HomeMy WebLinkAbout2006-12-06 Civil Review Sidewalk MOD Corresp I
I
i
352 Turnpike Road
B4HLER Southborough, MA 01772
508.480.9900
ENGINEERING, P.c. 508.480.9080 fax
November 28,2006
North Andover Planning Board
400 Osgood Street
North Andover,MA
Re: Proposed WaJgreen's&Petco f`
Intersection of-Salem_Turnpike&Waverly Road
North Andover,MA
Dear Members of the Board:
At Walgreens request and outlined at the Planning Board meeting,we have modified the
sidewalks from 7-`0"to 8'-05'. The number and size of parking stalls and aisles have not changed
from the approved site plan C3 signed by the Planning Board on April 18,2006. Should you
have any questions or comments regarding this matter,please do not hesitate contacting me at
508-480-9900.
Sincerely,
BOHLER ENGINEERING,P.C.
William D.Goebel,P.E.
�HOF
W041029
��■
L1r Planaing$ate I I.28-06 dpa
WILLIAM 0
GOEBEL �
CIVIL
Other Office Locations:
■Albany,NY ■Purchase,NY ■Ronkonkoma,NY ■Warren,N3 s Chalfont,PA ■Towson,MD t Sterling,VA ■Warrenton,VA
518.438.9900 914.251.9800 631.738.1200 908.668.8300 215.996.9100 410.821.7900 703.709.9500 540.349.4500
CIVIL&CQNSULTING ENGINEERS i SURVEYORS,,MZAFFIFIC CONSULTANTS r ENVIRONMENTAL& GEOTECIINICAL ENGINEERS
www.bohlereng.com