Loading...
HomeMy WebLinkAbout2004-04-22 MassDOT Review SPR -FL L A�� Mitt Romney Kerry Healey Daniel A. Grabauskas John Cogliano Governor Lf,Governor Secretary Commissioner PERMIT - NORTH ANDOVER Driveway(Commercial) Permit 4: 4-2004-0214 Subject to all the terms, conditions, and restrictions printed or written below, permission is hereby granted to PETERS STREET REALTY TRUST to enter upon the State Highway known as ROUTE 114 (SALEM TURNPIKE) for the purpose of constructing a driveway approach between stations 12+42 and 12+92 at the easterly location line and flaring to stations 12+24 and 13+20 at the edge of the roadway. The Grantee shall construct an island between the driveways. The island and the drives shall be defined by bituminous or granite curbing six (6) inches above the grade of the hardened surfaces. Said curbing shall be setback four(4) feet from the edge of the highway with a center island. All work shall be done in accordance with the plans submitted and on file in the District Four Permits Section by Vanasse Hangen Brustlin, Inc. entitled "Permit Application Plans, CVS Pharmacy, Salem Turnpike (Route 114)" dated December 3, 2004. The Town of North Andover must submit a letter to MassHighway accepting all future maintenance of the sidewalks constucted along Route 114 as part of this project. The Proposed State Highway Alteration must be approved by MassHighway prior to the constuction of the sidewalks along Route 114 as part of this project. WORK HOURS: 9:00 A.M. thru 3:00 P.M. Monday thru Friday. The drive/drives shall be surfaced with Bituminous Concrete, Type I and shall be comprised of a 3" Class I Bituminous Concrete Base Course and two (2) 1 112" courses of Class I Bituminous Concrete Pavement for a total depth of 6" with a foundation of at least 6" of compacted gravel. The finished surface shall butt into and not overlap the existing highway grade at the road edge. The drive/drives shall be graded so that no «eater shall enter the State Highway layout nor pond or collect thereon, including the roadway. The curb shall be placed in conjunction with or immediately before the completion of the driveway surfacing. Bituminous concrete or curbing removed from within the proposed driveway limits shall be disposed of outside the State Highway location lines. The Grantee shall install granite curbing outlining the limits of the driveway approaches. The part of the drive/drives located svithin the limits of the State Highway shall be Page i of 6 A4assachusetts Highway Department•District 4.519 Appleton Street,Arlington, MA 02476•(781)641-8300 negligence by the Grantee all costs for this work will be charged to the Grantee. Flashing arrow boards will be used at all times when operations occupy the roadway and shall be available for use at all times. All warning devices shall be subject to removal, replacement and repositioning by the Grantee as often as deemed necessary by the Engineer. Free flow of traffic shall be maintained at all times. When in the opinion of the Engineer, this operation constitutes a hazard to traffic in any area, the Grantee may be required to suspend operations during certain hours and to remove his equipment from the roadway. Care shall be exercised so as not to disturb any existing State Highway Traffic Duct Systems or any underground structures that exist. If said system is disturbed, it shall be restored immediately to its original condition. Also any damaged Traffic lines shall be restored to their original condition. All expenses for restoring conditions shall be charged to the Grantee. The Grantee will be responsible for any damage caused by his operation to curbing, structures, roadway, etc. The Grantee shall be responsible for any settlement which may occur as a result of the work done under this permit. The Grantee shall be responsible for any ponding of water which may develop within the State Highway Layout, caused by this work. When a snow or ice condition exists during the progress of this work, the Grantee shall keep the highway well sanded to a point not less than two hundred (200) feet beyond the limits of the barriers and signs. No bituminous concrete shall be installed between November 15th and April 15th. No work shall be authorized during snow, sleet, or ice storms and subsequent snow removal operations. The Highway surface shall be kept clean of debris at all times and shall be thoroughly cleaned at the completion of this permit. At the completion of this permit, all disturbed areas shall be restored to a condition equal or similar to that which existed prior to the work. Page 4 of 6 Any grass areas disturbed within the State Highway Layout shall be graded, loamed to a depth of 4" and seeded. If the sidewalk area is disturbed, it shall be restored, full width, in kind a minimum of five feet beyond any disturbed area. It shall be the responsibility of the Grantee to replace all pavement markings which have been disturbed by this permit. These pavement markings shall be restored within ten (10) days after this work is performed or as deemed necessary by the District Highway Director. Any bound marked MHB shall not be removed or disturbed. If it becomes necessary to remove and reset any highway bounds then the Grantee shall hire a Registered Professional Land Surveyor to perform this work. It shall be the responsibility of this land surveyor to submit to this office a statement in writing and a plan containing his stamp and signature showing that said work has been performed. Grantee assumes all risk associated with any environmental condition within the subject property and shall be solely responsible for all costs associated with evaluating, assessing, and remediating, in accordance with all applicable laws, any environmental contamination (1) discovered during Grantee's work or activities under this permit to the extent such evaluation, assessment or remediation is required for Grantee's work, or(2) resulting from Grantee's work or activities under this permit. Grantee shall notify Grantor of any such assessment and remediation activities. This permit is issued with the stipulation that it may be modified or revoked at any time at the discretion of the District Four Highway Director or his representative without rendering said Department or the Commonwealth of Massachusetts liable in any way, The Grantee shall indemnify and save harmless the Commonwealth and its Highway Department against all suits, claims or liability of every name and nature arising at any time out of or in consequence of the acts of the Grantee in the performance of the work covered by this permit and or failure to comply with terms and conditions of the permit whether by themselves or their employees or subcontractors. APPLICANT'S REPRESENTATIVE: Wayne Armco (VHB) TELEPHONE NUMBER: (617) 924-1770 Page 5 of 6 No work shall be done under this permit until the Grantee has communicated with and received instructions from the District Highway Director of the Massachusetts Highway Department at 519 Appleton Street, Arlington, Ma. 02476-7009. The permit shall be void unless the work herein contemplated shall have been completed before December 9, 2005. Dated at Arlington this 9th day of December, 2004. Massachusetts Highway Department, By / Patricia A. Leavenworth, P.E. District High-,vay Director PAI/p m Page 6 o€6 a s•warn toy f 7G.*-!1 f r CJ NU.LB�3 �. 0?%u7iu� `va�39 rna �t8164vo.��u MASS HIGHI9AY 1A01)2 , I USA ` Mitt ilomney Karty Healey Daniel Grabaaskas Jahn Coghano, PON OFF- rT Claverrtar U GDWMOT SecreDary Commissfaner PBRWT-.NORTH ANDOVER Temp Indirect Construction Access Permit#: 4-2004-0374 Subject to all the terns, conditions, and restrictions printed or written below,pCrW6A0n is hereby granted to WALTER ROGERS, pF_TERS STREET REALTY TRUST,LLC, for the purpose of gaining-TEMPORARY T1dDEMCT ACCESS FOR CONSTRI lC'I'YON to their property.located on Peters Street which abuts State Highway Route 114,tie accordance with M.G.L. Crap. 81,Sec.21, as amended by Seetion 60 Of Chap. 15 of the Acts of 1988. Na work shall be performed within the limits of the State Highway Layout The Completion of Work Form shall be sent to the Grantor via certified mail as soon as possible after the completions of the physical work. WORK HOURS: 9:00 A.M. thru 3:00 P.M. Monday thru Friday. The work will be performed as per plans on file at the Massachusetts Highway Department District Four Penuits Office. Any bound marked MHB shall not be removed or disturbed. If it becomes necessary to Yemove and reset any highway bounds then the Grantee shall hire a Registered Professional Land Surveyor to perform this work. It shall be the responsibility of this land surveyor to submit to this office a statement in writing and a plan containing his stamp and signature showing that said work has been performed, Grantee assumes all risk associated with any environmental condition within the sabject property and shall be stalely responsible for all costs associated with evaluating, assessing, and. remediating,in accordance with all applicable laws, any environmental contamination(1) discovered during Grantee's work or activities under this permit to the extent such evaluation, assessment or remediation is required for Gmtee`s work, or(2) resulting from.Grantee's work or activities under this permit. Grantee shall notify Granto.rof any such assessment and remediation activities. This permit is issued with the stipulation that.it may be modified or revoked at any time at the discretiota of the District FourHighway Director or his representative without rendering said Department or Oie Commonwealth of Massachusetts liable in any way. The Grantee shall indemnify said save barmless the Commonwealth and its Highway Page 1 of 2 Massachusetts Highway Department a Dlstrlct 4 .5i9 Appleton Street,Arlington, MA 02476•(781) 641-8300 07iU1% � . 0ut0i4391inA4iFi$169naiia2 77� MASS HIGAWAY �l0.286 P. ap03 Department against all suits, claims or liability of every name and natare arising at any tine Out of or in consequence of the acts of the Grantee is the performance of the work covered by this pemiit and or failure to comply with terms and conditions of the permit whether by themk)lvez or their employees or subcontraotors. APPLICANT'S REPRESENTATIVE: Wayne Amico TELEPHONE NWIBUR: (611) 924-1770 No work shall be done under this permit until the Grantee has communicated with and 1,eceived instructions from the District Highway`Director of the Massachusetts lfigbway Departmeut at 519 Appleton Street,Arlington,Ma.02416-7009. The permit shall be void-unless the work herein contemplated shall have been completed before July 6-,2008 Dated at A l,lingtvn this 6th day of July,2004. Massachusetts Highway Department, By Stephen T. O'Donnell District-Mghway Director MSK/wsk Page 2 of 2 —f0/20/04 12:11 FAX 17816465115 MASS HIGHWAY002 #NWA ifMIN Romney Kerry Healey Daniel A. Grabausdas John Coyliano Governor Lt.Governor Secretary Commissioner PERN11IT- NORTH ANDOVER Permit#: 4-2004-0523 Subject to all the terins, conditions, and restrictions printed or written below,permission is hereby granted to TOWN OF NORTH ANDOVER to enter upon the State Highway known as ROUTE 114 or SALEM TURNPIKE for the purpose of installing a 6" water servijce from the existing 12" water main located within the northerly side of the roadway to the northerly location line at station 12+36, The Grantee will install a 6" sewer service from the existing 12" sewer maim located within the northerly side of the roadway to the northerly location line at station 12+54. The work will be performed as per plaris on file at the Massaebusetts Highway Department District Four Permits Office. A copy of this permit must be on the job site at all times for inspection. Failure to have this permit available will result in suspension of the rights granted by this permit. The Completion of Work Form shall be sent to the Grantor via certified mail as soon as possible after the completion of the physical work. If it becoines necessary to open the roadway surface in a larger area or relocate the existing work area to a location other than specified in this permit then the Grantee shall apply for an additional permit to cover this project. The sidewalk area shall be restored, full width, in kind a minimum of five feet beyond any disturbed-area. No equipment,trucks, etc. shall occupy any part of the traveled wiry except between the hours of 9:00 AX and 3:00 P.M. No work shall be clone under the terms of this permit on Saturdays, Sundays or Holidays, Provisions shall be made for the safety and protection of Pedestrian Traffic during the construction period. It shall be the responsibility of the Grantee to provide access to the property of residents and business owners during progress of the proposed work. WORK HOURS. 9:00 A.M. thru 3-00 P.M. Monday thru Friday. The Grantee shall notify the District Permit Engineer or leis Representative at(78t) 641-845 i, two (2) days prior to the start of work. No work shall be authorized without said notification. Page 1 of 5 Massachusetts Highway Department e District 4 *519 Appleton Street,Arlington, 1& 02476 0 (781)641-8300 r The Grantee shall matte;contau with the Ater, C:ontvat t ST)cciabst U] vi©Pager(730 r'1N to 4:00 PM Monday t1uouglr Friday ON-LY)Pager Numliff(781)187-02-55, forty-eight hours prior- to the start of woA, The Grantee shall notify Dig-Safe at 1-888-344-7233 ;it lust 72 hours prior to the start of work for the purpose of identifying the inoation of undergrcand utilities. big-Safe 4 To be obtained prior to the cormnim"r .ent of'work. All work shall be in compliance with the 1988 Edition of the "Mass aclathsetts Highway Depwtmnt;Standard Specifications ns for Highways and Bridget", and Supplemental Specificot�iom Dated December 11, 2002. No work will be pez'fortned on the eitry before or the dfiy after a lotrg weekend which involr'es a Holiday otr any highway,roadway or property under the nontrol of the.N/wssacltusett:; Highway Department or in areas ,vhere the,work would adversely impact the norinal flow of traffic on the Statc Highway System, withow per nissiora of'tho District l•iighway Dirw.tor or his kepresentative. JnifoiTned Police Officers shall be in attendance of all times while work is being dome under NS permit. Ml pemonnel who are working on the travoled waa•or breakdown lames shall wear safoty N'Vsts wd hard W5, The furnishing and erecting of all reyrtired signs and traffic safety devices shall be the responsibility of the Grantee. k11 sigrw artd devices shall conform to the 2000 erlitioar of tile MaIiUal On Ualiforrrr T MOC :ontrol De%icos(I M,CD)with the Commonwealth (4 MaBsoobusetis ,Amendment,, -Ones and non-reflecting warning devices shall,not be left in optuatirrg position on this lrigltwwray ,when the daytime Operations have ceased, if it bmom(,s necessary for this Dellartmmnt to :emave any cons°tructinn warning devices or#heir appurtenances from 0 prOi -t dui to aeglipnee by the Grantee all costs for thig Work will be rYrarged to the Grantee. Flashing arrow bouds will be used at all times when(Ter►rtioris occupy the roadway and shall rye availt~rle for use at all times. Ail warning devices shall be subject to removal,replaraement and repositioning by the Grantee as often:is deemed oceagarf by the Engitiom Pug*2 of 10f20104 12:13 FAX 17816465115 MASS HIGHWAY U004 When in the opinion of the Engineer, this operation constitutes a hazard to traffic in any area, the Grantee may be required to suspend operations during certain hours and to remove his. equipment from the roadway. At any time.during the operation when a traffic delay of over twelve(12)minutes occurs and the situation is worsening,the Grantee will begin to suspend operations. Two way traffic shall be maintained at all times. Care shall be exercised so as not to disturb any existing State Highway Traffic Duct Systems or any underground structures that exist. If said system is disturbed, it shall be restored immediately to its original condition. Also any damaged Traffic lines shall be restored to their original condition. All expenses for restoring conditions shall be charged to the Grantee. The Grantee will be responsible for any damage caused by his operation to curbing, structures, roadway, etc. The Grantee shall be responsible for any settlement which may occur as a result of the work done under this permmt. The Grantee shall assume full responsibility for the structural integrity of any trench located within the MassHighway Layout. This responsibility shall remain in place for a period of three (3) years after the completion of the physical work, this time frame starts when the Grantor receives the Completion of Work Form fr6m the Grantee. The Grantee shall respond to trench maintenance requests by the District Highway Director or his representative within two (2)working days.Non-response within the specified time will result in the required maintenance work being done by the Grantor, with all the expenses charged to the Grantee. Failure to respond to trench maintenance shall result in denial of future Permit requests. The Grantee shall be responsible for any ponding of water which may develop within the State Highway Layout, caused by this work, No work shall be authorized during snow, sleet, or ice storms and subsequent snow removal operations. The Highway surface shall be kept clean of debris at all times and shall be thoroughly cleaned at the completion of this permit. At the completion of this permit, all disturbed areas shall be restored to a condition equal or similar to that which existed prior to the work. Page 3015 10/20/04 12:13 FAX 17816465115 KASS HIGHWAY lei 005 Whenever trenches are cut in the traveled way the surface shall be cut in straight lines using a concrete saw or other accepted methods equipped to cut the full depth surfacing and including the reinforcing steel on concrete roadways. -The excavation.shall''only be between these lines. The cutting operation shall not be done with a backhoe, gradall or any type of ripping equipment. Controlled Density Fill (CDF) shall meet the requirements of Section M4,08.0 of the Massachusetts Department of Public Works Standard Specifications for Highways and Bridges, 1995 Metric EditionYl988 Edition and Supplemental Specifications dated December 11, 2002. CDF must be batched at a concrete plant, is flowable,requires no vibrating, and the finished product must be excavatable without the use of power tools. The material shall flow under and around the pipe or conduit,providing uniform support without leaving voids. Flowable mortar shall be discharged from the miner by a reasonable means into the trench area to be filled. Filling Operations shall proceed simultaneously on both sides of pipe or conduit so that the two fills are kept at approximately the same elevation at all times. An external load shall be applied to the pipe or conduit, sufficient.to hold it in place before:filling. A permanent patch shall then be placed consisting of 2"ofbinder and 2" of'modified top (Class I.Bituminous Concrete Pavement - Type 1-1)to meet the existing pavement surface grade. After the work has been completed.the Grantee shall use the Infra-Red Method as a surface treatment a minimum of one(1)foot beyond the limits of the trench. All utility companies whose services are located within or adjacent to the proposed installation areas shall be notified in writing of the proposed installation at least 48 hours prior to the start of any excavation in said areas. This is independent of the required dig safe notification. It shall be the responsibility of the Grantee to replace all pavement markings which have been disturbed.by this permit. These pavement markings shall be restored within ten(10) days after this work is performed or as deemed necessary by the District Highway Director. Any-bound marked MR-B shall not be removed or disturbed. If it becomes necessary to remove and reset any highway bounds then the Grantee shall.hire a Registered Professional Land Surveyor to perform this work. It shall be the responsibility of this land surveyor to submit to this office a statement in writing and a plan containing;his stamp and signature showing that said work has been performed, Grantee assumes all risk associated with any environmental condition within the subject property and shall be solely responsible for all costs associated with evaluating, assessing, and Page 4 of 5 10/20/04 12:14 FAX 17816465115 MASS HIGHWAY C ODE remediating, in accordance with all applicable laws, any environmental contamination(1) discovered during Grantee's work or activities under this permit to the extent such evatuation, assessment or remediation is required for Grantee's work, or(2)resulting from Grantee's work or activities under this permit. Grantee shall notify Grantor of any such assessrzzent and rernediation activities. This permit is issued with the stipulation that it may be, modified or revoked at any time at the discretion of the.-District Four Highway Director or his representative without rendering said Department or the Commonwealth of Massachusetts liable in anyway, The Grantee shall indemnify and save harmless the Commonwealth and its Highway Department against all suits, claims or liability of every name and nature arising at any time out of or in consequence of the acts of the Grantee in the performance of the work covered by this permit and or failure to comply with terms and conditions of the permit whether by themselves or their employees or subcontractors. APPLICA-N T`S REPRESENTATIVE: .lack Sullivan TELEPHONE NUMBER; (978)685-0950 No work shall he done under this permit until the Grantee has communicated with and received instructions from the District Highway Director of the Massachusetts-.Highway Department at 519 Appleton Street,Arlington,Ala. 02476-7009. The permit shall be void unless the work herein contemplated shall have been completed before October 12,2.005. Dated at Arlington this 12th day of October, 2004. Massachusetts Highway Department, By r` Patricia A. Leavenworth,P.E. Acting District Highway Director LFRIIfr Page 5 of 5 MRR.29.2004 6:97PM VI 110.527 P.2 MV-fAH6,1,UA=HwwAAry Massachusetts Highwav Department . To be completed by the applicant. See reverse for instructions. 1, Town/City T r a. State Highway route number and/or name ate a e i 14 at Peters it S. Descrlptlon of property and/or facility for Which aecass to sought(attach additional sheetO If necaesaty), !' lion for l 8 -f-sf GVS heir OUMIIV Undavololad alill pnAho opmet of Peters Sireatffloute 114 MIMsachusette. Pmppsed ImW&yg enta are shown on the attached Site PhM entitled. TIORAW CV8 PhIM12+ Route 114 No Andover MA dald July 20Q2, Vj1hr 24 2094" a Han en 4. Descriptiori of work to he perforated within ate HVwxy Layout(attach additional&ham If neoeavvy). _permit for Access is sought to construct a 14.78&a/-of GVS Pharrrl cy on an existing undevelgpfld alto on the comer of e u 114 'n Npah, A ove Mae 19 013 ► ist bulld' mtmnine area, 'phis nroW is_cur antly Mg permitted ihinsib the'IMM a too -Andgmr,with minor roadway wit2nina s o Peter S�eet a s ri t to in-ri t i i land o outs 194. tenlLayiWar runoff r to gnto.Jhg ® ,If not bk1wroased b i t the p istin qn Patsm Mreet and on the ApplMnIft f'roti M. b. Rig Safe rrrt�er; G. Applicant information 7» Property Owner Name _ -Waber_ 202M PoWn Street_Rau L LLQ Name � Wall fir re.et Rr~alnrTrust.UG._ ._do Eaola Tr&yne Pubrrshing Cgmamw c/o FAdTn Tribune PUblfsh many Mailing address Making address ,100 Turnpike Shoat. a Andover. MA Tee numb 7 Telephone n 1 STpnatwe Z1WrV slgrrawre 6 Date owe Retum compLeted application to tlisido Wigh►vay Engineer for your Town/city.R616r to rQVMG side 4nr mpoam addmv% I. Application number S. Section 61 finding 2. Date receNed 6. Mass hiatorlc action 3. Fee amount 7. Plans returned 4. MEPA required_ Revision submitted ENF-EOEA Cart. S. Application complete EIR•EOEA Carl, 9. permit isauad Other EaEA pert. 10. Permit denied 6'�;.7frAsWNtr6y�meva�tr+.us+'v�+a f7�Mete • MAR.29.2004 6:37PM VHB lO.527 P.3 InStrUCtiollS for Application for�Perrrijt to Access.State Highway General The MHD is granted authority to Issue State Highway Access permits by M.G.L.,Chapter 81,Section 21. Fee Access Is dofined as: A check payable to the Commonwealth of Massachusetts for I. Any physitoi work performed within the State Highway the appropriate permit application fee must accompany the Layout,and/or, permit application. 11, Provisions for motor vehloles to enter or exit a State Highway facility from abutting properties. Fee Schedule for Access and Utility Permits A. Application for residential davaloprrimos of$units or leas Residontfal Access Pests shall include a sketch which indicates lot 61ae,frontage along 6 or less units $25.OD the State Highway,building Incationa(s),and proposed From 6 to 49 units 000.00 driveway fooation(s)Mth respect to State Highway baseline. Graat•r than 49 units r$2,000.00 8. Apphcatfon for all non-residential developments and residential developments greater than 6 units must include Hart-Fiscfderttldl Access Permits englnsered access plans(minimurn of 2 coplas)at an Lass than 25,11D{1 square test $90U.00 appropriate scale(1 inch=20 or40 Beet)which chatty From Zan 25,0OD to 0 squar square fit $$500.00 shave all proposed work and: rmm 300,000 to,750,00D a uare feet $2,000,00 {information available at District offices),$), 1. State N'lghwa Layout line and baseline Qreatar than 750,0DO square feet $3,000.01) 2. Fmporty comers and dimension and beating of lot lines. Non4tunielpal Utility Permits Not In Conjunction with 3. Location and dimensions of proposed drive(s). Aceesa Patnhe 4. Location of existing driva(s), Annual blanket ulitity permit $500,00 5. Complete details or existing and proposed drainage. Caphhl improvemantrs to a utility S500.00 Specific instructions(print or type) Line 1. Line 8. List name of municipality in which mess is sought. Individual or bualness making appticat(on trust complete the Llne2 required information,Including date of application and List name or number of State Highway Route(s)to which signature. access is sought. Lane 7. r Line 3. Complete this section only h the individual or business If access is sought under Definition 11 above,briefly(Inscribe making application is other than the property owner of the facility for which access is sought. making for which access Is sought. ammple 1: private single family residence at 100 State Road, Approximate sire of proposed building 2,600 r f, ApproAmate tot size 0.76 acre& Eetartupfe 2: Return completed application and W to appropriate SOD.000 V.sneiosad shopping mall adjacent to State Route District Office listed below. Please contact the Permit 1490 and Route 20. Approximate lot la size 67 aerea. Engineer at thin address If additional Information la Line 4. required. Briefly deaaribe the proposed work to be performed within the State Highway layout, District i District 4 >bomple 1: 270 Pittsfield Road SI D Appleton teat Remove So rear of exsting granite curb on south side of Lenox,MA 01201 Arlington,MA 02174 highway in order to construct driveway atx eve and modify (413)837.1760 (617)648-6100 the roadway geometry to awarnmodate left-tum Jane. Examplo 2. District 2 iDisvict 5 lE>cavate 10 Toot x 10 foot section of roadway at Station 811 North King Sveet 1000 County Street t00+D0 in westbound Inns in order to install water seMoas to Northampton,MA 01 D80 Taunton,MA. 0278D residency at 100 State Street. (413)584.1611 (506)824-6633 Line S. A Dig Safe number must be obtained by calling 1-80D- District 3 322-4844. it construction within the State Highway Layout 403 Belmont Street does not Commence within the period allowed by Dig Safe,a Worcester,MA 01804 new number must be obtained prior to beginning (508)754.72.04 construction MAR.29.2004 6137PM VHB N0.527 P.1 Transportation Land Development Environmental 0 r V ; a e a MAR 3 '1 ?0104 101 Walnut street •MM Va U= Ua2z P.0.Box 9151 Tw ", .-"; *AterfowAMA 02471-9151 617 924 1770 Fax To: Julie Parrino DaW. March 29,2004 PAX 617 924 2286 Transmittal Town Planner 27 Charles Street North Andover,MA 01845 Fax, C179-W36-cIS4t Project No.: 08475.00 From: Jon Stepherism P.E. Re'. CVS North Andover Julie, Attached(vi4 fax)is a copy of the Massachusetta Highway Department"Application fax Permit to Access State Highway"for the proposed CVS,located at the comer of Peters Street and Route 114.A copy of the permit,when received,will be provided to you for your records,once received,if you have any questions please do not healtate to call. Jon