Land Development
Environmental m 0
Sef' vices
MAR 12 1")
Imagination innovation energy Creating results for our dients and benefits for our communid"
March 24,2004
Ref: 08475.00
Ms.Julie Parrino,
Community Development&Services Director
27 Charles Street
North Andover,MA 01845
Re: CVS/Pharmacy—Response to Site Plan Review Comments
Dear Ms.Parrino:
In response to the March 11,2004 engineering review letter from MHF Design Consultants,Inc.,
regarding the proposed CVS/Pharmacy at the corner of Route 114 and Peters Street,VHB offers
the following response to comments:
Section 6 Signage
1. Two proposed"monument"signs are shown on the plans at the drive entrances,although no
details are provided. Are these directional in nature? Will they have external illumination?
Dimensional data? The Applicant should clarify what these are,and if any freestanding site signs
or details are proposed. At this point no main site sign appears to be proposed. (Not Addressed.
At the very least,the directional signs should be labeled and detailed appropriately,and a
note placed on the plan that no freestanding sign is proposed.)
Responw: VVe are indicating one 'directional'sigii at the entrance to CVS off
Peters Street. A detail is
provided oil the detail sheet, C-12. All styles
4es and materials will be similar to the building, which
0
the planning board has approved the concept of. CVS through the
building inspector, as indicated ill the signage bylaw.
2. The proposed wall signage needs specifications for colors,area,confirmation on projection
dimensional limits,and materials. (Not Addressed. Usually the Planning Board requires this
information for their review,although the Building Commissioner would have final review
for the sign permit issuance. See comment below for example.)
Response: The elesrduicprr sheet(architectrazrl)coirtdrr"vas colors drrul areas dllldl otlrr�r perthtrrtnt sign
iqfen-lnatioll. CVS will apply'for all signs through the building inspector. as hidi(:ated in the
signage bY/am
3. The Board should refer to the Building Inspector regarding interpretation of the following: (a)
Sign limit measurements of 6.3.19 pertaining to the surrounding use of materials and colors; (b)
per 6.6.17,we assume that the CVS/Pharmacy is one integral tenant,as separate identifiable
101 Walnut Street
Post Office Box 9151
Watertown, Mawichusetts 02471-9151
Proposed CVS North Andover 61Z924.1770 n FAX 61Z924.2286
Response to Site Plan Comments eriiail: info@vhb.coin
www.vhb.cofn
tenants are not listed. Therefore,the maximum number of signs allowed is one primary and one
secondary, which are both assumed to be two wall signs'?(thus any freestanding signs need to be
addressed vis-a-vis the ByLaw);(c) supplementary accessory signs as they relate to the Bylaw; (d)
percentage calculations as required in 6.6.D.1,which should be provided on the plans. (Not
Addressed)
Response: The building inspector will be supplied ii,-ith till signage hijbI-mation. No signage will be
installed without approval fromthe building inspector.
Section 8.1 Parking
2. The Peters Street driveway is not provided with an adequate leveling platform,which should be
evaluated due to the long 7%grade off that drive. (Please address what appears to be a 20-foot
leveling area measured from the stop bar that exceeds 2% and then drops to over 7%--this
will be the only means of site egress for all other travel directions other than the one-way out
onto Route 114 North,and at a drive intersection that will require some delay waits queuing
out of the drive. Also,please review the sidewalk ramps shown at the crosswalk).
Response: A leveling area is provided at the Peters Street entrance, as indicated on the reNsed Site Plan
set. A sit cient landing area has been provided at this location.
ffi
Section 8.3.5 Supplementary Regulations-Site Plan Review—Information Required
e.iv) The proposed construction easement for the wall needs to be verified by the abutter via an
easement deed reference note on the plans. (Not Addressed. At a minimum,the board needs
to be assured that the abutting land owner approves this.)
Response: The applicant is currently engaged in discussions with the Board oj'Directors ofthe First
United Methodist Church at this time. A letterfi-oin the FUMC will be provided to the Planning
Board stating that the Church will approve of the temporary constritefioii easement.
e.xvii) Please address possible conflicts between the wall-pak building light mounting height(z-value on
detail table)and where those would be located and shown on the building elevations. Please also
clarify pole details, including pole heights. (Not Addressed. Are the wall paks mounted on the
roof,or are the z-values incorrect?)
Response: The wall pack lighting heights have been changed to reflect the actual height of the lighting
fixtures, which do not exceed the building height. Die z-values it) trine site lighting chart represent
the light fixture heights.
e.xix) Refer to VAI review letter issued directly by them,regarding traffic comments. Please address
conflicts at curbing/sidewalks between the site/grading/utility plans and the Concept Traffic Plan
submitted.
Response: 7he site plans have been revised tea show the offsite improvements also sholt"11 ()It the traffic
improvement plan, the two plans are now coordinated.
e.xx) The applicant has indicated that the MILD permit application has not yet been filed with the State,
as specifically required for this Site Plan submission and NAPS review. (Not Addressed.)
Proposed CVS North Andover
Response to Site Plan Comments
Response: A cola),qJ*the Mass Highway Department peonit applicatioa is,ill be provieledfi)r the town's
review. The application has beenfiled u,iih,the Massachusetts Highway Department.
Utility Plan &Details
1. As previously suggested,SMH 2 Rim will be raised up out of the pavement byabout 1/2 foot,and
SMH-I may be slightly low—these issues could be avoided if the grading information was shown
on the sewer design,from a Q/A standpoint. (Not Addressed)
Response: All SARI rims have been mdiustedtoproperly reflect the correct elevations.
2. To provide improved visual screening and safety signage placement,consideration should be
made to extend the landscape island near DMH-A5 to the north. This could be done and still
provide compactor and building access,and would tremendously improve aesthetics at that site
entrance. You may also need to look at the SU-Vehicle Turning Template. (Not Addressed)
Response: The island has been extended 4' to provide more screening and traffic sa ty.for the compactor
Oil
area. Exteiiding the landscape islaand fnrtlaer zvaarld result in the loading truck being obstructed from the
loaditag door. 1he vehicle turning templates irtelicate the compactor pail is properly laid out. the engineer of
record has laid the site out to accommodate standard OIS loading operatiO11S,Which have been approved by
CV S at the corporate level.
Please do not hesitate to call if you need any additional information. I can be reached at 617-924-
1770x1402.
Very truly yours,
VANASSE FIANGEN RUSTLIN,INC.
Jon Stephenson,P.E.
Project Manager
Proposed CVS North Andover
Response to Site Plan Comments
Transportation
Land Development
Environmental A.
S e r v i c e s
101 Walnut Street
_VaY arse [Ian iZ n -r1 L CtrZYI, Inc. P.O.BOX 9151
Watertown,MA 02471-9151
617 924 1770
FAX 617 924 2286
Memorandum To: Julie Parrino Date: July 15,2004
Town PIanner
27 Charles Street
North Andover,MA 01845
Project No.: 08475.00
Fro— Taylor Dowdy,P.E. Re: CVS North Andover Plan Revisions
The following is summary of the minor drawing changes to the approved CVS site plans,for the
proposed CVS at the corner of Route 114 and Peters Street:
1. MHD drainage connection-MHD required that the discharge from the site pass through a
biofiltration swale,to provide additional pretreatment before entering the MHD drainage
system. A Swale is now provided on the adjacent Eagle-Tribune property. The owner of the
Eagle Tribune has agreed to provide a drainage easement for the improvements.
2. An additional sewer manholes and sewer line were added to the Peters Street side of the
building,so that CVS would not have to run the sewer pipe under the building. Three
additional manholes and associated sewer pipe have been added.
If you have any questions,please let me know.
JUL 1 6 2PO a
Fin+
�IUL 1 6
•_ S
i
\\\08475\doc s\memos\D&k75_JP ar rino_Rev i s iv n s.d oc
i
E
Transportation
Land Development
Environmental '
Services
•
•
a imagination rnnovatlon I energy Creating results for our clients and benefits for our communities
February 10,2005 Vanacee Hangen Bn&tUn,_Inc___
Ref: 08475.00
Ms.Heidi Griffin
Community Development&Services Director
Town of North Andover
400 Osgood Street
North Andover,MA 01845
Re: CVS North Andover Engineering Certification
Dear Ms.Griffin,
In accordance with Special Condition 6(c)of the Site Plan/Special Permit Decision dated
April 22,2004 granted for the premises located at the Northest corner of the Peters Street
and Route 114 intersection for the construction of a proposed CVS retail/pharmacy.This
letter serves as written certification that all work has been conducted in accordance with the
approved site plans and Special Permit decision to the best of my knowledge with the
exception of the following items:
➢ Landscaping is not completed due to winter conditions,landscaping will be
completed in the Spring in accordance with the approved landsacpe plan.
This certification is based on my review of the"As-Built Survey",dated February 7,2005 by VHB and
visual observations made on the site.Please note that the connection to the Route 114 drainage
system has been completed,disregard notations on the As-Built survey which indicate that this
connection has not been made.
Very truly yours,
VANASSE HANGEN BRUSTLIN,INC.
JIM
;Jo�n`b.Stephenson,P.E.
Project Manager
i
i
101 Walnut Street
Post Office Sox 9151
Watertown, Massachusetts 02471-9151
617.924.1770 ■FAX 617.924.2286
\\\08475\does\lelter$NW475-_HGdfffn_gBWltEng-CerLRFV-reb_10 QS.dce emali:infogAlb.eom
www.vhb.com
f
Transportation
Land Development
Environmental
Services
e
� I1'17d4)tl"1at14'Y N1 IN'1 Y10Vatrl6l"1 energy Creatirt};re5ulls for our elicirtt attd t7a*refits for our Cenn.Inl➢n.itic95
February 8,2005 Yanasse Hangen Brustlinfric,
Ref: 08475.00
Ms. Heidi Griffin
Community Development&Services Director
Town of North Andover
400 Osgood Street
North Andover,MA 01845
Re: CVS North Andover Engineering Certification
Dear Ms.Griffin,
In accordance with Special Condition 6(c) of the Site Plan/ Special Permit Decision dated
April 22,2004 granted for the premises located at the Northest corner of the Peters Street
and Route 114 intersection for the construction of a proposed CVS retail/ pharmacy.This
letter serves as written certification that all work has been conducted in accordance with the
approved site plans and Special Permit decision to the best of my knowledge with the
exception of the following items:
Connection of site drainage into the Route 114 drainage system has not been
completed due to MHD winter construction restrictions.
Y Landscaping is not completed due to winter conditions,landscaping will be
completed in the Spring in accordarce with the approved landsacpe plan.
This certification is based on my review of the "As-Built Survey',dated February 7,2005 by VH13 and
visual observations made on the site.
Very truly yours,
VANASSE HANGEN BRUSTLIN,INC. m�� Elip
010 p
Jon.D.Stephenso;l sP ',1',, "
Project Manager jR%1 � .
F
101 Walnut Sti-eet
Post office Box 9151
Watertown, Massachusetts 02471-9'151
617'.924.'1770 n FAX 617.924.2286
\\\OM75\etas\letters\08475_kiGriffin_ABni1l_I7D&_Cert.doc email: Info@vhb.con)
WWW.V11b.com
T R A 1\1 S P 0 F-,I TAT 10 P'-1
rumr�r rr�€�Er ir..a .q- CC�r,�_';-r ,,uL�'f'rrarq, ie a erWd�.,r:� eai c,ra�; jr� rar,r
rj,ir.c;-r rJULsvr:raY
January 31> 2005
Ref: T0092 FT "'
Mr. Donald S. Smith t"t.Ffw�fdElt'; r t.�rmd a ssaa:;°ta�.
Saxon Partners
200 Oak Point Drive
Middleborough, MA 02346
Re: CVS Site Construction?
Peters Street &Route 114
North Andover, Massachusetts
Mr. Smith:
Transportation Engineering and Construction, hic. (TEC) has been providing our Client,
Peters Street Realty Trust, LLC (PSRI'), Owner's Representative and Construction
Monitor(in accordance with the Planning Board Decision) services. TEC's Contract
with.PSRT was a time-based Contract from June 28, 2004 thru.December 31, 2004.
TEC has been informed that PSRT has sold the property to your firm. As such, PSRT is
no longer directly involved in this project and is not extending our current Contract as
they consider our services complete. TEC's services as Owner's Representative and
Construction Monitor are considered concluded as of this date.
Thank you,
Transportation Engineering and Construction, Inc.
Brant F. Ballantyne
cc: W. Rogers ---PSRT
M. Burke--DF Pray
J. Bcrylyn - NA Planning Dept,
R. Nicetta—NA Bldg. Dept
J. Sullivan --NA DPW
T. Willet—NA W&S
J. Stephenson - VHB