February 23, 2004
Mr. Karl Dubay
MHF Design Consultants, Inc.
103 Stiles Road
Salem,NH 03079
Re: Professional Review Comments
Proposed CVS Pharmacy
North Andover, Massachusetts
Dear Mr. Dubay:
Vanasse& Associates, Inc. (VAI) has completed our review of the proposed CVS Pharmacy retail store
to be located off Salem Turnpike(Route 114), in North Andover, Massachusetts. Our review focused on
the project's conformance with Town of North Andover Planning and Zoning Regulations with regard to
impacts on the transportation infrastructure and on-site vehicle and pedestrian circulation, as well as the
Massachusetts Environmental Policy Act (MEPA)/Executive Office of Transportation and Construction
(EOTC) guidelines for the preparation of Traffic Impact Studies (TISs)and accepted Traffic Engineering
practices. In completing our review,the following plans and documents were evaluated:
• Traffic Memorandum, Proposed CVS Pharmacy, North Andover,Massachusetts;
Vanasse Hangen Brustlin;October 2, 2003.
• Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin; October 3,2003.
• Memorandum, Proposed CVS — Peters Street; Vanasse Hangen Brustlin; December
23, 2003.
• Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin; December 23,2003.
• Memorandum,Peer Review—Traffic; Vanasse Hangen Brustlin;February 9,2004.
• Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin; February 9,2004.
VAI also performed a site visit to observe general conditions within the project site with regard to on-site
vehicle and pedestrian circulation and access to the development, as well as to review existing conditions
and traffic operations along Route 114 in the vicinity of the project site.
Mr. Karl Dubay
February 23, 2004
Page 2
Findings
In general, we found that the Traffic Memorandum and Peer Review response memorandums were
prepared in a professional manner and in general accordance with accepted engineering standards. The
Peer Review response memorandums responded to the requests for additional information identified in
VAI's November 11, 2003 peer review memorandum and the MHF December 31, 2003 memorandum.
Summary
VAI has completed the review of the proposed CVS retail development. The information reviewed was
found to have been prepared in a professional manner and in general accordance with accepted
engineering standards.
At the intersection of Salem Turnpike at Peters Street and Haverhill Street, improvement measures have
been identified to help alleviate impacts with potential queuing at the site driveway on Peters Street.
Review of the VHB Concept I plan, dated February 5, 2004, indicates that additional pavement markings
should be included to clfannelize traffic flow into a single lane as it enters Peters Street form
Salem Turnpike or from Haverhill Street. As currently shown, the Peters Street departure leg is 26 feet
wide, which drivers could use as two lanes.
Review of the analyses performed by VHB indicates that the widening of the Peters Street approach to
Salem Turnpike would not significantly improve intersection operations. VAI concurs with the analysis
performed by VHB, particularly due to the proposed signal coordination of the Salem Turnpike signals by
Eaglewood Shops.
Sidewalks are proposed, connecting to sidewalks to be constructed as a part of the Eaglewood Shops
project, as well as a connection to the neighboring Eagle Tribune parking lot. Construction of sidewalks
along the site frontage should also be considered.
We appreciate the opportunity to assist the Town and the project proponent in evaluating the proposed
project. If you should have any questions regarding our initial review, please feel free to contact me.
Sincerely,
VANASSE&ASSOCIATES, INC.
Kenneth P. Cram, P.E.
Associate
KPC/rla
cc: RDV, File
CAWINDOWSWemporary Wemel Files%OLK63IMK.Dubay 0M304 doc
Ref: 3992
March 11, 2004
Mr. Karl Dubay
MHF Design Consultants,Inc.
103 Stiles Road
Salem,NH 03079
Re: Professional Review Comments
Proposed CVS Pharmacy
North Andover,Massachusetts
Dear Mr. Dubay:
Vanasse & Associates, Inc. (VAI) has completed our review of the proposed CVS Pharmacy retail store
to be located off Salem Turnpike(Route 114), in North Andover,Massachusetts. Our review focused on
the project's conformance with Town of North Andover Planning and Zoning Regulations with regard to
impacts on the transportation infrastructure and on-site vehicle and pedestrian circulation, as well as the
Massachusetts Environmental Policy Act (1vIEPA)/Executive Office of Transportation and Construction
(EOTC)guidelines for the preparation of Traffic Impact Studies (TISs) and accepted Traffic Engineering
practices. In completing our review, the following plans and documents were evaluated:
• Traffic Memorandum, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin;October 2, 2003.
* Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin; October 3, 2003.
i
• Memorandum, Proposed CVS — Peters Street; Vanasse Hangen Brustlin;
December 23,2003.
9
• Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin; December 23, 2003.
• Memorandum,Peer Review—Traffic; Vanasse Hangen Brustlin; February 9,2004.
+ Site Plans, Ptoposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin;February 9, 2004.
• Traffic Memorandum Proposed CVS—Route I I4/Peters Street; Supplemental Traffic
Evaluation; Vanasse Hangen Brustlin; March 1, 2004.
z ® Site Plans, Proposed CVS Pharmacy, North Andover, Massachusetts;
Vanasse Hangen Brustlin;March 9, 2004.
Mr. Karl Dubay
March 11, 2004
Page 2
VAI also performed a site visit to observe general conditions within the project site with regard to on-site
vehicle and pedestrian circulation and access to the development, as well as to review existing conditions
and traffic operations along Route 114 in the vicinity of the project site.
Findings
In general, we found that the February 9, 2004 and March 1, 2004 Traffic Memorandums and Peer
Review response memorandums were prepared in a professional manner and in general accordance with
accepted engineering standards. The Peer Review response memorandums responded to the requests for
additional information identified in VAI's November 11, 2003 peer review memorandum and the MHF
December 31,2003 memorandum.
Summary
VAI has completed the review of the proposed CVS retail development. The information reviewed was
found to have been prepared in a professional manner and in general `accordance with accepted
engineering standards.
At the intersection of Salem Turnpike at Peters Street and Haverhill Street, improvement measures have
been identified to help alleviate impacts with potential queuing at the site driveway on Peters Street.
Review of the VHB Concept 1 plan, dated February S, 2004, indicates that additional pavement markings
should be included to channelize traffic flow into a single lane as it enters Peters Street from
Salem Turnpike or from Haverhill Street. Review of the latest Concept 1 plan, shows the additional
striping to channelize flow into Peters Street.
The Concept Plan shows a minor widening of Peters Street at the intersection with Turnpike Street, yet
the site plans do not reflect any changes in curb geometry. This needs to be rectified.
Review of the analyses performed by VHB indicates that the widening of the Peters Street approach to
Salem Turnpike (to include an exclusive right turn lane) would not significantly improve intersection
operations. VAI concurs with the analysis performed by VHB, particularly due to the proposed signal
coordination of the Salem Turnpike signals by Eaglewood Shops. The supplemental analyses performed,
without the Eaglewood Shops project, indicates similar findings.
Sidewalks are proposed, connecting to sidewalks to be constructed as a part of the Eaglewood Shops
project, as well as a connection to the neighboring Eagle Tribune parking lot. .Construction of sidewalks
along the site frontage was recommended and has been included in the most recent Concept. The
sidewalk along Peters Street, from the proposed site driveway to Turnpike Street needs to be adjusted.
The Concept plan shows this curb line being slightly moved, yet the site plans show the sidewalk against
the existing edge of road, Additionally, if the sidewalk is to be against the edge of road, vertical granite
curbing should be used in lieu of sloped granite edging.
Also, it is not clear when comparing the Concept plan to the site plans as to the limit of the curb work
along Turnpike Street, fiom Peters Street to the proposed Turnpike Street driveway. This should also be
clarified.
CAWNDOWSVempomry Entemet FilesIOLK631M.Dubay 031104.doc
Mr. Karl Dubay
March 11, 2004
Page 3
We appreciate the opportunity to assist the Town and the project proponent in evaluating the proposed
project. If you should have any questions regarding our initial review, please feel free to contact me.
Sincerely,
VANASSE&ASSOCIATES,INC.
Kenneth P. Cram,P.E.
Associate