Loading...
HomeMy WebLinkAbout2004-04-22 Monitoring Reports SPR i IT TRANSPORTATION EN®1NEERING+CONSTRUCTION �� ter?E,f f 6 pin^� TEN NEW ENGL.AND BUSINESS CENTER DRIVE Peters Streetl SUITE 107 - ANDOVER, MA D 1 B 1 D Realty Trust TEL 978.794.1 792 - FAX 978.794.1 793 Transmittal No. 118 __� Date: 9/28/2004 From: Brant Ballantyne To: Julie Vondrak Town of North Andover Fax: 978-688-9542 Community Development & pages: Services 27 Charles Street N. Andover, MA 01845 Re: CVS - Weekly Report 4 - 6 Type: TRANSMITTAL Status: FYI Transmitt No Copies Date �Descriptlon 1 9/10/2004 Weekly Report 6:9106-9/10 1 9/3/2004 Weekly Report 5:8130 9/03 1 I 8/27/2004 Weekly Report 4:8123 8/27 Comments: Julie, Enclosed are weekly reports 4- 6 for the CVS development. As you know,TEC is acting as construction monitor for this development. Heel free to call with any comments, questions,or concerns. Thank you Additional Walter Rogers Bob Nicetta Jack Sullivan Tim Willet Taylor Dowdy Page 1 of 1 WEEKLY REPORT TRANSPORTATION �� ENGINEERING+CC7NSTRLCTION �tr� TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01 a 1❑ Realty Trust TEL 97S.794, 1792 - FAX 978,794.1 793 Weekly Report No.: 4 _ Week of: 8/23/04 - 8/28/04 Report by: Brant Ballantyne General: 1. Excavation for proposed parking lot area is on-going. 2. Excavation for proposed infiltration system has been completed. Infiltration system under proposed parking lot has been completely installed and bakfilled over. 3. DF Pray has begun digging trenches for proposed building foundation. Work Progrgss: - Infiltration system was installed through coordination/inspection with J. Sullivan. -DF Pray has nearly completed stone walls along Rt. 114 and Peters Street. - Site sub continues to raise and compact ground level to sub-base elevation on west side of proposed building. Inspection items: -DF Pray will contact Building Inspector for foundation inspections. Building designer will also be contacted by DF Pray in accordance with controlled construction requirements Circulation: Additional Julie Vondrak T. Dowdy-VHB Jack Sullivan Bob Nicetta Tire Willet Walter Rogers Circulation Date: 9/28/2004 Page I of 7 i WEEKLY REPORT TRANSPORTATION �� EN GIN EER1NG+CONSTRUCT1ON TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 1C37 • ANDOVER, MA 01610 Realty !rust TEL 978.794.1 792 • FAX 978.794.1 793 Weekly Report No.: 5 Week of: 8/30/04 - 9/03/04 Report by: Brant Ballantyne General: 1. DF Pray has dug all trenches for proposed building foundation and placed 260-ft of concrete foundations. Footing reinforcing was inspected by building designer in accordance with controlled construction requirements. 2. Excavation for proposed parking lot area is on-going. 3. Site sub continues to raise and compact ground level to sub-base elevation on west side of proposed building. Work Progress: -DF Pray informed TEC that the field stone wall radii will not be built until heavy construction activity on site is completed and utility poles have been re-located. Inspection Items: None at this time. ' ,qd itional Julie Vondrak T Dowdy-VHB Jack Sullivan Bob Nicetta Tim Willet Walter Rogers Circulation Date: 912812004 Page 1 of 1 WEEKLY REPORT TRANSPORTATION �� EN GIN EERINC3-FDONSTRUOTION TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01 BID Realty Trust TEL 978.794.1 7132 • FAX 978.794.1793 Weekly Report No.: 6 Week of: 9/06/04 - 9/10/04 Report by: Brant Ballantyne General: 1. Majority of site excavation is complete. 2.DF Pray has placed most of the proposed building foundation. 3. DF Pray has obtained the building permit. 4.DF Pray has begun capping straight portions of fieldstone wall along Rte.114 and Peters Street with pieces of slate. Work Prggresa: -General building construction is on-going. DF Pray has indicated that the building designer has performed approapriate inspections for controlled construction Inspection Items: Sewer&drainage line installation is scheduled for the next 2 weeks. it i Additional Julie Vondrak T.Dowdy Jack Sullivan Bob Nicetta Tim Willet Walter Rogers Circulation Date: 912812004 Page 1 of 1 WEEKLY REP()RT TRANSPORTATION CN DIN EERINI2+00NBTRUCTION CW '.. TEN NEW ENOLAND OUBINE55 CENTER DRIVE Peters Street SUITE 107 •AND6IVER. MA Q 18 117 Realty Trust TEL 978,794.1792 - FAX 978,794,I')93 Weekly Report No.: L 3 Week of. 8/16/04-8/20/04 Report by: Brant Ballantyne General: 1. Excavation for proposed parking lot area is on-going, 2.Site sub continues to raise and compact ground level to sub-base elevation on west side of proposed building. 3.DF Pray continues to build stone wall along Rt. 114, Work Progress• -DF fray continues to break ledge encountered during excavation for the proposed future parking spaces along Petcrs Street. -DF Pray will commence excavation for the infiltrations system on Saturday 8/21,install on Monday 8123,and has already contacted the town of North Andover for inspection. -DF Pray will close the Rt.114 entrance gates,and re-open the Peters Street gates in the coming week 8/23-27. Insp-ection Items., -Sub surface detension tank-DF Pray has scheduled w/J Sullivan for$123/04 Ciroulation. Atonal, Julie Vondrak Jack Sullivan Bob IVicatta Tim Willet Walter Rogers Circulation late: 812012004 Page 1 of f 091-d D00/b00'd 900-1 E611-1161-916 0110HISN00 I ON1833NION3 N011VISUSNV41-90114 WU vii DOOZ-Omny I i TRANSPORTATION ENGINEERIN13+ 0ON9TRUCTION CW TCN NEW ENGLAN© 91151n1E59 CENTER DRIVE P6bL};'S Street :SUITE 107 . ANDUVeR, MA R 1 90 10 Realty Trust TEL 97 03-79o-1792 - FAX 9719,794.1 79a Weekly Report No.: �2 Week of: 8/9/04- 8/13/04 Report by; Brant Ballantyne 1.Topsoil removal is complete. 2.Concrete pool is completely removed. 3.Excavation and preparation for field-stone wall is on-going. 4.Three control points have been located. 1+ Er_ogress: -Fencing and tarp it in-place adjacent to the Church's day care area. -TEC,ViID and DF pray re-located the transformer per Mass Electric for their review. ImpgCtIontms: None at this time Circulation: Additional Julie Vondrfak Jack Sullivan Bob Nicetta Tim Willet Walter Rogers Circulation Rate: 812012004 Page 1 of 7 891-:1 q00/£00'd 888-1 sell-q8,l-en Ot10f1S1SN00 I ONIVBBN19NB N011vIDON41-Y1011:1 h0t:II VOU-N-9ny WEEKL 1 REPORT TRANSPORTATI®N ZN13INCCRINO+0ONSTRUOTIMN CW TEN NEW EN13LAND BUSINES9 CENTC$t ©RIVE Peters Street. SUITE 1137 .ANDOVER. MA 01S10 Realty Trust TcL 978.7'3++.1102 - FAX 976.794,E 793 Weekly Report No.: � Week of: 8/2/04- 8/6/04 Report by: Brant Ballantynt: General: 1.DP Pray has stripped and stockpiled topsoil. 2.Removal of the stockpiled topsoil has started and is scheduled to be completed by 8/13/04. 3.DP Pray and TIC has coordinated electrical feed location and requirements with Mass.Electric. Per Mass. Electric recommendation,power and telephone will feed the site from a relocated pole across from Burger King on Peters Street, The proposed pole on Rte 114 will be eliminated- Work Progress, -Construction fencing is in-place. -Site trailer and portable bathrooms are on-site. -A reinforced concrete swimming pool has been unearthed, Removal with a hoe ram is scheduled for next week, Iris ection Items: N'onc at this time Circulations Additional Julio Vondrak Bob hicetta Jack Sullivan Tire Wil let Waiter Rogers Circulation pate: 812M004 Page I of i 691-A nooizoo'd 080-1 ee l-�rfl-e!a 01l�fliilSN03 � JNIa33N19H3 H41lVl�OdSNYal-iYoad VIYVE=il rooa-aZ-on>t TRANSMITTAL TRANSPORTATION T0092 ENGINEERING+CONSTRUCTION S TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01810 Realty Trust TEL 97a.794.1 792 - FAX 97EI.794„1 793 Transmittal No. 43 Date: 1/12/2005 From: Brant Ballantyne To: Jackie Berytyn " Town of North Andover Fax: 978-688-9542 Community Development& Pages: Services 400 Osgood Street N. Andover, MA 01845 Re: TEC Weekly Reports No. 14 - 19 Type: TRANSMITTAL Status: FYI Transmittina: No Copies Date Description 1 11/12/2004 jTEC Report No.15 _...^ _ _TEC Report No.16 m f _.-.. _...— 1 126/22004 jTEC Report No,17 1 f 1k4/iOO4 TTEC Report No. 1$ 1 1f7/2005 'TEC Report No, 19 a 1 11/5l2004 jTEC Report No.14 _.. Comments: CC, Additional Walter Rogers Bob Nicetta .lack Sullivan Tim Willet Taylor Dowdy Page 1 of 1 1 P J' WEEKLY REPORT TRANSPORTATION �� EN GIN EERIN13+CONSTRUCTION TEN NEW EN13LAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA OISI 0 Realty Trust TEL 978.794.1792 • FAX 976.794.1 793 Weekly Report No.: 19 Week of: 1103105 - 1/07/05 Report by: Brant Ballantyne General' 1. Work continues on curved stonewall segment closest to the church along Peters Street. 2. Landscaping and planting has been postponed until spring due to winter weather. Green flags mark sprinkler head locations. 3. All curbing,paving and line stripping is completed. Work Progress: -Light poles are on-site,but not yet installed. -No fence ontop of wail along church property. Work to begin on fence installation by weeks end. -No handrail present along sidewalk adjacent to Peters Street enterance. -No bollards present between handicap spaces and sidewalk along west wall of building. - Signs are not yet installed, -Transformer not on-site ins ection Items: None at this time Qi(c ! #i n: Additional Jackie Berylyn T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date: 111212005 Page 1 of 1 I WEEKLY REPORT TRANSPORTATION EN GINEERIN13+CONSTRUCTION C/ VS TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01 61❑ Realty Trust TEL 979.794.1 792 - FAX 979.794.1 792 Weekly Report No.: 18 Week of: 12/20/04 - 12/24/04 Report by: Brant Ballantyne General: 1. Site sub continues to place trees. 2. Work on-going inside building. 3. Work on-going inside building and on roof. 4. Pitt Pipeline performing survey. Work Progress: ns a tion Items: None at this time Circulation: Additional Jackie Berylyn T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date: 111212005 Page 1 of 1 I i 3 i i WEEKLY REPORT TRANSPORTATION �� EN GIN KERINS+CONSTRUCTION �r� TEN NEW EN13LAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANOOVER, MA ❑1 a 1 D Realty Trust TEL 97a.794.1 792 - FAX 97151.794.1 793 Weekly Report No.: C 17 Week of: 12/13/04 - 12/17/04 Report by: Brant Ballantyne General: 1. Loam&sod being spread among landscaping. 2.Drainage'work ongoning along west side of site. 3. Concrete placed for sidewalks surrounding building. 4. Binder course of bituminous concrete was laid throughout the entire parking lot. Extruded concrete curb placement is on-going, 5. 1.5" laid in gerneral parking area. 6. 2.5"laid in"heavy duty" area to accommodate for truck traffic,curb-to-curb. 7. Approx. 480-tons laid at 315 degrees. Work Pr re s: -Paving to be completed by Thursday, 12/I6. -Landscaping to be planted around building tomorrow, 12/14 -D.Bearce inquires about drainage permit -Top coat will be laid at a future date -Inventory taken of plants already in ground Inspection Items: None at this time Circulalion: Additional Jackie Beryfyn T. Dowdy-Vl-1B Bob Nicetta .lack Sullivan Tim Willet Walter Rogers Circulation Date: 111212005 Page 1 of 1 i 3 i i WEEKLY REPORT TRANSPORTATION �� EN GIN MERING+CONSTRUCTION TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 • ANDOVER, MA 0 1 a 1 D Realty Trust TEL 97S.794.1 792 - FAX 979.794.1 793 Weekly Report No.: 16 Week of: 11/22/04 - 11/26/04 Report by: Brant Ballantyne General: 1. The driveaway and parking lot areas to be paved have been graded and compacted. 2.The concrete island on Peters Street has been removed. Work_Proaress: -TEC and DF Pray reviewed the drainage swale area to determine which tree branches needed to be trimmed. -Water and sewer tie-in connections are complete. -Concrete for the perimeter sidewalk along Rte 114 is being placed with power buggies. -DF Pray was directed to install the chain link fence along the church's property. DF Pray is requesting a layout of the fence. nspectlorl Item: None at this time Circulation:, Additional Jackie Berylyn T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date; 111212005 Page 1 of 1 "WEEKLY REPORT TRANSPORTATION �� ENGINEERIN G+CONSTRUCTION TEN NEW ENGLAND SUSINESS CENTER DRIVE Pete e7 Peters Street SUITE 107 - ANDOVER, DNA O I B 1 O Realty Trust TEL 97B.794.1 792 - FAX 97B.794.1 793 Weekly Report No.; IS Week of: 11/8/04 - 11/12/04 Report by: Brant Ballantyne General: 1. Curb work on Peters Street is on-going. Vertical and sloped granite curb is being installed 2. Electrical trenching,conduit and pullbox is being installed. Portions of the conduit have been encased in concrete. Electrical inspections have been occuring. 3.Water main tie-in has been performed. Work Pro r ss: -A portion of the retaining wall supporting the Peters St. entrance has been damaged by a truck. DF Pray indicated that Pitt Pipeline has been made aware that a repair is needed. -The retaining wall along the church property has been backfilled. -Portions of the stone site wall appear to have settled and loosed stones. DF Pray is aware and anticipated repairing portions of the wall. -Construction fencing along the north lot Iine has fallen over,presumably due to wind, DF Pray to repair. - Curb installation on Peters St nearly completed. Curb within the lot has not been placed yet. Inspection Items None at this time Circulation: Additional Jackie Berylyn T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Waiter Rogers Circulation Date: 111212005 Page 1 of 1 l WEEKLY REPORT i TRANSPIORTAT113N �� ENC,INEERIN13+CONSTRUCTION TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANOOVER, MA O 181 Ia Realty Trust TEL 978.794.1 792 - FAX 978.794.1793 Weekly Report No.: C 14 Week of: 11/1/04 - 11/5/04 Report by: Brant Ballantyne General: I. Some ledge removed for electrical trench between the site lighting poles. 2. Excavation for light pole bases completed. 3. Concrete placement for site lighting foundations is on-going. 4. Electrical trenching at Peters Street entrance. Work Progress: -Installation and backFlling of VersaLok walls continues. -Grading activity around wall near Rt. 114&Peter St. intersection. - Versa-Lok wall units complete and nearing completion on backfilling. Insper,tion Items: -Route 114 utility tie-ins(Sewer and Drainage) Circulation Additional Jackie Berylyn T. Dowdy-VH13 Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date: 111212005 Page i of 1 TRANSMITTAL, TR!ANSPE3RTATIE3N T0492 EN GIN EERING+CON STRUCTI©N 1 �y TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER„ MA O1 B I O Realty Trust TEL 978.794.1 792 - FAX 97B.794.1 793 Transmittal No. 32 —� Date: 11/11/2004 From: Brant Ballantyne To: Hiedi Griffin Town of North Andover Fax: 978-688-9542e.- Community Development & Pages: Services NOVI ( 4 400 Osgood Street N. Andover, MA N4) t 16-I MP ,",;„ 01845 Re: TEC Weekly Reports No.'s 10 -13 Type: TRANSMITTAL, Status: FYI Transmitting: No Copies Date Description I 1 ITEC Weekly Report#10 1 TEC Weekly Report#11 1 TEC Weekly Report#12 TEC�Weekly Report#13 1 __... ._ ... ... epor -- -..... _... .__ _....._ .. .. Comments: Hiedi, Enclosed is weekly report 10 thru 13 for the CVS development. As you know, TEC is acting as construction monitor for this development. feel free to call with any comments, questions, or concerns. Thank you Additional Walter Rogers Bob Nicetta Jack Sullivan Tim Willet Taylor Dowdy Page 1 of 1 WEEKLY REPORT TRANSPORTATION "S EN GIN EERING+EMNSTRUOTION 1 TEN NEW ENGLAND E]USINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA ❑1 G 1❑ Realty Trust TEL 978,794.1 792 . FAX 978.794.1 793 Weekly Report No.: 10 Week of: 10/4/04 W 10/8/04 Report by: Brant Ballantyne General: 1.Various drainage manholes and catch basins have been installed including the StormCeptor control unit and catch basin 2. The subsurface detention system outlet control structure has been installed, and the roof gutter drainage has been connected to the detention system. 3.All structures have been set on a layer of crushed stone. Work Progress: - Ledge has been encountered and removed to allow for utility installtion an the future parking lot and drive-thru areas. Ledge was removed by mechanical means-a hoe ram mounted on an excavator. -Hay bails and silt fence along the north perimeter of the lot are in good condition. Inspection Items - On-going drainage line installation Circulation: Additional Hiedi Griffin T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date: 1111112004 Page 1 of 1 WEEKLY REPORT TRANSPORTATION �� EN GIN EERINa+CONSTRLJCTICIN �•�I TEN NEW EN13LAND BUSINESS CENTER DRIVE Peters Street SUITE 1 07 - ANOOVER, MA 01 61 D Realty Trust TEL 975.794.1 79Z - FAX 97e.794.1799 iL A Weekly Report No.: I1 Week of: 10/1 1/04 - 10/15/04 Report by: Brant Ballantyne General: 1. Catch basins within the parking lot have been installed and backfilled. 2. Retaining wall preparations along the church property have begun. Work Progress: -Excavation and crushed stone bedding have been prepared for the retaining wall along the church property. - Layout for the retaining wall along Peters Street entrance is being laid out. - DF Pray is finalizing the quantity of ledge removal to date and was directed to submit the change. - Standing water within the site has been removed. Inspection Items: - No site inspections at this time Circulation: Additional Hiedi Griffin T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation pate: 1111112004 Page 1 of 9 tl. WEEKLY REPORT 0 i TRAN S P 0 RTATI 0 N �� EN13INEERING+C©NSTRUVTIDN TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA ❑1 810 Realty Trust TEL 978.794.1792 - FAX 978.794.1 793 Weekly Report No.: 12 � Week of: 10/18/04 - 10/22/04 Report by: Brant Ballantyne General: 1. Drainage and sewer utility lines have been installed and backf311ed within the site. 2. Parking lot area has been excavated and backfilled with dense graded gravel. 3. Wal I intallation prep is ongoing along the church proprty and by the Peters Street entrance. Work Progress:. -Pitt Pipeline is moving the construction fence along the church to enable excavation for the wall. - Crushed stone has been placed as a bedding for both walls. -Electrical and fire alarm trenching has begun. 1nSpection Items: - Electrical and fire alarm trenches will be inspected by Mass.Electric. Circulation: Additional Hiedi Griffin T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation Date: 1111112004 Page 1 of 1 d f A i r WEEKLY REPORT f TRANSPORTATION EN13INEERINr.+UONSTRU1:TfON T] TEN NEW EN13LAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01 61❑ Realty Trust TEL 97e.794.1 79Z - FAX 97B.794.1793 Weekly Report No.: L 13 Week of: 10/25/04 - 10/29/04 Report by: Brant Ballantyne General 1. VersaLok retaining wall installation is on-going. Soil reinforcing is being installed in conformance with the shop drawings. 2.Electrical trenches have been started between the building and the lightpole adjacent to the church. 3.Fire alarm conduits are being installed from the service pole to the building. The electrical trenches maintain 36"of cover for the conduits. 4. Some ledge was removed for the electrical trench between the site lighting poles. Work Progress: -The hole for the first light pole has been dug and little rock encountered. -DF Pray anticipates encountering ledge for 2 or 3 light poles within the parking lot. - PVC conduits are being beign used for the fire alarm. - VersaLok wall units have been installed and partially back0lled. A drain has been installed in a crushed stone bedding behind the wall -DF Pray indicated that the Peters Street improvements are scheduled for 11/3/04 and police details have been arranged. - Coordinated Rte 114 utility requirements with Town DPW. Inspection Items: -Utility{sewer,water and drainage}tie-ins along Rte 114 will be upcoming. Circulation: Additional Hied! Griffin T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Wllet Walter Rogers Circulation Date: 1111112004 Page 1 of 1 r: . , TR .N►3a,i'llTTx`3L T RA►N S P O RTAT I Q N EN GIN EERING+CONSTRUCTION wr m TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 1 07 -ANDOVER, MA 01 B 1❑ Realty Trust Realty E, TEL 978,794.1 792 - FAX 975.794.1 793 wG Transmittal No. 120 Date: 10/4/2004 From: Brant Ballantyne To: Julie Vondrak Town of North Andover Fax: 978-688-9542 Community Development & Pages: Services 27 Charles Street N. Andover, MA 01845 Re: CVS - Weekly Report 9 Type: TRANSMITTAL Status: FYI Transmitting: No Copies p Date Description f ..__._ .. .... ... ........w 1 TEC Weekly_Repari 9:9127-1011 Comments: Julie, Enclosed is weekly report 9 for the CVS development. As you know,TEC is acting as construction monitor for this development. Feel free to call with any comments, questions, or concerns. Thank you Additional Walter Rogers Bob Nicetta Jack Sullivan Tire Willet Taylor Dowdy Page 1 of 9 i I r WEEKLY REPORT TRANSPORTATION �� EN GIN EERING+CONSTRUCT113N TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANOCVER. MAD]S 1 0 Realty Trust TEL 978.794.1 792 - FAX 978.794.1 793 Weekly Report No.: 9 Week of: 9/27/04 - 10/l/04 Report by: Brant Ballantyne General: 1. Sewer line installation is on-going within the property. 2. Dainage line installation is on-going within the property. Work Progress. -The sewer line has been installed and backfilled except for the tie-in connection. -Drainage line installation has started including the installation of the two stormceptor units.The drainage detention system outfall controls structure has also been installed. All drainage and sewer structures were installed on a I2" layer of crushed stone. Inspection Items: -Drainage line installation will be ongoing next week. Circu,l„iltionc Additional Julie Vondrak T. Dowdy-VHB Bob Nicetta ,lack Sullivan Tim Willet Walter Rogers Circulation Date: 101412004 Page 9 of 9 TRA NSMITTAL " X TRANSPORTATION �� ENGINEERING+CONSTRUCTI0N TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Sheet SUITE 107 ANDOVER, MA D 1 81 D Realty Trust TEL 978.794.1 792 - FAX 978„794.1 793 Transmittal No. 119 Date: 9/28/2004 From: Brant Ballantyne To: Julie Vondrak a , Town of North Andover Fax: 97$-688-9542 � ' "N Community Development &c Pages: Services 27 Charles Street N. Andover, MA 01845 Re: CVS - Weekly Report 7-8 Type: TRANSMITTAL Status: FYI 'transmitting_ No Copies [late Description 1 TG EC Weekly Report 8 9/20-9124 1 LTEC Weekly Report 7 9/13-9/17 Comments: Julie, Enclosed are weekly reports 7-8 for the CVS development, As you know,TEC is acting as construction monitor for this development. Feel free to call with any comments, questions, or concerns. Thank you V11 „ Additional Walter Rogers Bob Nicetta Jack Sullivan Tim Wiilet Taylor dowdy Page 1 of 1 WEEKLY REPORT TRANSPORTATION CV'S EN GIN EEFlING-FCONSTRUCTION TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01810 Realty Trust TEL 976.794.1 792 - FAX 978.794.1793 Weekly Report No.: 7 Week of: 9/13/04 - 9/17/04 Report by: Brant Ballantyne General: 1.Building construction is on-going. 2. Site fieldstone wall is about 90%complete. 3.Temporary power is not in-place 4. Gas tie-in connection will be from Peters Street because Bay State Gas has indicated that gas line on Route 114 is abandoned. Work Progress: -Mass. Electric and VHB have approved electric conduit re-routing from Peters Street. - Standing water is on-site. Because of excavation level,water is not flowing into adjacent properties or Route 114. -Hay bails and silt fence along Northeast side of the property are in-place and in good condition. -Permanent utility pole on Peters Street has been placed-overhead wires have not been relocated from existing pole(to be removed). Inspection Items: Sewer line installation scheduled for end of next week. Circulatlon: Additional Julie Vondrak T. Dowdy-VHS Bob Nicetta Jack Sullivan Tim Willet Walter Rogers Circulation bate: 912912004 Page 9 of 9 iJ WEEKLY REPORT TRANSPORTATION �� ENGINEERING+DONSTRUCTION TEN NEW ENGLAND BUSINESS CENTER DRIVE Peters Street SUITE 107 - ANDOVER, MA 01810 Realty Trust TEL 978.794.1792 - FAX 978.794,1 793 Weekly Report No.: C�_ 8 Week of: 9/20/04 - 9/24/04 Report by: Brant Ballantyne General: 1.Building foundations are complete and structural steel has been erected. 2. Sewer line installation has started within the property. SMH-1 was placed. Work Pro r ss: -Ledge has been encountered and removed during sewer line installation. - Sewer pipe installation has been in accordance with the Construction documents:12"of crushed stone have been placed areound the PVC pipe with caution tape placed ontop of stone prior to trench backfilling. Sewer line has been installed from SMH-1 to SMH-2. Inspection Items: - Sewer line installation will be ongoing next week. And drainage installation thereafter. Circulation: Additional Julie Vondrak T. Dowdy-VHB Bob Nicetta Jack Sullivan Tim Willet Waiter Rogers Circulation Gate: 9/29/2004 Page 1 of 1