gov> Wed, Sep 15, 2021 at 11:05 AM To: James Morin <jim@neclassicengineering.com> Jim, I wanted to follow up on the As Built plans for 125 Boston Street and 544 Johnson street. Please submit 3 hard copies of each property's as-built plan with all items on the checklist shown, and please also submit the installation certification for each property to us. For your reference, both are attached below. If you have any questions please let me know as soon as possible. Sincerely, Stephen Casey Jr. Health Inspector Town of North Andover 2 attachments As-built Checklist 3-17-15 (1).pdf 145K Septic Disposal System Installation Certification.pdf 273K