Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2014-10-07 Monitoring Report 1
3/9/2016 Town of North Andover Mail-Re:Fwd:Merrimack College Re-development project February 2016 Monthly Report 0kTfi ANDOVER Massachusetts Rebecca Oldham <roldham@northandoverma. ov> Re: Fwd: Merrimack College Re-development project February 2016 Monthly Report 1 message Rebecca Oldham <roldham@northandoverma.gov> TT�Tue, Mar 8, 2016 at 3:36 PM To: scott kelloway <skellowaype@yahoo.com> Scott: Please suspend site monitoring until further notice. Thank you, --Rebecca Rebecca Oldham Staff Planner Town of North Andover 1600 Osgood Street,Suite 2043 North Andover,MA 01845 Phone: 978,688,9535 Cell: 978,494.2218 Fax: 978.688.9542 Email: PONdharn@northandcrrcrma,gov On Tue, Mar 8, 2016 at 3:13 PM, scott kelloway <skeHowaypc@ I cc.co > wrote: ecc , Presently, r xi el / of the project has been constructed (2 of the 4 residence buildings). However theseit is likely all of the work within the Town of North Andover is complete, and the remaining work is i Andover. The site is secure n all previously exposed earth has been stabilized i either permanent or temporary vegetation. I wouldfine with suspending site monitoring until such timethat site work resumes. Scott ell® P.E. From: Rebecca Oldham <rcldham@no hando vane, ov> To: skeHcwa e@yahoo,com Sent: Tuesday, March 8, 2016 2:37 PM Subject: Fwd: Merrimack College Re-development project February 2016 Monthly Report hftps://mail.google.com/mail/?ui=2&ik=ab4f3cb798&viewzpt&search=sent&th=15357flaala4e2bO&siml=15357flaala4e2bO 1/3 3/9/2016 Town of North Andover Mail-Re:Fwd:Merrimack College Re-development project February 2016 Monthly Report Scott, In your opinion, if construction is complete and the site is stabilized, can monitoring be stopped? Thank you, --Rebecca Rebecca Oldham Staff Planner Town of North Andover 1600 Osgood Street, Suite 2043 North Andover, MA 01845 Phone: 9 8.68 .96 6 Cell: 9 8. 94,??1 Fax: 978.688.9542 EmailROldham@no,,thandoverma.gov ---------- Forwarded message ---------- From: scott kelloway ®ate: Tue, Mar 8, 2016 at 9:26 AM Subject: Merrimack College Re-development project February 2016 Monthly Report To: Jean Enright <jenri it townofnci ndc er. c > Cc: Bonnie Wolstromer <bwolstromer@towno northandover.com>, Felipe Schwarz <schwa r t errima aed u>, Lynn Kramer <Ikr er proco i ,Ccr >, Marc Lehoullier <mlehoullier lridenil rp.co >, "K re ne proconi .coo" <1 re e prc c i .co > Dear Ms. Enright, Attached is a copy of the February, 2016 Monthly Report for the Merrimack College re-development project at 315 Turnpike St, in North Andover, Ma. It is my opinion that all site work is currently in compliance with the project SWTPP, and consistent with best management practices. Please contact me with any questions. Scott D. Kelloway, P.E. https:Hm ai l.google.com/m ai I/?ui=2&i k=ab4f3cb798&view=pt&search=sent&th=15357fl aal a4e2bO&s i m l=15357fl aal a4e2bO 213 3/9/2016 Town of North Andover Mail-Re:Fwd:Merrimack College Re-development project February 2016 Monthly Report (978)479-56400 Sincerely, Jean Enright Assistant Director Community and Economic Development Town of North Andover 1600 Osgood Street,Suite 2035 North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: jenright@townofnorthandover,com Web: http:l'/Www,townofnorthandover.com/ dd:image001.jpg(; Please note:As of January 11, 2016, all Town Hall offices, except Assessor and Veterans Services, will be temporarily moving to 1600 Osgood Street, Suite 2043. All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www,northandoverma.gov. https://m ai l.google.com/m ai I/?ui=2&i k=ab4f3cb798&view=pt&search=sent&th=15357fl aal a4e2bO&s i m l=15357fl as 1 a4e2bO 3/3 Scott A Kelloway, P.E. Professional ChM and Ear frommenteal Designs and Inspect on& 148 North St.Andover,Ma.01810 Phone: (978)682-5054 M&Use 940122 2129/2016 No Andover Planning Department. Attn: Ms,Jean Enright North Andover Planning Dept- 1600 Osgood St. Suite 2035 N.Andover,Ma. 01845 Dear Ms. Enright, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development"project located at 315 Turnpike St. in Andover/N. Andover,Ma. DEP File 4090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This month's construction activities on this site include the following: * There has been no recent site work on this project.The site has been secured and de- mobilized-All heavy equipment has been removed for the site. * All areas of previously exposed earth have been graded,and hydro-seeded for temporary or permanent stabilization_ Allerosion controls are presently maintained in suitable condition.All other BMP's including sediment traps inside drainage structures correctly installed,and are in suitable condition-All equipment his been removed from the jobsite.Trash and debris have been appropriately contained and disposed of Grading is presently consistent with the approved site plan.There has been no encroachmentwithin restricted areas. At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices Pg: 1 /2 g_M If vo have any, quesnons or concerrts.pleW feet fi-ee to contact me at ad x � g 3 . e £ell- _ `p k KramerCC- (Via e-mal,paper copy upon request): Lynn -Mark euffier °eiiie Schwartz Ben Satudy Russell Bennett Stormwater Construction Genera ImftrRudim campus us Uwe of IRqMcfiM - StartTmd Time 2:00_2:30 pm IMMMewes s _KeHoway, Emspectees MAWS) Prefessiowl Engineer bspectzes,Contact Informatiom Eupectaes Qzammtim Licensed Pro Eqggineer Prwwmg o-wer 15 yew, mhwgg in Constuction K x = - e of_ Describe p-nment phase o 49 No add-diorial sde worlL Site has been secured cleaned ; p and de-moblitzed- Previouslye providing temporary ` mation- of InspectIOM: °-� r: tom event U Durmg storm—owt U Post-s-tyrm everff Weather Inibrmatim Flas t ? UYes XNe If yes,providm —.rt Date&Tme Storm Dmnafion(Im (in)-- VS, +I .e5 weather at time of inspection? U C ,,� U Rain U, Sr U Foe U Snowing U High Wimds, Odler Tempmrare: 50 dew Have smy di-schargess- - ? d .. If yes, r f AM them amy dischargese Ofinspection?Oyu X No 1 a 't Bw E Cwrccfrwe Aefim Needed amd Notes VersionRequhyP 1.14 BMP Bmw BNP Adim.Needied a t 2 Tme Pim y E r' 3 �. .� O t Oyes x NO r 1 Dust Camel r O uyes x NO I � es XINTO es XN Rkrkem A =� s s. F C r me e t Sedimenutbashis, x Yes UNC a 3 W 4, 0a � t 11 T .m Slope x Yam. al-al-es x RGc . k _M Y stmL °4 3 c Eres" No � t x - x v '' 15 —%ea es x m uyes _ Vwslw 1. � �r 16 SOW wasm cmmkers xyes fro ayes x N 17 Eqxiipmzent vlehkire des XNo ( ElYes X No All heat/equipmeat mism- camsm preswtv stored Gn site- Overal cerreedve w ?�� NO i disnwbed areas not ve e-wry I' 2 Are mamumd resource es areas wetlands-tines, _ or sim� ttbarrien ; . X Yes and sz&ment barriers x adtquarc�v kmraUed ftyc-d imm substrazy -Am d _pamis and X Yes UNa UYes X o and,SSE i! 5 d Wets X YL-s ems for w mter The smawbduigu C' by either —seat Fence s;m cco&uk. gfemted e t w the samet areas codected and a lac I! what ficaaws X Yes a ivUYes > n CML c 9 km vehicle x cf mairmmffiwe areas five of ffls:Demk--, A SWPPP&q2ectfdffo - . Rmptuedvitw h _sr- cMantmaRce Curredne Aetna Needed amd Nafts f _ Cl Yes UNG, C2Yes XWo, Not agRi bbe_No comstru d zacan 10 Are materials that are, sroted on site- aler L swred inside or undercover. ( r r € t dqwg (e j.,wash Water-&Waterip'.) properf,yed I r J--y N x N=-Cmplimmee Describe any incidents Gf am-c-amplimnce nor descnbed ate- t wF cer�,under penaky Gf favf thiat this docurnent and aH anachrrients were prepared under _ `ors the informafon submwed-Based an my . of the person or persons who mamge tbe system directLy responsible gduxing im�ion, > '� submimed is,to*best of k�kmwrcc*and be-fief Vue-ace°,. I am awam tkat tip am sWeant penalties for b fAl, mfitrutatm- kchding-the 7ii�ot �f r p for mg v .r x EPA SWPPP ftspecbm, RepaM Vansfou 1-1,Septembw 17, Stormwater �n Report L 1 Date Gf fin - - Time eft - Licensed -afinsknal Prac& 1-5 yam,speeaFamg im, cmswamm ske moakwiwr and,reportkLf—Pre-appm-wed siL-monitor in the Tmn,af-Andover D ,HDL-present phase of n PrawkXISFY eaqmsed earth have been hydm seeded and ve�c � �. G : Z Durrag,SMEM , event weather b1formatim Has there been a storm evemt since the kut msveetwn? ` 'e X No, IZ40EM start Date&TM- Z. arm Dw,awn,( rti:-Amount o (in)- y Weather at thne this UCH X Ckudy URA ZI Skeet U Fag U Sngwing El ,_ _ Temper deg i Have azy cliseharges occurred s ? UYes XNe If yes,desm-be.- Are there any diseliarges,at the fimm of hispectiW.UYes X No I€' i i N j E IE �3 k EpA SwPFF k Veto w %Sepftmber' F buitalreer mx� LL. n E i I i Erwiculcam: -y GfX Yes UN- d r Dus �. t Control UYes, X N t r In III. Ewen f clyes e Y Z G `toile sue: x Y �. N v, I �. r ID j' uyes x NoN fifterbi, ( f n [ fi = hope k €. t' (` I [ stabifiza€ k�menf �I; k Ske Erosim x Yesx NO conamk hi L' C i Swea.Sweepkrg ayes: x ay ts x No r € €` �4 a _ � N B Needed and Notes r � ed? Reg 16 Solid Waste Containers o UYes X No 17 ETeaepment.f' ehe cle U 'es x NO Uyes X NO All heavy equipment ent ass€fated with the construction Ste -ge -ea Prod has been removed.No Heavy equipment presently stored on site. Ow-eraH Site Issm MP/activity bitplementee- Maintenance Corre `ve Action Need and Notes RequireV 1Are all slopes and X Yes EINo UYes X No disturbed areas not actively leis%orked l " stabilized? 2 Are natural resource Yes UNo l] es I-o A areas(e g_ wetlands.trees,etc.) protectedwwth barriers or similar BMPr 3 Are perinieter controls X Yes U a UYes X No and sediment barriers adequately installed substrate) (kqyed Ito and tl i 4 Are discharge pole and X Yes UNo LlYes X No receiving waters five of } sediment w Are storm dam inlets X Yes LINo byes X No Catch sacks have been removed from adjacent catch property protected? baste for winter.The sounding areas are protected f€ by either lay bale—silt fence erosion controls an&or vegetated earth- 6 Is the construction eat kX 'es 0,, o UYes X'No preventing-sediment beingfmm tracked into. the streco 7 t is trasklifter from work t X Yes UNo ' LI]Yes X NO arm collected and placed covered duritpsters? stucco, c )available, t 1 , clearly marked.and r t { 9 Are vehicle and X Yes UNo UYes X Nia equipment fueling. ckanin!—! and { maintenance ofspll lead or amy € . U Yes U-- UYes X No, Mn apyf abl -No e imkm,roes arm cmmerth insWe or under coven YAre erg stormwater X Yes _ es I, e&_wash to I pert; ' r. E r L Dewnbe icy Gf n -C TIance met descrR�ed f. I' �l ee afry of law that this document and aE supervision,in accordmTee with a sta-m dasped to,2ssure,dm quafiffled d el pruperk,gadiered amd e%mluamd int� a,ion subm Based MIT ark-` of the person orems ba,managesysmm PerSUEU remresponsible -p&eringg tfte klfi6 Rbmlnzd il. to,tie zen't of m Eelrue,ac tmam�a' mnv f am amrarre thardicre are sygmffi . Prk,t name-a j5 r £k. a for ester Construction Site Inspection Report Generalinformatim Meek College North Gamma NPDES TracUng No. MAR12AZ775 turnpike St N.Andover Ma- Date of Inspection -14- 6StartMnd Time 3.I3 - k Inspector's Name(s) Scott D.Kellowa z Inspectors Title(s) ` Professional Engneer Inspector's Contact Information 148 North St Andover,m.Ol IG (97,8)479L5648, Inspector's Quaiiiications Licensed Professional Ender_Practicing over 15 dears,speciaaingg in construction site monitorin&and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction No additional site Site has been secured cleaned up and de-mobilized. Previously exposed eat have as hydro seeded and vegetated providing bili Bare. t Type of Inspection: Zl 18.egralar 13 Pre-storm event Ll Durinasstorm event Ll Post-storm Post-storm event Weather Information s there been a storm event since the last inspection?. UYes X No If yes,provide: € Storm Start Date&Time- Storm Duration(hrs): Approximate Amount of Precipitation(in)- Weather at time of this `ores? Clear X Cloudy El Rain U Meet LI l`og Ll Snowkg— U _ Temperature: 5deg Cold!! Have anv discharges c since the last inspection? , es XNo, lfwes,describe: Are here any discharges at the time of inspection?L[ es X No If yes,describe: t I€ i P Mp CorrectivemsNotes Installed? Maratewulce B Yes UDC -fi2Ud=Of r X Yes ecess- Eggess ( 5 Dust Cad LlYes X N 1 Ies X No UYes X No 1kets mien i fs x Yam: � ( Uyes X NO swales sly E 12, I, pa-Mmentowe X Yes, UK LlYes X Na C IK C Y "ate'C _ X 15 ( stmet Sweeping dyes I f I EPA S _ k �.e Actma Needed and Notim - ' 16 SiAid Waste Containers °es ayes 7 i i e r'Ve in Yes €, �es R hozamv equtment associoed with the caustnw-tian Arw- erect has be=mmavei`T -y e{ xmea preseady stared,mi sib-Ll Site Essues BMPfac&-ftvfMmate==ee I Are all sees amd x Yes G UYLS XNO disturbed areas not & e ^being wwked pedN stabirized� Are . . re-SOMW X Yes UNG UYes X No areas(e g-_ (. *mthinds,treeF,etc.. prutected with barriers or sirr R. s Are perimetercone 9X Yes UNe ayes x NO d sedirment bayriers fly' ed (keyed into s a e i edT 4 Are discharge points and X Yes UNho uYes, x NIO, receivinmwatas ee P vd s+ s ent ? g . �Y Are t Yes ` IYes X No Catch mcks have been rived:&m basaw fur wfiiwr-The surroundmg areas are protected, eir hay bale srk fermi erosim e Eearth- 6 Is the eomstrua; n exit Yes UNe, Uses XNa fiem� e �:"titi:�ier �sedFe being tacked mita € the sue`^ i I b der fiom work X Yes UN-, o ayes x No I. p ed in co-w-ePied x C G . es des a e,paint,stucc-G. cc �e ckmdv arse -and x Uyes 4 ctemirg and mainteamee areas fime (, « of rl�.jam. � A SWPPP kispectidn RepOM Versida 1-1, ` te ` e Action` Yes X No Not applicable.No construction materials are currently 10 Are materials d=are :wed on site. potential contamimnts stored hiside or wider cover IS I t st w- Yes LING U es Xe discharges e.&, waber- t --) property Controner 12 1 r) UYes LI nn T�� any incidents of non-compliance not described . RTI FT ITN,STATEMENT -f cep.under penalty of law that this document and aU anachments were prepared under my direction or supervision c ee with a s3 m designed to assure that qualified personnel properl epathicred and evaluated the inforrnation submitted-Based on rrny=inquLry of the person or persons who manage the systerrn,or those persons di.rrectly responns le for g e€ks the infonnation,the information submitted is,to the best of my knowledge and belief*true-- accurate,and complete-t am aware that there are signif icant penalties for subuutting false information, l .- g the possn of fine and imprisonTent for knovo irm vi e d'. A Print name d o-r -. F�Rggkeer Signature sDate: EPA SWPPP In 1- ,Sqmftwbar 17,2007 StormwaterSite Fraiect_ "ruck Caflege klotthtry Devebm,are - MAR12—AZT7 Lomdm W e -7- ' F ma`s Ia G ` Lied Pmfi!ssfaaal Engri Prww mar 15 yeus � � c��ctcr t' r Describe present phase,of PMVMUW MMOsed&-Nzh have been hydm seeded and vegetated atim I` , G g Sturm eve-at event Elas tfiere been a storm event since the Ent haspeethm? UYes X No El Clew X Ctbu4 Cl of Cl Sbeet O F Tempura : Have my "F r ? If,yes,deserib—,- i7 tke time of inspecdon7Z Lm. r, r` s me Achom Needed and Notes IBsbifled? Maintenance Erosim C' `des . wo Uyes X No ,' r ? Tme ProlecdeftYes UNo "Ives x No mmim�,of X Yes UNo es X No Cansmmm A - Egess I� Emsion Can p G m s E Sr UYes X No, UYes X ro NG stockpiles on site- Dnersm Channels K x Yes LINO Lid es X No Byres E Dem mte g -— } uyes XN, ,o UYes X No j 11 T Stape X Yes UNo LAY es X No sEmbilizanon C { r x 1,4 ° Terra;,Check, r L " F I.k iz .1,S 17,2007 2 . Bw Bmp Acbm Nce&&and M&S 6, Yest ZEN& U I ETi� e- y,ems; X XL, QUYes X No �� rL-2- bemm- c&No Heaxy,emi preseudy sture S l m� � Correirfme i a a,S k v es,an,d�-- x Yes Uyes x NO d5mrbed areas M, [. ice X Yes UNo areas(a& � 1 t b m ifeAre _ : F Yes 1. __ r Amd9chum- d ,< rec6viig way five o x -sa fince emium w° c . Es ft e figum beikgtrw i, areas,���and a Y ('eLt-Paintsmmam., pleadm h ckum imamadf -or m BmA ,FPP A-mSpeeffimm R m _ , 3" � -_:e Convefi e Actiam Nee&md RevikWE Yes, i:I" Not aka_.No constrackm moarmis a . W Are maws dtat a sibe- Contafflikalas stored I der coves I Are. - wash F war 12 Descrffne-mm, -inciJerits of am-cenT -mat deSet e iI CERTIRCXTION NT -f�-�=d mdeT Penah7 ems'law t tds dacunmmr and aH amav2unents were prepared,under mc direct5ar Gr pery Isma in a=arcknice wia&System destgued tia,assure that qualifed personnel and evmhmmzd i ce..mmt-main; d cumpie 5L,i a aware that dm=am s4piffimas for Rkinkrag ELts--i7fi r sue,, i fs thC FGSS&Rky and impm-san-mmt - m� .�7 s d a s ,t� �: �?}�;. f k�v� sa��' to �; �;� ����� � , ��� µ s �ax� ti�t °�' s�€'s �*,� t� ,r � �� F�4k 5 � ' � A {P�1 i �b }� t fi ' t�{; t f� i4 �t � `{. f Y��d S c�e 1 4 ,� � - Ii�IgtY�yq. `1 4,YhS �� ,`�a n� a e `�� �� � � u`� �„ `` I �, �,�`�ss,,)��.�z�'fn��'� . �� 3 r �� ,� krct ap,�t�i� h � ���h a��t����R`'1t �; ��sa���s�s�7�a°ytf'� i . � - ' 9 P � c�h {�� r - 7 1$ ��� 1- �a�s. ,�{,��3�)7�s ��. �` Y tt ;� y �.. �g try � f{�� 5 EL�� t � x<.n Y { � �� �t y.� 5 ) ¢� C s �� x � h! R �� i V` 3 �� � � � � a { � S ~, � f r� � r��.�Er�'.� ��r, S '' � P t s s fi F ��+ A�i ss fit. �t s s�Y �„- € '��'e a � � '� �Y ��� �, �� { '. . , � 3 } i .�: :,. .,.��l.*W �'¢�vsta�a,. �a��'Sn:'�� ,.ire.' ..,�. �:_... :., ,�1�5�!�aM'� va.,k��:<itr.;a i';���,`'.? �.�"�,��`' ��:,�Y,�`.�y i'.���t�;, _ i it 4� �kx r i F �'c wi .r rya t p i l i1 f ff, Y�i } �t tt{ii�� i i ,fi Sa 4 i k t t 5 t Scott D. Kelloway, P.E. Professional Civil and Environmental Designs and Inspections. 148 North St. over, as 01810 Phone: (978)682-5054 Ha.Lisc #40122 1/31/2016 North Andover Planning Department. Attn: Ms, Jean Enright North Andover Planning Dept. 1600 Osgood St. Suite 2035 N.Andover,Ma. 01845 Dear Ms. Enright, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development"project located at 315 Turnpike St. in Andover/N. Andover,Ma. DEP File 4090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This month's construction activities on this site include the following: ® There has been no recent site work on this project. The site has been secured and de- mobilized. All heavy equipment has been removed for the site. * All areas of previously exposed earth have been graded,and hydro-seeded for temporary or permanent stabilization. All erosion controls are presently maintained in suitable condition.All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment has been removed from the jobsite.Trash and debris have been appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water pollution Protection Plan and consistent with best management practices Pg: 1 /2 Pg: 212 If you have any questions or concerns,please feel free to contact me at 77 number listed.above. # ? � v Scott D.E% o ay,P CC. is e-mal,paper copy upon request): Lynn Framer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Sennett Report Stor Water Construction Site Inspection General Information FNPDES ject Name ° Merrimack College North Campus Development" Tracking No. MAR12AZ77 Location395 turnpike fit. Itt.Andover Ma. e of Inspection 1-31-16 Start/End Time 4:15-4:45 pm Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact inform; 148 North St.Andover,ma.O 1810 (978)479-564& Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the'Town of Andover Describe present phase of construction ® No additional site work.Site has been secured craned up and de-mobilized. ® Previously exposed earth have been hydra seeded and vegetated providing temporary stabilization. Type of Inspection: ®Regular Q Pre-storm event Q During storm event ®Post-storm event Weather.Information Has there been a storm event since the last inspection? UYes Y No If yes,provide' Approximate Amount of Precipitation(in): Storm Start Date&Time: Storm Duration(hrs): pP Weather at time of this inspection? ®Clear X Cloudy L3 Rain U Sleet ®Fog ®Snowing L3 High Winds U Other: 'Temperature: 31 deg Have any discharges occurred since the last inspection? ®Yes X No If yes,describe: Are there any discharges at the time of inspection?UYes X No If yes,describe: BMP BAIP Corrective Action Needed and Notes BMP Installed? Maintenance Re uired? EPA SWPPP Inspection Report, Version 1.1, September 17,2007 � B `P -Bmp Corrective Action Needed and Notes BMP Installed? Wtaintenance Required? 1 Erosion Control- X Yes QNo ®Yes X No Sediment Barriers 2 'free Protection X Yes ®No ( Yes X No 3 Stabilization of X Yes ®No UYes X No Construction Access- Egress 5 Dust Control UYes X No L3Yes X No 6 Erosion Control ®Yes X No l�Yes X No Blankets 7 Stockpiles ®Yes X No [ Yes X No No stockpiles on site. 8 Diversion Channels/ X Yes ®No ®Yes X No Swales 9 Sediment basins X Yes ®No t Yes X No 10 Dewatering basins— dYes—X No UYes X No filter bags. 1 i Temporary Slope X Yes ®No UYes X No Stabilization 12 Permanent slope X Yes QNo ®Yes X No stabilization 13 Interior Site Erosion X Yes LINo ®Yes X No Controls 14 Temporary Check Dams X Yes ®No ®Yes X No 15 Street Sweeping ®Yes—X No ®Yes X No E'PA S PPP Inspection Report, Version 1.1,September 17, 2007 2 I MP Corrective Action Needed and Notes Installed? Maintenance Required? 16 Solid waste Containers X Yes E]No C�Yes X No 17 Equipment/Vehicle Yes X No ®Yes X No All heavy a\equipment associated with the construction Storage Area. project has been removed.No Heavy equipment presently stored on site. Overall Site Issues B P/activity Implemented? Maintenance Corrective Action Needed and Notes Re uIred? 1 Are all slopes and X Yes QNo ®Yes X No disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes UNo UYes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes UNo OYes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ®Yes X No Catch sacks have been removed from adjacent catch properly protected? basins for winter.The surrounding areas are protected by either hay bale—silt fence erosion controls and/or vegetated earth. 6 Is the construction exit X Yes ®No ®Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes UNo UYes X No areas collected and placed in covered dumpsters? Are washout facilities X Yes UNo ElYes X NO (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes UNo UYes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1,September 17,2007 3 BMp/activity ,! Implemented? Maintenance Corrective t�ctior►Needed and Notes Required? 0 Yes ®No ®Yes X No Not applicable.No construction materials are currently 10 Are materials that are stored on site. potential stormwater contaminants stored inside or under cover. i 1 Are non-stormwater X Yes ®No Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 7(Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: cERTTFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and tit Scott D.Kelloway,Professional IJn ineer Elate: r 1 Signature: 4 ! t EPA PPP Inspection Report, Version 1.1, September 17,2007 4 Stogy water Construction Site Ins tion Report General Inf atior Project Name ° Merrimack College north Campus Development —RP—DESTracking No. MAR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 1-24-16 staruEnd lime 4. - P Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-564$ Inspector's Qualifications specializing in construction Licensed Professional Engineer.Practicing over 15 years,sp g site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present please of up construction � o additional site work.Site has been assured cleanedand de-mobilized. previously exposed earth have been hydro seeded and vegetated providing temporary stabilization. Type of Inspection. Q Regular U Pre-storm event L1 During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? UYes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Feather at time of this inspection? X Clear ®Cloudy U Rain ® Sleet U Fog ®Snowing Ci High Winds Q Other: Temperature: 35 deg Have any discharges occurred since the last inspection? Oyes X No If yes,describe: Are there any discharges at the tune of inspection?QYes X No If yes,describe: BMP Corrective Action Neededand Notes BMP Installed? Maintenance Required?.__ EPA SWPPP Inspection Report, Version 1.1,September 17,2007 � Corr€c ive Action Needed,and Notes BMP Instilled? ' Maintenance g" nired2 1 Erosion Control- X Yes ®No ®Yes R No Sediment Barriers 2 Tree Protection X Yes ®No ®Yes X No 3 Stabilization of X Yes ®No ®Yes X No Construction,Access- Egress 5 Dust Control. ®Yes X No ®Yes X No 6 Erosion Control ®Yes X No ®Yes X No Blankets 7 Stockpiles ®Yes—X No ®Yes X No No stockpiles on site. 8 Diversion Channels! X Yes ®No UYes X No Swales 9 Sediment basins X Yes ®No ®Yes X No 10 Dewatering basins— ®Yes X No ®Yes X No filter bags. 11 Temporary Slope X Yes ®No ®Yes X No Stabilization 12 Permanent slope X Yes ®No ®Yes X No stabilization 13 Interior Site Erosion X Yes ®No ®Yes X No Controls 14 Temporary Check Dams X Yes ®No ®Yes X No 15 Street Sweeping ®Yes X No Yes X No EPA S RPP inspection Report, Version 1.1, September 17,2007 2 BMP B P' Corrective Action Needed Notes BMP Installed? Maintenance Required? 16 Solid Waste Containers X Yes ®No ®Yes X No 17 Equipment/Vehicle C�lYes X No ®Yes-X No All heavy projment associated with the co� ect has No heavy equipmen�ction Storage Area. has been presently stored on site. Ove Site Issues B :rall ctivity implemented? Maintenance Corrective c�cti�an Needed and Notes Requited? i Are all slopes and X Yes ®No ®Yes X No disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ®No ®Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes LINO ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ®Yes X No receiving waters free of any sediment deposits? 5 Are Catch sacks have been removed from adjacent catch storm drain inlets X Yes LINO ®Yes X No properly protected? basins for winter.The surrounding areas are protected by either hay bale—silt fence erosion controls and/or vegetated earth. 6 Is the construction exit X Yes UNo ®Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ®No Yes X No areas collected and placed in covered dumpsters? Are washout facilities X Yes UNo QYes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No DYes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PPP inspection Rapoft, Version 1.1, September 17, 2007 3 BMPLIOAre ivity implemented? Maintenance Corrective Action Needed and.Notes aired ®Yes Na ®Yes X No Not applicable.No construction materials are currently BMPrials that arestored.on site_ stormwater ants stored under cover. stormwater X Yes i�No LlYes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the infonnation submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." e: Se tt D. elloway.Professional n ia Print Weans and tal eer Bate: Signature: _ t EpA ), ppP Inspection Report, Version 1.1,September 17,2007 4 Stormwater Construction Site In es io Report General information Project Name " Merrimack College North Campus Developme NPDES'Traacking o. MAR12AZ77 Location 315 turnpike St. N.Andover i�a_ Date of Inspection 1-17-16 ---dStart/End Time 3: -3:30 p Inspector's Name(s) Scott D.Kelloway, Inspector's'Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01814 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of g No additional site work.Site has sectored cleaned up and de-mobilized. 0 Previously exposed earth have been hydro seeded and vegetated providing temporary stabilization. Type of Inspection: ®Regular ®Pre-storm event U During storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? ®Yes X No If yes,provide: Storm Start Date&Time: Storm.Duration(hhrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? €3 Clear Q Cloudy Q Rain E3 Sleet ®Fog X(Light)Snow U High Winds ®Other: Temperature: 31 deg Have any discharges occurred since the last inspection? UYes XNo If yes,describe: Are there any discharges at the time of inspection?UYes X No If yes,describe: DRIP BCorrective Action Needed demotes Installed? Maintenance e uired pA S Wppp Inspection Repot, Version 1.1,September 17,2007 I BMP8 1 Corrective Action N e and Dates Installed` Maintenance 1 ed`? 1 Erosion Control- X Yes ®No ®Yes X No Sediment Barriers 2 Tree Protection X Yes ®No UYes X No 3 Stabilization of X Yes UNo UYes X No Construction Access- Egress S Dust Control ®Yes X No UYes X No b Erosion Control ®Yes X No ®Yes X No Blankets 7 Stockpiles UYes X No ®Yes X No No stockpiles on site. 8 Diversion Channels/ X Yes ®No UYes X No Swales 9 Sediment basins X Yes o ®Yes X No 10 Dewatering basins— ®Yes X No ®Yes X No filter bags. i 1 Temporary Slope X Yes ®No ®Yes X No Stabilization 12 Permanent slope X Yes ®No ®Yes X No stabilization 13 Interior Site Erosion X Yes ®No UYes X No Controls l4 Temporary Check Dams X Yes ®No UYes X No 15 Street Sweeping L3yes X No UYes X No EPA inspection Report, Version 1.1, Septembers 17, 2007 2 Corrective Action Needed and Dotes ' Installed? Maintenance Required? 16 Solid Waste Containers X Yes dNo ®Yes X No 17 Equipment/Vehicle dyes—X NO dyes—X No All heavy a\equipment associated with the construction Storage Area. project has been removed.No Heavy equipment presently stored on site. Overall Site Issues verallctite I Implemented`, Maintenance Corrective faction bleed and Dotes BMP/aRequired? l Are all slopes and X Yes dNo dyes X No disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes dNo dyes K No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar EMPs? 3 Are perimeter controls X Yes dNo ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes dNo dYes X No receiving waters free of any sediment deposits? N6 -fs Are storm drain inlets X Yes dNo ®Yes X No Catch sacks have been removed from adjacent catch properly protected? basins for winter.The surrounding areas are protected by either hay bale—silt fence erosion controls and/or ve etated earth. the construction exit K Yes dNo ®yes X No preventing sediment from being tracked into the street? 7 is trashtlitter from work X Yes dNo dyes X No areas collected and placed in covered dumpsters? 8 Are washout facilities Y Yes LINO ®Yes X No (e.g.,paint;stucco, concrete)available, clearly marked,and maintained? Are vehicle and X Yes dNo UYes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PPP Inspection Report, Version 1.1, September 17,2007 3 BMP/activity Implemented? J%Jaintenance, Corrective Action Needed and prates Required? ❑Yes UNo ' UYes X No Not applicable.No construction materials are currently 10 Are materials that are stored on site. potential stormwater contaminants stored inside or under cover. I I Are non-stormwater X Yes ®No UYes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) UYes UNo Non-Compliance Describe any incidents of non-compliance not described above: L- CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing-violations." Print name and itlee Scott D.Kelloway.Professional Envyineer t tee Signature: �� g I ; EPA S PPP Inspection cart, Version 1. ,September 17,2007 4 Star water Construction Site Inspection Report General information ENPDES me " Merrimack College North Campus Development" racking No. IvIAR12AZ77 Location 3 i 6 turnpike St. N.Andover Ma. 1-10-16 Start/End Time 4:1 -4:40 prn Date of Inspection Inspector's Name(s) Scott D.Kelioway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 No additional site work.Site has been secured cleaned up and de-mobilized. a Previously exposed earth have been hydro seeded and vegetated providing temporary stabilization. Type of Inspection: ®Regular ®Pre-storm event U During storm event ®Post-storm event Weather Information Tlas there been a storm event since the last,inspection? X Yes ®No If yes,provide: Approximate Amount of Precipitation(in): Storm Start Date a&Time: Storm Durationk/ (hrs}: PP I.Sg' 1-9-16 2 PM Feather at time of this inspection? ®Clear ® Cloudy X Rain ®sleet U Fog®rnperatu®:Snowing deg ®High Winds Ll Other: Ilave any discharges occurred since the last inspection? ®Yes X No If yes,describe: Are there any discharges at flee tines of inspection?®Yes X No If yes,describe: BMP BMP Corrective Action Needed and Dotes BMP installed? Maintenance Required? EPA PPP inspection Report, l/ersPota f.t, September��,2�IDP � l� P BMPCorrective Action Needed anal dotes Installed? Maintenance aired? I Erosion Control- X Yes ®No ®Yes X No Sediment Barriers 2 Tree Protection X Yes ®No ®Yes X No 3 Stabilization of X Yes ®No ®Yes X No Construction Access- Egress 5 Dust Control ®Yes X No ®Yes X No 6 Erosion Control ®Yes X No ®Yes X No Blankets 7 Stockpiles Yes X No ®Yes X No No stockpiles on site. 8 Diversion Channels I X Yes ®No ®Yes X No Swales 9 Sediment basins X Yes ONO ®Yes X No 10 Dewatering basins— ®Yes X No ®Yes X No filter bags. i 1 Temporary Slope X Yes ®No ElYes X No Stabilization 12 Permanent slope X Yes UNo ®Yes X No stabilization 13 Interior Site Erosion X Yes ®No ®Yes X No Controls 14 Temporary Check Dams X Yes ®No ®Yes X No 15 Street Sweeping ®Ycs X Nu ®Yes X No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP B Corrective Action Needed and Notes BMP Installed? Maintenance R uired? I6 Solid Waste Containers X Yes EINo ®Yes X No 17 Equipment/Vehicle UYes X No Yes—X No prll heavy oJect has beenipment associated Nvith the retnoved.No Keay equipme�ttruction Storage Area. presently stored on site. Overall Site issues lI /acti�a ly implemented? Maintenance Corrective Action Needed and Notes Required?_ 1 Are all slopes and X Yes ®No ®Yes X No disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes QNo ®Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ®Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ®Yes—X No Catch sacks have been removed from adjacent catch properly protected? basins for winter.The surrounding areas are protected by either hay bate—silt fence erosion controls and/or ve etated earth. 6 is the construction emit X Yes ®No ®Yes X No preventing sediment from being tracked into !areas he street? 7 trash/litter from work TX Yes ®No UYes X No collected and placed in covered. dumpsters? 8 Are washout facilities X Yes LINO ElYes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes l]No ®Yes X No equipment fueling,- cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S F Inspection Report, Version 1.1, Septembers 17, 2007 l tivity Implemented? Maintenance Corrective Action Needed and Notes BMPRequired?. ®Yes ®No ( Yes X No Not applicable.No construction materials are currently 10 Are materials that are stored on site. potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ®No ®Yes X No discharges(e.g.,wash water,dewatering) ----_ properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated. the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and tit Scott D.Kelloway,Professional En ineer \t 1 Date: a Signature: f t EPA S PPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site lns ectinn 0 nrt General Information Pro ecY Name " Merrimack College Borth Campus Development:° NPDES'Tracking No. MAR12AZ77 Location 315 turnpike 5t. N. Andover 1V4a. Date of Inspection 1-2-16 Start/End Time 4:00 -4:30 P Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction � o additional site work.Site has been secured cleaned up an de-mobilized. 0 Previously exposed earth have been hydro seeded and vegetated providing temporary stabilization. Type of Inspection: ®During storm event ®Post-storm event ®Regular ®Pre-storm event Weather Information Has there been a storm event sines the leaf inspection? ®Yes X No If yes,provide: Approximate Amount of Precipitation(in): Storm Start Date&Time: Storm Duration(hrs): PP I ather at tine of this inspection?Clear X Cloudy ®Rain ®Sleet ®mperatureSn wing 35 deg ®High Winds Other: ave any discharges occurred since the last inspection? ®Yes X No If yes,describe: Are there any discharges at the time of inspection?®Yes X No If yes,describe: MP p Corrective Action Needed and Notes Installed? maintenance Re uired? EPA S PPP Inspection Report, Version 1.1, September 17, 2007 1 13 I IP Corrective Action Deeded an Notes BMPInstalled? Maintenance Ike paired? 1 Erosion Control- X Yes ®No ®Yes X No Sediment Barriers Tree Protection X Yes ®No FYes4No3 Stabilization of X Yes UNo Construction Access- Egress 5 Dust Control ®Yes XNo ®Yes XNo 6 Erosion Control UYes X No QYes XNo Blankets 7 Stockpiles ®Yes X No ®Yes X No No stockpiles on site. 8 Diversion Channels/ X Yes ®No ®Yes X No Swales 9 Sediment basins X Yes ®No UYes X No 10 Dewatering basins— ®Yes X No ®Yes X No filter bags. 1 I Temporary Slope X Yes ®No ®Yes X No Stabilization 12 Permanent slope X Yes ®No E3Yes X No stabilization 13 Interior Site Erosion X Yes ®No ®Yes X No Controls 14 Temporary Check Dams X Yes L]No ®Yes X No 15 Street Sweeping [ Yes X No ®Yes XNo EPA SYi PpP inspection Report, Version 1.1, September 17,2007 2 BMP B P BMP Corrective Action.Needed and Notes Installed? Maintenance Required? tb Solid Waste Containers X Yes ONo ®Yes X No 17 Equipment/Vehicle ®Yes X No UYes X No All heavy a\equipment associated with the construction Storage Area. project has been removed.No Heavy equipment presently stored on site. (Overall Site Issues B /activity Implemented? Maintenance Corrective Action Needed and Notes Re uired? 1 Are all slopes and X Yes QNo ®Yes X No disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ®No ®Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BWs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ®Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No Yes X No Catch sacks have been removed from adjacentJand/or properly protected? basins for winter.The surrounding areas are p by either hay bale—silt fence erosion controls vegetated earth. 6 Is the construction exit X Yes ®No ®Yes X No preventing sediment from being tracked into the street? 7 is trash/litter from work X Yes UNo UYes X No areas collected and placed in covered dumpsters? Are washout facilities X Yes �No ®Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No UYes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA s P Inspection Report, Version 1.1, September 17, 2007 It /activity implemented?, Maintenance Corrective Action Deeded and Notts Ige uired? ®Yes ®No ®Yes X No Not applicable.No construction materials are currently 10 Are materials that are stored on site. potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ®No ®Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and tit e: Scott D Iloway,Professional En inset Signature: fl Date: v i EPA S PPP Inspection Report, Version 1.1, September 17, 2007 4 y, P ktl�tS�� to § '�``F. "�tF"•�;� ~�� ���ti � y '�t����i .'ut LM1 F 4y- Vol b ,y � rs CIO Yt C �� � 3 ^u`�C t 5'° .� #" �iTx`��x _ ,�'s t 'fi r�+�k� 3t y�.f�`��F { �" °'- �"e •,, F {, t. `•' 4,y s su'S�,�m� "k ik`t` "1 "i . {�2F< 4 u ��� �' �;r�5' t��t�'d"�r{```{�F��a dr''}� R;3� Lr� z n "ayry� tf 3 tiya n�f' '�syr,�t`•�^f�``tsS> zew.k"x�f`�4 � �; �. ����� -., x � s ,.'�.���'�` x���� ��. �. F':, � r'� r' .�s �`���, n �s t�s� � � az x x .z� s �t 'i x?•~� a�,a;-�i - $ ���F'{ `§tv' Fr§gJ, ..a fd 6'Z,+v- t �z'3' �. �i•tt$ fir,G" y(,w � �,. r} 3 t isr 1 ,�� t r k t y � vim•"s� � '�` �' € NS•,m f" ir't��7,t zx't2 � .��3" a'#�x,9t�`tts��il k � ,r �t ��r t 1? . 't�S``;n 2����•�Ex er+ �k�� rr '+�� � 7 a+5 4�7t °�� �"� F will,� t=" n � } a� '. x. , L t f[ { A ik � ���� t'"�` �. �� ,� tj is r '� �4 ' � t �1 ;' r �� , t { ';��,;, rh .s�_ V ;S: 1> k' �} 7 ,Y� )� 1 l 4 �� t}, a � � Xf �� t��y 5! i t � , � ���� ' � t r'b= pp55 rt'- 3 at �Jr 1 y 'S {e. 1 v ) � � �', a, � i yM, �� }>"_ �� �t� ��d uc�i" i � �`��� t � �,� ��.r, }`� ' i µ :� � ��,r ��: �� i �1, .fk � u 4 �,.> � Y. t Y i�e � ti �`� S � Y� 3 t y�n� ��t�k �4'�r$ r� � ��r +� �y�€ �� f ti i � � f�f 4 U� �!$ �t �k � �i � � � n Y�rwc `� � � ��, � dui �� ���� f, � ��� hr T ?T�?� "� ,; P J r 4� rk Y i e hi' r t , a v r V a c� r b n i r �xr ail 'y �a`�a� ta�� 1� '�ri�a'�e,� �7 �'�,'n'� ,yr�,�'�'v'f"� •rv7. ,v� .z ,� �t a e„ v a r'x a��u�,^ ��?'a. e k�J�:�+-v K� �fa� r��ii 4s� h�.. �,�.y��'• ,"s:,� $��.,.��'4."; .. ��, „j}ti a �a Scott D. Kellowa'Y'. P.E. Professional Civil and Environmental Designs and Inspections. 148 North St Andover,Ma. 01810 Phone: (978)682-5054 M&Usc #40122 12/31/2015 North Andover Planning Department. Attn: Ms,Jean Enright North Andover Planning Dept. 1600 Osgood St. Suite 2035 N.Andover, Ma. 01845 Dear Ms. Enright, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development"project located at 315 Turnpike St. in Andover/N. Andover,Ma. DEP File#090-0750 Amended, NPDES Tracking No:MAR 12AZ77 This month's construction activities on this site include the following: • Complete proposed drainage installation—connection at Burke Rd. • All.trenches in parking areas and roads have been backfilled,compacted, and patched with bituminous pavement. • The site has been secured and de-mobilized. All heavy equipment has been removed for the site. • All areas of previously exposed earth have been graded, and hydroseeded for temporary or permanent stabilization. All erosion controls are presently maintained in suitable condition.All other BMPs including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment has been removed from the jobsite. Trash and debris have been appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. Pg: 1 /2 Pg: 2/2 At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices If you have any questions or concerns,please feel free to contact me at address kd on e number listed above. i ceL04 eScottloway,P.E. fF u y CC. (Via e-mal,paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Stormwater Congruction Site Inspection Report General Information Project Marne M6rrimack College North Campus DevelopmenC NPDES Tracking No. MAR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 12-24-I5 Start/End Time 3:300 PM—4:00 P Inspector'sName(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction e No additional site work.Site has been secured cleaned up and de-mobilized. ® All areas of exposed earth have been hydro seeded for temporary stabUization. Type of Inspection: ll Regular U Pre-storm event wring storm event ❑Post-storm event Weather Information s there been a storm event since the last inspection? a No If yes,provide: Storm$tart Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? X dear OCloudy, Cl Rain 0 Sleet Cl Fog ®Snowing U High Winds t3 Other: Temperature: 65 Deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: i Are there any discharges at the time of inspection?byes X No If yes,describe: s i P BMP BMP Corrective Action Needed and Notes Installed? Maintenance e aired' 4 EPA SWPPP Inspection Report, !Version 1.1, September 17,2007 1 BAW BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uire I Erosion Control- 1AYes ❑No L3YQj6Wb Sediment Barriers 2 Tree Protection ❑Yes ❑No ❑Yes 04o 3 Stabilization of Yes ❑No ❑Yes No Construction Access- Egress 5 Dust Control ❑Yes o ❑Yes No 6 Erosion Control ❑Yes LNo ❑Yes QNo Blankets 7 Stockpiles ❑Yes ONo ❑Yes i3No 8 Diversion Channels IdYes ❑No ❑Yes ONo Swales i 9 Sediment basins UYes ❑No ❑Yes Lallo 10 Dewatering basins— ❑Yes LENo ❑Yes LANo filter bags. I I Temporary Slope es ❑No ❑Yes-�3No Stabilization 12 Permanent slope Yes ❑No ❑Yes UfNo stabilization 13 Interior Site Erosion UfYes ❑No ❑Yes LdNo Controls 14 Temporary Check Dams UYes ❑No ❑Yes UNo 15 Street Sweeping ❑Yes UNo ❑Yes 011o EPA SWPPP Inspection Report, Version 9.1,September 97, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance air 16 Solid Waste Containers QYes N QYe 'ca 17 Equipment i Vehicle QYes o �lYes a Storage Area. Overall Site Issues lI /activity Implemented? Maintenance Corrective Action Deeded and Notes Required? 1 Are all slopes and QYes QNo QYes QNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource lY'es QNo Dyes Uo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls UVes QNo QYes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es QNo ❑Yes LIKO receiving waters free of any sediment deposits? 5 Are storm drain inlets es QNo EJYes No properly protected? 6 Is the construction exit UYes QNo QYes o preventing sediment a from being tracked into the street? 7 Is trashilitter from work ElYes QNo QYes LlNo areas collected and placed in covered dumpsters? 8 Are washout facilities , es ®Na QYes LKO (e.g.,paint,stucco, concrete)available, g clearly marked,and maintained? ' 9 Are vehicle and UYes UNo ®Yes UNo equipment fueling, cleaning,and maintenance areas free € of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report Version 1.1,September 17, 2007 3 BMP/activity Implemented:' Maintenance Corrective Action Needed and Notes Re uired7 s ®No ®Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater s ®No UYe N discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowring violations" r Print name and t* I . Scott D.Kelloway,Professional Engineer f f Signature: r Date: 1AA-el 's L EPA SWPPP Inspection Report, Version 1.1,September 17, 2007 4 Stormwater Construction Site Inspectiono General In€c ',za Project Name irnack Coltege4forth Campus Development' DI S Tracking No. NUR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 12-18-15 Start/End Time 3:00 PM—3:30 P Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 No additional site work.Site has been secured cleaned cap and de-mobilized. 0 All areas of exposed earth have been hydro seeded for temporary stabilization. T e of Inspection: T I e;of ar oPrc-storm event Q During stoma event Q Poste storm event `i?t�eather Information Has there been a storm event since the last inspection? e" o If yes,provide: Storm tart Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? X Clear ClCloudy Ll Rain ❑Sleet Cl Fog Ll Snowing Ll High Winds, *Other: Temperature: 45 Deg Have any discharges occurred since the last inspection? UYes X No If yes,describe: Are there any discharges at the time of inspection?UYes X No If fires,describe: i B _ Corrective Action Needed and Notes Installed? Maintenance It EPA SYYPPP Inspection Repoftt Version 1.1,September 17,2007 1 € BMP BMP 9UP Corrective Awn Needed and dotes Installed? Maintenance R uir 1 I Erosion Control- -.-es LINo ®Yes o Sediment Barriers 7 Tree Protection -' es C1No ®Yes UNo 3 Stabilization of U es ®No ®Yes Colo Construction Access- Egress 5 Dust Control es ®No ®Yes U to I 6 Erosion Control UYes ®No ❑Yes 9140 Blankets 7 Stockpiles aYes ®No ®Yes ZNo 8 Diversion Channels LdYes ®No ®Yes IdNo Swales 9 Sediment basins LdYes ®No ®Yes LJNo i 10 Dewatering basins— CYes `1No ❑Yes UNo filter bags. I I Temporary Slope Q'Yes ®No l]Yes €jNo Stabilization PZ Permanent slope ® 'es 0N0 ❑Yes LfNo stabilization 13 s Interior Site Erosion Yes ONo L3YesONo Controls l 1 14 ? Temporary Check Dams ❑Yes Mo ®Yes L11-4o E d , s 15 Street Sweeping ®Yes QNo ®Yes URo 3 i EPA SWPPP Inspection Report, Version 1.1,September 17,2007 2 BMP BMP FIIVIP Corrective Action Needed and Notes Installed? Maintenance Re uir 16 Solid Waste Containers OYes Oyes , 17 Iquipment/Vehicle ®Yes o Oyes o eras es Storage Area. Overall Site Issues B /activity Implemented? Maintenance Corrective.fiction Needed and Motes Re aired 1 Are all slopes and OYes ®No Yes No disturbed areas not actively being worked properly stabilized? 2 Are natural resource O es ONo OYes UNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls UYes ONo OYes UNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and UYes ONo ❑Yes GINo receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes ONo OYes Eii o properly protected? 6 Is the construction exit ElYes ONo OYes LdNo preventing sediment from being tracked into the street? 7 Is trash/litter from work UYes ONo Oyes o areas collected and placed in covered dumpsters? 8 Are washout facilities es ONo ❑Yes No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and O es ONo OYes ®No equipment fueling, ` cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 $ /activity ImPleme ? Maintenance A Corrective Action,Needed and Notes es L3No _ ®fie .o 10 Are materials that are � � potential stormwater contaminants stored inside or under cover? In 11 Are non-stormwater o L]Yes o discharges(e.g.,wash water,dewatering) properly controlled? 12 4 (Other) ®Yes LINo Non-Compliance Describe any incidents of non-compliance not described above: s i CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.used on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, d complete.l am aware that there are significant penalties for submitting false information, including the posse i° of fine imprisonment for knowing violations." Priest name and title� � tt I}_ ellowa, Professional Engineer Signature: I Matt: i, J EPA S PPP Inspection Report, Version 1_4, September 17,2007 4 Stn>r water Construction Site Inspection e General Information Project Name "Merrimack College North Campus Development" NPDES Tracking No. MAR12AZ77 location 315 turnpike St. N.Andover Ma. Date of Inspection 12-10-15 Start/End Time 3:30 la —3:55 P Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's qualifications Licensed Professional Engineer.Practicing over IS years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction ® Completed proposed drainage installation at Burke Rd.All patching of parking area has been completed. ® Site has been secured cleaned up and demobilized. ® All areas of exposed earth have been hydro seeded for temporary stabilization. T e of Inspection: Regular ®Pre-storm event ®During storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? X Clear UCloudy ® Rain 0 Sleet U Fog U Snowing 13 High Winds ®Other: Temperature: 55 Deg Have any discharges occurred since the last inspection? ®Yes X No If yes,describe: Are there any discharges at the time of inspection?llYes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17,2007 1 131V P BNW BIVW Corrective Action Needed and dotes ]Installed? Maintenance Required? 1 Erosion Control- CJYes L]No C]Yes o Sediment Barriers 2 Tree Protection UYes ❑No ®Yes LrNo 3 Stabilization of LdYes UNo ®Yes LrNo Construction Access- Egress .- 5 Dust Control ®Yes UNo ®Yes o 6 Erosion Control L]Yes Lallo ®Yes Uffo Blankets 7 Stockpiles ®Yes ` o UYes-3No 8 Diversion Channels Wfes UNo UYes UNo Swales f 9 Sediment basins UVes ®No ®Yes o 10 De watering basins— L7Yes L-fNo ®Yes No filter bags. 11 Temporary Slope IlYes ®No UYes LdNTo -o�2" x -1 Stabilization AM 12 permanent slope Wes UNo ®Yes ljKo stabilization 13 Interior Site Erosion Ules ®No UYes o Controls 14 Temporary Check Danis es UNo UYes o 15 Street Sweeping Oyes ®NO LlYes Ugo - EPA SWPPP Inspection Report, Version 1.1,September 17,2007 2 BW BMP BMP Corrective Action Needed and Notes Maintenance Required%� lb Solid Waste Containers UYes (ado LJYes UNo I7 Equipment/Vehicle UYes ONo CIYes No � vim" � Storage Area. Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Ree wired? I Are all slopes and QYes UNo QYes ®No disturbed areas not actively being worked properly stabilized? 2 Are natural resource es UNo UYes ZINo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers 1 or similar BMPs? 3 Are perimeter controls es UNo UYes ONo g and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es QNo UYes LdNo receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes ❑No ®Yes ZlNo properly protected? 6 Is the construction exit es ®No ®Yes I o preventing sediment ' from being tracked into the street? 7 Is trash/litter from work es ®No LJYes LINo areas collected and placed in covered dumpsters? 8 Are washout facilities UYes ®No ❑Yes No (e.g.,paint,stucco, concrete)available, clearly marked,and i maintained? 9 Are vehicle and UYes CINo LlYes r No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PPP inspection Report, Version 9.1,September 17, 2007 3 1IMPlactivity Implemented? :Maintenance Corrective Action Needed and Notes Required?--, Y s_QNa ®Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater ales UNo ®Yes o discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) LIYes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name am title: Scott D.Kellowav Professional En sneer Signature: - Date: EPA SWPPP Inspection Deport, Version 1.1, September 17, 2007 4 Stu>r water Construction Site Inspection Report General Information Project Name Merrimack College North Campus Development" NIPDES Tracking No. MAR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 12-3-15 Start/End Time 3:15 P —--- PM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction ® Completed proposed drainage installation—connection at Burke Rd.All structures installed and back filled .Awaiting trenches have been patched with bituminous concrete. ® Bituminous concrete berm installed along edge of parking lot as per proposed plan. ® Site has been secured cleaned up and de-mobilized. T e of Inspection: Regular ❑Pre-storm event ❑During storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? XYes ®No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 12/3 8 AM 24 hrs+/- .75"+ Weather at time of this inspection? ❑Clear ®Cloudy X Rain ®Sleet ®Fog ®Snowing ❑High Winds Other: Temperature: Have any discharges occurred since the last inspection? ®Yes UNo If yes,describe: Are there any discharges at the time of inspection?®Yes UdNo If yes,describe: EPA SUIIPPP Inspection Report, Version 1.1,September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Instil? Maintenance Re aired? I Erosion Control- &Ves ONo ®Yes ONo Sediment Barriers 2 Tree Protection Wes ONo ®Yes Mo 3 Stabilization of Cd Yes ®No ®Yes No Construction Access- Egress 5 Dust Control Yes ®No ❑Yes ai o 6 Erosion Control ❑Yes UNO ®Yes URO Blankets 7 Stockpiles Oyes o ❑Yes ONO kKO 8 Diversion Channels/ Yes ®No Oyes o Swales 9 Sediment basins es ONo ®Yes LINo 10 Dewatering basins— ®Yes llo ®Yes No filter bags. 1 I Temporary Slope es ®No ®Yes t3No Stabilization 12 Permanent slope Yes ONo OYes No stabilization 13 Interior Site Erosion Wes ONo ®Yes qNo Controls 14 Temporary Check Dams UVes l7No OYes Qf4o 15 Street Sweeping Of es ®No ®Yes UNo EPA SWPPP Inspection Report, Version 9.9,September 17,2007 2 BMP !Yes B1klP Corrective Action Needed and Notes ta `d? Maintenance Re aired? 16 Solid Waste-Containers ®No ❑Yes UNo 17 Equipment/Vehicle "CONo ❑Yes UNo Storage Area. Overall Site issues B /activity Implemented? Maintenance Corrective Action Needed and Notes Re uired? 1 Are all slopes and ❑Yes ®No ®Yes ®No disturbed areas not actively being worked properly stabilized? % 2 Are natural resource UYes ®No ®Yes No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es QNo ❑Yes1No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and LfYes ®No ®Yes Of4c, receiving waters free of any sediment deposits? 5 Are storm drain inlets LJYes ❑No LJYes UNo properly protected? tr 6 is the construction exit Yes ®No ®Yes iNo preventing sediment from being tracked into the street? 7 Is trashllitter from work QYes UNo ❑Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities UYes ®No ❑Yes UNo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and Wes ®No ❑Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17,2007 3 BMPfactivity Implemented. Maintenance Corrective Action Needed and Notes Re nir es ®No LiYes 10 Are materials that are potential stormwater contaminants stored inside or under cover? I I Are non-stormwater Yes ®No ®Yes UXo discharges(e.g.,wash water,dewatering) properly controlled? r-) (Other) ❑Yes CINo Non-Compliance Describe any incidents of non-compliance not described above: d CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possility of fine and imprisonment for knowing violations." Print name and t4tt : Scott D.Xellowaly,Professional EnIzineer Signature: a Bate• j EPA SWPPP Inspection Report, Version 1.1, September 17,2007 4 �,�:.� ;: � :, �M .w ti,, �_ �� N � . �` �.. � � " .. �� ��� �,��; ,g'��� ��� � �� y�� �� ,. ��. . �, <� � � �< �.� '� ��� � � ��,-� ���,� �.- � � s,,. .fir. b x � N v w z t➢�£ t;�ft�ar„. � s het{s}��ic�`iIr��} K �2�§1'�7`i 1�1 r � }t, t i u { t� rt� r t t i g "f P�a ott D. Kelloway, Professional Civil and Environmental Designs and Inspections. 148 North St.Andover,Ma.01810 Phone: (978)682-5054 Ma. Lisc #40I22 10/31/2015 North Andover Planning Department. Attn: Ms, Jean Enright North Andover Planning Dept. 1600 Osgood St. Suite 2035 N.Andover, Ma. 01845 Dear Ms. Enright, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development"project located at 315 Turnpike St. in Andover/N. Andover,Ma. DEP File#090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This month's construction activities on this site include the following: ® Complete utility installation from Rock Ridge Rd to future site of residence buildings 43 -#4. • Continued proposed drainage installation—connection at Burke Rd. WQU—C1, DCB—CI &C2, as well as 12 and 15"RCP connecting same to existing 48 Drain line. Installed and back filled. Awaiting patching of trenches. ® Improvements and maintenance of BMP's. ® Miscellaneous site work. All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment is being stored, fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. pg. 1 /2 Pg: 2/2 At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is tieing performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices If you have any questions or concerns,please feel free to contact me at adtress aid pione number listed above. S�ncerely, Scott D.Kella`v�y,P.B. CC. is e-mal (� ,paper copy upon request): Lynn Kramer 'Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Storrrlwater Construction Site Inspection Report General Information Project Name Merrimack College North Campus DeveloF315 NPDES Tracking No. MAR12AZ77 Location rnpike St. N.Andover Ma. Date of Inspection 11-28-15 Start/End Time 4:15 PM—4:45 PM Inspector's Name(s) Scott D.Keiloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction ® Continue utility installation from Dock Ridge Rd to(future site o residence buildings#3- 4. ® Improvements and maintenance of B P's. ® Continued proposed drainage installation—connection at Burke Rd. WQU—C1, DCB—C1 &C2, as well as 12 and IS" RCP connecting same to existing 48 Drain line.Installed and back filled .Awaiting patching of trenches. ® Miscellaneous site work and clean up and continued de- mobilization of worksite. Tyke of Inspection: _Regular D Pre-storm event ❑During storm event D Post-storm event Weather Informatio Has there been a storm event since the last inspection? ®Yes o If yes,provide: Approximate Amount of Precipitation(in): Storm Start Date&Time: Storm Duration(hrs): PP Weather at time of this inspection? dClear ®Cloudy D Rain ❑Sleet D Fog LI Snowing ®High Winds ®Other: Temperature: Have any discharges occurred since the last inspection? ®Yes ZNO If yes,describe: Are there any discharges at the time of inspection?Dyes 13NO If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 9 BMP B BNiP Corrective Action Needed and Notes lfd tailed? Maintenzance 1 Erosion Control- Re aired? #Yes ®No CJYes ©No Sediment Barriers 2 Tree Protection Ulf es ®No LUYes o 3 Stabilization of es CQitlo CiYes?3No Construction Access- Egress 5 Dust Control Yes ®No DYes L'No 6 Erosion Control 'r+ ®Yes CdNo UYes o Blankets 7 Stock-piles � P Yes o € Yes o 8 Diversion Channels r-Yes ®No 13Yes o Sti,ales 9 Sediment basins es 11No C1Yes NTo 10 Dewatering basins— ®Yes No L]Yes No filter bags. 17 Temporary Slope CYes ®No ®Yes No Stabilization 12 Permanent slope YeS ®No ®Yes. No stabilization 13 Interior Site Erosion es ®No ®Yes o Controls 14 Temporary Check Dams 'es CiNo ❑Yes U,40 15 Street Sweeping UYes ®No [-Yes o Ef'A SINPPP Inspection Report, Version 1.9,September 97,2a07 2 BMP B B Corrective Action Needed and Notes I led? 1Vtainternance RR dired2' 16 Solid Waste Containers ❑Yes ❑No ❑Yes o 17 Equipment/Vehicle es ❑No ❑Yes No Storage Area. Overall Site Issues Maintenanceg�(PJactivity Implemented`: Maintenance Corrective Action Needed and Notes Required? _ 1 Are all slopes and ❑Yes ❑No ®Yes ❑No disturbed areas not actively being worked properly stabilized? 2 Are natural resource Yes ❑No ❑Yes No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es ❑No ❑Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and ❑ es ❑No ❑Yes ❑No �i receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes ❑No ❑Yes No properly protected? 6 Is the construction exit ®Yes ❑No ❑Yes No preventing sediment from being tracked into the street? 7 Is styeash litter from work es ❑No ❑Yes , No areas collected and placed in covered dumpsters? 8 Are washout facilities es ❑No Yes No j (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and Yes ❑No ❑Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SINPPP Inspection Report, Version 1.1, September 17, 2007 3 li3MPJaetivity Implemented? Maintenance Corrective Action Needed and Notes Re uir es ONO OYes ® ` 10 Are materials that are Potential stormwater contaminants stored inside or under cover? 11 Are non-stonnwater Yes ®No ClYes LINO discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes L No YCncen bv Describeyins n- mantdb 9 CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurat , d complete.I am aware that there are significant penalties for submitting false information, including the poss�bil ty of fine and imprisonment for knowing violations.- Print name and t e Scott. wa Professional Engineer Signature: � V1 Date: EPA 3 PPP Inspection Report, Version 1.1, September 17,2007 Stor water Construction Site Inspection Report General Information Project Name " Merrimack College North Campus Development" NPD ES Tracking No. MAR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 11-20-15 Start/End Time 4 PM—4:45 PM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction ® Continue utility installation from Rock Ridge Rd to(future site of residence buildings#3-##4. ® Improvements and maintenance of BMP's. ® Continued proposed drainage installation—connection at Burke Rd. Including WQU—C1, DCB—C1 &C2,as well as 12 and 15" RCP connecting same to existing 48 Drain line. ® Miscellaneous site work and clean up De-mobilize site. Type of Inspection: ❑Regular ❑ Pre-storm event Dwing storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? Yes UNo If yes,provide: Storm Start Pate&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at ime of this ins ection? U Clear ®Cloudy U Rain U Sleet U Fog ❑Snowing U High Winds U Other: Temperature: u Have any discharges occurred since the last inspection? ❑Yes U114o If yes,describe: Are there any discharges at the time of inspection? UYes WNo If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BmP B1Vl!P BMP Corrective Action Needed and Notes Installed? Maintenance Re aired? I Erosion Control- UVes ONO Dyes ONO Sediment Barriers 2 Tree Protection UYes ®No ®Yes t;lo 3 Stabilization of LWes ®No ®Yes ONO Construction.Access- Egress 5 Dust Control LrYes ®No ❑Yes o 6 Erosion Control ®Yes 0 4o Dyes Ito Blankets 7�0ckpiles ®Yes No ®Yes No 8 Diversion Channels/ LlYes ONO ❑Yes IdNo Swales f 9 Sediment basins ®Yes ®No ®Yes ONO 10 Dewatering basins— ®Yes LItvo ❑Yes o filter bags. 11 Temporary Slope Q es ®No ❑Yes UNo Stabilization 12 Permanent slope es ®No ®Yes U1,4o stabilization 13 Interior Site Erosion LJYes ®No ®Yes UNo Controls 14 Temporary Check Dams U Yes ®No ®Yes LINO 15 Street Sweeping Yes ®No ®Yes [i3No EPA SWPPP Inspection Report, Version 9,9, September 17, 2007 2 BM !es P BMP Corrective Action Needed and Dotes alled? Maintenance Re uired? 16 Solid Waste Containers ®No Dyes o 17 Equipment/Vehicle UYes ®No Dyes o Storage Area. overall Site Issues FAre ctivity Implemented`? Maintenance Corrective Action Needed and Notes Re uired? slopes and es ®No Dyes ®No ed areas not y being worked ly stabilized? tural resource [3Yes ®No ®Yes Noe.g.,streams, ds,trees,etc.) ted with barriers / or similar BMPs? 3 Are perimeter controls Yes ®No ®Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Dyes ®No ®Yes ®No receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes ®No ®Yes LJIN0 properly protected? 6 1s the construction exit es ®No ®Yes o preventing sediment from being tracked into the street? 7 is trash/litter from work es ®No Dyes No areas collected and placed in covered dumpsters? 8 Are washout facilities ®Yes No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? g Are vehicle and ayes LINO ®Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 3 EPA SWppp Inspection Report, Version 1.1, September 17, 2007 >BlOIP/activity Implemented? Maintenance Corrective Action Deeded and Notes Re uir Y s ❑No 10 Are materials that are ❑Ye; o potential stormwater contaminants stored inside or under cover? r' 11 Are non-stormwater es ❑No ❑yeS 0 discharges(e.g.,wash water,dewatering) Properly controlled? 12 (Other) ®Yes ®No 7anyincidents of non-compliance not described above:m lianee CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared tinder my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibi ' of fine and imprisonment for knowing violations." Print name and ti IC Scott D.1K Iowa professional Eu ineer Signature: ' ` Date: l 2.�l EPA SWPPP inspection Report, Version 1.1, September 17, 2007 Stor water Construction Site Ins ection Report General Information Project Name " Merrimack college North Campus Developments MAR12AZ77 Location 315 turnpike St. N.AndoveqMa. NPDES Tracking No. _4-20 P Date of Inspection 11_12-15 Start/End Time 3: P Inspector's Name(s) Scott D.Keiloway, inspector's Title(s) Professional Engineer inspector's contact Information 148 North St.Andover,ma.(11810 (978179-5648 inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of Rd construction � Continue utility installation from Rock Ridgeto(future site o residence buildings 93- . ® Improvements and maintenance of 13 F's- Continued proposed drainage installation—connection at Burke Rd.Including WQU—C1,DCB—C1 ear.C2,as well as 12 and 15" RCP connecting same to existing ail$Brain line. ® Miscellaneous site work and clean up de mobilizing equipment from site. Type of Inspection: Q Regular ®Pre-storm event ®During storm event ®Post-scorn,event Weather information Has there been a storm event since the last inspection? LlYes QN0 if yes,provide: Approximate ount of Precipitation(in): Storm Spa Date&Time: Storm Duration(hrs): if Weather at ti of this inspection? C3 Clear Cloudy ®Rain ®Sleet CI Fog C Snowing ®High minds Temperature LlOther: 4a Have any discharges occurred since the last inspection? UYes LdNo if yes,describe: Are there any discharges at the time of inspection?UYes o If yes,describe: EPA SINPPP Inspection Report, Version 1.1, September 17,2007 1 B1;liP BMP BMP Corrective Action Needed and Notes Installed? Maintenance 1 Erosion Control- Re hired Sediment Barriers Yes ONo OYes No 2 Tree Protection es ONo OyeS o 3 Stabilization of Yes ONo Yes No Construction Access- Egress 5 Dust Control Yes ONo Oyes No € b Erosion Control Oyes No OYes No Blankets 7 Stockpiles Yes UNo OYes No 8 Diversion Channels t Yes ONo OYes o Swages 9 Sediment basins Yes ®No OYes UNo, 10 Dewatering basins— ®yes o ®yeS No filter bags. 11 Temporary Slope Yes ONo ❑Yes No Stabilization 12 Permanent slope Yes ONo O yes o stabilization 13 Interior Site Erosion Yes ONo OYes No Controls 14 Temporary Check Dams Yes ONo OYes 10No 15 Street Sweeping LJYes ONo ®Yes No — SPA SWPPP inspection Report, Version 1.7, September 97,2007 2 Scott D. KeII0WaY_9 P*E* professional Civil and Environ"Iental Designs and Inspections- 1,48 North St.Andover,Ma. 01810 Phone- (978) 682-5054 Ma. Lisc #40122 10/31/2015 North Andover Planning Department. Attn: Ms, Jean Enright North Andover Planning Dept. 1600 Osgood St. Suite 2035 N. Andover,Ma. 01845 Dear Ms. Enright, inspection reports 315tTug�nro ,Meack Please refer to the attached field ,project located at pike St. in Andover/N. college North campus Development' Andover,Ma. DEP File 9-090-0750 Amended, NPDES Tracking T N O: MAR 12AZ77 This month's construction activities on this site include the following: * Re-location of temporary access road has been completed and aved w/binder. * over excavation and removal of unsuitable subsoil for residencpe Building 4. Replace same W/compacted gravel. Rock Ridge Rd to future site of residence * Commence utility installation from buildings#3 -#4. stockpiled material. * Removal Of Previously icinity of future site of residence buildings#3 * Re- grading of exposed earth areas in v -94.Hydro—seed exposed earth areas in vicinity of future site of residence buildings 4 * 44 for temporary site stabilization. • Maintenance and improvements of BMP • Miscellaneous site work. All erosion controls are presently maintained in suitable con installed,and dition. All othern Bsuitable MTS including sediment traps inside drainage structures correctly are i n. All equipment is being stored,fueled and maintained in a contained conditio approptely and disposed outside wetland resource areas.Trash and debris are beingencroachment of. G g p radin is resently consistent with the approved site plan.There has been no within restricted areas. ed BMP'S w/in the work zone to minimize The Contractor has maintained and iMPTOV infiltration of sediment to drainage structures w/in the work zone- pg: 1/2 Pg: 2/2 At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices If you have any questions or concerns,please feel free to contact me at address number listed above. Sincerely co I t Cott D. Kelloway, E. CC. (Via e-mal,paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Stogy water Construction Site IMP iport General information Project Name " PJierrimaek Co4lege North Campus ;ovation Ef9-2,�-n5 Start/End Time pus Development' turnpike fit. N.Andover Ala. 1�PDES Tracking No. 4P _4: Date of Inspection Inspector's Name(s) Scott D.Kelloway, )s(( irnspector,s'TitEe Professional Engineer Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Title(s) Inspector's Qualifications Licensed Professional Engineer.Practicing over IS}ears,specializing in construction ' site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of Continue utility installation from cRidge Rd to(future site of construction residence buildings#3- ® improvements and maintenance of B P's. * Begin drainage installation--connection at Burke Rd. o significant site work. Type of Inspection: ular �Pre-storm event C Durintr storm event ®Post-storm event U Re Weather in ,naat�on Has there been a stores even since ties last inspection? pyes UNo if yes,provide: Storm Duration(hrs): Approximate Amount of Precipitation(in): Storm Sta. Date&Time: eather`"at time of this isnsction? C Clear Cloudy r Raun ®Sleet U Fog El Snowing High Winds Temperature* U father: Have any discharges occurred since the East inspections? ElYes No If yes,describe- Z Are there any discharges at the time o:inspection?UYes if yes,describe: BAP P HMP Corrective Actions Needed.and Notes JEsnstaEled? Maintenance zj e uired? I Erosion Control- C Yes UNo ®Yes o Sediment Barriers 1 EpASWppp inspection Report, Version 1.1, September 17, 2007 Corrective Action Deeded and Notes IuStallgd? Maintenance Re uireQ 2 Tree Protection LdyeS DNo / Dyes o 3 Stabilization of Yes DNo Dyes o Construction Access- Egress 5 Dust Control ®Yes No Dyes DNo 6 Erosion Control DYes o Blankets DYes 7 Stockpiles Dyes La NO r ®Yes No 8 Diversion Channels/ 21Yes DNo ®Yes IdNo Swales 9 Sediment basins C Yes DNo ®yes No 1 0 Dewatering basins— Yes DNo filter bags. DYes No 11 Temporary Slope es DNo DYes Llo Stabilization 12 Pennanent slope es DNo DYes No stabilization 13 Interior Site Erosion es No DYes No Controls 14 Temporary Check Dams Yes L]No DYes o 15 Street Sweeping P g es DNo ®yes RNo 16 Solid Waste Containers ®Yes DNo DYes DNo SPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 €P Bl i' li iP Corrective Action Deeded and Notes Installs,? Maintenance e uire - 17 Equipment/vehicle l 'es UNO QYe o Storage Area. Overall Site Iss€€es IY PIac(ivity Implemented? I l aintena�nce Corrective Action Needed and Notes Teti?, 1 Are all slopes and Yes No ®Yes o disturbed areas not actively being worked properly stabilized? % 2 Are natural.resource ElYes LINO OYes UN ZO areas(e.g.,streams. wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls 'es LIN To Yes �Na and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and I -' es L3No LlYes ONo receiving waters free of any sediment deposits? 5 Are storm drain inlets f �Yes ®No �UYcs�No properly protected? 1 6 —Is—the construction exit Yes ®No LlYes No preventing sediment from being tracked into the street? 7 Is trashllitter from work �Yes �No Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities es No QYes No paint,stucco, concrete}available, f clearly marked,and maintained? 9 Are vehicle and es LINO UYes No equipment fueling, cleaning,and maintenance areas free of spills,leafs,or any other deleterious material? = l�Yes No L�Yes �No materials 3 BMA'/activity Implemented`: Maintenance Corrective Action Needed and Notes contaminants stored inside or under cover? I l Are non-stormwater Yes UNo ®Yes UNo discharges(e.g.,wash water,dewatering) properly controlled? l2 (Other) 0Yes ®No Non-Goan fiance Describe any incidents of non-compliance not described above: CERTI€+'ICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accur�t'p,and complete.I am aware that there are significant penalties for submitting false information, including the posSi alit} o fine and imprisonment for knowing violations." Print Weans and'` 'H Scott D.Keliomva �aofessioaaai En i€seer I I � Signature: t i G�-� Date: EPA aWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater ConstructioR Site Insp tion Rep rs General Information Project Name MerrirnEi �o[ie e North��r€rpus L�e�elopment IAR12AZ77 f ocation 315 turnpike 5t. { .Andover PDES Tracking No. 4 PM—4:35 P Date of inspection 10-23-15 Starte`i✓nd T`ie Inspector's Name(s) Scott D.Kellw ray, Inspector's Title(s) Professional Engineer inspector's contact Information 148 North St.Andover, )479-5648 nspector,s Qualifications Licensed Professional Engineer.Practicing over 15}rears,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of santiratae utilitY istaininstallationfrom Rock Ridge Rd to(future site Of construction residence buildings improvements and maintenance of B la's. ® Begin drainage installation—connection at Burke Rd. No significant site work. 'I' a o€lE�aspection: Regular �Pre-storm event During storm event C�Lost-storm event eatiter nfortatatii was tisere beau.a storm event since the last inspection`? C3Yes ,o � it'yes,provide: Approximate Amonnt of Precipitation(in}: Storm Start Date&Time: Storm Duration(lus): epdher at time of this inspection' Clear i�Clot�dy Rain Slut C31'og Snowing iIigltS3inds El Other: Temper tare: . / ave any discharges occurred since the last inspection`? Yes o If yes,describe: f Are there any discharges at the time of inspection?UYes " No If yes,describe: j BMP BMIP Corr tine Action Needed and Notes BYR installed? Maintenance i R aired? 1 Erosion Control- ElYes ®No Llyes 4'No Sediment Barriers EPA PPP Inspection Report, Version 1.1,Septembers 17,2007 COrreefive Attion Needed end Notes Insta ed? aintena ce R abed? ? Free Protection es ONO � Elyes I f _ o Stabilization of es WINO UYes ONO Construction Access- Egress 5 Dust Control , f� Yes No Yes No 6 Erosion Control QYes No Yes �o Blankets i i Stockpiles Yes No ®Yes No 41 P Diversion Channels Uyes LIl�lo Oyes o Swales j 9 Sediment basins des QNo ®Yes o I 10 ' Dewaterin basins— f � 1 � es QNo Oyes ElNo filter bags. [ l.1 Temporary Slope 'es QNo l Yes No Stabilization 12 Permanent slope res LJNo UYes EINo s stabilization 8 � a 1J ; Interior site Erosion Yes LINo C�Yes o Controls 14 Temporary Check Dams Yes LJNoLOWS o 15 , Street Sweeping Yes QNo Yes 1�Io 16 Solid Taste Containers j L-4yes QNo LYes vQ 777p t 9 f C EP4 SWPPP In-s ec o Report, Verslon 1.1,September,17, 0 7 BMP BMP BMP Corrective Action Needed and Notes I lle€i? Maintenance e uire . 17 Equipment r Vehicle Yes LJNo UYes o Storage Area. Overall Site Issues I�I�I�factit�ity l�pteae�ca�ted? Maintenance Corrective Action Needed and dotes Re uiresl? 1 Are all slopes and Yes LINo UYes UNo disturbed areas not actively being worked roperly stabilized? 2 Are natural resource Ies �3No C�Yes �No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar B Ps? es �No �Ye S ®N° 3 Are perimeter controls and sediment barriers adequately installed (keyed into substrate) f' and maintained? 4 Are discharge points and CYes No CIYes No receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes LlNo UYes UNo properly protected? Is the construction exit es ®No UYes No preventing sediment from being tracked into the street? / 7 is trashf Litter from work Yes �No Yes �No areas collected and placed in covered dumpsters? / rr 8 Are washout facilities Yes UN o � ElYes o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? yes �No Yes No 9 Are vehicle and equipment fueling, cleaning,and maintenance areas free i of spills,leaks,or any other deleterious material? es LED33No ®Yes o 10 Are materials that are potential storrnl EPA SWPPP Ins ect'On Report' Versions 1.1, September 17, 2007 3 B_ /activity Implemented? Maintenance Corrective ive Artisan Needed and Notes contaminants stored Required? Inside or wader cover? ? 11 Are non-stormwvater es LlNo QYes o discharges(e.g.,wash water,dewvatering) property controlled? I 12 (Other) UYes UNo t /lessee Describe any incidents of non-compliance not described 7 above: CERTIFICATION STATEMENT "1 certify sander penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accuratFa and complete.I am aware that there are significant penalties for submitting false info ion, including the possi ,i stt�°of fine and imprisgnrnent for knowing violations." rmat i i Print name and I ; � - D. eoWay rsal'essiorsal Engineer Signature: 1 ? EPA SWPPP Inspection Repeat, Version 1.1, Septembers 17,2007 Stogy° eater Construction Site Ins Pe on Report General information Project Dame " C errirnack College forth Campus Development"P�PDES Traclrinb o. R1�A 77 Location 3�5 turnpike St. �1. Andc��er Ma. 10-16-15 Start/End Time 3:30prn—4:20 Pm Bate of inspection Inspector's Name(s) Scott D.1{elloway, Inspector's Title(s) Professional Engineer inspector's Contact information 148 orth St.Andover,ma.f11810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of 0 Re-grading of exposed area(future site of residence buildings construction • i Temporary hydro-seeding of exposed earth(future site of � residence buildings#3- • continue utility+installation from Rock Ridge Rd to(future site Of residence buildings#3- . • improvements and maintenance of 13 P's. • Cont.misc grading and site work. Tyr 'bf inspection: U Durin storm event ®Post-storm event UAe-ular ®Pre-storm event � Bather Informatipa lcias there been a storm event since the last inspection? ElYes o if yes,provide: Approximate Amount of Precipitation(in): Storm Start Date&Time: Storm Duration(hrs): ther at time of this inspection? {3 Snowing U High Winds Clear QCloudy U Rain U Sleet U Fog ®then: Tetnperature:,, t have any discharges oc€trrre€l since fire last inspectio�t? ®Yes i�o If yes,describe: Are there any discharges at the time of ins eetlase. Yes o if yes,describe:. I t 4 t F EPA S WpPP Inspection Report, Version 1.1,september€7, 2007 7 orreetive Action Needed and Notes Installed? ' l ainten a ce 1 Erosion Control- e €€€r ? t QYes No UYes No E Sediment Barriers 2 Tree Protection Yes LJNo Dyes ' No I 3 Stabilization of 1 es LJNo i Yes _ o Previously noted concern at the comer of the Construction Access- 3 Egress temporary approach rd and bock Midge Rd has been re- graded and re seeded and protected with drums and 5 Dust Control cones. Yes l]No Dyes to 1 i 6 Erosion Control UYes o ®Yes C N0 Blankets 7 Stockpiles es UNo ®Yes No 9 Diversion Channels! Yes UNo L7Yes ®No Swales f;. 1 Sediment basins ' Yes LINo UYes 3 o 10 DeWatering basins— es UNo ®Yes PNo filter bags. 11 TemPorary Shape Elyes No QYes 'o Stabilization t 12 Permanent slope Yes C]NO Yes No stabilization l,s Interior Site Erosion Yes UNTo ®Yes UNo Controls 14 ; Temp orar Check Darns es QNo QYes 201 'o 15 Street Sweeping f Yes UNo UYes QNo L! ---------------- EPA SWPPP Inspection Repor4 version 1.1, September 17, 2007 � )i' P Corrective ctFon Needed and Notes T3 1� Ins Iced. ' 1�e cairn ce f I�� t�ir ' 16 Solid Waste Containers Dyes No UYes ONO /` 1 f 17 Equipment 1 Vehicle Yes ONO aye ®No Storage Area. overall Site Issues Ca�rrective Actio�a Needed and Notes I$. /aetivity Irnp! .xnente€t? Maintecaane Re ul ecl' 1 Are all slopes and Yes UNo ®Yes O disturbed areas not actively being worked ro erly stabilized? es ®No ®Yes o 2 Are natural resource areas(e.g.,streams, wetlands,trees,etc.} protected with barriers or similar BMPs? Yes ®No ®Yes No 3 Are perimeter controls and sediment barriers adequately installed (keyed into substrate) and maintained? ®yes No 4 Are discharge points and Yes ®Na receiving waters free of any sediment deposits? r^, 5 Are storm drain inlets Oyes ®No ®Yes No properly protected? / 6 is the construction exit 1 es 0N0 Dyes Na preventing sediment from being tracked into the street? es ®No Oyes No 7 is trash/litter from work areas collected and placed in covered dumpsters? Are washout facilities Yes UNo ®Yes No (e,g. paint,stucco, concrete)available, clearly marked,and maintained? fes ONO Ceyes No g Are vehicle and equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 3 jPA PPI�I sp e tar�rr Rey , Version 9.1, September 175 2007 ]IMP/activity IM ented? Maintenan e air Corrective Action Needed and- Notes 10 Are materials that are s E]No QYes potential stormwater contaminants stored inside or under cover? I I Are non-stormwater lees o ®Yes o discharges(e.g,,wash water,dewatering) properly controlled? 1? (Other) UYes C]1*lo Describe any incidents of non-compliance not described above: in Hance CERTIFICATION IFICA'1 ION STATEMENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.1 am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Print name and# itle: 66- ellowva Professional q,n `Weer Signature. Hate: i EPA SWPPP insPecti€n Report, Version 1.1, September 17,2007 Stormwater Construction Site Ins port neral Information Project Name l " Merrimack College North Campus DeveloP315 turnpike St. N_ Andover Ma. AR12r�Z77 Location I�II'IIIi,S TrackingTrackinglido. Ivl Start/End'Tune 3:31) tn—�'2�p Date of Inspection ill I0-9-15 Inspector's Name(s) Scott D.Kelloway, 1 spector's'Title(s) professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications specializingin construction Licensed Professional Engineer.Practicingover 1.5 years, ing. Pre-approved site monitor in the Town of Andover site monitoring,and report Describe present please of 0 over excavation and removal of unsuitable subsoil for residence construction Building - improvements nerd maintenance of 's. ® Cont.mist grading and site work. i� Type of Inspection: Dunn storm event �Post-storm event - U Regular Pre-storm event During .storm Informatio Has there been a storm event since the last inspection? UYes o If yes,provide: Approximate, mount of Precipitation(in): Storm Duration(irrs}: Storm Start D to&Time: Weather at time of this I �ection? ®snowing �High Winds U Clear ®Cloudy ;Rain ®Sleet U Fog � Temperature: 4 U Other: Have any discharges occurred since the last inspeetio€ f ®Yes N o If yes,describe: Are there any discharges at the tine of inspection`.'UYes �No If yes,describe: BMP BMP Corrective Actiozr Needed and Notes B P installed? Maintenance Ike €rired`s 1 Erosion Control- UYes ®No UYes CINo Sediznent Barriers EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 Installed? Cart active Action esI d bates maintenance �e tired? 2 Tree Protection es QNo Yes o 3 Stabilization of Yes ®No ®Yes ®No Construction Access- At the corner of the temporary approach rd and Dock Egress Ridge Rd vehicles have been cutting the comer and tracking nnud into the street adjacent to WQU#3.1 notified the contractor.Instructed to sweep street,and place cones and or stakes to prevent further vehicle damage.Long term I instructed to install bit.cone. 5 Dust Control berm as previously agreed. ®Yes E)No ®Yes o 6 Erosion Control ®Yes No Blankets Yes No 7 Stockpiles Dyes ®No lQYes No 8 Diversion Channels/ Yes ®No LUJYes ®Na Swales 9 Sediment basins UYes ®No Yes o 10 Dewatering basins— es ®No Yes No filter bags. 11 Temporary Slope ®Yes No Stabilization ®Yes o 12 Permanent slope Yes ®No stabilization ®Yes ONO 13 Interior Site Erosion WYes ®No ®Yes No Controls i 14 Temporary Check Dams [ s LINO ®Yes o r` 15 Street Sweeping Yes L]No ®Yes No EPA SWPPP Inspection Report, Version 1.1, SGPtember 17, 2007 BMP BAP BTVIP Corrective Action Neededand Dotes tnst ed? Maintenaxi e uir lb Solid Waste Containers es ®No ®Yes 17 Equipment/Vehicle ®yes ®No UYes LINO Storage Area. Overall Site Issues >�ll��'/activity implemented? 1Vlointenanee corrective Action Deeded and Dotes Re taired? I Are all slopes and ®Yes LINO ®Yes LLU31N ILIt ' disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ®No ( Yes o areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? Are perimeter controls Yes LINO Dyes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Yes ®No ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes LINO Dyes LINO properly protected? Is the construction exit es UNo ®Yes No preventing sediment from being tracked into the street? 7 Is trash/litter from work es �No Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities Yes ®No ®Yes ONO (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? es ®No Yes No 9 Are vehicle and equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? pASWppp inspection Report, Version 1.1, September 17, 2007 3 P/activity Im ►nentod? Maintenance Corrective Action Deeded and Notes e uIr 1.0 Are materials that are Y UNo Yes Potential stormwater contaminants stored inside or under cover? l 1 Are non-stormwater Yes UNo ®Yes o discharges(e.g.,wash water,dewatering) properly controlled? 12 (other) E]Yes LJNo l�lon-horn fiance Describe any incidents of non-compliance not described above: Alt _L7 CERTIFICATION STATEMENT ITT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possi ity of fine and imprisonment for knowing violations." Print name and t t e. Scott D.Kelloway,Professional Engineer J ; Dater EFTA S PPP I n-9pect®csna Repo, , VersionP 7.1, SepteMber 97, 2-007 xr y w � Y w m g r x =' �,a - � � �" 1 '- .� m�- ":��" �� �" � it ';�- � 3 �° y ,lei �' `� � P ��a - 1 '4 � �: c3 It�'v. � t� � a �: t'�t aY 4¢ t�t tis t� i § x.t #S,^ t .1r, 3 ti i �a t :�tawfia E`, s�, t v s� tt S � ``++� .,}� ➢ � � �' *.,tip �' j 4� s � � ,� �;. t� �{�4 a .� ��� � f,� �r,� � � v:;� 4 �, a� f t � �* �� �` x-a �i,�` ��`��� �s.'; ;f r 1 y� 'S� �i �Z A' �9 n ka f,. �ra � � � - z's �- d � �. ���4�'� '� 1� � � a {{ a `fit` z;�,"1 ) c�-., r. it iZ3��; { a�var�r" � S _' ��'� �� r� �'pa,� ,. � :r,,. � �. �; s, ,,�. � � a�Ais S � �'� � 1�' t � `� `aN, �� .;r ,� a �', �i ���'��� � � h ,� � `"� c � ���� t ' � K � �}�j'ty� 4 1�� -�_.. �}���s k � 2 t�- Ceti r yY�� t����Y�� ``ssv � pia � � �'� �� yy�Y'�t i y�fi3 ����f'L �'�g}�ti�. ';.r ,.fie� �� �' ��`, yL°`' �ter` � )'�`�j���r h f5��� �.��� Yry7 �v��. � ��E���� � 1� r, k a. z wP s � �� �� _ ��� ' ,�. r� {� a• r" a� � i4 � � f}t � °, F�'".. ,.. a ti.� ` r Y , r � � Scott D. ell fir, RE ppofessional Civil and Environmental Designs and Inspections. 148 North St. Andover,Ma. 01810 phone: (978)682-5054 Ma. List #40122 9/30/2015 North Andover Planning Department. Attn. Ms, Kristine Cheetharn Town Planner 1600 Osgood St. Suite 2035 N. Andover, Ma. 01845 Dear Ms. Cheetham, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development" project located at 315 Turnpike St. in Andover/N. Andover,Ma. DEP File 4090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This months construction activities on this site include the following: ® Completion of all landscaping for residence buildings 41,and 92. * Complete installation phase 1 underground infiltration system. * Re-location of temporary access road. ® Maintenance and improvements of BMP's * Miscellaneous site work, and management of stockpiled material. All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed,and are in suitable condition. All equipment is being stored, fiteled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas, The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices Pg: 1/2 2/2 If you have any questions or concerns,please feel free to contact me at addre phone number listed above. u Sincerely, h, X, f s , y � Scott D.Kelloway,P.E. � � CC. (Via e-anal,paper copy upon request): F Lynn Framer ` Mark Lehoullier Feilipe SchNvartz Ben Saturly Fussell Bennett Star mwa pConstruction Site Insi ection Re o General Information Project Name errimack College North Campus Development' Andover M NPDES Tracking No. MAR12AZ77 Location I 3-it)I mpike St. N. A a. Date of inspection 9-. 5-15 Start[End Time *10:30 am-11:10 AM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifleations Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 Residence Buildings 1&2 are substantially co plate * Continued installation of Phase I Underground infiltration system ® Installed temporary Shallow(CB-1) , Inst DMH B-14. * Cont.mise grading and site work. Type of Inspection: Eli Regular 13 Pre-storm event L3 During storm event El Post-storm event Weather Information/ Islas there been a storm event since the last inspection? OYes LINO If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): WVther at time of this inspection? Clear E3CIoudy U Rain U Sleet L3 FOIG L3 Snowing L3 High Winds E3 Other: Temperatures 7( Have any discharges occurred since the lastinspection? L3 es To If yes,describe: Are there any discharges at the time of inspection?UYes No If yes,describe: B BMP VIP BMP' N Corrective Action eeded and Notes Mainte:na e Re uir Erosion Control- Yes ®No ®Yes No S�ro.n.( osi Sedirnent Barriers EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 l P BAP MW Corrective fiction Needed and Notes Insta I d? Maintena e Ile wire . v � 2 Tree Protection Ia es ❑ o L]Yes o 3 Stabilization of ®}Yes LNo ®Yes o Construction Access- Egress 5 Dust Control O'Yes ®No ®Yes ONo 6 Erosion Control ®Yes�N�o� Yes @No Blankets 7 Stockpiles Yes ®No Yes No 8 Diversion Channels/ ( 'es ®No ®Yes UF4o Swales 9 Sediment basins es UNo ®Yes No 10 Dewatering basins— es UNo ®Ye No filter bags. 1 i Temporary Slope ®Yes No [ Yes No Stabilization f 12 Permanent slope Yes ®No ®Yes No stabilization 13 Interior Site Erosion � es QNo ®Yes o Controls 14 Temporary Check Dams es ®No LOYes o 15 Street Sweeping eUYes ®No ®Yes ®No 16 Solid Waste Containers ®Yes INo ®Yes ®No EPA 3WPPP Inspection Report, Version 1.1, SePteMber 17, 2007 2 BXP - BMP Corrective Action Deeded and Notes BMP In ed? Maintenan i Re ui� 17 Equipment/Vehicle % Yes f UNo UYes ' N Storage Area. f overall Site Issues /aetavity Iiiipleiireixted? Maintenance Corrective Action Needed and Notes BMPRe uired? I Are all slopes and ®Yes UNo L3Yes UNO disturbed areas not actively being worked ro erly stabilized? / 2 Are natural resource Dyes ®No ®Yes No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls Yes ®No ®Yes LINO and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Yes ®No Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes ®No ®Yes UNo properly protected? 6 Ise construction exit Yes ®No Yes ®No preventing sediment from being tracked into the street? 7 Is trash/litter from work Yes LNo Yes ®Na areas collected and placed in covered dumpsters? 8 Are washout facilities Yes EINo UYes EYT40 (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and ® es ®No Dyes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 3 EPA S PPP inspection Report, Version 1.1, September 17, 2007 FArte tivity Ii�p1lemented? Maintenance Corrective Action Deeded and Notes Re paired? erials that are '®Yes ®No Yeshlta l stormwater nants stored unde4cover? /11 Are non-stormes ®No ®Yes LJNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) bYes ®No Nan-Coen Hance Describe any incidents of non-compliance not described above: CE T >i ICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under illy direction or supervision in accordancmith a system designed to assure that qualified personnel properly gathered and evaluated the information submitt d]Based on my inquiry of the person or persons who manage the system,or those persons directly responsible forhering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,andtcomplete,I am aware that there are significant penalties for submittingfalse information, including the possibility fine'dnd imprisonment for knowing violations." Print name and tit colt -Kelloway,Pr2kssional En ineer 1 , Signature: ] 1 EPA S PPP Inspection Report, Version 1.1,September 17, 2007 Stormwater Construction Site Inspection Report_ General Information Project Name Merrimack College North Campus Development" NPDES Tracking No. NIAR12AZ77 Location 310 turnpike St. N.Andover Ma. Date of Inspection 9-12-15 Star rid Time I I am—11:45 am Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 1 148 North St.Andover,ma.01810 (978)479-5648 — I — Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing hi construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover zn Describe present phase of construction 0 Residence Buildings 1&2 are substantially complete * Continued installation of Phase I Underground infiltration system is complete. * Begin removal of temporary access rd,and begin relocating same. * Begin preparation of site for stage 11 construction. * Cont.misc grading and site work. Weather In rmation Has there been a storm event since the last inspection? dYes ONo if yes,provide;Storm Start Date&Time: Storm Duration(tars}: Approximate count of Precipitation(in): (c) $V rther at time of this inspection? (a Clear UCloudy L3 Rain L3 Sleet U Fog Q Snowing Ll High Winds El Other: Temperature:. ?'� Z Have any discharges occurred since the lastinspection? UYes E13No If yes,describe: Are there any discharges at the time of inspection?E3yes UNO If yes,describe: BMP BMP corrective Action Needed and Notes Installed? Maintenance Requi tember 17, 2007 EPA SWPPP Inspection Report, Version 1.1, Sep Corrective Action Needed and Notes I staiied? Maintenance uIr �l . 1 Erosion Control- Y�s t33 i�lo ®Yes Sediment Barriers 2 Tree Protection UYes UNo ®Yes EdNo 3 Stabilization of i�Yes QNo QYes ONO Construction Access- Egress r` 5 Dust Control Yes l�No ®Yes @No 6 Erosion Control LJYes UNo QYes 13 o Blankets I 7 Stockpiles C Yes ®No ®Yes No r 8 Diversion Channels EfYes ®No QYes ENo Swales 9 Sediment basins Wes UNo UYes ONo Nap 1694 10 Dewatering basins— QYes QNo UYes UNo filter bags. 11 Temporary Slope []Yes UNo ®Yes WNo Stabilization 9 12 Permanent slope UVes ®No 5Yes Nt� stabilization 13 Interior Site Erosion es L3No Controls 14 Temporary Check Danis es ®No L]Yes LdNo 15 Street Sweeping ( Yes l]No UYes LI o EPA SWPPP Inspecdon Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and mates In ailed? Maintenance .e uIred 16 Solid Waste Containers S UNo ®Yes 17 Equipment!Vehicle C Yes UNo Oyes o Storage Area. overall Site Issues i�lf��t�ity implemented?' li'tainte�tarice Corrective Action Needed and dotes Ile aired? 1 Are all slopes and OYes ONo ®Yes ONo disturbed areas not actively being worked roperly stabilized? / 2 Are natural resource `Yes UNo UYes No areas(e.g.,streams, wetlands,trees,etc-) protected with barriers or similar 13MPs? % Yes ®No ®Yes No 3 Are perimeter controls and sediment barriers adequately installed (keyed into substrate) and maintained? f Are discharge paints and es U ®Yes o receiving waters free of any sediment deposits? 5 Are storm drain inlets [ 'Yes UNo ®Yes ONo properly protected? 6 is the construction exit Yes ®No uYes o preventing sediment from being tracked into the street? 7 is trashllitter from work Yes ONO Yes No areas collected and placed in cohered dumpsters? Are washout facilities es U 0 LJYes t Flo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and es UNo LYes 0 equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? `PA SWPPP inspection Report, Version 1.1, Septembers 17, 2007 iir— ilPfaetivit Implemented? ll ain`aenanee °rr 'v on ed and jNotes Requi s y s QNo tjYes � o 10 Are materials that are potential stormwater contaminants stored. { inside or under cover? i I I Are non-stormwater es ®No Yes No discharges(e.g.,wash water,dewatering) properly controlled? 3 12 (other) Byes ®No Describe any incidents of non-compliance not described aboe Non-Compliance CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of any knowledge and belief,true,accurate,and complete.I am aware that there are significant including the possibility of fine and imprisonment for knowing violationsenalties for submitting false information, Print name and i 17: SeottD rT ellowa Professional Ey ineer i � g Signature: r k f�ice-„ ,f. A EPA S WPPP Inspection Report, Version 1.1, September tuber 17,2007 Stogy titer Construction Site MsPectiOn RePort General Information Campus Development Project Name Merrimack olle e Noh rt 315 turnpike St. N.Andover Ma. P�dPDES Tracking No. MAR 12A-777 Ocation Date of Inspection 9-19-15 Start[End Time Sam—9:35 am Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) professional Engineer Inspector's Contact Inforrnation 148 North St.Andover,ma.01810 (978)479-5649 Inspector's Qualifications Licensed professional Engineer.P "'racticin Over 15 years,specializing in cO-nstrucqonOR .Pre-approved site monitor in the Town of Andover site monitoring,and reporting Describe present phase Of Re Bu sidence ildings 1&2 are COMPletO system. construction Continued installation of Phase I Underground infiltration Continue excavation of existing access rd and relocation to the South. ess rd. placing sub grade grave for n acc ew Cont.misc.grading and site work. l of Inspection: lReg�.lar Pre-storm event C3 Dunn storm event 0 post-storm event weather informs. since the lastinspection? Yes 1AINO 14,gs there been a storm event If yes,provide; Storm Duration(hrs): Approximate Amount of Precipitation(in): Storm Start Date&Time: Fog W ` er at time of this inspection? Clear UCloudy 13 Rail, 0 Sleet 0 0 Snowing 0 High Winds d0 other- Temperature i 1210 P On?Have any discharges Occurred since the last inspection? Dyes If yes,describe: Are there any discharges at the time Of inspection?byes If yes,describe: BIMP BW Corrective Action Needed and Notes BMP Installe Maintenance d? Re uired? EPA S Inspectron Repor4 Version 1.1,September 17, 2007 BMP B Installed? �� � e� Maintenance 10n Needed and Notes l Erosion Central- ire 9 Y Sediment Barriers s I]No LJYes a 2 Tree protection es QNo ®Yes ram' a 1 , 3 Stabilization of es L3No Yes o Construction Access- Egress S Bust Contra] Yes U o 13Yes a 1 s b Erosion Control byes a ®Yes No .Blankets 7 Stockpiles es L]No Yes o 9 Diversion Channels t ® es QNo UYes va Swales j 9 Sediment basins I Yes UNa QYes No 10 filter bags,Deer baags.s basins— � LjYes ®No ®Yes o I I ' Temporary Slope Yes �N o ®Yes No � Stabilization 12 pennanentslope es ®No L3yes No ili' i stabilization P 2. 3 13 Interior Site Erosion Controls des ®No UYes o 14 Temporary Check Dams ClYes ONo ®Yes q--14o 15 Street Sweeping ( rres LINo ®Yes A SWPPP Inspection Report, Vefs/on 1.1,September 17,2007 f BMP Corrective Action Needed and Notes BMP in tied Iled2 Mainten ee dir 16 Solid Waste Containers es �No LlYe ° f, 17 Equipment/Vehicle Yes ON ®Yes o Storage Area. Overall Site Issues /at:Ii�ity implemented' Maintenance Corrective Action Needed and Notes BTAPRe uired`i 1 Are all slopes and ®Yes ®No UYes ®No disturbed areas not actively being worked pro erly stabilized? 2 Are natural resource _ es ENO �Ye No areas(e.g.,streams, wetlands,trees,etc-) protected with barriers or similar 13ivIPs? 3 Are perimeter controls es (ENO ®Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ®No Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets es UNo UYes UNo properly protected? 6 is the construction exit Yes UNo ®Yes No preventing sediment from being tracked into / the street? f 7 Is trashAitter from work @ es Ll 0 ® 'es C No areas collected and placed in covered dumpsters? r/ 8 Are washout facilities lees ®No byes No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? / g Are vehicle and es ®No ®Yes �No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EpA SWppp inspection Report Version 1,1, September 17,2007 BMP/activity Implemented? Maintenance corrective Action Needed and Notes 1 Re uii 10 .Are materials that are k Y s UNo ®Yes o Potential stormwater contaminants stored inside or under coder? I 1 Are non-stormwater es LINO ®Yes ®No discharges(e.g.,wash water,dewatering) Properly controlled? 12 (other) ®Yes UNo Describe any incidents m ofnon-compliance not described above: dance CERTIFICATION AT'ION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel praperIy gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible fo gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate V complete.I am aware that there are significant penalties for submitting false information including the possi 14 of fine and imprisonment for knowing violations." Priest name and ti I I S tt D.Kello v . otessional Erg ineer r !t hate._f 2 EPA SWPPPIRSPOCtion Deport, Version 1.1, SOptember 17,2007 for water Construction Site inspection Report General Information Project Name Merrimack College North Campus Development" NPDES Tracking No. MAR12AZ77 Location 316 turnpike St. N.Andover Ma. 8:46 AM Date of Inspection 9-26-15 Start/End Time 8 A — Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting. Pre-approved site monitor in the Town of Andover Describe present phase of construction . Residence Buildings 1&2 are complete 0 Completed installation of Phase I Underground infiltration system. 0 Complete relocation of temporary access rd to the south. Place temporary binder course of bit cone. pavement. 0 Re-grade interior portions of interiot site to provide pool for excess rain runoff. mporary stormwater ® Place dense graded crushed stone for te detention area at SW portion of Phase 11 site. 0 Cont.misc grading and site work. TV0e of Inspection:kegular El Pre-storm event El During storm event El Post-storm event li Weather Informatiow' Has there been a storm event since the last inspection? Oyes L3NO If yes,provide: Storm Duration(hrs): Approximate Amount of Precipitation(in): Storm/Start Date&Time: Clear at time of this inspection? ®High Winds Clear ®CloudyL3 Rain 0 Sleet L3 Fog 0 Snowing 0 Other: Temperature: r17 Have any discharges occurred since the last inspection? ®Yes 0 If yes,describe: Are there any discharges at the time of inspection?®Yes No If yes,describe; EPA sWPPP Inspection Report, Version 1.1, September 17, 2007 P � l Corrective Action Needed and Notes Insta ed` iVt is�teo nee I Erasion Control- e UNo lYes o Sediment Barriers r�r 2 Tree Protection MVes ®No. ®Yes No 3 Stabilization of es U1^vTo ®Yes t leto Construction Access- Egress r' 5 Dust Control es L]No ®Yes U-4o 6 Erosion Control e4E3No OYes UNo Blankets 7 Stockpiles Yes QNo Yes Q o 8 Diversion Channels/ es Leto Lives o Swales 3 9 Sediment basins es QNo ®Yes No 10 De-watering basins— LJ es QNo ®Yes No filter bags. I I Temporary Slope OYes EnNo ( Yes ONo Stabilization 12 Permanent slope x es UNo UYes U7 o stabilization it I3 Interior Site.Erosion Oyes T ,� Controls �F 14 Temporary Check Dams Lily es LiNo 13Yes l 'To I5 Street Sweeping U es ONO � OYes No {}R 7 EPA SWPPP Inspection Report, version 1.1, September 17, 2007 2 BMP B>i P Corrective Action Needled and Notes in aid? Maint� ra ei 16 solid Taste Containers C es ®No UY. 0 f 17 Equipment 1 Vehicle es UNo L3Yes LINO Storage Area. Overall Site Issues l�etivity ��pleenesated? Maintenance Corrective sti€nra Deeded and Notes I3e` uired? l Are all slopes and ( Yes l]No ®Yes UNo disturbed areas not actively being worked to erly stabilized? l�lYes LEIo 2 Are natural resource Yes ° areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar l3MPs9 [ res ®No UYes Ll 0 3 Are perimeter controls and sediment barriers adequately installed �. (keyed into substrate) and maintained? 4 Are discharge points a d Yes LJ ®Yes C No receiving waters free o any sediment deposits? 5 Are storm drain inlets Yes UNo ®Yes ONO property protected? 6 is the construction exit Yes UNo C]Yes LINO preventing sediment ; from being tracked' the street? es UN0 L]Yes ZINo 7 is trash/litter from work areas collected and placed in covered dumpsters? f 8 Are washout facilities tlYes LJNo ®Yes No (e.g.,paint,stucc®, concrete)available, clearly marked,and maintained? L]Yes 'UNo 9 Are vehicle and Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 3 EPA SWPPP ltrs ection Report, Version ?.1, September 17, 2007 DMP /activity Imp ented? Maintena ce Corrective Action Needed and Notes Re uIre °? ®No UY N 14 Are materials that are potential stormwater contaminants stored inside or under cover? 1 l Are non-stormwater Yes l]No ❑Yes No discharges(e.g.,wash water,dewatering) properly controlled? 12 (other) 5Yes L1No 7anyincidents of non-compliance not described above:m fiance CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submi Based on my inquiry of person or persons who manage the system,or those persons 4 directly responsible f r g thenng the information,the information submitted is,to the best of my wledge and belief,true,accurate andicohi fete. I am aware that there are significant penalties for submitting faisoe information, including the possib lity f e and imprisonment for knowing violations" Print name and tit e• S.Ott D.Kellowa ,Professional>En ineer Signature: t P 3 I < Date: I, I EPA SIPS'Inspection Report, Version 1.1,September 17,2007 tor° r Construction Site Inspection Report General Infor ation Project Name Merrimack College North Campus Development" NPDES Tracking No. MAR12AZ77 Location 315 turnpike St. N. Andover Ma. Date of Inspection 9-30-I5 Start/End Ti 5 AM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma,018I0 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 Excavate unsuitable materials for common area,and residence building 3. nt. mosc grading and site work. ant.maintenance of la's at southern portion of workzone. Type of Inspection: U Regular El Pre-storm event During storm event U Post-storm event Feather Information Has there been a storm event since the last inspection? UYes ®No If yes,pro ]d z Storm t Ti Storm D ation(h s : Approximate Amount ofPreci i tion in Weather at tilne of this ins etion? ®Clear QCloudy Rain ® Sleet ®Fog El Snowing 0 High Winds Q Other: Temperature: Have any discharges occurred since the last inspection?" ®Yes LINO If yes,describe: Are there any discharges at the time of inspection?®Yes o If yes,describe: BW MP BMP Corrective Action Needed and Notes Installed? Maintenance II.e'aired? l Erosion Control- UYes ®No 13Yes ®No Sediment Barriers EPA . PPP Inspection Pepoft Version 9.f, September 17, 2007 3 P BMP BMP Corrective Action Deeded and Notes Installed? Maint ranee Required? 2 Tree Protection ®Yes ONo ®Yes ®No 3 Stabilization of ZYes No Dyes - o Construction Access- Egress , 5 Dust Control ®Yes M,,To ®Yes MNO 6 Erosion Control UYes UNo QYes o Blankets 7 Stockpiles Yes E3No C]Yes E Rio S Diversion Channels Wes LJNo UYes Mo �t Swales d' 9 Sediment basins `Yes UNo UYes U91D 10 Dewatering basins— MYes l]No ®Yes Mo filter bags. l I Temporary Slope ®Yes U90 UYes ;3No Stabilization 12 Permanent slope ( Yes ®No ®Yes ErNo �� � ' 4 .. stabilization f 13 Interior Site Erosion Yes UNo Oyes M No Controls 14 Temporary Check Dams es UNo Uyes w o 15 Street Sweeping UYes U&O ®Yes No 16 Solid Waste Containers es L]No UYes . EPA SWPPP Inspection Report, Version 1.1, September ber 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance II;e trice -TT Equipment I Vehicle ` es UNo ®Yes r o Storage Area. Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required?_ l Are all slopes and ®Yes ®No ®Yes QNo disturbed areas not actively being worked properly stabilized? X 2 Are natural resource es LINo Yes �No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers f or similar BMPs? /� — 3 Are perimeter controls is LINo ®Yes ZNo and sediment barriers adequately installed (keyed into substrate) and maintained? Are discharge points and UYes UNo LJYes o receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes ®No ®Yes 2 o properly protected? 6 Is the construction exit PYes UNo es preventing sediment from being tracked into the street? 7 Is trash litter from work UYes ®No uYes o areas collected and placed in covered dumpsters? 8 Are washo�facili�tties �/ CiNo C�Yes Nocone pain concrete)available, clearly marked,and maintained? 9 Are vehicle and Yes IJNo UYes Mo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? 01yes UNo ®Yes UNo 10 Are materials that are potential stormwater EPA SWppp inspection Report, Version 1.1,September 17, 2007 BAIP/activity Implemented?— Maintenance Corrective Action`Needed and Motes e aired? contaminants stored inside or under cover? 11 Are non-stormwater es CNo ®Yes 40No discharges(e.g.,wash water,dewatering) properly controlled? 12 (other) QYes ®No Non-Compliance Describe any incidents of non-compliance not described above: After site-inspection the Contractor(ben)contacted me that subsequent heavy rain resulted to stormwater release at the south comer of the project.The stormceptor WQU-#3 was overwhelmed.The contractor responded with pumps to divert water back into the permeable area Win the LOW.The applicant asked of they may pump water from the on site temporary storage areas,and directly into the 48"drain line,prior to the storm forecasted in the next few days.I did not agree to this plan.I had suggested that id pumping down of the temporary stormwater storage area is necessary that it a crushed stone settling area at or near Temporary Catch Basin(CB-B 1).A filter could be placed over this,and then water will then find it's way form the filter bag to the CB,then into the underground filtration system. CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the o ibility of fine and i isonment for knowing violations.- Print name nd Itle: Ott K flows Professional lEn i � �" Weer � Signature: G l ° i� g ��-e• late: EPA S WPPP Inspection Report, Version 1.1, September 17,2007 4 N ,�:. ��- . ��, �� e� �� � , .,� ;� „a� �.��,.. a,=�, .,�� } � � � . . r._ ,� �- ��is � ;�„ �s� � � �� ,, �. , � ��� � �: ti �� #; $ ��m ����, r � " ,.� � y�� y, �,; .=,. _ �,u, ', ,ems: :" �� �r�r"r�r��`..r r :.r :. � -'��,�*`��`'--���r�� �,r� �''r,;"" ��; a � r � T �> „_ �� 7 r �� -� r. ,-=� r �? r � r r' ,a x � ��°� �� r-� f r=� �� . r " f ,..,a-..s r' �''"""...rr.�.,a'' �� � � ,,i .- ��" f "'� � ,' t w Ate 1 t � at 2SA Rr FFs i 3 a - �'`���»� � St1 �; ;. ag� �may:' '; ��� � y ������ ,a=� ��% "� ��: �� - � �3� � Y�� � � v �,. ,- ,, �—� �' ��' � � Sul z� �Ai � � � ' �ram" -�--*"� �� �,..,.� ��" �' � � � �, � �� �.�:-.�"� �: �,. 1 -�-�" -.� ,� � t � ��.. ,.�:�,., �.-, r,. �� � � .� x i "� � �� 4 �`:� h. D � <.( r, `e � �� �, t �� ; 2 y� L � �$ � �� Ka '� pig- Y 9Du is ° Y �,r � � ��' � � ��� ���` '+ a �� `,� � � r 4 6 �i to � �r x �s s �� � i '�� # � � '#� �r�h, i •w,� b ,fi, - 6 d , 33C� '. ��� .W b � F� � � � a i 4����pk .a. }� ��,� F� P£ � l - ; a ���r� �` �'' .�s N #z /� - '. � � k k' F s �� i ��� .. y _1 } �.'d �` � "��� .' 4 �7 1 � #ts �4 �.�Ytt tJ � r hkh Pj 1 t i � �S:%,{ Yet�. �{i`G y' Y Y E `2 { t a� ? ' a � _ ���.i��x �7x ��'�`��Fy'`�{ �'}11�R TM #�5�m�3f'i� r�'�aE ���a, � a � a.� 5 4 � 7��, � �y��� ��� t a a � �d ��� � � � �, � �k i� { _ # 1". t�s$ti I i t t � 4 '� � � 5 4 � a �i # Zyy R t �,��� i r� Ks— €. �r g < T t w r ^ry 3 r� ��. ,` �,� _ � ; t �� � � �.' ��:: r --w .. �- _3 � � �� �� �j �a �,�� 3' r�� � �� �?s"'E�.v. rya o„ u,5 �.M s' �K. ....> � ! t e�' ..aa-aa' �'. � �' yyy � �F e,5 p ... r �....�� A.�„, }5.h � � � � �. r'" � r � i�' � ���� e��"' Scott A Kelloway, P.E. professiollal Civil and Environmental Designs and Inspections. 148 North St. Andover, as 01810 phone: (978) 682-5054 Ma. Lisa: #40122 9/30/2015 North Andover Planning Department. Attn: Ms, Kristine Cheetham Town Planner 1600 Osgood St. Suite 2035 N.Andover,Ma. 01845 Dear Ms. Cheetham, Please refer to the attached field inspection reports of site monitoring for the"Merrimack College North Campus Development'�project located at'315 Turnpike St. in Andover IN. Andover,Ma. DEP File 4090-0750 Amended, NPDES Tracking No:MAR 12AZ77 This month's construction activities on this site include the following: * Completion of all landscaping for residence buildings 41, and 42. * Complete installation phase 1 underground infiltration system. ® Re-location of temporary access road. * Maintenance and improvements of BMP's stockpiled material. ® Miscellaneous site work, and management of All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed,and are in suitable condition. All equipment is being stored, ftieled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained enc andispo sed of. Grading is presently consistent with the approved site plan. There has been no chinent within restricted areas. The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At the time of this report there have been no notable impacts to wetland resource areas from the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices Pg: 1/2 Pg: 2/2 If you have any questions or concerns,please feel free to contact me at address and phone number listed above. Sincerely, gm- r A j r Scott Kelloway,I .E. s CC. (Via e-anal,paper copy upon request): Ly nn Framer Mark Lehoullier Feilipe Schwartz .lien Saturly Russell Bennett Stormwa jr-Construction Site Inspection Report e General Information r C017 MaCk College No Project Name erri 7 ollege North Campus Development' _t mack C Project Tracking No. Location 315 turnpike St. N. Andover Ma. Date of Inspection 9.,-5-15 Start/EndTime 10:30am -11:10AM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction Z� site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 Residence Buildings 1&2 are substantially complete 0 Continued installation of Phase I Underground infiltration system. ® Installed temporary Shallow(CB-1) , Inst DMH B-14. a Cont.mist grading and site work. Type of Inspection: L1,Regular L3 Pre-storm event 0 During storm event 0 Post-storm event Weather Information/ Has there been a storm event since the last inspection? Dyes L_]No If yes,provide: Stone Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): W ther at time ofthis ion? Clear L]Cloudy El Rain 0 Sleet Q Fog L3 Snowing 0 High Winds L3 Other: Temperatur Have any discharges occurred since the last inspection? LJYes LJNo If yes,describe: Are there any discharges at the time of inspection?DYes —dN—o If yes,describe: BMP BMP BMP Corrective Action Needed and Notes s ed9 Maintena e Requiredwr- s ®No ®Yes [�No I Erosion Control- tV��e Sediment Barriers EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 P B P BMP Corrective Action Needed and Dotes Insta d°? Maintena e Re nir . 2 Tree Protection 13 es DNo Dyes o 3 Stabilization of 06'es DNo ®Yes o Construction Access- Egress % 5 Dust Control Ryes DNo ®Yes QNo 6 Erosion Control ®Yes No ®Yes No Blankets 7 Stockpiles Yes CNo DYes,' No , 8 Diversion Channels/ es DNo ®Yes UNo Swales f. 9 Sediment basins es DNo ®Yes DNo 10 Dewatering basins— 91 es ®No DYe No filter bags. l l Temporary Slope Dyes I No Dyes No Stabilization 12 Permanent slope Dyes DNo ®Yes DNo stabilizationr 13 Interior Site Erosion D es ®No ®Yes o Controls 14 Temporary Check Dams Qfes ®No ®Yes GRNo 15 Street Sweeping A3Yes DNo DYes DNo 16 Solid Waste Containers ®Yes DNo ®Yes DNo EPA S PPP Inspection Report, Version 1.1, September 17, 2007 2 13 P B - BMP Corrective Action Needed and Dotes Inseh �d? Iaintena re`uir 17 Equipment/Vehicle Yes JUNo ®Yes N Storage Area. l- Overall Site Issues P/activityy Implemented? Maintenance Corrective Action Deeded and Motes Re uired? _ 1 Are all slopes and ®Yes UNo QYes ®No disturbed areas not actively being worked properly stabilized? 2 Are natural resource UYes ®No ®Yes MNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls PYes ®No UYes 13No and sediment barriers adequately installed (keyed into substrate) ; and maintained? 4 Are discharge points and UYes ®No ®Yes •No receiving waters free of any sediment deposits? 5 Are storm drain inlets 43yes ®No ®YeS LINo properly protected? 6 Is the construction exit Yes UNo UYes ®No preventing sediment from being tracked into j the street? 7 Is trash/titter from work Yes UNo Yes LJNo areas collected and placed in covered dumpsters? 8 Are washout facilities Yes ®No ElYes C2 0 (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and ®Yes ®No OYes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 B lactivit Implemented? Maintenance Corrective Action Needed and Votes Required.. i0 Are materials that are f®Yes' ®No ®Yes 14 potential stormwater `- contaminants stored inside or under cover? 1 I Are non-stormwater es UNo ❑Yes QNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) L]Yes UNo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance ith a system designed to assure that qualified personnel properly gathered and evaluated the information submitted Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for�g J tiering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.i am aware that there are significant penalties for submitting false information, including the possibility fine lid imprisonment for knowing violations." Print name and talfe/ l Cott D.Kellowav,Professional En ineer Signature: A Date: EPA S PPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Report General Information ProjectI Name Merrimack College North Campus Development" NPDES Tracking No. MAR12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection 9-12-15 Start/End Time 11 am—11:45 am Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction 0 Residence Buildings 1&2 are substantially complete * Continued installation of Phase I Underground infiltration system is complete. * Begin removal of temporary access rd,and begin relocating same. ® Begin preparation of site for stage 11 construction. * Cont.misc grading and site work. Weather�Inrma 'on "rmat' 1-�in,�since the J Y 0 Has there been a storm event since the inspection? Yes �L]No If yes,provide:Storm Start Date ion(hrs): Approximate AF ount of Precipitation(in): &Time: Storm Durat[�o �5 A W /ther at tim6 of this inspection? U U raear ®Cloudy U Rain U Sleet J Fog Snowing High Winds El Other: Temperature: Yli/ Have any discharges occurred since the last inspection? Dyes QNo If yes,describe: Are there any discharges at the time of inspection?Uyes U'No If yes,describe: BYET BMP BMP Corrective Action Needed and Notes Installed? Maintenance Rquired" tember 17, 2007 EPA SWPPP Inspection Report, Version 1.1, Sep BMP BMP BMP Corrective Action Needed and Dotes Installed? Maintenance e uir' t Erosion Control- Y s ®No ®Yes Sediment Barriers 2 Tree Protection ®Yes ®No ®yes No i 3 Stabilization of 0Yes 3NNo QYes o Construction Access- Egress 5 Dust Control 'Yes l�No E3Yes No 6 Erosion Control LJYes UlNo UYes o Blankets f 7 Stockpiles es QNo ®Yes 1ANo 8 Diversion Channels/ Yes ®No [ Yes UNo Swales 9 Sediment basins es ®No QYes No A } mra{i a � two 10 Dewatering basins— Yes ®No Oyes UNO filter bags. I 1 Temporary Slope ®Yes UNo ®Yes WNo Stabilization 12 Permanent slope QfYes ®No [ Yes Q'N'o stabilization 13 Interior Site Erosion C3Yes ElNo Controls i 14 Temporary Check Danis es ®No ®Yes IdNo 15 Street Sweeping !Yes ®No 1Yes o EPA S WPPP Inspection Report, Version 9,1, September 17, 2007 2 BMP BMP I3 I� Corrective Action Needed and dotes In �alled? Maintenance Re aired 16 Solid Waste Containers Y s UNo UYes 17 Equipment/Vehicle es ®No uYes o Storage Area. Overall Site Issues �l erall Site I implemented' l Iaintertance Corrective active Action Needed and cater Ike aired? 1 Are all slopes and UYes UNo ®Yes ®No disturbed areas not actively being worked roperly stabilized? 2 Are natural resource `Yes UNo ❑Yes UNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls Yes ®No ®Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? i 4 Are discharge points and es ®No ®Yes o receiving waters free of any sediment deposits? J - 5 Are storm drain inlets es UNo UYes C No properly protected? 6 is the construction exit Yes ®No ®Yes 0 o preventing sediment from being tracked into the street? 7 is trash/litter fi-am work Yes ®No ®Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities es ®No UYes a (e.g.,paint,stucco, concrete)available, clearly marked,and. f maintained? 9 Are vehicle and es UNo ®Yes U o equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PpP inspection Report, Version 1.1,September 17, 2007 B /activity Implemented? N[2intenance Corrective Action Needed and Notes Re ui ? 10 Are materials that are Y s LJNo ®Yes o potential storm-water contaminants stored inside or under cover? l i Are non-stormwater es ❑No ®yes No discharges(e.g.,wash water,dewatering) Properly controlled? 12 (Other) ®yes ®No Describeincidents of non-compliance not described above Non-CoNon-Compliance CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted._Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and i I : Scott D 21101121,Professional En ineer 1 , Signature: Date: EPA SWPPP Inspection Report, Version 1.1, September 17, 200 Stormwater Construction Site inspection Report General Information Project Name Merrimack College North Campus Development' ES Tracking No. MAR12AZ77 Location 315 Lumpike St. N.Andover Ma. Date of Inspection 9-19-15 Start/End Tune gam—9:35 am Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-56548 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase Of construction . Residence Buildings 1&2 are COMPlete Q Continued installation of Phase I Underground infiltration system. ® Continue excavation of existing access rd and relocation to the south. 0 placing subgrade grave for new access rd. 0 Cont.misc.grading and site work. Ty of Inspection: D post-stomi event Regular D Pre-storm event 0 Durin storm event Weather InformatiO Has there been a storm event since the last inspection? Dyes 1Vo If yes,provide: Storm Duration(hrs): Approximate Amount of Precipitation(in): Store Start Date&Time: they at tune of this inspection? Yclear OCloudy 0 Rain D Sleet D Fog Q Snowing ®High Winds 0 Other: Temperature: -0 b Z Have any discharges occurred since the last inspection? Dyes UNo If yes,describe: Are there any discharges at the time of inspection? Dyes 0 If yes,describe: Corrective Action.Needed and Notes MP BMP Installed? Maintenance Regaired? EPA SWppp inspection Repor4 Version 1.1,September 17, 2007 P BWP BMP Corrective Action Needed and Notes Installed? Maintenance € e uiie I Erosion Control- Y s LINo ®Yes o Sediment Barriers 2 Tree protection es ®No ®Yes o 3 Stabilization of LJYes LINo LIYes E1, o Construction Access- Egress i 5 Dust Control es LINo ®Yes o 6 Erosion Control / C�Yes o ®Yes GNo Blankets 7 Stockpiles es ®No ®Yes LrNo i; Diversion Channels/ ®Yes ®No l]Yes o Swales 9 Sediment basins Yes UNo =LUIYes10Dewatering basins— Yes UNo UYes filter bags. TF Temporary Sloe N P Y P ®Yes No ®Yes No Stabilization 12 permanent slope es ®No ®Yes No � •1 ;-' � stabilization 13 Interior Site Erosion Yes ®No ®Yes o Controls 14 Temporary Check Dams LlYes ONo ®Yes o 15 Street Sweeping LA .es ®No L]Y e_sd o EPA S PPP Inspection RopoPt, Ver it-n 1.7,Septe tbor 17, 2®07 BMP B1 P Corrective Action deeded and Notes ::: : lledd? Mninten ce e lilt 16 Solid Waste Containers es ONO ®Ye o i 17 Equipment/Vehicle es LINO Dyes ONO Storage Area. Overall Site Issues /aertivity Implemented? aarrterrarace corrective Aetloffi Needed and Dotes BMP )Ete aired? I Are all slopes and Dyes ®No ®Yes ®No disturbed areas not actively being worked r properly stabilized? f 2 Are natural resource Yes ®No ®Yes No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers /f/ or similar BMPs? / 3 Are perimeter controls es LINO ®Yes -No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and 91'es ON ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets es UNo Dyes ONO properly protected? 6 Is the construction exit Yes UNo ®Yes No preventing sediment from being tracked into the street? 7 Is trash/litter from work es UNo ®Yes 'No areas collected and placed in covered dumpsters? 8 Are washout facilities es ®No Dyes, No (e.g.,paint,stucco, concrete)available, ; clearly marked,and maintained? 9 Are vehicle and es UNo ®Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EpA SWppp inspection Report, Version 1.1, September 17, 2007 BAIL'/activity Implemented? Maintenance Corr,ecfive Action Needed and No uir ?� Y tes 10 Are materials that are s ®No ®Yes o Potential stormwater contaminants stored inside or under cover? 1 I Are non-stormwater Yes LINO I�Yes No discharges(e.g.,wash water,dewatering) Properly controlled? 12 (Other) ®Yes LINO 7anyincidents of non-compliance not described a ove•m lance CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible f gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate a°�d complete.I am aware that there are significant penalties for submitting false information including the possi ii of fine and imprisonment for knowing violations." Print Warne and ti S tt ID,I ella otessional E" ineer Signature: Date`. ETA Sl f PP Inspection,deport, Version 1.1, September 17, 2007 Star water Construction Site inspection Report General Information Project Name Merrimack College North Campus U velopment' DES Tracking No. MAR12AZ77 Location315 turnpike St- N. Andover Ma. Date of Inspection 9-2r;,.-15 I Start/EndTime 18 A —8:46 AM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of 0 Residence Buildings 1&2 are Complete construction 0 completed installation of Phase I Underground infiltration system. 0 Complete relocation of temporary access rd to the south.Place temporary binder course of bit cone. pavement. 0 Re-grade interior portions of interlot site to provide pool for excess rain runoff. d stone for temporary stormwater ® Place dense graded crushe detention area at SW portion of Phase 11 site. a Cont.misc grading and site work. Typp�e of Inspection: ®Darin storm event 0 Post-storm event Regular 0 Pre-storm event weather Information, e_e'L 0'u f Inspection: post-storni�event Has there been a storm event since the last inspection`? Yes If yes,provide: of Precipitation(in): Storm tart t Date&Time: Storm Duration(hrs): Approximate Amount WY,ather at time of this inspection? Li Clear ®Cloudy 0 Rain Ll Sleet Li Fog L3 Snowing Q High Winds 0 other: Temperature: Have any discharges occurred since the last inspection? Yes LfNo If yes,describe: Ov No Are there any discharges at the time of inspection?®Yes If yes,describe: EPA SwPPP Inspection Report, Version 1.1, September 17, 2007 BIMP BMP BMP Corrective Action Needed and Notes Installed? l aintenanc I Erosion Control- f e nir° . e LIM ®Yes o Sediment Barriers i 2 'Tree Protection. es DNo. ®Yes No 3 Stabilization of es DNo Dyes o Construction Access- Egress 5 Dust Control es DNo DYes o 6 Erosion Control Yes DNo DYes DNo Blankets f 7 Stockpiles Yes DNo DYes D o i 8 Diversion Channels/ es DNo ®Yes UNo Swales J`. 9 Sediment basins es DNo DYes No 10 Dewatering basins— ®r,Yes DNo DYes PNo filter bags. , I I Temporary Slope Dyes °No DYes No Stabilization 12 Permanent slope Yes DNo ®Yes o stabilization 13 Interior Site Erosion Ldyes DNo ®Yes o Controls 14 Temporary Check DarnsDyes DNNo I5 Street Sweeping LJ es DNo ®yes ' No EPA S PPP Inspection Report, Version 1,1, September 17, 2007 B P Corrective Action Needed and Nantes BKP r Installed'? Maint t n R . 1.6 Solid Waste Containers es ®No ®Y0 0 o 17 Equipment t Vehicle ®�`es L N ®Yes No Storage Area. overall Site Issues $ /activity Implemented? Maintenance corrective Actican Deeded and Notes Re nired? l Are all slopes and L]Yes ONO ®Yes UNo disturbed areas not actively being worked roperly stabilized? 2 Are natural resource d�lYes QNo ®Yes ®�,No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es ®No E]Yes U o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and E Yes ®No �lYes C�fi�lo receiving waters free of any sediment deposits? Are storm drain inlets ZlYes ®No ®Yes No properly protected? 6 Is the construction exit Yes ONO UYes ®No preventing sediment from being tracked into the street? 7 Is trash/litter from work N'es UNo CYes No areas collected and placed in covered f f. dumpsters? l g Are washout facilities Yes ®No ®Yes No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? Dyes No 9 Are vehicle and ®Yes ONO equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EFTA SWppp inspection Report, Version 1.1, September 17, 2007 3 IBMP /activity Imp ented? I aintena ce Corrective Action Needed and Notes Ile nire ? e 10 Are materials that are Of ®No ®Y potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater Yes ®No ®Yes No discharges(e.g.,wash water,dewatering) Properly controlled? 12 (Other) (/Yes ®No Describe any incidents of non-compliance not described abave m lance CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information subim Based on my inquiry of the person or persons who manage the system,or those persons directly responsible f r g thering the information,the information submitted is,to the best of my knowledge and belief,true,accurate and c inlilete. I am aware that there are significant penalties for submitting false information, including the possib city f i e and imprisonment for knowing violations." Print name and tit e• S Ott D.Kellowa Y.Professional En ineea Signature: U /', Date.. I 1 EPA S PPP Inspection Report, Version 1.1, September 17, 2007 Stormweer Construction Site Inspection Report General information Merrim us Development' Project Name NPDES Tracking No. MAR12AZ77 Location 315 turnpike IF11 e St. N.Andover Me. Date of inspection 9-30-15 StarttEnd7:30 A -8-1 SAM Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer 01810 (978)479-5648 Inspector's Contact information 148 North St.Andover,ma Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of 0 Excavate unsuitable materials for common area,and residence construction building#3. a C ro M. misc grading and site work. rit.maintenance of BMPs at southern portion of workzone. Type of inspection: event Ll Post-storm event El Regular Q Pre-storm event During storm eve Weather Information yes ®No Has there been a storm event since the last —1-th,Provid If yes, Storm Durati Ns Approximate Amount of PreciriWtion t un Storm q- [1-b "b weather eather at ti e of this Fog ins etion? Q E3 Snowing U High Winds U Clear Ucloudy �tain U Sleet Temperature.9 0 other: 6 Z_ dischargesIlave any occurred since the last inspection? ®Yes u" If yes,describe: Are there any discharges at the time of inspection If yes,describe: BMP BMP 'Corrective Action Needed an I d Notes JIM I P installed? Maintenance Re uired? Erosion Control- ®Yes 0 ®Yes ®No Sediment Barriers EPA SWppp inspection KepOft Version 1.1, September 17, 2007 ILIP B Corrective ACtion Needed and Notes Installed? Maintenance 2 Tree Protection `t2e aired? Yes UNo ®Yes ONO 3 Stabilization of Yes LJNo LOYes 0 Construction Access- Egress 5 Dust Control ®Yes ONO ®Yes ONO 6 Erosion Control ®Yes QNo LlYes 0 Blankets 7 Stockpiles Yes ®No ®Yes No s" g Diversion Channels/ es ®No ®Yes io Swales 9 Sediment basins es QNo ®Yes 0 10 Dewatering basins— des ONO ®Yes No filter bags. ll Temporary P ry'SlopeYes o UYes 10 Stabilization 12 Permanent slope `Yes ®No ®Yes o stabilization 111ZEa 13 Interior Site Erosion yes ❑No Yes o Controls 14 Temporary Check Dams es ONO ®Yes 0 15 Street Sweeping ®Yes o ®Yes No 16 Solid Waste Containers es ®No [ Yes EPA SWPPP inspection Report, Version r.1, September 17,2007 131 P BAP; Corrective Action Needed and Notes BMP Installed? I1'Iaitez�ancd Ile uir.. 17 Equipment!Vehicle es ®No ®Yes o Storage Area. 9 overall Site Issues /activity Inapieeuted`? Maintenance corrective Acti®n Needed and dotes la lured? 1 Are all slopes and UYes UNo UYes L]No disturbed areas not actively being worked roperly stabilized? 2 Are natural resource es �1Na Yes Na areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls [ Yes ®No ®Yes o and sediment barriers adequately installed . (keyed into substrate) and maintained? 4 Are discharge points and �4fes ONa Yes ` o receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes ®No ®Yes r o properly protected? Is the construction.exit es ®No Dyes o preventing sediment from being tracked into the street? 7 Is trasbllitter from work Yes C3No ®Yes o areas collected and placed in covered dumpsters? g Are washout facilities es ®No Dyes No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and Yes CINo C�Yes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? es ®No ®Yes Na 10 Are materials that are potential stormwater EPA S pPP inspection Report, Version 1.1, September 17, 2007 3 DM /activity Implemented? Maintenance Corrective Action Needed and Dotes contaminants stored Re niied inside or under cover? I I Are non-stormwater Yes ®No ®yes No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) dyes ®No Non-Compliance Describe any incidents of non-compliance not described above: After site inspection the Contractor(ben)contacted me that subsequent heavy rain resulted to stormwater release at the south corner at the project.The stormceptor WQU-#3 was overwhelmed.The contractor responded with pumps to divert water back into the permeable area w/in the LOW.The applicant asked of the may areas,and directly into the 48"drain line,prior to the storm forecasted in the next few dayp water s.I did not agree to thom the on site is plan I age had suggested that id pumping down of the temporary stormwater storage area is necessary that it a crushed stone settling area at or near Temporary Catch Basin(CB-B1).A filter could be placed over this,and then water will then find it's way form the filter bag to the CB,then into the underground filtration system. CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared Lmder my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the o ibility of fine and i tpisonment for knowing violations." Print name nd itle. Ott Ilowa ProlessiOnal E _r n gineer Signature .bate. EPA S WPPP inspection.Report, Version 1.1, September 17,2007 OMMM ........... ..................... s �r p ; Ar q� � si .� n�� � � n `� Jsr ��� ������ � ,��� � �t �� �- �� �� �� � -� `"� � �� ��° ��r" ",, ��— ��.: '� �'� � � � � ," �� ��x '�'�' r meµ. � � ��� , � � ���� - ��, �=''�''�2,,�-s- :, ?'" � �; f�� �' `� '�� �, .# }'s".1.y t � a,a u,:;' Aa t f y3, E� �, �S'� �� ��" *� � �'� t� ����� '„ ,fit -, }. k � k}� � � � � fy +�a�` arc ' t '� Sir � (t�.�� ` � a�a$ 4��t j �'� f B � � }� !� tk�z z ��� �& � � �� � ' Jr� '�}°� x� �_ '" N 3 �r 1 � k it t i � � �` y � t ,. � � �, s � t � s{ft'�,�.� '�t��,:' . S � � a t' � � a � �' � z�r k�����,. 4 � � � � �� ��VPf l� � �� � �� �,a b � � �' ������r� E n� y a�} zi.3 z ' �� ��'7'3g,� r L b v p�j k ��� �rv5ss. -����,}� '1- ¢,k itu � -� n :, � �� � a�„ � �`' y '� �, i� 4 � :: �� { =*ate F r� ; i � �, - � � # �� _ � � ' �� i... "4 ��� � �.x ���� �x�. �ecv "�Y, .�•�w � '� �� � �� -ti? ��. 1 z. � ��yxt � Az w � � �� fir_�� �._:� e k _Y 4 � C %f 6 E«. _ �� r �� � � �� ����, ^t � r� � �a" - c _ s, �� � �, �� � x s Scott A Kelloway, P.E. Professional Civil and Environmental Designs and Inspections. 148 North St.Andover, Ma. 01810 Phone. (978)682-5054 Ma. Lisc #40122 8/31/2015 Andover Conservation Commission Town Office Building 36 Bartlett St. Andover,Ma. 01810-3882 Dear, Conservation Commission. Please refer to the attached field inspection reports of site monitoring for the "Merrimack College North Campus Development''project located at 315 Turnpike St. in Andover/N. Andover, Ma. DEP File#090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This month's construction activities on this site include the following: * Substantial completion of construction of residence building#1,and#2. * Finish landscaping for residence buildings#1, and#2. ® Begin installation phase I underground infiltration system. * Maintenance and improvements of BMP's ® Miscellaneous site work, and management of stockpiled material. All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment is being stored, fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At the time of this report there have been no notable impacts due to the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions, the project Storm Water Pollution Protection Plan and consistent with best management practices. Pg: 1/2 Pg: 2/2 If you have any questions or concerns,please feel free to contact me at p €�ne number listed above. PM idl" Sincerely, cott D. Mello CC. (Via e-rnal,paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Fen Saturly Russell Bennett _ to ter Construction Site Inspection Report General Information Project Name " Merrimack College North Campus Development' DES T"raciiing No. MAR12AZ77 Location 315 turnpike St. N. Andover Ma. Date of Inspection Start/End Time Z� Inspector's Name(s) SCott O'Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of 4 construction L �>' 6..�,� �cr r L Ty of Inspection: egular L3 Pre-storm event ll During storm event C3 Post-storm event Weather Infor ati�v Has these been a storm event since the last inspection? []Yes 014o If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Feather at ti w o this inspection? ®dear Oloudy L3 Rain ® Sleet ®Fog ®Snowing ®High Winds®Other: Temperature Have any discharges occurred since the East inspection? ®Yes MNo, If yes,describe: EPA PPP Inspection Report, Version 1.1, September 17, 2007 � Are there any discharges at the time of inspection? UYes PX6 It yes,describe: IIMP BMP 1gMP Corrective Action Needed and Notes I stailed° Maintenance Re uired; 1 Erosion Control- Yes CiNo ®Yes o Sediment Barriers 2 Tree Protection Yes ClNo UYes Mo 3 Stabilization of WYes UNo OYes ZfNo Construction Access- r Egress 5 Dust Control CI es UNo ®YesPNo 6 Erosion Control ®Yes o ®Yes PNO Blankets 7 Stockpiles aYes UNo ®Yes JJNo 8 Diversion Channels/ es 3No ®Yes wit'o Swales x Z 9 Sediment basins Mes QNo QYes Pf4o 10 Dewatering basins— ®Yes ®No ®Yes o filter bags. l l Temporary Slope QYes UNo ClYes UNo Stabilization 12 Permanent slope ®Yes ZNo Yes No stabilization EPA S PPP inspection RepoM Version 9.1, September 37, 2007 2 t MP IF BMP Corrective Action Needed and Notes nst ? laitenanc Ike uired? 13 Interior Site Erosion lYes ®No ®Yes o Controls i 14 Temporary Check Dams es ®No UYes UKO 15 Street Sweeping RYes ®No QYeS ZfNo 16 Solid Waste Containers Wes ®No ®Yes 04o 17 Equipment/Vehicle es ®No Dyes o Storage Area. Overall Site Issues EMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required?...__ I Are all slopes and UYes ®No UYes ONO disturbed areas not actively being worked i properly stabilized? X 2 Are natural resource E[Yes LINO ®Yes 5VO areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es ®No Yes o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and des ®No ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets es LINO ®Yes g o properly protected? ,j 6 Is the construction exit es UNo ®Yes No preventing sediment from being tracked into the street? 7 is trashAitter from work LJYes ®No UYes QNo areas collected and placed in covered dumpsters? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 lM /activityImplemented? Maintenance Corrective Action Needed and Notes Re aaar� `� 8 Are washout facilities es No ®Ye l o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and Yes ®No ®Yes No equipment fueling, cleaning,and maintenance areas free of spills, leaks,or any other deleterious material? Yes ®No UYes No 10 Are materials that are potential stormwater contaminants stored inside or under cover? I I Are non-stormwater Yes ®No ®Yes ONo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) UYes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICA'TI.ON STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.used on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the pt�ssi ility of fine and imprisonment for knowing violations." Print name an le: Scottl ,Kkoway,Professional Engineer 7 Bate: Orzo Signature I EPA S PPP Inspection Report, Version 1.1,September 17,2007 4 Stormwater Construction Site inspection Report General Information Project Name " Merrimack College North Campus Development" NPDES Tracking No. M R12 77 Location 315 turnpike St. N. Andover Ma. Bate of Inspection i� . Inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Irnformation 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of �V construction -&� 'i �kt aLrr �et "C� S fcw Type of Inspection: / U Regular ® l 'P Pre-storm event El During storm event ost-storm event Weather In ation Has there been a storm event since the last inspection? Wes QNo If yes,provide: Storm tart Date,&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): e 'her at time of this inspection? Clear L]Cloudy U Rain El Sleet Q Fog ®Snowing I1igh Winds ® Other: Temperature: e, Have any discharges occurred since the last inspection? ®Yes No If yes,describe: Are there any discharges at the time of inspection? ®Yes o If yes,describe: BMP BMP $ZAP Corrective Action Needed and Notes Installed? Maintenance IIe mired? EPA S WPPP Inspection Report, Version 9.1, September 17, 2007 � B P 1gMP BMP Corrective Artisan Needed and Dotes `Installed? Maintenance Rs nired9 1 Erosion Control- L ®No LJYes Sediment Barriers 2 Tree Protection es ®No ®Yes { o 3 Stabilization of UYes ®No ®Yes o Construction Access- Egress 5 Dust Control es ®No UYes PNO 6 Erosion Control ElYes lei o ®Yes ZrNo Blankets 7 Stockpiles UVes ®No dyes ONO 8 Diversion Channels/ es ONO ®Yes Lallo Swales 9 Sediment basins L es ®No ( yes o 10 Dewatering basins— ®Yes U&o LJYeS o filter bags. 11 Temporary Slope U-i es ONO ®Yes o Stabilization i' 12 Permanent slope es ®No ®Yes Uf4o � Is stabilization 13 Interior Site Erosion es ®No ( Yes U1,10 Controls 14 Temporary Check Dams LYes ®No ®Yes JUNO 15 Street Sweeping ®Yes ®No ®'ices UNo EPA S WPPP Inspection Repots Version 1.1, September 17, 2007 2 if3 BMP BMP Corrective Action Needed and Notes best ed? Main en e Ile uir d? 16 Solid Waste Containers 13 s ®No UYes 17 Equipment/Vehicle es'®No Byes ZINO Storage Area. Overall Site Issues jdisturbe� P/activity implemented' Maintenance corrective Action Needed and Notes e uired?'Z re all slopes and ®Yes �No ®Yes o areas notctively being worked properly stabilized? 2 Are natural resource LI s DINo Yes UNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMps? 3 Are perimeter controls LIems ONO ®Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ONO UYes o receiving waters free of any sediment deposits? 5 Are storm drain inlets es QNo ®Yes o properly protected? j 6 Is the construction exit es ®No UYes o preventing sediment from being tracked into the street? f 7 is trash/litter from work es ®No UYes No areas collected and placed in covered dumpsters? $ Are washout facilities es ®%lo EDYes o (e.g.,paint;stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and Yes ®No Yes o equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP inspection RePOIt Version 1.1, september 17,2007 3 Bl p/acttivlty Implemented? Maintenance Corrective Action Needed and Notes Re uired`A ma's ®No ®Ye 10 Are materials that are potential stormwater contaminants stored inside or under cover? I 1 Are non-stormwater Q es ®No s Jallo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) Yes ®No Non-Corn lianee Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the po ib lity�of fine and imprisonment for knowing violations." Print name a 'Scott D.Kellowav Professional En ineer Signature° �' ? Date: U � EPA S WPPP Inspection Report, Version 1.1, September 17, 2007 tor titer Construction Site Iris port General Informatio Project name " Merrimack College North Campus Development° NPDES Tracl�i�ab�o. M12AZ77 Location 315 turnpike St. .Andover a. Bate o€Inspection Star nd'Tip '(.- aInspector's Names) Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact In€orm tion 1.48 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Praetieing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover r Describe present phase of � construction ,KLI. /of Inspection: e ®I)urina storm event U Post-storm event e�alar El Pre-storm event t Weather �nateon Has there been a storm event since the last inspection? elyes UNo if yes,provide: Approximate Amount of Precipitation(in): Storm Stan Date&Time: Stone Duration(hrs): pp , yWat—her a time of this inspection2 lear E3Cioudy I I Rain ® Sleet L]Fog ®Snowing U High Winds Te ®Other: mperatur y Have any discharges occurred since the last inspection? UYes o If yes,describe: ------------------- tyre there any discharges at the time of inspections?®Yes No If yes,describes EPA SWPPP Inspection Report, Version 1.1, Septembers 17, 2007 4 BIMP BMP Corrective Action Deeded and Dotes Ins a d? ainte ane e uiredl 1 Erosion Control- Yes o ®Yes No Sediment Barriers 2 Tree Protection Yes ®No ®Yes No 3 Stabilization of Yes �lNo UYeS E[No Construction Access- Egress 5 Dust Control UYes ®No Yes 5 o 6 Erosion Control QYes ONO ®Yes Mo Blankets 7 Stockpiles Yes ®No ®Yes ONo $ Diversion Channels/ es ®No ®Yes ONo Swales 9 Sedunent basins UYes UNo ®Yes WNo 10 Dewatering basins— ®Yes ®Yes 040 filter bats. t K i m` ^ l l Temporary Slope LlYes ONo Stabilization ff 12 Perrnanent slope ®Yes WNo LJYes QNo stabilization 13 Interior Site Erosion UVes ®No ®Yes UNO Controls 14 Temporary Check Dams Mes EJNo QYes ®No i 15 Street Sweeping Yes ®No ®Yes qWo EPA S PPP Inspection Report, Version 1.1,September 17, 2007 2 BMP I91IMP B P Corrective Action.Needed and Notes n Maintena Ike wire 16 Solid Waste Containers UYes ®No ®Yes No/ i 17 Equipment/Vehicle EiYes ®No ®Yes No Storage Area. Overall Site Issues B laetivity Implemented? Maintenance Corrective Action Needed and Notes e uired? l Are all slopes and ®Yes ®No [ Yes ®No disturbed areas not actively being worked pro erly stabilized? Are natural resource Yes ®No �1Yes ®No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are peritrieter controls Yes ONO ®Yes �No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ®No ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes LINO ®Yes No properly protected? 6 is the construction exit es ®No preventing sediment from being tracked into the street? ? is trash/litter from work Yes ®No C�Yes o areas collected and placed in covered dumpsters? 8 Are washout facilities CYes UNo ®Yes No (e.g.,paint,stncco, concrete)available, clearly marked,and maintained? 4 Are vehicle and ®Yes UN Yes o equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S RPp inspection Report, Version 1,1, September 17, 2007 3 1 PIactivity Implemented. Maintenance Corrective Action Needed and dotes e uIre s ®No ®Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater Yes UNo ®Yes UNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No I°lon-Coar� fiance Describe any incidents of non-compliance not described above: CERTIFICATION STATE,MENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system;or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the pos i ility of fine and impr sonment for knowing violations." Print name an t 'e: Scott I owa I'r®fessionai lea ineer Signature: _ � r� 1 i Date,_-----� EPA SWPPPInspection Repo , Version 1.1, September 17,2007 for .ter Construction Site inspection Repart General information Project Name "Merrimack College�iorih Campus Development" MA 12 Z77 Location 315 turnpike St. N. Andover Ma. �1PI?ES Tracking No. Start/End Time Date of Inspection - 6 r ^L f inspector's Name(s) Scott D.Kelloway, Inspector's Title(s) Professional Engineer inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Iescribe present please of `L construction f. T e of Inspection: Regular ®Pre-storm event U During storm event Past-storm event Weather Infor at o Has there been a storm event since the last inspection? ( Yes `NO If yes,provide. Approximate Amount of Precipitation(in): Storm Start Bate&Time: Storm Duration{hrs): pp i W ather at time of this inspection? Clear ®Cloudy L1 Rain U Sleet U Fog ® Snowing ®High Minds Other: 4rP Have any discharges occurred since the last inspection? CIYesLdNo If yes,describe: Are there any discharges at the time of inspection?L3yes " o If yes,describe: EPA S PPP Inspection Report, Version 1.1, Septembers 17,2407 1 BMP BMP BMP Corrective Action Needed and Notes I nstalled? Maintenance e nice ? l Erosion Control- Yes ®No ®Yes [ No Sediment Barriers r 2 Tree Protection Yes ®No ®Yes No 3 Stabilization of Yes �No Yes o Construction Access- Egress f S Dust Control Yes QNo ®Yes o 6 Erosion Control ®Yes No ®Yes o Blankets 7 Stockpiles � A Yes ®No QYes ZfNo i Diversion Channels 1 al�es ®No Dyes ONo Swales 9 Sediment basins ®Yes llo ®Yes U140 -To— Dewatering basins— Dyes o ®Yes UNo alter bags. 1l Temporary Slope�—IWBV7es ®No ®Yes o Stabilization P 12 Permanent slope ®Yes MNo L Yes QNo stabilization 13 Interior Site Erosion ®Yes or0yes No Controls l4 Temporary Check Dams es QNo No 13 Street Sweeping es ®No LJYesUNo EPA SWPPP Inspection Pope-rt, Ve sic- 3.1, SgPfO mb 97, 2007 B IB Corrective Action Needed and Notes a led` Maintenance r' Ike nir - 16 solid Waste Containers Yes I�No QYes No 17 Equipment f Vehicle es UNo UYes o Storage Area. overall site Issues fa�ti�ity 7Ye- '? Maintenance Corrective Action Needed and Notes BMPe uired? 1 Are all slopes and UNo, [ Yes ®tti4o disturbed areas not actively being worked properly stabilized? 2 Are natural resourceo OYes ®No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es UNo ®Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ®No UYes .®No receiving waters free of any sediment deposits? 5 Are storm drain inlets es UNo ®Yes QNo properly protected? 6 is the construction exit Yes ®No Oyes o preventing sediment from being tracked into f the street? 7 is trashJlitter from work es ®No C3Yes No areas collected and placed in covered diunpsters? 8 Are washout facilities es UNo LlYes i No (e.g.,paint,stucco, concrete)available, f clearly marked,and maintained? g Are vehicle and es UNo EYes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP inspection n Report, Version 1.1, September 17, 2007 BMP /activity Implemented? Maintenance Corrective action Needed and Notes Ike uir' 10 Are materials that are es ®No ®Yes potential stormwater contaminants stored inside or under cover? l I Are non-stormwater Yes ®No ®Yes 0 discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No -.Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsi for gathering the information,the information submitted is,to the best of my knowledge and belief,true,ace t ,and complete.I am aware that there are significant penalties for submitting false information, including the pos ib I'y of fine and imprisonment for knowing violations." Print name and ' I : Scott D.L llowa Prot'essional Engineer r Signature: V i . Bate: EPA SWPPP Inspection Report, Version 1.1,September 17, 2007 4 a.. 0 r 1 gN� ,o s„, r .% 'zr-'..,,-=-r- z -r... r.✓'" .rs �':nr r„.-�. ol- " s ter, r� r ;»r -�`"' n »,n -..,. a�f'�, a�:��� ��� „xy��, �. a 3. � x'�-'�S•`"`j'h� ,pt�``r s'� s�> x N t �aviP t�vlt �'� IVA SW v ?t 4 a 1t 9 L a r lot z s e w n HAVE T lv lam µ5N atNAnT� � ---------------- 1 v ` 4jt'.. i t m P t� a AM e � 9 N M a NA AM LA lE 4- 1 9 - bSIj t J a e,..<..a'i -