ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 544 Johnson Street MAP: 38 LOT: 48
INSTALLER: James Morin 774-696-2246
DESIGNER: James Morin
PLAN DATE: 03.13.2021
BOH APPROVAL DATE ON PLAN: 05.21.2021
INSPECTIONS
TANK INSPECTION: 06.16.2021 —S. Casey
DATE OF BED BOTTOM INSPECTION:7/14/2021 S.Casey
DATE OF FINAL CONSTRUCTION INSPECTION: 8/6/21 D. Ottenheimer
DATE OF FINAL GRADE INSPECTION: P/-23/202-W1 s C e�
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer
❑ Topography not appreciably altered
Comments:
SEPTIC TANK
® Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
® Bottom of tank hole has 6" stone base
❑ Weep hole plugged
® 1500 gallon tank has been installed
H-10 loading
® Monolithic tank construction
® Water tightness of tank has been achieved by
$f 1311k visual testing
Inlet tee installed, centered under access port
Outlet tee installed, centered under access port
(gas baffle/effluent filter)
3 24" cover to within 6" of finish grade installed
over one access port
P ® Boots around inlet & outlet
Comments: 8/6/21 —Two compartment tank with pass through. Contractor did
not have tools available to open tank manhole covers however it seems likely
that the proper tees were installed based on what the contractor indicated he
built. D. Ottenheimer
DISTRIBUTION-BOX
❑ Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or>0.08'/foot)
® Hydraulic cement around inlet & outlets
® Observed even distribution
® Speed levelers provided (not required)
® Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
❑ Bottom of SAS excavated down to C soil layer,
as provided on plan
® Size of SAS excavated as per plan
® Title 5 sand installed, if specified on plan
® 40 Mil HDPE barrier installed
❑ Laterals installed and ends connected to
header (and vented if impervious material
above)
® Elevations of laterals and chambers installed as on
approved plan
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments: 8/6/21 — One line of the soil absorption system was higher than the
distribution box outlet and would have not received flow. I remained at site while
contractor re-set the line and I then re-examined elevations. D. Ottenheimer
SOIL ABSORPTION SYSTEM (GeoMat)
® Brand and Model of Unit: GeoMat
Comments: 8/6/21 - Components were as specified on plan. D. Ottenheimer
FINAL GRADE
Loamed
Seeded
Cover per plan
Comments:
DOCUMENTS NEEDED
Certification of Installation Form submitted
By engineer and signed and dated by
-/ Engineer and installer
As-Built Plan
BM = 100.00
HR = 2.25
HI = 102.25
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Building Sewer OUT 6.00 95.92 96.13
Septic Tank IN 6.35 95.57 95.79
Septic Tank OUT 6.59 95.33 95.54
Distribution Box IN 8.10 93.82 93.77
Distribution Box OUT 8.35 93.57 93.60
Lateral 1 INVERT Beg 8.41/8.54* 93.67/93.54* 93.40
Lateral 1 INVERT End 8.53/8.60* 93.55/93.48* 93.40
Lateral 2 INVERT Beg 8.58 93.50 93.40
Lateral 2 INVERT End 8.58 93.50 93.40
Lateral 3 INVERT Beg 8.54 93.54 93.40
Lateral 3 INVERT End 8.62 93.46 93.40
Lateral 4 INVERT Beg 8.62 93.46 93.40
Lateral 4 INVERT End 8.68 93.40 93.40
8/6/21 — Line 1 was constructed with the soil absorption system distribution line
higher than the distribution box outlet invert. This was adjusted at the time of the
inspection and re-examined and confirmed the adjustment corrected this
deficiency. The rod readings and corresponding elevations observed before and
after adjustment are noted above with *. D. Ottenheimer