HomeMy WebLinkAbout2006-12-06 As Built Survey 6/28/07 352
Road
RE6+ > Vuth borough Turnpike
4� 1 BOHLER tel: 508,480.9900
Ll JON 2 g 2o07 fax: 508.480.9080 fax
ENGINEERING, P.C. NOR]H A1q)C)VER www.bohlereng.com
PLANNING DEPARTMENT
June 28,2007
North Andover Planning Board
c/o Lincoln Daley
400 Osgood Street
North Andover,MA 01845
Re: Proposed Walgreen's&Petco
Certificate for Occupancy
790&800 Waverly Road
North Andover,MA
Dear Mr. Daley:
Enclosed herewith you will find a copy of the As-Built survey for the above mentioned project. The As-
Build plan is entitled,"Alta/ACSM Land Title Survey,Walgreens, Salem Turnpike and Waverly Road,
dated 06/01/07 revised through 06/20/07,prepared by Control Point Associates,Inc.". Also enclosed
herewith you will find a letter from Bohler Engineering stating that the project has been substantially
constructed to the approved plans.
We offer the following in response to the conditions"Prior to verification of the Certificate of Occupancy"
as outlined in the Notice of Decision;
Condition#5 Prior to verification of the Certificate of Occupancy
A. Attached is a letter form the civil site Engineer stating that the project substantially complics
with the plans referenced in the decision.
B. Site lighting has been installed consistent to the approved plans.
C. Site lighting has been installed consistent to the approved plans. It was designed as to
minimize impacts to abutting properties and streets,
D. Certification of the fire sprinkler is anticipated any day. Once received, it will be forwarded
to the Board.
E. Comment noted. It is believed that all required permits have been obtained for the signage
that has been installed onsite.
F. All Massachusetts Highway permits have been obtained and the access to the site has been
installed consistent to the MHD and Planning Board approved plans.
I ask that you please review the enclosed information and consider endorsing the application for a
Certificate of Occupancy for the Petco and Walgreens project. Should you have any questions or .
comments regarding this matter,please do not hesitate contacting me at 508-480-9900.
Sincerely,
s
BOHLER ENGINEERING,P.C.
James A Bernardino,RE, Other Office locations:
■Albany,NY ■Purchase,NY ■Ronkonkoma, NY w Center Valley,PA n Chalfont, PA
518.438.9900 914.251.9800 631.738.1200 610.709.9971 215,996.9100
■Warren,NJ ■Towson,MD ■Sterling,VA ■Warrenton,VA
908.668,8300 410.821.7900 703.709,9500 540,349.4500
CIVIL&CONSULTING ENGINEERS* SURVEYORS ■ PROJECT MANAGERS r ENVIRONMENTAL CONSULTANTS■ LANDSCAPE ARCHITECTS
352 Turnpike Road
BOHLER Southborough, MA 09772
tel: 508.480.9900
ENGINEERING, Pc. fax: .bohl reng80 fax
www.bohlereng.com
June 28,2007
North Andover Planning Board
c/o Lincoln Daley
400 Osgood Street
North Andover,MA 01845
Re, Petco &Walgreen's
Certificate for Occupancy
790 & 800 Waverly Road
North Andover, MA
Dear Mr. Daley:
We have reviewed the As-Built plan is entitled, "Alta/ACSM Ladd Tide Survey, Walgreens,
Salem Turnpike and Waverly Road, dated 06/01/07 revised through 06/20/07"for the proposed
Petco&Walgreen's. We have compared the As-Built plans to the site plans that were endorsed
by the Planning Board. In comparing those plans we have found that the building, signs,
landscaping, lighting and site layout substantially comply to the plans referenced in the Notice of
Decision from the Planning Department.
I ask that you please review the enclosed information and consider endorsing the application for a
Certificate of Occupancy/Inspection. Should you have any questions or comments regarding this
matter, please do not hesitate contacting me at 508-480-9900.
Sincerely,
BOHLER ENGINEERING, P.C.
arnes A Bernardino,P.E.
W 041029
Llr Planning Board 6.28-07.doc
Other Office Locations:
■Albany,NY ■Purchase,NY ■Ronkonkoma,NY ■Center.Valley,PA ■Chalfont, PA
518.438.9900 914.251,9800 631.738,1200 610.709.9971 215.996.9100
N Warren,N7 ■Towson, MD ■Sterling,VA ■Warrenton,VA
908,668.8300 410.821.7900 703.709.9500 540.349.4500
CIVIL&CONSULTING ENGINEERS ■ SURVEYORS if PROJECT"MANAGERS a ENVIRONMENTAL CONSULTANTS 0 LANDSCAPE ARCHITECTS
Planned Commercial District/Site Plan Review.Special Permit- Map 27, Parcels 16 through 26
I Walgreens Pharmacy&Retail Building
November 15,2005
v.) site screening and street trees;
vi.) drainage facilities;
vii.) site restoration;
viii.) final site cleanup.
h) The applicant shall provide the Planning Board with copies of permits, plans and decisions
ieceived from all other town boards, commissions or departments. In addition to receipt of
these plans,the applicant shall*supply the Town Planner with a letter outlining any and all
revisions resulting from said permits,plans and decisions received from other town boards,
commissions and departments that differ from the approved plans referenced in Condition 22.
i) Building permits must be obtained for retaining walls over 4' high.
4. Prior to FORM U verification (Building Permit Issuance):
a) The Planning Board must endorse the final site plan mylars and three(3) copies of the signed
plans must bq.deiivered to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the Planning Department.
c) The applicant shall adhere to the following requirements of the North Andover Fire Department
and the North Andover Building Department:
i.) All structures must contain a commercial fire sprinkler system. The plans and hydraulic
calculations for each commercial System shall be submitted for review and approval by the
North Andover Fire Department. Plans and hydraulic calculations for each commercial
system must°also be supplied to the Building Department.
d) An as-built plan must be submitted to the Division of Public Works for review and approval prior to
acceptance of the sewer appurtenances for use.
e). Maintenance easements must be submitted for Town maintenance of the sidewalks located within
the Route 114 Right of Way.
5. Prior to verification, of the Certificate of Occupancy;
a) The applicant must submit a letter from the architect and engineer of the project stating that the
building,signs, landscaping, lighting and site layout substantially comply with the plans referenced
at the end of this decision as endorsed by the Planning Board.
b) The Planning Staff shall approve all artificial lighting used to illuminate the site. All lighting
shall be built in accordance with the documentation and approved plans as referenced.
c) A11 lighting shall have underground wiring and shall be so arranged that all direct rays from such
lighting falls entirely within the site and shall be shielded-or recessed so as not to shine upon
abutting properties or streets. The PIanning Staff shall review the site. Any changes-to the
approved lighting plan as may be reasonably required by the Planning Staff shall be made at the
owner's expense,All site lighting shall provide security for the site and structures however it must
not create any glare or project any light onto adjacent residential properties or oncoming traffic.
d) The commercial fire sprinkler systems must be installed in accordance with referenced standard
NFPA 13D and in accordance with 780 CMR, Chapter 9 of the Massachusetts-State Building
5