Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 544 JOHNSON STREET 8/23/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 544 Johnson Street MAP: 38 LOT: 48 INSTALLER: James Morin 774-696-2246 DESIGNER: James Morin PLAN DATE: 03.13.2021 BOH APPROVAL DATE ON PLAN: 05.21.2021 INSPECTIONS TANK INSPECTION: 06.16.2021 —S. Casey DATE OF BED BOTTOM INSPECTION:7/14/2021 S.Casey DATE OF FINAL CONSTRUCTION INSPECTION: 8/6/21 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: P/-23/202-W1 s C e� SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ® Bottom of tank hole has 6" stone base ❑ Weep hole plugged ® 1500 gallon tank has been installed H-10 loading ® Monolithic tank construction ® Water tightness of tank has been achieved by $f 1311k visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle/effluent filter) 3 24" cover to within 6" of finish grade installed over one access port P ® Boots around inlet & outlet Comments: 8/6/21 —Two compartment tank with pass through. Contractor did not have tools available to open tank manhole covers however it seems likely that the proper tees were installed based on what the contractor indicated he built. D. Ottenheimer DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or>0.08'/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ® 40 Mil HDPE barrier installed ❑ Laterals installed and ends connected to header (and vented if impervious material above) ® Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments: 8/6/21 — One line of the soil absorption system was higher than the distribution box outlet and would have not received flow. I remained at site while contractor re-set the line and I then re-examined elevations. D. Ottenheimer SOIL ABSORPTION SYSTEM (GeoMat) ® Brand and Model of Unit: GeoMat Comments: 8/6/21 - Components were as specified on plan. D. Ottenheimer FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by -/ Engineer and installer As-Built Plan BM = 100.00 HR = 2.25 HI = 102.25 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 6.00 95.92 96.13 Septic Tank IN 6.35 95.57 95.79 Septic Tank OUT 6.59 95.33 95.54 Distribution Box IN 8.10 93.82 93.77 Distribution Box OUT 8.35 93.57 93.60 Lateral 1 INVERT Beg 8.41/8.54* 93.67/93.54* 93.40 Lateral 1 INVERT End 8.53/8.60* 93.55/93.48* 93.40 Lateral 2 INVERT Beg 8.58 93.50 93.40 Lateral 2 INVERT End 8.58 93.50 93.40 Lateral 3 INVERT Beg 8.54 93.54 93.40 Lateral 3 INVERT End 8.62 93.46 93.40 Lateral 4 INVERT Beg 8.62 93.46 93.40 Lateral 4 INVERT End 8.68 93.40 93.40 8/6/21 — Line 1 was constructed with the soil absorption system distribution line higher than the distribution box outlet invert. This was adjusted at the time of the inspection and re-examined and confirmed the adjustment corrected this deficiency. The rod readings and corresponding elevations observed before and after adjustment are noted above with *. D. Ottenheimer