Loading...
HomeMy WebLinkAbout2014-10-07 Monitoring Report 2 Scott A Kelloway, P.E. Professional Civil and Environmental Designs and Inspecdons. 148 North St Andover,Ma. 01810 Phone: (978)682-5054 to Lisc #40122 7/31/2015 North Andover Planning Department. Attn: Ms. Kristine Cheetham Town Planner 1600 Osgood St. Suite 2035 N.Andover,Ma. 01845 Dear, Town Planning Dept.. Please refer to the attached field inspection reports of site monitoring for the "Merrimack College North Campus Development"project located at 315 Turnpike St.in Andover/N.Andover,Ma. DEP File 4090-0750 Amended, NPDES Tracking No:MAR 12AZ77 This month's construction activities on this site include the following: ® Continued construction of proposed residence building 41,and#2. * Completion of the installation of 48"drainage line relocation, and cutover of same. ® Pave parking access,and install walkways for residence building#1, and#2. ® Landscape areas adjacent to residence building#1, and#2. ® Maintenance and improvements of BMP's * Miscellaneous site work and management of stockpiled material. All erosion controls are presently maintained in suitable condition.All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition.All equipment is being stored, fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At the time of this report there have been no notable impacts due to the significant rain events this month. At this time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices. Pg: 1/2 pg: 2/2 If you have any questions or concerns,please feel free to contact me at address and phone number listed above. Sincerely, ask cott D_Kello ay,P E - CC. (Via e-mal,paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett 1 Stormwater Construction Site Inspection Report General Information Project Name Merrimack College North Campus Development" NPDES Tracking No. MAR12 I . 277 Location 315 turnpike St. N.Andover Ma. Date of Inspection - 7/ )I Start/End Time Inspector's Name(s) Scoft b'Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of Q J construction LZA� T*of Inspection- El Regular Q Pre-storm event Q During storm event U Post-storm event Weather Inform!!�ion Has there been a storm event since the last inspection? ®Yes Z Nio If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): afather at time of this inspection? Clear E]Cloudy U Rain U Sleet El Fog L3 Snowing U High Winds U Other: Temperature- Have any discharges occurred since the last inspection? ®Yes No If yes,describe: Are there any discharges at the time of inspection?UYes 5No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP B , Corrective Action Needed and Notes Inst ed? Maintenance. Ile `wired? I Erosion Control UlYes ®No ®Yes W& Sediment Barriers 2 Tree Protection OYes LINO ®Yes UNo 3 Stabilization of Wei s ®No UYeS No Construction Access- Egress 5 Dust Control IlYes ®No ®Yes ZINo b Erosion Control Dyes o ®Yes ENO Blankets 7 Stockpiles es ®No ElYes UNo 8 Diversion Channels/ aYes LINO ®Yes ONo Swales 9 Sediment basins (jYes ®No ®Yes o 10 Dewatering basins— LdYes ®No ®Yes @No filter bags. 11 Temporary Slope ®Yes UNo UYes o Stabilization 12 Permanent slope ( Yes o UY e­sU o stabilization i 13 Interior Site Erosion tdYes ®No ®Yes Uiqo Controls 14 Temporary Check Dams es ®No Ayes o 15 Street Sweeping Ves ®No ]3Yes QIRO EPA SIWPPP inspection Report, Version 1.1, September 17,2007 2 BMP B P� BMP I I I Corrective Action Needed and Notes Il�sled? Maintenance Required. 16 Solid Waste Containers UlYes ®No ®Yes o 17 Equipment/Vehicle es UNo ®Yes U14o Storage Area. Overall Site Issues I3 /activity Implemented? Maintenance, Corrective Action Needed and Notes Require 1 Are all slopes and ®Yes E]No ®Yes o disturbed areas not actively being worked properly stabilized? 2 Are natural resource Yes UNo ®Yes Mo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls @Yes ®No ®Yes Uf4o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Uires ®No UYes EdNo receiving waters free of any sediment deposits? 5 Are storm drain inlets QKes ®No ®Yes WTo properly protected? b is the construction exit es ®No ( Yes Mo preventing sediment from being tracked into the street? 7 Is trash/litter from work EYVes ®No ®Yes o areas collected and placed in covered dumpsters? 8 Are washout facilities Ux4es UNo ®Yes LNo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and es QNo ®Yes o equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Mplacfivity Implemented? Maintenance ce Corrective Action Needed and Notes Required?/ ® s ®No lees 9NO 10 Are materials that are potential stormwater contaminants stored inside or under cover? I 1 Are non-stormwater UYes UNo UYes LNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) QYes UNo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the po sgibility of fine and imprisonment for knowing violations." Print name and le:� j Scott D.Kelloway,Professional Engineer .I 1 Signature: ; �� "�ll Date: i t EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stor water Construction--Site Inspection cpo General Information Project Name "Merrimack College North Campus Development" NPDES Tracking No. MAR�2AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection /15' Start/End Time ,r1 Inspector's Name(s) Scoft D.kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information. 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of - construction t 7L Ty of Inspection: Re ular ®Pre-storm event ®During storm event ®Post-storm event Weather Inffor ati!n Has there been a storm event since the last inspection? UYes EINo If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): her at time of this inspection? Clear L�Cloudy Rain ®Sleet ®Fog ®Snowing ®Nigh Winds ®Other: Temperature , Have any discharges occurred since the last inspection? ®Yes ElNo If yes,describe: Are there any discharges at the time of inspection?®Yes LlWo If yes,describe: EPA S PPP Inspection Report, Version 1.1, September 17, 2007 � BMP BMP BMP Corrective Action Needed and Dotes Installed? Maintenance c Re nir° 1 Erosion Control- es ®No byes No Sediment Barriers 2 Tree Protection Eryes 1 No UYes ANo 3 Stabilization of EjYes ®No ®Yes UNo Construction Access- Egress 5 Dust Control es ®No ®Yes 21NO , r� v � 6 Erosion Control ®Yes Flo ®Yes UXo Blankets 7 Stockpiles Oles ®No ®Yes Qfqo 8 Diversion Channels UYes ®No ®Yes o Swales 9 Sediment basins CrYes UNo UYes o 10 Dewatering basins— MYes ®No ®Yes E No filter bags. 11 Temporary Slope UYes LrNo ®Yes o Stabilization 12 Permanent slope ®Yes UNo ®Yes @No stabilization 13 Interior Site Erosion es ®No ®Yes QNo Controls 14 Temporary Check Dams UYes ®No ®Yes ElNo 15 Street Sweeping LdYes ®No ®Yes nNo EPA SWPPP Inspection Report, Version 1.9, September 17, 2007 2 BMP f B Corrective Action Needed and Notes BMP Ins ed? Maintenance r Z' I2 aired 16 Solid Waste Containers UYes ®No ®Yes No 17 Equipment/Vehicle OYes ®No L]Yes ONO Storage Area. Overall Site Issues BM P/activity Implemented? Maintenance Corrective Action Needed and Notes e faired? l Are all slopes and ®Yes ®No UYes ®No disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ®No ®Yes o areas(e.g.,streams, wetlands,trees,etc.) ,- protected with barriers or similar BPv1Ps? 3 Are perimeter controls es ®No UYes UNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and UYes ®No ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets Yes ®No ®Yes UNo properly protected? 6 Is the construction exit OYes LINO ®Yes UINO preventing sediment from being tracked into the street? 7 Is trash/litter from work es ®No ®Yes o areas collected and placed in covered dumpsters? z! S Are washout facilities ' Yes ®No ®Yes UNo (e.g.,paint,stucco, concrete)available, clearly marked,and / maintained? d 9 Are vehicle and UYes UNo UYes No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S ppp inspection Report, Version 1.1, Septembers 17, 2007 I /activity Implemented? Maintenance Corrective Action Needed and Notes Re wire . es QNo UYes 10 Are materials that are potential stormwater contaminants stored inside or under cover? I 1 Are non-stormwater CYes ®No ®Yes O&o discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all allachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and tit d: tt€I. ello a Professional En ineer Signature: ' . Date: EPA S PPP Inspection Report, Version 1.1,September 17, 2007 4 S ®r water" Construction Site Inspection Report General Information Project Name °Merrimack College North Campus Development" NPDES Tracking No. RR12A//Z77 Location 315 turnpike St. N.Andover Ma. Date of Inspection `�j (�7 Sta nd'Time Inspector's Name(s) Sco I3.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction tAO Ty ®f Inspection. Re of ®Pre-storm event ®During storm event ®Post-storm event Weather Information Has there been a storm event since the last inspection? UYes o If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Wey�ther at time of this inspection? `Clear UCloudy El Rain ® Sleet ®Fog Ll Snowing ®High Winds ®Other: Temperature: ,0 Have any discharges occurred since the last inspection? Dyes QNo If yes,describe: Are there any discharges at the time of inspection?®Yes No If yes,describe: EPA S PPP Inspection Report, Version 9.1, September 17, 2007 9 BMA BW BMP Corrective Action Deeded and Dotes Installed? Maintenance ntenance Re,u ed I Erosion Control Yes ®No UYes UNo Sediment Barriers 2 Tree Protection UYes ®No UYes LfNo 3 Stabilization of OYes ®No ®Yes 040 Construction Access- Egress 5 Dust Control WYes ®No es ®No ! s , i b Erosion Control UYes ®No ®Yes o Blankets 7 Stockpiles ales ®No ®Yes i o 8 Diversion Channels J es ®No ®Yes o Swales 9 Sediment basins @Yes ®No ®Yes Z No 10 Dewatering basins— Yes CNo QYes UNo filter bags. �J 11 Temporary Slope ®Yes lNo ®Yes o Stabilization 12 Permanent slope ®Yes o UYes EYNo stabilization 13 Interior Site Erosion UYes ®No ®Yes LdNo Controls 14 Temporary Cbeck Dams Wyes ®No ®Yes LINo i 15 Street Sweeping UWs ®No ®Yes ONO EPA S WPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP B II Corrective Action Needed and Notes Ins led? Maintenance Reg ulred 16 Solid Waste Containers Yes ®No ®Yes ElNo 17 Equipment/Vehicle es L]No C]Yes UNo Storage Area. Overall Site Issues B /activity Implemented? Maintenance Corrective Action Needed and Notes e oire ? 1 Are all slopes and dYes ®No ®Yes ®No disturbed areas not actively being worked Proverly stabilized? 'z 2 Are natural resource UVes f]No ®Yes Na areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls Yes UNo ®Yes UNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and LlYes ®No UYes UNo receiving waters free of any sediment deposits? 5 Are storm drain inlets es ®No LlYes UNo properly protected? 6 Is the construction exit ®Yes ®No ®Yes @No preventing sediment from being tracked into j the street? 7 Is trash/litter from work UYes ®No ®Yes o areas collected and placed in covered ; dumpsters? 8 Are washout facilitieskEl/Y—esL3N—o ®Yes UNo (e.g.,paint,Stucc®, concrete)available, clearly marked,and maintained? 9 Are vehicle and UYes ®No ®Yes DNo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP inspection report, Version 1.1, September 17,2007 3 lacf avity Implemented? Maintenance Corrective Action Needed and Mattes Require s UNo ®Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater WYes ®No ®Yes CaRo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) L]Yes ®No Non-Compliance Describe any incidents of non-compliance not described above. CERTII+ICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possib',r y of fire ar d imprisonment for knowing violations." Print narne and t°tl � Sc t I.I.Kellowa Professional Engineer f �y Signature: Date: rc f �. EPA S PPP Inspection Report, Version 1,1, Septembers 17, 2007 4 Sttrr Watelr Construction Site Inspection e General Information Project Name "Merdmaek College[forth Campus[development' NPDES Tracking No. �MVA��lA Z77 Location 316 turnpike St. N.Andover�1a. Date of InspectionStart/l;nd igneInspector's Names) SKelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase ofz 1 construction Type of Inspection: ®Regular ®Pre-storm event U During storm event Post-storm event Weather In 'ation Has there been a storm event since the last inspection`? UrYes ®lido If yes,provide: Storm Startrl3ate&Time: Storm Duration(hrs): f Approximate ount of Precipitation(in): 1 - J We ert time of this inspection? Clear ®cloudy �l Rain Sleet Fog ®Snowing ®high Winds El Other: Temperature: f P Have any discharges occurred since the last inspection? QYes M&o If yes,describe: Are there any discharges at the time of inspection?®Yes o If yes,describe: �er��, 200� EPA PPP Inspection Report, Version 1.1, Septerta BMP BM?, otr°ective Action Needed and Notes Installed? Maintenance ate`uired,9 l Erosion Control Ur9es UNo ®Yes UNo Sediment Barriers 2 Tree Protection UYes ®No ®Yes PNO 3 Stabilization of Yes UNo Wes UNo Construction Access- r Egress 5 Dust Control aYes UNo UYes o 6 Erosion Control []Yes allo ®Yes UNo Blankets 7 Stockpiles UYes ®No ®Yes No 8 Diversion Channels Wes ®No ®Yes Qf4o Swales 9 Sediment basins es ®No ®Yes QNo 10 Dewatering basins— es ®No ®Yes 9fNo filter bags. 1 I Temporary Slope QYes QNo ®Yes EKO Stabilization 12 Permanent slope ®Yes @No Wes Qf4o stabilization 13 Interior Site Erosion UYes ®No CJYes QfNo Controls 14 Temporary Check Dams UYes ®No ®Yes VNo 15 Street Sweeping UYes QNo ®Yes o EPA S PPP Inspection Report, Version 1.9, September 17,2007 2 BMP B BMP Corrective Action Needed and Notes Ise alled? Maintenanc f Re uired9 16 Solid Waste Containers Liles LINO ®Yes ONO 17 Equipment/Vehicle Qyes ONO ®Yes o Storage Area. Overall Site Issues D /activityImplemented? Maintenance Corrective Action deeded and Notes Re aired? l Are all slopes and ®Yes ®No ®Yes LINO disturbed areas not actively being worked properly stabilized? 'f Z Are natural resource es UNo ®Yes ENO areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BWs? 3 Are perimeter controls es ClNo Cites ZINO and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and es ®No ®Yes "t30 receiving waters free of any sediment deposits? 5 Are storm drain inlets es UNo ®Yes Uf4o properly protected? 6 Is the construction exit UYes ONO UYes ONO preventing sediment from being tracked into the street? 7 Is trash/litter from work Yes ONO ®Yes UNo areas collected and placed in covered dumpsters? ' Are washout facilities es UNo CiYes ONO (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and ElYes C1No ®Yes ONO equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17,2ad7 3 B. /activity Im ente€]? Maintenan e Correc i e Action Needed and Notes Re 'mired. 4es LJNo ®Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? I Are non-stormwater ElWs ®No ®Yes UKo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) UYes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible fo atheri�g the information,the information submitted is,to the best of my knowledge and belief,true,accurat ,a c9rpplete.I am aware that there are significant penalties for submitting false information, including the poss' ili o ne an imprisonment for knowing violations." 1 Print name an tit]' �ej;tt D.Kelloway,Professional Engineer Signature: Date: � EPA S PPP Inspection Report, Version 1.1, September 17, 2007 Stormwater Construction Site Inspection Report General Information Project Name " Merrimack College North Campus Development' NPI?ES Tracking No. 12A 77 Location 315 turnpike St. N.Andover Ma. Date of Inspection Start/End Tirane {�' ll Inspector's Name(s) Scot D,ik6lloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5645 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of � construction t . GJ - Typ f Inspection: egular U Pre-storm event ®During storm event ®Post-storm event Weather In or ati Has there been a storm event since the last inspection? ®Yes UNo If yes,provide: Storm Start Date&Time: Storm Duration(brs): Approximate Amount of Precipitation(in): Feather at ti of this inspection? E3 Clear ' Cloudy ®Rain U Sleet El Fog ® Snowing U High Winds ®Other: Temperature:p Have any discharges occurred since the last inspection? ®Yes QNo If yes,describe: Are there any discharges at the time of inspection?E]Y'es o If yes,describe: EPA S PPP Inspection Report, Version 1.1,Septembers 17, 2007 1 DMP BMP B ig Corrective Action Needed and Pastes Instal all Maintenan Required. I Erosion Control_ UYes ®No LlYes MNO Sediment Barriers 2 Tree Protection qYes, ®No ®Yes WNo 3 Stabilization of IYes ❑No ®Yes UNo Construction Access- Egress 5 Dust Control CdYes ®No es ®No $ f ° t1Ctr� r tit 6 Erosion Control ®Yes Mo UYes La No Blankets 7 Stockpiles Wres UNo ®Yes Wo 8 Diversion Channels Ules QNo ®Yes o Swales 9 Sediment basins es /No QYes o 10 Dewatering basins— UYes E3No ®Yes i o filter bags. I I Temporary Slope ®Yes o ®Yes U Ko Stabilization 12 Permanent slope ClYes o LlYes Qf4o stabilization 13 Interior Site Erosion UYes ®No UYes EKO Controls 14 Temporary Check Dams es UM ®Yes UNO 15 Street Sweeping LAres ®No ®Yes o EPA S PPP Inspection Report, Version 1.3, September 17, 2007 2 I; 1I� Corrective Action Needed and Notes BMPIns ? Maintenan e ulredf- 16 Solid Waste Containers �es No LJYes o Z- -1T Equipment/Vehicle E]Yes UNo UYes GNo Storage Area. Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Dotes Required?. l Are all slopes and ®Yes � o UYes UNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource t Yes i--No ®Yes UNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers ' or similar II s? f 3 Are perimeter controls LlYes ®No ®Yes UNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Wfts ®No ®Yes JUNo receiving waters free of any sediment deposits? - 5 Are storm drain inlets es LNo ®Yes UNo properly protected? 6 Is the construction exit UYes ®No ®Yes UNo preventing sediment from being tracked into the street? 7 Is trashllitter from work es ®No ®Yes 590Z areas collected and placed in covered dumpsters? Are washout facilities MYes ®No C]Yes 6N4o (e.g.,paint,stucco, concrete)available, clearly marked,and l maintained? 9 Are vehicle and QYes UNo UYes l]No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PPP Inspection Deport, Version 1.1, September 17, 2007 3 l /activity Implemented? Maintenance Corroctive Action Needed and allota AP Reg rnire . Yes ®No < ®Yes � 10 Are materials that are potential stormwater contaminants stored inside or under cover? l 1 Are non-stormwater ®Yes UNo UYes UNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes UNo Non-Compliance liance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible f gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate/a d complete.I am aware that there are significant penalties for submitting false information, including the possiVili of n and imprisonment for knowing violations." Print name and tit � Scott D.Kelloway,Professional Engineer Signature. I A Date: i ,r EPA S PRp Inspection Report, Version 1.f, September 17,2007 'E �,.. �. 5,n M� � � � �' „x � --� � ��te�Ei�,<< "rise—�$�af�r� a .� __ � r�- �i �. `ie'r # :'+. � a�� use# �A"�,: "� �� �� �h`�. *.�'�r'-.�� �� � � �"r �- — .,-�,�"`` ..a, k=. �`_ �� �^T"war �Qr � 7"_". -�. �f S- ..,ggx�Y. ,�I`, i m 2 c, '1 � v + �. �r,ii� � � th� '' � e ,.. � .-� _: j3 � �1 syt y a � ' � f t 4 Y r. rs 70 a t CON rM' i t`U 'a �s F t} S 3 F � AAA r i tt �s s d � t H S5 t�`'` �( x Ff t ! 3, s� i�„d4�,�asrn�;�• e ��i to 5„t L c$� eF 7 d 3 2 i 3 e 2 t <t t 4 Y RI {: k s <. I� b. A k *vy4 Y 1 Scott A Kellowky, RE Th§MAW . Oa Evuhnumpad lwm4ps and LUPO.% ns- T 148 North St--kndove-r,AM&01810 Phone: (,977811 a2-501-5541 Alm Lho 4401222 No a-. kru do-.7er P-1ann=- .--D'per ri—merm Alta: Its.KHOO; Tuo7wi-n P'Lanuin-a2z 6f 10 Osgwode Suite 206 5, 1 Sk4100-415 Deea--,%Ty,cnwn Plarudng D;pt- pleas�r-d'ir to ffihe- wochal f kid imjxWon zzymts W 5A rnamitoSy LOT 1he Oc,,-'U�ge Nardi Caingan DcvR1oTT-'neTrnt-"projecl, loca at 3 115"IF-=kpike Sk-In Andon-er, N--��ndover, DEP F #00: U-675-0 MnaWYL WINS TracOng No:TO?& 121OZ77 Thiis ra 's c o n--,-,-r on acti-F;--i-fies om t!Lis she inchude,-The fffiEhur#Nihzg: o CcAnued wasnuWan of:zrc-Tposed re-siddence 101diagO,ZZO Q- e Ca " n c the KhOwina of 48 dunainn - hine mlocation,W omawn of T. aw:2W af ISMS Manumusus A mark, ani nuumgerwo AM=usi ann ca'nLmu ol-Is wv Invowly=1100 K RASNe wax%HL AZ Was BNE"s hne-11h se uws lathe Wilhux:stunrus conoW 7 insuMs!Z=INd am in In-10taLVI'le Rdon,-ALI e, em is being nored'�fneled ami a indwasa lavuhn Z- ocation utside SLR-fffi-cie�nmd-'� OUCH vwe-t—',��-%d rtso=ze-awas. Koh and dQuis zuv boby;agEngivanj culArMA Emk Ar"Knon of G-ra is Tanse f a,7;,F, site n. Thor has Nnano en-c-co- a-dunen %"Jvd-ehn 1,0200 anon. Ile Ewhgn Elfbaw has ra,sawi my inhow cd a �.�"Sal C, d2t s�Ab infilt7ati-o'n", sysunan (we aRzONA draft KOH)-I hawn nrvirvnNi khdis pnTevi and End but Ana cadculaRnis Kry to!to insthhhAn of tie 55 clanivers iSmIr I1ms -,, ' O f12se 1 iS smdic-ent Tc =itfigate Kaas(07Oyrd sw o WemheC a lW ' i; ,ksble ccWhicahWn enprray(RUH01)maruvw=41 a r, SPEW bahn hnsierrnice fbf as as poss%a T pryandaa of INSI IL Ile clammVy has'=�ainn awillprONVINIF"Smi" the-wudkkiaxit a7--minirn Ln 1-tration,of sei=hnt7n ta VAN,a swomms main to:vaN zons- A!to ity COOK w-upRouTtL hh--,vf--Tn—z ha-�-,bxeQ-Tq, no E,- It irn dut to tht sit lain evews Vis 1=0unwil-1- pyll Pgs 2"! t-ems time iffi workthe site is being per5ormed in compliance with the Order of Conditions,the prqject Storm'Water Pollution Protection Plan and consistent with best managen-kent practices. If o have any questaons or c ncerins,please feel free to contact me at address and phone. number listed above, A A!" 'I a ° .' { 3 - (Via e- ,paper copra upon request): I.N nn K ra er -Mark Le o ll er Feilipe Senwartz Ben Saturly Russell era ett N+In i tli+trnEui,r,IniIIHr3(IFir py,!rplrrlar Itt I Ir a€r 1 11,1 ui{,fnr,13IIIiitlrciU iit r1�rl nr tlutl sae##,,� �# ^'^ .,,-. X;IP 4 lii' Ito 7t7 ah' .,�a•.x N1, wit �Nt9 r " �. F '�` �tJ� w�• �.,� .,'� a, .fw �¢�. �+.w. _ t ail m ui�ia4,tatNF�r ' _�. dtl Lrldlh! , 3ai(nl� , ' y ,16 fl �r y �� 999 ifl 3� � It eye ¢� A ' 111, logh" ,¢ , � '9sinap €" l , a s�>aar � At .» . rriv iII1 rr. x era i a a *r , till M p ti& Did t+�r.lri' 'su3a Nir14;Ptrt4Yil?i���Tr 1 •. � a �° � �n ,Art 1,»=aa t4 yw- a• ,. ,. w. hIg I o IiLi � p p ti4 PI Q it A{I AY t gtl4!�ritUU(iti>N - Anf}CrvrNrlhfA �t q I Vt"NtirV`'tow,.ov ia p ktNJ I,ri�ii�.. 5Kc-1t _ mow North tAmptu 00volopmont Wirth Andavor,MA Sty water Construcidon Site tt �on Report prefect 1 ..0 4 zii th C busDeveloopmerl- NPDIS rt Timer e 3; pes' E Describe Pent pie of _ a s 4 F Sr a 9n: € -Ss3,.�z.�event ',���-12k ?vet Rost--cm e-ent i Weather Infarmfiam x Has there been a storm Bent s° e the t i ; n? ",-Z, UNo if Y role:: Ye a m� o � jai k v4at time of "r' 3...E+1.✓` �i X� Inds Hare v dhwharges mcurred since the h3ka. s-p l C. if � a . .e apt g at-. s� S mpBe I Y vw :a E ode. E h 'gam as ; r l ff 'zs ZN3 Wyei Use Cz : c zzess�- F Cal --> Uve _ F ig AT &tom a bas, 17 "w4.'. z m Cam+ i '", _K„ C Ste:,17 5 - i L? FI Is C _r sh,cwt hV s f- Soptember loopInn-3-1-0 Exledd- i � r a; � how r a 'Dw 4 e a sws nzoo ber walk PT s e �,.c,u �q s ed ads,t-= .rye s 14 SUM Eye of £es aCall Q0 L-tilt P- V .'T''ic _ yw hrG 1 r Fµ,t-la,l HASsine was :M?Sza- _ i " w .0 k...wn&zip on.owl P of WMAW1 a 4 _ Nett eq u " " es QN6 vzombno sand I I; P' I' I 4- CIRTITIGOACKV STAKE3,41W ,.:: 7eqXrOME f a -mme._.tad SAW D.Tfwaowav,WWWWOMY 1: lever t z r Eat a &MR51111MICUISM I IRM o PAY . Nam `MOMS NUA 17 11Z, to of paaz Time , ez- mow) tow EUMBOwnim the Town of Amdow - f r t l' Abe 1MMMMt PNMZ UT z 'na '':�"•.i' "' � �', v ..-^°.,.x'°^�., -.;:a s`*=,_# °<'+�y S.r.�fi's;',q. a "a^.s`Y,;,.3 +_. _ � = �i ��; c k VI jji7 Ate.'. x- is ; �,�. �'';^✓r ,�� q"a*."' ��t„�,. �„ �> k'. i -zrmx Smut list ?. l Q AM LJ TOM LI Fog �'�exr'_ is ZI D _ 1^ k a.i e* r�c� curved ava the. :m.s ecti ? IVCZ, r r i$,-re t' '_:;- . Is — T_eeu _a k` Biaakfts ` 3 I i T.^ v.._` YiL�'.r ay..;i Gmt " ._ 3 � v� w-n 4` sr X` "u.a k3 _ _�t".�d1u'=` ;'4 �, % :ivy &.''✓,,. - E L jL 3r'ss _ 'r".._.> s'y,,.. c�.a f} il zlyes W :1YI-31 NO in«t for She E cirri x `mcs UN& � aN r r �ZINC 1 t' EPA A In cl _,,X.. ,. ion vSeptamber 'O0 °. 3� f � K r3.w 'FV ,w c Il t67 4 t1J 1j,7 f� CS.i 41,A jt p h. ( r _ ,. 171 171 t�oi ip p �rsm „� l I All, r� l �[:� u h t � #,il) U: �y G� t, + � i �. il�e i� ,° '=t-:• `wx �"� �i'l YIJ 4S+ �' ,aa � P 1 hi3 �� j, d l �„ 1 141# !1 ,t mew f rr/) f7� �� x t ��� a F t k !!r e• �j" I, �rtf4 ° w n� .<,. , ,,. v �,..,� tr•� �dh Eli 'f e ONO zni-zs QN6 10 Are rnauSds that an; c " - smr nd F ..*..r .:a.v 3�+'s",. _roh..c ". s WIS WO 4 � Dess- s.__bi "` 4' I'. k CERTHTICATIONE . ;;,' 9^S€,„r,.f i_jar2hl€ of Ftz*tss Aus M dammmamt a::W 11 .:.,a..,:ffi"?,:ss w§:.b>�p7pr7 �.�""'�:?.an cc �'ec...�.._ ff:.iev - zs an,My KPOY efun 3.un° n s'*r`s-`'Os,..r=.. _ 3 az�. ��-Yx� lv ,_ �.�s-��-t�w_��_..=�""'���s I.'soak_';�E..wuakty is, ram, ^�.b4%'O Y' and b'—Im tw x..x..c.=n and.'c pI—Te., f am_¢`t-'xazz'?' _W._w,:ems`_•.:_._Aka d yolks Rr&A,�..—Ag Elm hI - . Prot nams RK title ��� a SYMOMMI Evylkys gma EPA SWIT,W x<n Avpwt S OTF I S r Cons; til Site Inspection s _ 3 15 tun nipike St N_ €v r Ma R-R-AlEnd Tim ve Date of TwTecdun In"s ecl z s e( D.Kell r -°, Ins is n �o Clam .. t - F Describe present phase o - . 4-4 i€ i r � y j s '1�vpe of 1 3peefian- ' t Rkezuii -_ta-,:?�even: U Dm _ a" _a- w m ev We r, r Hw there been 2 stem sent sket At D ? o I If ye -ruv ® ��4?3 f - `v,� m ...; _.z .. aka e'E,'€.�,v.' `.. ..'v r at M;-Pe C,mM- `. n Q F�`, Snuwinz U Hi Winds zi C- T Ifdesc-r-lbe.- Are at the f as s dma EPA SlVP-PP Inspeeffon RzPO,-4 Vamlar.t t q °' r ,207 BMP .' S-dm,.-a-,Bau C o-r, R c �mCarnt a Yes zl' 'e�:: U�u lar { R a s r { s ` `f ` w,.�.��. ,ram 9 " ?'':a".dim—e--ash.b —shr, a k I Dewemermgbasins- 2g& r T`emp ,S--I" lives O Z Nor, Zyes Swe- B �y � 3 i s i z brispecdon R ion IJ. C k� ` Al le, ${. Iq ,' C I a �� t z� rfrt� jl��gi ��a 1 !"7 P� f II, (w C is jd j !}�-�.F� k• f�1 f �v i r!} f.? f;� t 3` � £ q rya + g,. ',t p F?"� ' CF . �J +F;;! �� }�"" � a' rat ✓;a7f �� �°j �� r � ` �a pa rt;� `RI i1a '�,a �? �7 I� �r z(�� �� '�'1 z�! �,t {�,� Is ✓j Kti (X { tr£ I f! +.=p A�a rf i#" I t3' Ir�t) ;,,a nAd? ° YUW e Adim Wald aid%Totttes r; 1 h--A as r' s i e I� C a ET " " _.syst ___... g-ed to ass- -a_qu £F_ v^...,.= .,am_eo pNge ; gl-th-s.�A anj eNahose, V w Ss cd an my inquiry of z or persscns who= dtvt-- or 'sue__: An n MM_5`.:.07 g"uhn `"ss_the info—n the in-fboa .fr -s-u'b..ft---�''�..is.to the best o _w _ = � k�€ s=. �.,.,..� .rw r ad,annpive-larn a.wyn i..,,w,.V....n Mm::o_RM mow-,. o f-m M 4I w7ro,.:_" .s..�._ MA name EPA WOOF hmposdon Mpawtr I- sjYMNnKMw Site hank GemeM Iffomation m Men va x Cannu E ------------ 1 ARM_ . starvEhad Time �� 00a Ek MIN- - 148 NIT A:mad v 1 v9 e � { sAtinenhunin& y s&FgpvWd she munhm ia Tim of:nTm or x k E s< lose of bmeskm.- Q _ zi Pre-SMI-M _Weather InfRoarmMM124duld 7 k F-f-. tr beem p- Sl*� tt 1-41 pee I uiR E E e we BEY dbzhargges at.the time of inspection? y , UNo'. 1 If _rM { EPA % = a39009 ,2007 IP W&P711 i y x __"c- - B s� a It ZINO I' I, 11 Tom. _"l...=may+S l» 'Eva ar iq eATIMay2 z� Y �r- EFA WAS" c hmgmWon Mgmt WvOco 1,t S14MMAN, r, IX t �J s i .- ax� 4 i yyP^^f.gp: ��v"yy fib, ib 41 Fdd ttY a ti apt ! i Jif ,-ii ( I t f i ( ' p iI i'i '; it ✓' 7'7irJ) `` i it 4 Id �A f�� / a t r t fr ra rtl r ,.21 z t 3 a t;:x1 E rt a 1 't,1 6 a J Ml �- t fk ��e� Fy ' lU 'l .K„ t `s x n �,�+ it ,1 'ts r 'Qd` a t 4 f�7 E 9 °'E.+l Is5 I tJ a � r,� �. r•'a 4 !i,� � � 1 ,i {. � f,., k��? I � rPF� 4�N1 €J it t�„f r,�1 Cbrrectrwa Actim-N-ca&d and INoes o a 2m;,sm, g . " ':.,_ ZNC, wa � . C Nez—l- panne _ zot a_t5cT5 td "^ sue- Ep, ja jam.-,k iST-ATEMENT _. unde7 pen of ls�� _ . MY on ur supervisim in a :w -ate a sy �m ,as e. .,max ffi t-qmHfied'" zs 'n p g �e z evalua±ed in- o >Ja ._ fbb&,,a g � x k Pr_b_t s a .: i =. " 'fir ' ; . �. �s<��'.a 3. _ t y f _` DatE. _ m ptember ar_ 2W7 S c ; deu Ste 1 11 Repox A-W ton . ill - .7,d- .kiz .. � -;^;era zeT 143 link AS I? _,..WOKMAgr a an re; «.sy v ^^ vvi she M",-Mr S hit 7`'L?'...n W'a-"..u.h t.0 phase of cumstmz _ a i � Y Ix k Type gif,Irmi endon Tie JeT it S�- a Ar moo.,..,, E p x 4' r+i t I' apt: L 6 Rl ye- ,.'" rr 'II s 'k- 4a r r' ._ emu r I ; k4;+ w r 4 ` s i,v- =vim�� nex z , tojyes Oho I r ZlYeass ZINC Y _�. f ?0 Devatring b&;_s— ZrVes o ,--s ;Rlo fllhe-bags �F r uYes, zNb -e-s- Z&O t _ I` S i, 'e�". �� l eu-np= 'S�e...zti%yak D^..a_''i�y.'4 ma' f e � Oyes- O I. xv "es Ugo is EPA S In-speCtion Rspo?t Vef sion Ig, , ' � 0 4 0 mmWe Solid�x, `c `sue es NO �� rf C Equip _ Yes a Wei Z Amz-- IMM She _ w rta � Ctmam ee&-d and Notes sa Wmbvi man G ,v behigg 727m" w a k '? m—am-S and c KInum r m M.:� E (Plod We Sumaws) 1 ` d main'sue. F of 5, Aft Stumn ions t; y Um ?Wya E e 6 Ito cumos_vu-:m exit AS ZINO Spy,.._ Gyme e as c id a e r a Pak,SM4107 wnl a ' = awshm of RAM WX or ZqF cwho dclu�- EPA _ SL te oT zDdcr co Nu? Are discharges t` g e � e k - pry ' e s f z ,he jn� Ribm�Based un my inquiry awz: -y Lmmm ��`-.:T_-. —,&L`S _P;,S s"..,.'�—�..w. i EAD wv.Pruftes&aa Dat.. 9" HRASAI �. � � � -� �- ��� � �" � � � � �'%�'-�.,�7 �� ��y �` `ter" .t� F _ �� ���� �� � ' .ATM �* `� � �,�acr :i �'.�^- "` .^^ � a.� ,��� ����� '� �� �� x'. ,� -�,� "ems���--�-,.�, �, �'"e - - � }�� �� �` � � � *.�. µ s ,.�N� � � �"+r,� "�� � �� � T. �. � ���. � �' '�� ` � '� �� a ,7,"ate � �"� e,�� ���, `tom,�� '�u� �'� a� � �. M rc"� ': .��`' '"�� ��`"; ram.�'�" a� � � � '�' ',�y� Wr^`"Y "aa- ,.<.-: w � � �v. «, � 2 y� �� � �, � � r -� ��'� *�. .. � a "*r. .. �.�' ,*��§ -�`yes "; ��. - .�,�, � r � :. �*.� �"1� ���'� ���� �"�s;�^� ^�`� '����.� "��."+�s ,;� ,� .�.a� -* `�"'°=� sue, ,�^ -�;� �r- �' � x � �, t z s'��r �� .. . P r � � ' � ��. hA � � � a, k X S };.. F t� � I} '���x€ i �� 5�� .� � �� � � � 4 it � 2t 1 4 h t� 5 a� (� }s�G , t t � c � �} �Stii k���C>" �� � ��� ��3 ��, a�� r ��i � s �7�f�. ,. � r ,� r � � ��. � E� r� � � ��� _ �i t�} ,p�4i. � t � ,� _ � fir- ��� t f` %F ) & � �r � r �5 4�.� � �{ � � N' I f t �} � � }�Eitl � �'��k f � ' � kips L 'tt h� D i�r i� p { r � � 't��� �>t�� �i' FF fi � ,, w .�,,,.�� � y. l� f, � y4 � ' r, ��_ � �� ,. .�`����a '� ''4. r r,`':.3-:r.i c��f "'' �� 3.,,, x �,"`,"'�� '!fit �_�` �",,,�#y'�'Y,��t �y"" a�� '���}s �' `c• �"�' �c.,. t gg fit., .0;: r,, '`7+,F�. ,'4".,�� r a'v >a "t7)3� . J P •" f # v:.r � a� � �+F,� �'F: �a #�� �a a r � d m� ��r��t��� � rest, hr � � Ya msrx t t` s3F s' sgf x< �'� E s"{ uutkcs F yr Fir Fj .r i r �F*�tik" aLE i2 �,aPFt1j r b, ::irL ,'s•Y f ;rat Yi} §qt��t 33� e,3 m'f v` a ,t�,y � t #'' `� aS,i � � � F 8'kts'(2, ����x��s• t �t�a����;�'r rF � ����lr $4'� ��it3�r����: u, . ref:fi,�t o-:£�t }a ,�;.�,?}'§+ �' `` aSr°-,ti cgs t i�xat�d 1 f��;3 � "� � ���+`iX7 i��y�"��u Suta�"'✓t a u�i1k.�t"i t�R� �3 �, §us ;.a:TM' � �r��n z���, a`K F',- s< r�'�;�Y'l r a arr ad��t�,±�,if rE•�t ,,� ���� � � �����'" �, '�' �3�t�;', � �;���Sv* ' * r `" � t{ r.a� '. Fay ��t.' `emu � sMA � � tadis �a�,z � . i �_„ x t ,{��� {}{ { `�i�"rt'���s r (`"fit �xP r r`.�'`trt :'(�r ��.:d Na�ffv f;'i��',iF sk 4���� 1� � { ,.r r r '�s �Ye � _ ra"•sus%ti� Ir S yF7,'r, c f a'f i•., x a".. r� Y.�,, �`rro �` SO" u. - �� WNW e� s�,�., �n. .rs` �`' '�t �'�'��� _ � � ` �$�` �4 3 1 � -,� r� �,. $v ,,,,{{ �� 1 �, tfilj��, '��£�; e�� f �`,��', a�§�� �.� £t it. . � � 1 �£�� � t�� £m �e£ �-�����,y' � s ��� 'a�,�, ��� ` 3 � �;.; r ., s:. � �� t �yc a$��Ai���j�"��{dt�4j1 �'}�(:f{{£�,� � ..�'£��3 yeti F t T ���; i t k F i i� £ 5 �, t.` � f �� 3 l �" : £ y � f �f � �'l� s a s �,� ti*��£ �£S£ } �'�'N � £ t% k�� �£� £ r� z y� `�,� � r 4 �f £� �? �� > 3 � 9 � r £ £�'��� �'7��I £�Sfit� � f� a"ra�a din � � Y � ik��A�£s�,'���}Y�i s� ��a�� �`�{ £�� s}`� �` � r �.t 't��fir{t� �'£[a££3�S"''�s - �.,"? �§ ti�: '£" t t r���, t � t f t } �`� £���£}���tf£a'���` AS � � £r a� t�f��.ft� �,���Yy" 1 � £ s. £{lilf;��j t� u��£�a a t` 3+ f�� �}�s�2a�� �`ry -P t�,n.�". ,£?„� � t,. yt Yt�lsf � t ��£'`�{� �£SSC�s�?h �� �` ����'��� '`i Y �' .£y� is�'£�.f���s£S �� �*�qrr §£fir z:�'�c ?� f�� eft '�£ `�a'm }t ���°` i�. a � -� �$' � r >- ; ��� � �� ��' �£��{� �} z"��s nt{£'�z��': '` �`�� t�', -� a �t ��'���M`�f�'- f a��^i€�� ��',��y f�� 1 � � �e era f �� � G �, �,�f, ��,t " u�' j � ��`� ��£�tr�£� £ `'��t £4.� � ££s3 a�„ �: �sS��. ,*,i�� a, :£...r� ��<t'C '�14; } ��.a��l��' �z#�t�s}fi�Yc��I s�E� E�4{Y}t�41�$- �� � �� � P 55' �X 3���� ��'�}� � yy�$� �� \4 i'�,i�L ymr� ti i y�� {v 1 ;i{ S k # `lA to �-` �``�� �u#?.d'.�e, tl�'i y{ "r���d�h� tr �i� „x ii. �� _ � � �r3���� �,e�iti 1r"�3 tnti8`� s �Ea�����ti'3�F�f3 a��`��%f, �f�t�t�i£j� �- +£3- ,i� itih ;,;£�$'�����°��£�E�f rv4��`S`���'�``f N�z� z�£j ���'�£�� £���%fii��:. S� i � s 'h £ frt �a�{��t�� a y£4£ } ���.�._- ,,a.: 1� � �£� ����''�� � x�41'So�2�����r§y�£4 r £iA,,,�ti$�£7¢a+.�{i{ �rt'k'�h $ i' � ���2t���,� �'�lx£�i V�`�{��`££''7�,"f���,� 1:�££1 1 t�£;t 1 y;{ i ti i��5,�� i x` -x '� �. a A #� t � A i �t � fi�,£,tks s3 � -�; u��4£� � � i rc}£,�, -.;� u'£{���5 il�'i i f ttt��$���'�� �-,'�'{` $t� '"� �:t��t�1Y�p .._. ..... .... ..... .... .� ,,� �',`�, ,. £ .r �,�7 e Sf �t£�t}t�£i'1 �£s����rh�'£��£�i �t`�'� i'£f t is£�ie���is _. ... ..,__ .. .�.�.k< . .'£'£ b .. �ro £at;�.,a„��u ,c.r<�antia 4,f�b�'zz x%`�£a{h `;.,��o£�,.,?zr:�.�rk£u�,"�n£�� T 603.623.8811 PROCON F 603.623.7250 ;:RrAi F,CCtNS I Ri,:I P.O.BOX 4430 Manchester,NH 03108 North Andover Building Department 06/29/15 1600 Osgood Street Building 20,Suite 2-36 North Andover,MA 01845 Attn: Gerald Brown,CBO Inspector of Buildings Re: Merrimack College North Campus Development Residence®Austin Field Dorms Placing exterior concrete 06/30/15—off hours work Dear Gerry, As per your direction,Pro Con,Inc,would like to inform the North Andover Building Department that we will be placing exterior porch concrete slabs tomorrow 06/30/15. Based upon the concrete delivery and required concrete finishes,we will need to work past the 6:00 pm hour of construction. We anticipate having all concrete placed by 3:00 pm,and the finishing should be completed by 8:00 pm. Note,all finishing will be done by hand and we do not anticipate any noise from this construction activity. Upon your review of this information,please call if you have any additional questions. Thank you very much for your help and cooperation in working with Pro Con,Inc.to complete this work. Please confirm your acknowledgement in our request for off hours work. Sincerely, Lynn M.Kramer Senior Project Manager (603)623-8811 office (508)439-9501 cell Cc: Ben Saturley,Felipe Schwarz,Lieutenant Foulds,and file Wolstromer, Bonnie From: Scott kelloway <skellowaype@yahoo.com> Sent: Thursday, June 04, 2015 11:59 AM To: Cheetham, Kristine Cc: Wolstromer, Bonnie Subject: Re: Merrimack College Monitoring Reports Attachments: 6-1-15 Merr. Col. SWPPP inspection report.doc; Merr College SWPPP 6-1-15 (1).JPG; Merr College SWPPP 6-1-15 (2).JPG; Merr College SWPPP 6-1-15 (3).JPG; Merr College SWPPP 6-1-15 (4).JPG; Merr College SWPPP 6-1-15 (5).JPG; Merr College SWPPP 6-1-15 (6).JPG; Merr College SWPPP 6-1-15 (7).JPG; Merr College SWPPP 6-1-15 (8).JPG; Merr College SWPPP 6-1-15 (9).JPG Kristine, y 6/1 field report. Scott ............ --- _ From: Cheetham, Kristine" <KCheetham@townofnorthand over.com> To: "skellowaype@yahoo.com" <skellowaype@yahoo.com> Sent: Thursday, June 4, 2015 10:06 AM Subject: Merrimack College Monitoring Reports Hello Scott, Thank you for getting back to me regarding the monitoring reports at Merrimack College. In the future please forward all reports to myself and Bonnie Wolstromer. Kristine J. Cheetham Town Planner Community & Economic Development Town of North Andover 1600 Osgood St., Suite 2035 North Andover, MA 01845 978-688-9535 kcheetham@townofnorthandover.com All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.townofnorthandover.com i Social Networks twitter.corn/north andover www.facebook.com/northandoverma 2 Stormwater Construction Site Inspection Report General Information Project Name " Merrimack College North Campus Development" NPDES Tracking No. MA 1 AZ77 Location 315 turnpike St. N. Andover Ma. Date of Inspection l Start/End Time ( y� Inspector's Name(s) Scott . Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma. 01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years, specializing in construction site monitoring,and reporting. Pre-approved site monitor in the Town of Andover Describe present phase of L,- ql-I a construction �I�r� i Type of Inspection: ❑Regular ❑Pre-storm event During storm event ❑ Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs)- Approximate Amount of Precipitation(in): Weather at time of this ins p ion? ❑ Clear ❑Cloudy ain ❑ Sleet ❑Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature- Have any discharges occurred since the last inspection? LKes ❑No If yes,describe: Are there any discharges at the time of inspection? ❑Yes o If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Erosion Control- UVes ❑No ❑Yes No Sediment Barriers 2 Tree Protection Yes ❑No ❑Yes o 3 Stabilization of Yes ❑No ❑Yes No Construction Access- Egress 5 Dust Control es ❑No ❑Yes o 6 Erosion Control ❑Yes LrNo ❑Yes allo Blankets 7 Stockpiles &Yes ❑No ❑Yes o 8 Diversion Channels/ Yes ❑No ❑Yes ONo Swales 9 Sediment basins WYes ❑No Li-Yes ONo 10 Dewatering basins— LWYes ❑No ❑Yes No � 9 filter bags. 11 Temporary Slope ❑Yes o ❑Yes o Stabilization 12 Pennanent slope ❑Yes o ❑Yes o stabilization 13 Interior Site Erosion es ❑No ❑Yes o Controls 14 Temporary Check Dams es-LINO ❑Yes o 15 Street Sweeping es ❑No ❑Yes o EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uiredY 16 Solid Waste Containers LlYes ❑No ❑Yes No 17 Equipment/Vehicle Loes ❑No ❑Yes No Storage Area. Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? i Are all slopes and ❑Yes ❑No ❑Yes ❑No disturbed areas not actively being worked properly stabilized? 2 Are natural resource es ❑No ❑Yes o areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls es ❑No ❑Yes EdNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and LKes ❑No ❑Yes LdNo receiving waters free of any sediment deposits? 5 Are storm drain inlets es ❑No ❑Yes LdNo properly protected? 6 Is the construction exit 2Yes ❑No ❑Yes o preventing sediment from being tracked into the street? 7 Is trasb/litter from work Ves ❑No ❑Yes o areas collected and placed in covered dumpsters? 8 Are washout facilities es ❑No ❑Yes o (e.g.,paint, stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and LKes ❑No ❑Yes Oflo equipment fueling, cleaning, and maintenance areas free of spills,leaks, or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity Implemented? Maintenance Corrective Action Needed and.Notes Re'uir es ❑No ❑Yes 10 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater JZYes ❑No ❑Yes XAo discharges(e.g., wash water, dewatering) properly controlled? 12 (Other) ❑Yes ❑No Non-Compliance Describ any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and tit S tt D.Kellowa Professional Engineer ASignature: Date: 6- EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 �+ t °� °a����;,. x k� � s,, n F��F � � �., , . -_� � a� �� �� �x � �' �.. w �. k �1� r ,.,„ �.-, ', ti kt f � �)) �� i� sNs � 6 � r `�"���7 �'.^,..�: ,,., � � �� "� ,..:, "� :r .� � � rid � � .��1��� 1 r i :s ., ., lit t �, .., � �t hx n c� 1 c,,�g� ��z ��� � ... .,� ,� }h fi '§�`� 1f� 1� �i��4�"�.�x1:+��t�?��l�` ±.mm*'� �.i��4y4§�N i �: �r�i ti t h,�`,�ti `�' F�t'D����f� >�� ��`=r�.r s�.,stY i it�; �3 ti :;.� ��t�� d ��Aia t` ,"� i; ; � � ,.,,�.. ���Ci'�t��'`� " r ���'� � �� � � s l�'� � '� t \�� �t 3 �� � {1'� ttz3 � }� E\ �� u�'^Spa t 7i ��' �r15:4}�) �',t,�. �j ����� t t � s 134 ry��i � �' � � � �� tr t �� C t 1C �? � ,rs.. - ; 1h� h e�� -";;,�` s '2i�kt �zryfi ti�t 1��t�?�1 ks 1� f t��z r. ` to � s� a ��� �� t �� �� � tt th����� i� ,r<}�4'�iri t 'x?5' x}t�� j,x a T� ...r`� ,,, �t:r=, a,, ti ;t'�- ;,t�1�.� zt ,� �S} �1��, 1 4 } )� 1 t� �Ott �- � tt t�ctd�h5 j� S�1� ��j� � �����d,�� }}<t }} � t V�2��l��to i z�����, i 12 �,F `;�5;' ��;=: �, _: r - � ���,. -� ��� �; F � �, �. _. w '�r� �:�.- ���" u� � �, h �. r a � G, �� ' � � �,� �. � - ;�� �� v� � � �' �� � �; � � .p. � � �. Y� � � � v� '� �. r'' �,.¢ '. �' h 2 E r# A � i t w rt MGM t kart NO ON W."I'l S �" ��.v J��Sj,;, ��;. &1 2' � kt' v 1 ,„ z, ���� t"� �F `5;{���: � �4 �: � ��� { `��, }� � � a i �� °��� n��it � �t re£{l Y£ c£s! tp���i� t\�z�`£r rat t £t£r �'+£ titlziss���l ta�."l tt£{3�i£�lz 3A i£x�{�s _ c ,,,� 3 �2 �-- � "'� "'£t£.�i;.t£1��'i����£�.,6�,1�#ti���£~S`,l}�.�r#'�rx3�������t{����}£tt�tit _ 4 ti;tia �, '�. �i 7i£?a ;� 1u{'�G�2� '�1{s �t �'s�\t �£� t�s �' 1 � �- ` t £ 2 e����� 'x£� t �nl� i _ z 9 t k 1 Ai F� ��, r� a t ti 4� tt la£t£{t£�tS�h y���_.£t1� t� "k�����£"�r�£�'�+�UZ�t{7�32��££� i£�i t k}i1�� �'k 5 1 t } }DA3<;`t��L r.��;5 v .� c�.,,s�,�1 �t ��� �`4£lS��� sr Ysx����"��k�i {:`�(�t �ltl�£f 1'i £ti117 �rtt�i£"fi..-;r tt£t�����t i t." ` z r ik't'�>� tf� �. rtq�'rzSs£gza����, t t 'hth� �„�i,�1� t�'i„ ���..�M, � �r£tt�a� � �t�"�� � �, E � cs£� Sid£ z4 a � .,r r s �� s ��`� c� r43:. � -. t I� s���,tj£ f: �.tifk�? �'z�£a t�l���ti z � �. �� t ��S1�t\� �l x r r k� �,t r;i,:, �i��',, � v. s t; �I � � i � 7 h t a { �l 4 t t Its:-,1. � F t � 3 � i h �` ?t ) �� h ��. � t 4 t� u i ,:: ,, §� }�}��k z'��.;�rr3e2., i�St'�a- �h �s 7�is :.�tih �' k£ �1 �s) ti�tl �t2 F"�'ir a� ,�,� sit�r. �. t F � r �`�` T efl`. } t;. t a { n ��i �2`�.tat.. .>t, t :fi5£.,ttfi < �.� £�^ �r k s:�r �. £§s,. 3:a+�.� �£{ h., � ��- - z I ra ;. 1. ,. ?`c,.: '., .; t _�:, <. C. t � § t a � `�s .. t £..1� S s -..,.,,.,.:,t � 1 ;, ��., � i,.. �,, � � m z s r,fatia t �;£� £t ? rt£. � t, p � � ,�.�� e C I,. .. £ ) M1.. ..,.. � .. .i..1.. �.. .,.� .. .�..... i 4 i !i: � � $: e: 3 i s r .:i ,�...a -,v ... :.. ,,. <-, _... z.l t ,{ � �... .. f c.:= 5 i; �iS.1,� {n t ,.r, ,,.: ..�: .., ,.. .; ,,.. ��. ,,:..4.3. ,�t F?...,1,. �t.Re.,_r.� .,, t } }{,:E, ., ?� c a �. 1 1 ,:�,t2 f fr s����.4 s' S��'a £� � � it#� s�,l' n S�„rrnii $z �1(t t,a. � an<,s. :.t.:,��# 1 tc �< -z. is a.Ffst x.., �. r.. �, _.r.� f. 1i. �a r �,a..,t.£, ,c �1 <Zt� re J� ,���. ia,.\1 ti�. ,� �,{�n i k� £, ? F. ,�-i1,� r t£r t.,.S�'� t,>� d., - �, a .i£,�.t�,a� -£� £Ci3 ii�4:���i`��;? t r } �.,, ti s '1 i i£i cs. t$££;£'�£;U h�l�£..?..$5�y�a s�, ��T;,x,J, e{-,,`� ,�-. �� 1 ;�v �.£far r r �t 1 k c S t � tt� ,},�., 4£ 'i�ir,�, t t� l ti 1 �ti ti ;t ; It� t`fir �,��}�t�i # �1 1 p �� }�. �` �6a v�,�y r }} � .� t z t 1£ ���i a t'. ���8 l4 4 m c,S, t �� £�'' a� u,�a ,��' +� a ��, ��'" .:a #` ,,.?�.�,q.,i£� � ; V a�� 4t. a M1�" Pi � +fi3 �� �" ,�i �; �t � ��� ����� � � y�h px � 4 y '�!�{�� � � t}1@ ate. ;£ r S�£ t E ,.�o,. .4 e�t� � � ���r. .,a �},� a "`i S q I( ��{� u _ rca. z � a ON z r zv z OF -04 r z�z v, �zn a� µ 5 u4� k z x z J C�a a M ON All a / r n n f z; �f 4 ,a a w l �v r -s � � w y �{ 5 i � dt ���$r' t ..�}�i .�..,i>; t{ 7 3 £ X �i��x za+� #{ 'L$ 4f h � � k { �� -fit t� i� 7 � 4 2 s Az�i t � 1 4 � 4�za� "��tz +z� � tz���a a � ��, �t# `',���r�. _ ���� t, �� �� � t 1h �a� q `2St ��{S� lfi F3 _ 4 §'�t � r.;t� � �„},�2�� t t l F Sit k 4� 1 i ` g �ij 1 �;�Z # a �i _y k z 4ta z 4t V7 as .r �a j 7a z"t # � a Gaza,: � a z1a}zta i't � �. 'az rt,�; r{y{{7 fit;l� i�f3 # } ,:it' a�' z,r�# . . ,� s f � _ �F� '� �p ���, �r� ,, { �� ���o�' � �,�'� ', , � i� fn5 ev �� s }� �a i S s�� turd Yz 4kSrq� tz AW k7 Ii�} . � �'"' ,@ „ l'm, �-9"p r�lj 4� it'•���'�4"�k z 1 � �F r�. a, z r } i �.�,T r dktitft r kkzt``;Fi, tt�t §t, Wolstromer, Bonnie From: scott kelloway <skellowaype@yahoo.com> Sent: Friday, June 05, 2015 5:48 PM To: Cheetham, Kristine Cc: Felipe Schwarz; Lynn Kramer; Ben Saturley; Russell Bennett; Marc Lehoullier; Wolstromer, Bonnie Subject: Merrimack College Re-development project May 2015 Monthly Report Attachments: Merr. Col May 2015 Monthly Report North Andover.pdf Dear Ms. Cheetham, Attached is a copy of the May, 2015 Monthly Report for the Merrimack College re-development project at 315 Turnpike St, in North Andover, Ma. It is my opinion that all site work is currently in compliance with the project SWPPP, and consistent with best management practices. Please contact me with any questions. Scott D. Kelloway, P.E. (978)479-5648 Scott ® Kelloway, P.E. Professional Civil and Enr1roninental Designs and Inspections. 148 North St.Andover,Ma. 01810 Phone: (978)682-5054 Ma.Lisc #40122 5/31/2015 North Andover Planning Department. Attn: Town Planner 1600 Osgood St. Suite 2035 N. Andover,Ma. 01845 Dear, Town Planning Dept.. Please refer to the attached field inspection reports of site monitoring for the "Merrimack College No Campus Development"project located at 315 Turnpike St. in Andover/N. Andover, M-a. DEP File#090-0750 Amended, NPDES Tracking No: MAR 12AZ77 This month's construction activities on this site include the following: ® Continued construction of proposed residence building#1, and#2. * Continued installation of 48"drainage line relocation. (Please see attached plan revision). * Maintenance and improvements of BMP's * Miscellaneous site work, and management of stockpiled material. All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment is being stored, fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. The Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At the time of this report there have been no-notable impacts due to the significant rain events this month_ Atthis time all work on this site is being performed in compliance with the Order of Conditions,the project Storm Water Pollution Protection Plan and consistent with best management practices. Pg: l/2 Pg: 2/2 If you have any questions or concerns,please feel free to contact me at phone number listed above. S erely, -c hslk Zm­ g Cott D.Kelloway,P.B'. �A CC. (Via e-mal,paper copy upon request): Lynn Framer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Stormwater Construction Site Inspection Report General Information Project Name Merrimack College North Campus Developmenf DES Tracking No. € AR 12A�-77 Location � 315 turnpike St. N. Andover Ma. Date of Inspection �12'#t' S vnd '€aae Inspector's Name(s) Scott b.keiloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction Coss LI z Type of Inspection: Q Regular E2 Pre-storm event M During storm event U Post-storm event Weather Information Has there been a sterna event since the last inspection? UYes LINIo If_yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate A ount of Precipitation(in): ,f �,Psar ' { ea her at tiara -of this inspection? ® C_tear oudy LI Rain Ll Sleet Ll Fog Ll Snowing U High Winds l]Other: Temperature: Have any discharges occurred since the last inspection? Oyes ' , o If yes,describe: r Are there any discharges at the time of inspection?ElYes CFNo If yes,describe: I t EPA S WPPPInspection Repoft, Version 1.1, September 17,2007 1 BMP BMP BMP Corrective Action Needed,and Notes Installed,? Maintenance e ' ired9 1 Erosion Control- es ®No UYes InNo Sediment Barriers 2 Tree protection OFes ®No ®Yes a o 3 Stabilization of es UNo UYes o Construction Access- Egress 5 Dust Control es ®No ®Yes Piqo b Erosion Control UYes o Dyes o Blankets 7 Stockpiles UdYes ®No ®Yes ENO Diversion Channels QVes ®No UYes DTo Swales 9 Sediment basins PA es LINO ®Yes UWo f. 10 Dewatering basins— l 'Ves UNo ®Yes Pr&O filter bags. l' 11 Temporary Slope ®Yes 5KO Yes Mo Stabilization 12 Permanent slope Uyes o i�Yes o stabilization 13 Interior Site Erosion es ®No ®Yes 0 Ro Controls 14 Temporary Check Dams es UNo UYes o 15 Street Sweeping es ®No Dyes EPA S PPP Inspection Report, Version 1.1, September 17, 2007 2 Corrective Action Needed anti Notes In Maint a 6 n ' 16 Solid Waste Containers es UNTO DYes i No 17 Equipment?°vehicle 'es QNo [ Yes F o Storage Area. Overall Site Issue n /activity Implemented? Maintenance Corrective Action Needed and Nantes Required? l Are all slopes and UYes LINO UYes CINo g disturbed areas not actively being worked properly stabilized? 2 Are natural resource es LINO C3Yes =To areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar B Ps? i Are perimeter controls es UCNo l]Yes E o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Ules LINO ®Yes ZfNo receiving waters free of any sediment deposits? 5 Are storm drain inlets es L-2No ®Yes ZNo properly protected? 6 Is the construction e-it € Ulres No CYes No { preventing sediment from being tracked into the street? G 7 Is trash/litter from work 011es No Dyes AENTO areas collected and placed in covered s dunnpsters? 8 Are washout facilities es i'nNo E]Yes ONo (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and LAYes LJNo QYes PXo equipment fueling,. � cleaning.and maintenance areas free of spills,leafs,or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17,2007 lactivity Implemented? Maintenance Corrective Action Needed and Notes e oire `� UYes UNo ®Yes UNo 14 Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater UTes El QYeS EJNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes UNo Non-Compliance Describe any incidents of non-compliance not described above: , CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible forgathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,a complete.I am aware that there are significant penalties for submitting false information, including the possibilitof fine and imprisonment for knowing violations." Print name and ti . ott D. llowa Professional Engineer 1 � - Signature: i Date: t EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Stormwater Construction Site Inspection Re o General Information Project Name " Merrimack College North Campus Development' PIT S Tracking No. NLA412AZ77 Location 315 turnpike St. N.Andover a_ bate of Inspection ✓1 % Start/End Time �r Inspector's Name(s) Scoft IX Kello`vay, Inspector's Title(s) Professional Engineer Inspector's Contact Information l48 North St_Andover,ma.01810 (978)479-5648 E Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the To-wn of Andover s Describe present phase of construction 4 k fy of Inspection: 4 Regular U Pre-storm event !l During storm event L1 Post-storm event Weather Information Has there been a storm event since the last inspection? E]Yes o If yes,provide: Storm Start Date&'Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): ' iiier at time of this inspection? ',Clear EICloudy U Rain Q Sleet 0 Fog U Snowing Q High Minds ®Other: Temperature: � ?r Have any discharges occurred since the last inspection? E]Yes U o If yes,describe: Are there any discharges at the time of inspection?®Yes UNo If yes,describe: 3 pE t 3 d EPA SWPPP Inspection Report, Version 1,3, September 17, 2007 WI � BW Correchic Action Needed and Netes Zes € ne�- .7 e zErosionControl- :UNo Oyes Sediment Barr;efs 1 l 2 Tree Protection es UNo UYes MNO 3 Stabilization of es ? ca lYes o Construction Access- Egress 5 Bust Control es No UYeS F o 6 Erosion Control ®Yes ;'No Yes lea 9 Blankets 7 Stockpiles fifes UNo E3Yes ' &To s 8 ; Diversion Channels f EfYes UNo UYes UNo 3 Sri ales 9 Setlirnent basins UYes UNo ®Yes , o 3 =ODeNvatefin-basins— 'es ONO Yes _ o s. € l I Temporary Slope l�Yes o Yes � o Stabilization E r' �f s s 12 Permanent slope ®Yes . 4 o Oyes n NO g stabilization 13 Interior Site Erosion es � o UYes ' q o ControlsE I4 Temporary Check Dams es UNo ®Yes, N-o T15 -- eet Sweeping ( d es UNo UYes c €� gi 9 EPA SWPPP Inspection Re o , Version ion 1.1,September 17, i#MP B P BW rrective Action Needed and Notes In stall ? Maintena e Ile uir ? 16 Solid Waste Containers LaYes E]No ®Yes UNo 17 Equipment/Vehicle LUYes ®No ®Yes - o Storage Area. Overall Site issues B /activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and ®Yes E]No [ Yes ®No disturbed areas not actively being worked properly stabilized? 2 Are natural resource MVes UNo ®Yes InNo areas(e.g.,streams, wetlands,trees,etc.) protected with barriers % or similar BMPs? 3 Are perimeter controls UYes ®No ®Yes UNo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and MYes ®No ®Yes Ui4o receiving waters free of any sediment deposits? 5 Are storm drain inlets aYes ®No ®Yes Qf4o properly protected? 6 Is the construction exit UVes ®No UYes o preventing sediment from being tracked into the street? 7 Is trash/litter from work ffYes ®No Dyes QN0 areas collected and placed in covered dumpsters? 8 Are washout facilities Mes UNo Dyes lk o (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and es QNo ®Yes qo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S PPP Inspection Report, Version 1.1, September 17, 2007 3 t /'activity implemented? Maintenance -rective "Action Named and Notes e`uired9 dyes UNO Uyes o 1 fa Are materials that are potential stormwater contaminants stored inside or under cover? I I Are non-stormwater es UNo ®ales � o discharges(e.g.,wash E eater,de-watering) properly controlled? 12 (Other) UYes UNo i Non-Corn liance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT s tify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the hest of my knowledge and belief,true,accurate,and complete.1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.' Print name an le;it Scott D.Kello av Professional Engineer Signature: d ' 3ate ,� � EPA S WPPP Inspection Repor4 Version 1.1,September 17,2007 Stormwater Construction Site Inspection Report General Information Project Flame " Merrimack College North Campus Development" DES Tracking No. M 12AZ77 Location 315 turnpike St. N.Andover Ma. Date of Inspection LIP, 1 art/End Time Inspector's Name(s) Scdtt D.Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer. Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of constructions � ✓` a w Ty e of Inspection: Regular Q Pre-storm event ll During storm event ®Post-storm event Weather InformatiO Has there been a storm event since the last inspection? ®'Yes Mo If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Wei'her at time of this inspection? U,tlear ®Cloudy U Rain ® Sleet ®Fog U Snowing U High Winds ® Other: Temperature: Have any discharges occurred since the last inspection? E]Yes UNo If yes,describe: Are there any discharges at the time of inspection? UYes d No If yes,describe: EPA S PPP Inspection Report, Version 1.1, September 97, 2007 1 BMP B P BMP Corrective Action Deeded and Notes tnnsta ed? Main tenan :fie uize . I Erosion Control 'Yes LINO 5Yes ONO Sediment Barriers 2 Tree Protection 'es QNo UYes UKo 3 Stabilization of UfYes ONO QYes ENO Construction Access- Egress 5 Dust Control 'Yes ®No ®'Yes o � � -t'u la' b Erosion Control UYes UNo UYes ONO Blankets 7 Stockpiles es ®No C]Yes o 8 Diversion Channels I es QNo UYes ONO Swales r 9 Sediment basins es ®No UYes o f 10 Dewatering basins— aYes ONO ®Yes ONO filter bags. 11 Temporary Slope UYes Mo ®Yes LdKO Stabilization 12 permanent slope QYes QNo ®Yes Wqo stabilization 13 Interior Site Erosion es ®No LlYes qAO Controls 14 'Temporary Check rams E es ®No ®Yes UXo 15 Street Sweeping Wfes UNo UYes o EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 € BP4P � Corrective Action Needed and Notes. is a ? nipteia it 16 Solid Waste Containers EfYes ONO UYes ONO f' 17 Equipment I Vehicle Wes QNo UYes PRO b,$ Storage Area. G Overall Site Issues l MP/activity Implemented: Maintenance � Corrective Action beaded and Notes Required? 1 Are all slopes and QYes ONO UYes ONO disturbed areas not actively being worked properly stabilized? 2 Are natural resource U es UNo UYes o areas(e.g.,streams, wetlands,trees,etc.) protected with barriers ' i or similar BMPs? 3 Are perimeter controls Wes UNo ®Yes ° o and sediment barriers adequately installed (keyed into substrate) and maintained? r 4 Are discharge points and QYes LINO UYes _ o receiving waters free of any sediment deposits? 5 Are storm drain inlets QYes LINO ®Yes ONO properly protected? E 6 Is the construction exit Yes LINO L]Yes PAO preventing sediment from being tracked into the street? 7 Is trash/litter from work s LINO ®Yes Pf4o areas collected and placed in covered dumpsters? /F 8 Are washout facilities es LINO UYes ZNO (e.g.,paint,stucco, concrete)available, clearly marked,and f maintained? 9 Are vehicle and es ®No ®Yes Mlo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? EPA S `P P Inspection Report, Version 9.1, September 17,2007 BMP/activity Implemented? Maintenance ntenance Corrective;Action Needed and Motes e `ir sir bYe 10 Are materials that are IY _L_3No potential stormwater contaminants stored inside or under cover? lT Are non-stonnwater es QNo es UNo discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) UYes UNo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a systern designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the po 1 ility of fine and im prisonment for knowing violations." Print name a d le: Scoti&.Kelloway,Professional En iaeeer Signature: Date: 1 v' EPA SWPPP Inspection Report, Version !.@, September 87, 2007 4 Stormwater Construefimi Site Inspeefion Report General Information Project Name "Merrimack College North Campus Development` ICES'Tracking No. 12AZ77 Location 315 turnpike St. N. Andover Ma. � Date of Inspection f` K Start/End'Time � �M g # Inspector's Name(s) Sco D'Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Describe present phase of construction UVI 9 ,rv1 t WTVS Ty of Inspection: Regular E3 Pre-storm event U During storm event ®Post-storm event Feather Information Has there been a storm event since the last inspection? UYes LINo If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at of this inspection? U Clear LYCloudy U Rain 0 Sleet El Fog ®Snowing El High Winds C3 Other: Temperature: � Have any discharges occurred since the last inspection? E3YeS U14o If yes,describe: e there any discharges at the time of inspection?UYes U14o If yes,describe: EPA SWPPP Inspection Report, Version 1.1,September 17, 2007 BMP BW BMP Corrective Action Needed and Notes Insta� d`? Maintenance fie' uired`� i Erosion Control- es ®No ❑Yes IdNo Sediment Barriers f' 2 Tree Protection UYes UNo ®Yes ado r 3 Stabilization of ®'Yes DNo ®Yes ZJNo Construction Access- Egress 5 Dust Control es DNo DYes ErNo S 6 Erosion Control ®Yes 2N0 ®Yes No Blankets 7 Stockpiles es ONO Dyes DNo � 1 8 Diversion Channels/ es DNo Dyes Of,40 Swales s1 9 Sediment basins Yes DNo Dyes 490 10 Dewatering basins— es DNo Dyes o filter bags. i 1 Temporary Slope DYes No ®Yes D Stabilization 12 Permanent slope DYes PNO Dyes Q3 o stabilization 1.3 Interior Site Erosion Uires DNo ®Yes f No Controls 14 Temporary Check Dams 0 es DNo ®Yes 0140 r 15 Street Sweeping DYes DNo DYes o ` EPA SWPPP Inspection Report, !Version 1.1, September 17, 2007 2 BW BMP Z BNW Corrective Action Needed and Notes to led? lea' ten ee e di 16 Solid Waste Containers UY es ONO L]Yes o 17 Equipment/Vehicle Yes Ohio Dyes caffo Storage Area. E Overall Site Issues B /activity° Implemented? Mai tenance Corr�c e Action Needed and Notes Require d? 1 Are all slopes and Dyes ONO UYes UNo disturbed areas not actively being worked properly stabilized? I 2 Are natural resource es ONO Dyes NI O areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BM Ps? 3 Are perimeter controls es UNo Uyes ONO and sediment barriers ! adequately installed (keyed into substrate) and maintained? l 4 Are discharge points and laYes ONO ®Yes ONO receiving waters free of � any sediment deposits? 5 Are storm drain inlets Wes ONO DYe No properly protected? r' 6 Is the construction exit es ONO l L]Yes '3blo preventing sediment from being tracked into the street? 7 Is trash/litter from work aYes ®fro Dyes ONO areas collected and placed in covered ` dumpsters? g Are washout facilities es LINO L]Yes l o (e.g.,paint,stucco, concrete)available, clearly marked,and t' maintained? 9 Are vehicle and QYes UNo UYes UNo equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious k material? r EPA SWPPP Inspection Report, Version 1,9, September 17, 200 BMP/activity Implemented?? Maintenance Corrective Action Needed and Notes R uir . UNo UYes PN 10 � Are materials that are i potential storm-water s contaminants stored inside or render cover? X' 1.I i Are non-stormwater Ules UNo ®Yes No ` discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) UYes UNo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the po/s.sibility of fine and imprisonment for knowing violations." Print name � �it��� Scott D.Kellowav,Professional Engineer -- Signature: Jx Dqte.._o 13/6 1% t EPA S WPPP Inspection Report, Version 1.1, September 17,2007 4 Stormwater Construction Site Inspection Re ort General Infor ation Project Name Merrimack College€ orth Campus Devefoprrmenf E PDES Tracking No. IVL MAZ77 Location 315 turnpike St. N. Andover Ma. Date of Inspection Start/End Time ,9I`� Inspector's Name(s) Scott b.KellovN°ay, Inspector's Title(s) Professional Engineer Inspector's Contact Informaton 148 Iortln St.Andover,ma.01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring,and reporting.Pre-approved site monitor in the Town of Andover Deconstruct scribe pre nse€nt phase of , i ' i a o4l—/ . Ole- i� Ty e of Inspection; Regular ® Pre-storm event 0 During storm event U Post-storm event Weather Informa i€rn Has there been a storm event since the last inspection? UYes ; To If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): `e,�# er at time of this inspection? M,Clear UCloudy Q Rain U Sleet U Fog Q Snowing U High Winds U Other: Temperature: Have any discharges occurred since the last inspection? E]Yes LdNo If yes,describe: Are there any discharges at the time of inspection?UYes EgNo If yes,describe: E 4 EPA SWPPP Inspection Repots Version 1.1, September 17, 20079 BIMP BW BMP Corrective Action Deeded and dotes I sta <,? Iiaintena it iaire I Erosion Control Yes ®No UYes ONO Sediment Barriers -- 'Z-2 Tree Protection E �es ®No ®Yes o � - Stabilization of MVes UNo ®Yes No Construction Access- Egress Z Z/ 5 Dust Control es ONO ®Yes &Ko r' 6 Erosion Control ®Yes No OYes UNO Blankets 7 Stockpiles Nes ®No C]Yes o 8 Diversion Channels/ uirzesLuNo DYes UNc, Swales 9 Sediment basins es CINo UYes o 10 Dewatering basins— Yes ®No ®Yes Ito filter bags. ,lam l 1 I Temporary Slope dyes MO l3Yes ENO Stabilization / 4 � f 12 Permanent slope UYes (2 o ®Yes PNlo stabilization 13 Interior Site Erosion Yes ®No Yes o Controls 14 Temporary Check Dams ® es ®No ®Yes o 15 Street Sweeping UYes UNo dyes ko EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 f BMA BMP half' Corrective Action Needed and Notes ? aiptena €( e pair 16 Solid Waste Containers LlYes UNo UYes O No f 17 Equipment/Vehicle es UNo Yes PRo t A-5� 1 Storage Area. Overall Site Issues 1 P/activi€ Implemented? Maintenance Corrective Action Needed and Notes faired? I Are all slopes and QYes UNo UYes LINO disturbed areas not actively being worked property stabilized? Are natural resource Uyes L]No ®Yes U14o areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls Wes Li to ®Yes J o and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and loes CiNo UYes PNo receiving seaters free of any sediment deposits? 5 Are storm drain inlets es CINo L]Yes UNo properly protected? / 6 Is the construction exit Wes (]No ®Yes P340 preventing sediment from being tracked into the street? 7 Is trash/litter from work s E]No Oyes 9610 areas collected and placed in covered dumpsters? 8 Are washout facilities es UNo ®Yes No (e.g.,paint,stucco, concrete)available; clearly marked,and � F maintained? 9 Are vehicle and es E]No ❑Yes o equipment fueling, cleaning,and 4 maintenance areas free of spills,leaks,or any other deleterious material? EPA SWPPP Inspection RepoM Version 1.1, September 17,2007 3 13_ Gactivi FLmplepiented? Maintenance Corrective,Action Needed and Notes Reguir (3y 10 Are materials that are. r- s UN o Uyes potential storm water contaminants stored inside or under cover? I I Are non-stormwater UYes IONo discharges(e.g.,wash water,dewatering) properly controlled'.? 12 r (Other) Zdes UNo Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a systern designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of any knowledge and belieL true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the pos ntility off fine and imprisonment for knowing violations." Print name and le; sco.t ello-way. rofessiranal n iaaeer Signature: /I A$/ z Date: V EPA SWPPP Inspection Report, Version 1.1,September 17,2007 4 Star ester Construction Site Inspection General Information Project Name Merrimack College North Campus Development' -'DES,Tracking No. � el R � 77 cation 315 turnpike St. N.Andover a_ Date of Inspection , Y Sta nd'"i ' s E Inspector's Name(s) Scott D eiloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St_Andover,ma.01910 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer.Practicing over 15 years,specializing in construction site monitoring.and reporting_ Pre_approved site monitor in the Town of Andover Describe present phase of construction / gPg t / 4 Ty e of Inspection- Regular El Pre-storm event Q During storm event U Post-storm event Weather Informagi€st� Has there been a storm event since the last inspection? UYes a o If yes,provide: I Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 'Vile• er at time o this inspection? i ar llCloudy 0 Rain U Sleet Fog U Snowing ®High Winds El Other: Temperature: ? Z' Have any discharges occurred since the last inspection? Yes ONo � f yes,describe: Are there any discharges at the time of inspection?UYes UNTo f yes,describe: i EPA SWPPP Inspection Report, Version 1a1,September 17, 2007 BNTP BMP BMP Corrective Action and Notes Instal Maintenance Requi 1 Erosion Control- Yes ONO Yes .` NO Sediment Barriers f 2 Free Protection es UNo QYesLUNo r 3 Stabilization of Pies LINO LlYes UNo Construction Access- Egress ~. ' f 5 Dust Control es UNo LJYes a To l 6 Erosion Control UYes ZKO ®Yes o I Blankets 2 7 Stockpiles des LJNo UYes UNo I r 8 Diversion Channels UYes ONo UYes UN6 Swales 9 Sediment basins UYes Oslo UYes ENO lO Dewatering basins— ElYes ONO UYes. V- o filter bags. l l Temporary Slope UYes Flo UYesUNo Stabilization g ( 12 Permanent slope UYes so Yes'No stabilization I � 4 13 Interior Site Erosion -es ONO LlYes Na i Controls 14 Temporary Check Darns UrYes ONO ( LlYes o l 15 Street Sweeping UYes LINO QYes o i s ° 9 EPA SWPPP Inspection Report, Version 1.1,September 17,2007 rCorrective Action Needed and Notes F stalled? Maintenance kRequirW 16 Solid Waste Containers ZfYes ONo UYes No 17 Equipment/Vehicle OYes Nd DYes 21,fo Storage Area. s Overall Site Issues BMP/activity i lemeated? Maintenance,,, Corrective Action Needed and Nate gequired?,�,- IAre all slopes and UVes LJNo Oyes PNO disturbed areas not actively being worked properly stabilized? 2 Are natural resource Fes ONo es r- \No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BM. Ps? f r 3 Are perimeter controls la''es QNo UYes e and sediment barriers adequately installed (keyed into substrate) and maintained? ' 4 Are discharge points and t 'es QNo OYes _` No receivina waters free of I any sediment deposits? 5 Are storm drain inlets Wyes I No ley es o Properly protected? i- i 6 is the construction exit s es ONo oyes U_ o preventing sediment from being tracked into [ the street? 2 is trashIlitter from work es UNo � Elyes O o areas collected and l placed in covered dnmpsters? 8 � Are washout facilities Eyes fo es" lto (e-.g.,paint,stucco, ` P a concrete)available, P clearly marked,and a Y lmaintained`? 9 Are vehicle and IlYes, UNo UYes No E equipment fueling, cleaning,and maintenance areas free [` of spills,leaks,or any other deleterious s material. " r EPA S WPPP Ins ectfon Report Version 1.1,September 17, t BIMP/activity tmplemwedT Maintenance, Corrective Action Needed and Notes € Required! es O Yes pro 10 Are materials that are potential storm water 3 E contaminants stared inside or under cover? � 1 i Are non-stormwater Yes Iso UYes ONo discharges(e_g.,wash eater,desratering) 9 Iproperly controlled? 22 ther) UYes ONO € a I Non-Corn fiance Describe any incidents of non-compliance not described above: I €f 3 3l t CERTIFICATION STATEMENT T 1 certify under penalty of lave that this document and all attachments Nvere prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.used on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my l-no-vvledge and belief true,accurate,and complete.I am aware that there are significant penalties for submitting false information. including the possibility of fine and imprisonment for knowing violations." l Print name and €tlq�. '`' Scott D.Kello av,Prof ional Engineer s ,j A f �/ Signature � t> � mate° EPA SWPPP Inspection Report Version 1,1,September 17, 2007 4 \\vhb\pru Mat-L0\1 i625.091c�id\ld\PIOnt;ot1 Slcotch(s*tD RAPT-SKCa19-Driln(nine Alts1GKC-11_11626.00-PR,dwrg ""`Hti'NI'tlUV1V C.AIe}IIIV4ti 'V' \ 0"WATER LINE MAINTAIN EXISTING SANITARY StWER LINO �ma FROM BUILDING ; CUT AND GAP ABANDON EXISTING t - 0" WAFER LINE CUT AN Y SEAR ,,, w , ,v �. l try t Ott , Q"FIiJ "FLU t o"W 1 "t0 yV «�� � � FOR FUTURE CONNECTION ,4 V wm i .e 11, 12.30 0MH-,A2 'J. PVC STUB FAR 1212,21.) OUT IUTURE CONNECTION �—INV-297 9 A� CM — 1NV R10.t 5, NO 48 . C y s UT 10"x6" TES FIRE DLPARIMCNT ya CONNECTION (TYP) CONNECT TO 6,L) DOMESTIC ING 2 WATER (COORIDE SEPARATE DINATE � � AI�EXISTING Q��B� pre:�22 �OMESITC WA1ER METER AT �., INE (C 2 WITH MERRIMACK FACILITIES) ;r �,� � ✓� R� 24 4 -�0 RESTRAINCO DOWNSPOUT �11y t A6' MD Pt. ABANDON EXISTING f�223.5 INv 22Z0(TYP) ��., WATER LINE NI. RELOCATED 0*DRAIN LINE , (UNDER PARATE PROJECT) DMH 2 f= 1-21 25. DMI j 1.2 0.10 Ap—U25 W o,, CLEANOU7. 10 FOCI CCNCfaA'UP INV- 220.2 S,ETDACK PER CODE EMERGENCY� . . a � BLUEPWONE CLEANOUT 3 $ INV� 220.3 $ GT d , J' ACCESWIDE,SEMENT SKC-I.IA May 19, 2015 Drain Alternative North Campus Dovulopment Merrimack Colloge DUAL,WALL. FABRICATED 11,259 BENDS 0" - 60" DIAMETER PART# PIPE SIZE A JOINT 30 in 17.9 In 3091AN (`750 null) tA`7� rnrr�) 30 in 9.7 in ST i 3091AN (7 f� ruin' (l' 6 1rn1ll 30 in 9.7in 3091 AN WT 36 in 22.3 in , 3691AN i oo tern) (567 rnr>•tj '> 3691 AN85D 36 in 2.0 in ST (900 ri'm I) 3Qt rrtt7 - �� A i# 3691AN65 36 in 12.0 in WT 42 in 17.6 in � PLAIN END 4291AN (1050 rnt�tl 1�EF1 rnnt 4291AN85B 42 in 12.4 in ST 4291AN65B 42 in 12.4 in WT 4 1050 rrtrrt' (3"16 rrtnt 4891AN 48 in 18.1 in + f (1200 roni) 061 r;un) 4891 AN858 48 in 12.9 in ST 02.00 4891AN65B 48 in 12.9 in WT I200 r;t n #'. rat] 6091AN 60 in 21.1 in i'1500 rom, 6091AN85B 60 in 15.1 in ST ST&WT(INCLUDES 2 CASKETS) ('ir�()t1 rrtITtj (;3<3:., rtE,n) 091AN65f3 60 in 15.1 in WT 6 15,00 mm, B3 i�t7Tt " -PLAIN END ST-SOIL TIGHT DRAWING 4: 2200A WT-WATER TIGH`f DRAWN BY: JCB 04.06,06 APPROVED BY: JCB 06.25.07 NOTE:ALL FITTINGS DIMENSIONS ARE FOR REFERENCE ONLY MEMO REVISIONS: TJR 2/2=10 rar,�mtG�a❑re�rauac.�r.�aa:n i�, t�;iaSs ? t �' t > tag SS's?'s'^ f i , } t+ t* �., t •�� � } st���� k }�S t•� - t3 Sth! '� ry �'i'tS3�.�, U } ti`' �'. s�{ #a'� � �� '��` f vt��� =�5 .s kf k� 7 ��rt=S�}� S' S ta4�s}l��i - ���, r.��t'}h s., •�..�{t� .�i��y�z�ir:. `xf��`��- .�s'.. r sol, k t'•.�. t �S ''i r t S:SQ �t R •#" nz1 xf4 '" it'cel'jfd `' it s't \r _ 3 t i ,;t1 S,�r `k i;y � � � Lxf` l..?`�t'��4t�. t}4�Z'i`d �` �t f�41�) �t';_•, -4 ,�f .. d �'= f� � �a1. �� �'t1���a ;t „1� ��sf�4•k�: �`�C c�`,� 7 t tLS���tR �° -�• ' not Asa �t ,�, �n �t 1 a y`_.. '` tk III" v i :AN �•fi t is c §, i •• hl ` b t•.•rt mill i 3.+ •1 � ".f 4 `4 �4 �f/t4 { fi. t pa s 1 ;-r"i AIR r, �s i• 1i5' 's 1h � r ��'<. "� < is kt ���{t �`��1 ��� �`' Sm"A' t Sk 1 t } iiS�`Sf1k�A i i11fi> ti t t r �� � � E1 � t t1 `t t t' fi t r tii 1 S A ,�his � S fi' �"s•z?� f � � t 3 G•' .t, t}F�} �'^f Alfa FBI G fi��fl Si � yr k M ry� t'� 4r t 4 �t .£ £"� 8 Ma a t, ; a5gtaa � �; _. 5 G t Y � � h F-f r } k A r j zs ' ch � R0 { 1 Kit, t R �N .r Y l F Y E ssj� f L J i f MW i t # fUP .z Mo pop -MEW"T jwko�00, E 1 E,L t y t a31 Pam" C k � b > f' r r -- P r r` r r rri r r F w w r � r - _ N �"-. s*'� —' ✓� r°� ,� �-`"'' "%zf em°''x- s... � '�,.�-' ram"-.�'� P cfa, w a a r� P Wolstromer, Bonnie From: scott kelloway <sl<ellowaype@yahoo.com> Sent: Thursday, June 04, 2015 11:57 AM To: Cheetham, Kristine Cc: Wolstromer, Bonnie Subject: Re: Merrimack College Monitoring Reports Attachments: 5-31-15 Merr. Col. SWPPP inspection report.doc; Merr College SWPPP 5-31-15 (1)jpg; Merr College SWPPP 5-31-15 (6)jpg; Merr College SWPPP 5-31-15 (7)jpg; Merr College SWPPP 5-31-15 (8)jpg; Merr College SWPPP 5-31-15 (9)jpg; Merr College SWPPP 5-31-15 (10)jpg; Merr College SWPPP 5-31-15 (11)jpg; Merr College SWPPP 5-31-15 (12)Jp9 Kristine, Thank you, and I will. For the time being I am sending you my field reports for my site inspections during this most recent storm event. My handwriting is often difficult to decipher as I use a tablet in the field. If you have any trouble interpreting these please just ask me any questions. Due to file size and for clarification I am attaching my 5/31 inspection report to this email. I will forward you a copy of the 6/1 report immediately after. I plan to be sending you my May monthly report very shortly which will include the 5/31 inspection report. The 6/1 report will be included in my June report next month. The pictures are dated individually. I am still working on further mitigation efforts to retain storm water within the limit of work during significant rains events. I will keep you in informed of these efforts as well. Please contact me with any questions or concerns Scott D. Kelloway, P.E. 978-479-5648 - - - — - -- _ - -- -- _-- ------- -----................ From: "Cheetham, Kristine" <KCheetham@townofnorthandover.com> To: "skellowaype@yahoo.com" <skellowaype@yahoo.com> Sent: Thursday, June 4, 2015 10:06 AM Subject: Merrimack College Monitoring Reports BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Erosion Control- es ❑No ❑Yes ZJNo Sediment Barriers 2 Tree Protection es ❑No ❑Yes LKO 3 Stabilization of Zles ❑No ❑Yes o Construction Access- Egress 5 Dust Control U16s ❑No ❑Yes o 6 Erosion Control ❑Yes 12T, o ❑Yes 4allo Blankets 7 Stockpiles LffYes ❑No ❑Yes ANo c�� 8 Diversion Channels/ es ❑No ❑Yes o Swales 9 Sediment basins es ❑No ❑Yes o 10 Dewatering basins— Yes ❑No ❑Yes PNo filter bags. 11 Temporary Slope ❑Yes f;i o ❑Yes Ao Stabilization 12 Permanent slope ❑Yes ONo ❑Yes No stabilization 13 Interior Site Erosion ?es ❑No ❑Yes LYINo Controls 14 Temporary Check Dams es ❑No ❑Yes ONo 15 Street Sweeping es ❑No ❑Yes o EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Ins e ? Maintena e Re uii 9 16 Solid Waste Containers 2Ves ❑No ❑Yes 6No 17 Equipment/Vehicle es ❑No ❑Yes o Storage Area. Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and ❑Yes ❑No ❑Yes ❑No disturbed areas not actively being worked properly stabilized? 2 Are natural resource Pj es ❑No ❑Yes No areas(e.g.,streams, wetlands,trees, etc.) protected with barriers or similar BMPs? 3 Are perimeter controls r'es ❑No ❑Yes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Difes ❑No ❑Yes�ONo receiving waters free of any sediment deposits? 5 Are storm drain inlets ZYes ❑No ❑Yes .JNo properly protected? 6 Is the construction exit Yes ❑No ❑Yes ZJNo preventing sediment from being tracked into the street? 7 Is trash/litter from work Yes ❑No ❑Yes OJNo areas collected and placed in covered dumpsters? �J. 8 Are washout facilities L2fes ❑No ❑Yes allo (e.g.,paint,stucco, concrete)available, clearly marked, and maintained? 9 Are vehicle and es ❑No ❑Yes 1Jo equipment fueling, cleaning,and maintenance areas free of spills, leaks, or any other deleterious material? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes` Required? ❑Yes ❑No ❑Yes ❑No 10 Are materials that are potential stonnwater contaminants stored inside or under cover? 11 Are non-stormwater es ❑No ❑Yes EdNo discharges(e.g.,wash water, dewatering) properly controlled? 12 (Other) ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,a d complete. I am aware that there are significant penalties for submitting false information, including the possibi ' of fine and imprisonment for knowing violations." Print name and ti l ott U. _ello way,Professional Engineer l Signature: Date: ( - EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 rs £`c 4A n , z �t���g`=itelt tap;C_i13��1t','"•1�F��ts' sT� .far i£ti� s'. ,£sk��j����F;��eY ���s � n''£ 1��1�',����� �fz�}}'iti"s(1s�Ft�F���`£�„�"`•�y1 s t� ii -.c �;s„ �f� { ST t x t x is i}t hi2rn ;. s i a sY �s,7 a� ets- e RIF s `���•` {� s��t',; i�s >r,2�i�� �g `{`� tip. � � .,` t£� �A? f. �t i, s o: �x f a a7r' j^ x5 N > k � z t ` ;r r r � OJT pgj QZ" " a TO I , x 3 .A � ��: ' rSf- . ," r figmm � y � E 1{ � k s of 1,21 a. ,. pp EM 0.�,w,11 Is X m Akits t xA. x ,. _7U ` A04 I pulp g Ac ` a LA I an ft " � AM �. e a v' �rt 1 r a i a a „ a 14� la his #u 8R° w. w _ , w x , w DWI AG lip x � Ad . z r; s, �r r � F a _ � r-r r ry x r „ r 'ter. �✓r-�r�`'��,,,..-°''� "^ * /.� 1. V ' ;j re 01 wo o � w 'IF44 All, r ,It c ' � x` Al rs if NP o ' ✓ ,% ( ' 3 s t ; u.tl mot, cs a.. ' a '.�im -€ `4 � t fr:t y r �, s I owlMEN i irk , o TO { � �aa F' E �'v Y it § x x t `S'�nk AiNI s ee 4� }"e7"a"t `' r� , t i S A - k Wolstromer, Bonnie From: scott kelloway <skellowaype@yahoo.com> Sent: Tuesday, May 05, 2015 6:28 PM To: Enright,Jean Cc: Felipe Schwarz; Lynn Kramer, Ben Saturley; Russell Bennett; Marc Lehoullier; Wolstromer, Bonnie Subject: Merrimack College Re-development project April 2015 Monthly Report Attachments: April 2015 Monthly Report Merrimack College North andover.pdf Dear Ms. Enright, Attached is a copy of the April, 2015 Monthly Report for the Merrimack College re-development project at 315 Turnpike St, in North Andover, Ma. It is my opinion that all site work is currently in compliance with the project SWPPP, and consistent with best management practices. Please contact me with any questions. Scott D. Kelloway, P.E. (978)479-5648 Scott A Kefloway, P.E. PrafmFonar CWH and En Wronmv7fal Designs and Inspecdons. 148 North St.Andover,Ma.01810 Phone: (978)6825054 Ma.Lkc 440122 4/30L7015 North-Andover Planning Department. Attn: Town Planner 1600 Osgood St- Suite 2035 N.-Andover,Ma- 0 18-45 Dear,Toxim Plannin4c=;Dept_ Please refer to the attached field inspection reports of site monitoring for the "Merri-inaek College North Campus Developmenf"project located at 315 T-umpike St. in Andover 1 N_Andover,M-,, a- DEP File 7-4090-0750 Arnended, -,NTDE-S Tracking No: MAR 12AZ77 This montl's construction activities on this site include the following: a Continued construction of proposed residence building#1,and 42. a Installation of sewer line,and drainagge line relocation. a Back-EFI,-fine grade and compact portions of sewer and drainage fine- 's -NINEscellaneous site Nvorl,- and management of stockpiled material. All msion control-,are presen-dv maintained in suitable condition.All other BMFs incl admg sef liment traps i n side dmmage structures correctly instaRed,and are in suitable condition-ALI equipment is being stored, fueled and maintained in a suitable location Fuffi cis nfly ols-side, wetland resour-ce areas. Trash and debris are being appropriately contained,a-ad disposed of.Grading is presently consistent with the approved site plam Tinere h-as becen no encroachment withm restricted areas- T he site is presently ver muddy due to spring thaw.The Contractor has maintained and irnpro­.ed BNIP"s win the work zone to nunimure infiltration of sediment to drainage structizes w in the work-zone- -Ihere have been no notable impacts due to the significant rain events this month- -Al this time all work-on 1 his site is being performed in compliance xxith the Order of Conditions,the-project Storm WWier Pollution Protection Plan and consistent with best management practices - P g;_ 1 J-2 Pg:2/2 f you have any questions or concerns,please feel free to contact me at --t ADO phone number listed above. „ Sincerely, x AL co ell ay,P. CC. (Via e-mal,paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Stormwater Construction Site hispeefion Report Genera information ProjectName c M k College yen � N � J A � Date of Inspection i ShartlEnd Time 1�7- Inspector's Tt€ s) Proffessional Engireer In spectorls Cu test Information (978)4-9-5648 Inspector's Qualffications L erg nal Bnghnetre PiracticLng over 15 years-,specializing t fion s site a r Y� _ - sits-it the To of- ado � y t J Describe present phase o construction z ' PK- ,�_" - �, t 3 ` of Inspection: O"Regular sty e'vent wnz event U P storms eNent weather fn there been a sty - , �a If yes,Pro-wide- Stonn Pro-Sty Date star starm ai r k 't Approximate Ammmt of dip orx(in)- Weather&i ti of this inspection? 0 Clear ZiCloudy fan 0 Slee! Fog rowing fN Have any "' a arg uirred since the last ins If ,describe: s t ` ire there,an -barges-at the time rof inspection? f - _'v If Fes,describe: x t Y, g$ $ t J . Ina-p-w-lion Rspwt Veision 1.1, ,2007 CorrectWe Action Needed nd Notes � Insta ': Maintenance Requlred�/ 1 Erosion Control- i UY,-s o uYes Wo Sediment Barriers 2 'free Protection k es ® o uYes END s 3 Stabilization of 3, Yes QNo QYes UNo Construction Access- Egress I 5 Dust Control es UNIO yes W40 6 Erosion Control '�'es Mis 13yes, WNO Blankets j 7 Stockpiles res u NO Uyes > o X 9 8 Diversion Channels Wes UNIo UYes o Su ales i 9 Sediment basins 9Yes UNo lees allo 10 3 Dewatering basins— Mes UN NO ages WNTO i Ater bags. 1 I 'Temporary Slope toes LINO lees So Stabilizat-ion F s 12 Permanent slope 'es LWo uYes Ulqo stabilization f fr 13 Interior Site Erosion 3 esLINo Oyes ' 'NO Controls � � I i u 14 if Temporary Check Dams Ules NL o UYes 12Wo e 3 15 Street S-weeping ' Yes 0,No UYes QAo EPA SWPPP Inspection Report, Version 1.1,September 17, r' { r r Site upi ctivel � `z 3 Guper N,slily? . � -., ZIN6 e 7 ew w . ,, t withor + E a si=n 7 �Ps 1 3 Yi. 5 s K ,,pg Sediment E adcqmtely !to S Wb-t-— iv ✓ e No layes _w'�-'¢,w.ttvh--s "3: z"'�"a s �� At Are sln ,.,inle es � Oyes 3�4b�,pff v erhy - f? a < u.=won ex"t U 3' 4 7, k 3 } v�n tnx s -mil lming tacked inze. the if 4 masih : �11,� ueas ogle in cove zed n - s= y _ clean '?'�..��"rke-&,and j`"' Amt clean"n and _ Ereee of spfi b..re—dks-or a2y vL set=n=n:"Us f' n 1,September 1 7�2DO7 Maintenance e Action Needed a €l Notes Requi red?, >. U'Ves UNTO oyes 13140 10 ATe materials that are potential storm water contaminants shred inside or under cover? I I Are non-storrnwater UVes QNo ®Yes RNO g discharges(e.g.,wash water,de ate mg) properly controlled? 12 (Other) UYes QNo 1 I � v E i Non-Compliance Describe any incidents of non.-compliance not described above: CERTIFICATION STATEMENT `1 certify under penalty of law that this document and all attachments were prepared sander my,direction or supervision in accordance,%xvith a system designed to assure that qualified personnel properly gathered and evaluated the information submitted_Based on nay°inquiry of the person or persons vrho manage the system,or those persons directly responsible fog-gathering the information,the information submitted is,to the hest of my,knowledge and belief,tract accurate,and complete.I am aware that there are significant penalties for submitting false informnation, including the possibility of fine and imprisonment for knowing violations." Wriest name and titt Scott D.Kellowav,Professional Engineer Date: EPA SWPPP Inspection Report, Version 1.1,September 17, v� 7: �,w =r ��r „�: '� � r� ���` � K, � „��' � .'jam �,��-�:-l � :�i,�- ,�" �,��- v �� � -� ��,� � � � � t �� � � � � t k � "" ���ate- ''., � .,;". ��. rw N � � � �" � ��. r � �.— ,� �'� �m �_, �- d �� -� ��: j: �. f _+ d;, a �- ,�-. � � �� � _ �,} � �. ' ��� �,� ����� �� �,. �.� ..a ���� �,. -: , a, � � � .� *� � �' a v.' �`� �..,� �" .� ° �i k "�`'- �' 7 K �� r Y, �3 �,S b �° a m' ;.r"�x, ...�s... wormwater Construction Site Inspection Report Generz] Information Project Name Memim, ack College Nn-rVr Canpjs Devebpm _PDES Tmcking Nl_AiZlW,77 Lccafion 315 tumpike St N.. Ardwer RAa. Date of Inspection -A �cqv, Prufessiona_l Engineer Inspector's Contact Information 1-48 Nrorffi ;L Andover. r,,,a- 019-1,0 (978)479--56,48 Licensed ?fofessl al En ear� C � Mrl gineer, P,­actjcjqg over 15 ye , s j ,z in .aHz� pec �= construction site rnonitWma, and repa7ting- Prt—, approved site monitor in ffit To-% n of Andy er Describe pre -vent phase o struction t :0"con27 - a ro� TAW of Ins tuna 0 Regular Pre—.-imnm event 0 Durhigstorm. event Weather Information Has there been a storm event since the last inspection? riygs If yes. provide. Stogy $,6ut Dame & Whine- umfion (hrsl, Appr=mte Amount of f Preciptation (in): J., r We2tner at t, ype of this inspection? U, Clear WoudY U R zin 0 Sleet Q Fog 0 Snowing U HjgTipds U Other: Terape-raVue: WQ Have an- y chn-l-,7eS OCCurred since the last inspection? QYes W,o Ifyes, describe: Z re there any discharges at the time ofinspection?OYes L316,7,-s LL EPA SVfPPP Insowtforl Report V--Mbn 1. 1, September 17, 2007 e I ` e_ . .' m 4 I Sede Barriers t � x 3 �'` b�n� frc Access- i.oS3st Ltc'no i k 5 e � f 6 5 EJ.MOSiOn CQnt.S j E i.''d F 8 es xo yk d � yE 1� p /�f'• r i i aeggis€ rChannels es, uNo __o � 10 De "�z �Cas,Ang b s, — E es ONo yes o ` # L`n e YT S z, '+ '✓"' 3.'1" .�+^,, ,a"'ti'.. i. xLs" r 3 Tye y [2 -Pem mmaza S!0p;, . # es pl!�-G I He's „o e 13 - InteTio.Stte € _ . con YA. col s [ z`fir , eumpe:.:ra*, Check s s; 4 u P es p� 5 x $$ k 3 i E � Version t 1, September _ t Y�` E .'R 1 ...'8 RA�,r � e ll a nay € s fl i� , 'ii i � ` -10 t Y `.qx"v� "+,--�`-k',�3 V l,_xv_ ? -es wtl' Fes pN' C' E f s h � overall Site Lsgues _' r Maintenance Corrective ActiGn Needed and Requ. ireW d a, ° `s"� -'and s s —g x e s L .:, $ t3'+' n.�.,�'..�:�"�3?.E,;.3.'�'&.'v ass Oyei+ s areas S-Lmamts, vzes- a- sialilku WARS? Are pefi�rcommls eyed hrm ' A and aned? Eme o It 5 A Zswi,m , ii.""'^sk-m— EY'i'e. ZING F oyes 0 `§ Spro e v �am3 6-E.Y u6 Is z� cm=, .-r Pais cat UYe-S F `byres :" RM 3 tprenandng se'ds5` tert E t. ly md k cle- =ked- and and u_s -1 ram, a i � u Y C EPA ;, In --a l _ 1, WNUVactivily hmplemenW? -Maintenance Corrective Action Needed and NIDtcS q es QNo PotentialstorrniiWer as contaminants stored inside or under cover"' I I Are Pon-stoyrnwater c3yes CIN'o Elyes cVo dischar ges a.g., wash water, dewatering) 12-1 (Other) UYes No Q Describe any incidents of non-compliancee not described above- CERTInCATION STATEMENT "I cefti-ti.V upder penal�, as law that this document and all attachments were prepared under my direction or supervision in accordance I'Vit11 a system designed to assure that qualified personnel properly 'gathered and evaluated the info 'can submitted. Based on my inquiry of the person or persons -kVno manage the system, or those persons directly responsible for gathering the information. the information sub'pied is, to the best of my knowledge and -belief, true, accurate, and complete. I anon aware that There are sippii-19-cant, penakies for submitting false information, including, the possfl bility of fine and imprisonnierr, for kno-,,Nringgg violation&- 11It'A Date SIgnature ,, , � �4 ) �t� V;�, ; - -/-1 2- Stormwater Construction Site lm22LHon Report Gewral lz&rm.-r&am Project N-ame Nam Cennpu-- -,NPDES Tracki. ng-N-o MAR12ALZ 7 3-�'! 5 tumpurce st N., kndr2var Ma- D,-te of laspech-on 2, f a" surt"lmd Ti I! Scuttb. KeK, Title(s) Engin—,- gory Inspeez,Ws Contact Informsaf ton Inspector's Qua liflizations aMl En P-Twe-cng E. amgio-�i-diinn dc Silt MMO aw-ld re-naft tilz Pll-- approv'Y" site Monitor in tae -f, -ndbaver Destribe present phase of i construction A-_I T of Luspeefton: event Dui- s=m event :2 Pos-'starm cvcnt weafft-er werwmtiD!" Has there been r. storm event since the inswimm? :lye-,-, If yes, provide: Ste,met Start De:,- & Tftne- Stwm D-,:- >onA=rm—off=pil=--on fink Weather at Clem-7 U R-=; Slezl 1:1 FC-9 U Smawinqg :2 High N�-uk& rFv Have an -Y discharges Ocemr ed since the last I-R.-Pelion? Uyes zNb If yes, describe: Are there any dischazVess at the fime of iasp�-onl Zl yr�-- ws. d'escriel. EPA S WPPP ki-spectron P.--pwt Verslo,7 1 - 1, September I T2007 i �. a r ` e Arban Needed amd NotEs i a' ? ' '$ s -c o Tree i SWyes s o '^ F � 1 c:Ye..ab�y -.0 ''`.E�Yet-�s oM' � es NO € Off.. � 1, 6 z Emsimn Control afes uxa t = ° $ F 9 e' 1 ..Tt''oekpi'k's fi 'I1e -UNTO Z�x "sa !i 3✓'tE�±.r'y`�# ."! 'Y'' i g (k E £ F o fi fi p � L. y w-menag mains — ONO I 01—t be-g--s- E f 4 1p� $P,Se � _ Y i3 inmen-n—o, Size Enasz?' a 1 3 aves UINIFIO yes uNroCoEtm C E k P' h � e > x ttr ' aConwthe Actma Needed aBdNotes ite s r I6 NYaste Cone-s f Yes es M4 r 1' $ p e t x -"e icle x Yes ZINNO Yes I Z _ O I Sge -Are-d- Overan SiteIssues BN"IP/activily, m Requit ed- YonNeeded and Not Are aH sloes and m esuyes =- distwbtdareasnot actively, being corked s K 2 e naftzral up s ti r uyes ulqd a e (e.g., streams, wetlands, etc. t Prat cs vvith arrit.s Are perimeter wntrols Yeti QINo a k and sediment _ � t adequately installed (keyed into su s--ate�and F traintained? t Are discharge PoiMts Q Yes No aters fte o any sediment deposits? Are stonn drain inlet a es is -cl OYes, OR6Uyles r c a.+t [i'3'..Cd E�tii into ## ine str�- m areas 2K..oilec ed and z d° m s'ers'? 4 was cut fiacflfties_ s _ mo C_&i t, s v � e avaffa'ble. ` clemrly maTked, and in $ erucle. and 3y _. o uYes.. o pk L $ SxEcY: amp e ofspills- Ie s, or and° � other deleterious G Version-, Sam pe + k y I FP -..i �c� Ls�yK � y`t°T L. u k� � ? t i# � t F s � f '.: MCATION STATE- ` ; ::: 3: �dy mr-L-deT ac a "i' Z 'his ,m wze.: zL arm � ` ����4� :,=ate � �';.e .� �a�- �x�� u3 Or m can rM a dm, a & _ a �., .�..� .....s. ,�... ,.�.� % �.,'•.S.;t::%. *..,.fir , _ �a° "^.�`L'-' pmpwi;y ck�"a'-uss.ai mad evalueted ffihe i. _�r _ aade asud cm am — belief, =e� an 3wn.m�pa i mn "szW C £ - h —zm sftrm e mahles'sforsubmh 53j-ate= 3S "g sup er I 4 , a m '* EPA SYYPPP Inspe—c-tibn. � ^ 3?, Valsion 1. 1, SAS 'S El Stormwater Construction Site Inspection Report Project Name Merrimack College North Campus Developmenf NPDES Tracking No. MA 13AZ77 Loeation 315 turnpike St N- Andover Ma. Date of Inspection StartEndTime Inspectol's Name(s) Scoft 0. Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma- 01810 (978)479-564-8 Inspector's Qualifications Licensed Professional Emlineer- Practicing caves 15 years, specializing in construction site monitorino and reporting. Pre- approved site monitor in the Town of Andover Describe present phase of construction 1E 4, f L1 Type of Inspection: eguiar 0 Pre -storm event 0 During storm event 0 Post -storm event Weather Information Has there been n storm event since the last inspection? UYes UNO If yes, provide: Storm Start Date & Time: Storm Duration Off): Approximate Amozint of Precipitation (in): Weather at timp4f this inspection? U. Clear UCloudy Q Rain E3 Sleet U Fog 0 Snowing U High Winds 0 Other Temperature - Have anv disc ha—zges occurred since the last inspection? OYes If yedescribe: Are there any discharges at the time of inspection? UYes byes; describe: m9mm E BMP BIMP " I BMPCorrective Action Needed -and Notes ita Requiredl.p Erosion Control- Sediment Barriers es o 1 Uses Uf4o 2 Tree Protmion � Ues U `O E Llyes U1410 6 999£ 3 Stabilization of 1 'es 2No I UYes Elko Construction Access- � Egress 5 must Control Uyes UNo 01 es _ _ Y �d r�iLi Erosion Control Uyes U&O uyes ` no f Blankets 7 Stock -piles UrYes ONo Uyes USO 3 8 Diversion Channels Ufides 7o 3 y s I O Swales a 3 9 Sediment basins es o UYes Uiqo g 2 �qI # 1€3 Dewatering basins — f °es No J *✓ � yes - ,o filter bags. 7 1 t Temporary Slope ZYes UNu UYes o Stabilization z 12 Pernianent slope Yes WNo I ages LP90 stabilization % Y 13 Site Erosion `es o � Yes v VO ((Interior Controls 3 X' f LL 9 14 TempoTary Cheek Dam LWes UNPo zlyes _ o 15 k3Y S:Y'eti:t Swoe g . '' 4 es 3 N yes a o � 55 g� 55g BM-P BMP,,- 111 ? BMA' Maintenane Required. Corrective Action Needed and Notes 16 Solid Waste Containers es QNo - UYes Mo 17 Equipment / Vehicle Wes UNo QYes EKo Storage Area. I-N/activity Implemented? Maintenance Corrective Action Needed and Notes Required? Are all slopes and UYes QNo UYes QNo disturbed areas not actively being worked -properly stabilized? 2 Are natural resource VYes QNo Llyes LIKO areas (e.g., streams, wetlands, trees, etc.) protected with barriers or similar BWs? Z 3 Are perimeter controls 13'Ves LINO Elyes Q'No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and U14es QNo ®Yes AO -No receiving waters free of any sediment deposits? 5 Are storm drain inlets UYes QNo UYes Pgo properly protected? 6 Is the construction exit UfYes QNo QYcs Q'No preventing sediment from being tracked into the street? 7 Is trash[litter from work Ulles QNo L]Yes J2No areas collected and placed in covered dumpsters9 8 Are washout facilities Wles QNo ®Yes UrNo (e.�-, paint stucco, concrete) available, clearly marked, and maintained? 9 Are vehicle and JaYes QNo ®Yes QNo equipment fueling, cleaning, and maintenance areas free of spills, leak-s, or any other deleterious material? "I, IIIIIIIJIF1111111o''I 111 151 Il !11, 1:111 1! rl�111!111IIIPII III!I11111111 -T. D- �17 M I 00w BRP/activity Implemented? Maintenance Correclive Action Needed and Notes P. 10 Are es UNIo G UYes LP KTTO materials that are potential storm -water contaminants stored inside or under cover? I I Are non-stormwater Uyes ONO UYes 2"No discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) UYes USao Describe any incidents of non-compliance not described above: "I certify under penalty of law that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible r gathering the information, the inf6rmation submitted is, to the best of my knowledge and belief true, accurat , d complete. I am aware that &a -ere are significant penalties for submitting false infarmatior4 including the posspbji of fine and imprisonmeq for knowing violations." W=-- EPA SWPPP Inspecdon Report, Vealon 1. 1, Septwnber -17, 2007 From: Sent: To: Cc: Subject: Attachments: Dear Ms. Enright, scott kelloway <skellowaype@yahoo.com> Tuesday, April 07, 2015 12:44 PM Enright, Jean Felipe Schwarz; Lynn Kramer; Ben Saturley; Russell Bennett; Marc Lehoullier, Wolstromer, Bonnie Merrimack College Re -development project March 2015 Monthly Report March 2015 Monthly Report to N. Andover, Merrimack College.pdf Attached is a copy of the March, 2015 Monthly Report for the Merrimack College re -development project at 315 Turnpike St, in North Andover, Ma. It is my opinion that all site work is currently in compliance with the project SWPPP, and consistent with best management practices. Please contact me with any questions. Scott D. Kelloway, P.E. (978)479-5648 Scott D. Kelloway, P.E. Professional Civil and Environmental Designs and Inspections. 148 North St. Andover, Ma. 01810 Phone: (978) 682-5054 Ma. Lisc 940122 3/31/2015 Town Planner %kQQ.IId 01 N. Andover, Ma. 0 1845 1 Dear, Town Planning Dept.. Please refer to the attached field inspection reports of site monitoring or t "Merrimack College North Campus Development" project located at 315 Turnp e Andover / N. Andover, This month's construction activities on this site include the following: * Continued construction of proposed residence building #1, and #2. * Installation of sewer line. ® Only very limited site work. All erosion controls are presently maintained in suitable condition. All other BMP's including sediment traps inside drainage structures correctly installed, and are in suitable condition. All equipment is being stored, fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of. Grading is presently consistent with the approved site plan. There has been no encroachment within restricted areas. The site is presently very muddy due to spring thaw. The. Contractor has maintained and improved BMP's w/in the work zone to minimize infiltration of sediment to drainage structures w/in the work zone. At this time all work on this site is being performed in compliance with the Order of Conditions, the project Storm Water Pol-lution Protection Plan and consistent with best management practices. Pg: 2/2 If you have any questions or concerns, please feel free to contact me at a4#gwand phone number listed above. Sincerely, A Scott D. Kellow 4 tkl--, CC. (Via e-mal, paper copy upon request): Lynn Kramer Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett 01M General Information Project Name Merrimack College North Campus Development" NPDES Tracidng No. MAR12,= Location 315 turnpike St. N. Andover Me. Date of Inspection Start/End Time Inspector's Name(s) SiYott DI-Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma. 01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer. Practicing over 15 years, specializing in construction site monitoring, and reporting. Pre- approved site monitor in the Town of Andover Describe present phase of C��Aj--C-Ltqo construction Type of Inspection: �ost-storm E3 Regular U Pre -storm event Ll During storm event U4 event Weather Information Has there been a storm event since the last inspection? QVes UNo If yes, provide: t Date & Time: Storm Storm !P Duration (hrs). ApprofhI Amount of Precipitation (in): ,! 29 4vgl/-- Weather at tiof this inspection? Ll Clear RlCloudy gRain U Sleet 13 Fog El Snowing U High Winds Cl Other: Temperature: Have any discharges occurred since the last inspection? QYes ZMo If yes, describe: Are there any discharges at the time of inspection? 13Yes @No If yes, describe: 11 11 1111111 IN 1111111 1111!111 11�q BMP BMP Corrective Action Needed' and Notes Installed? Maintenance Required:L!. I Erosion Control- Wes LINo UYes ONo Sediment Barriers 2 Tree Protection Mes LINo ®Yes ONo 3 Stabilization of Wes UNo ®Yes No Construction Access - Egress Z* 5 Dust Control ®Yes 14N o ®Yes 21,10 I'll" 6 Erosion Control --d—Yes WfNo UYes QN- Blankets Z 7 Stockpiles Lfi'es ®No ®Yes 9IRo 8 Diversion Channels Yes ®No UYesONo 02:74;�-MF-- Swales 9 Sediment basins Wes ®No ®Yes Q% h 10 Dewatering basins - OYes ®No ®Yes Mo filter bags. I I Temporary Slope ®Yes UTjo ®Yes U;Ko Stabilization --f2 Permanent slope ®Yes QNo ®Yes UNO stabilization —13— —Interior Site Erosion ZYes LINo ®Yes No Controls IZ, 14 Temporary Check Dams ElYes LINo Z ®Yes No 15 Street Sweeping Yes ®No Uyes ONO 1011 BMP BMP Installed? BMP Maintenance Required;!!�� Corrective Action Needed and Notes 16 Solid Waste Containers elYes UNo ®Yes &No 17 Equipment/ Vehicle ffYes UNo ®Yes ZAT o Storage Area. I �1MURNIOT -0 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and UYes ]No QYes LINTo disturbed areas not actively being worked i)rover1v stabilized? 2 Are natural resource ElYes UNo E]Yes No areas (e.g., streams, wetlands, trees, etc.) protected with barriers or similar BhOs? 3 Are perimeter controls Uves UNo Uyes 040 and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and @Yes LlNo UYes @No receiving waters free of any sediment deposits? 5 Are storm drain Wets UYes UNo UYes No I properly protected? z" 6 Is the construction exit aryes L3,140 Dyes No preventing sediment from being tracked into the street? 7 is trash/litter from work Wes UNo UYesONo areas collected and placed in covered dumpsters? 8 Are washout facilities es UNo uYes IRRO (e.g., paint stucco, concrete) available, clearly marked, and maintained? 9 Are vehicle and WYes ONo uYes, EW404 equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? BI (activity Iniple aented? Maintenance Corrective Action Needed and notes Re 'air . s QNo Yes a 1(} Are materials that are potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater es UNo UYes o discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) ®Yes QNo Describe any incidents of non-compliance not described above: ' =f I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Date: my�qm•- rtr • -e «- J#; Stormwater Construction Site 1p�pecfionm Re ort roject Name Merrimack College North Campus Developmerif NPDES Tracking No. MAR1277 Location 315 turnpike St. N. Andover Ma. Date of Inspection :=m, Sta —;-, — , , , S, Inspector's Name(s) Sc6tt Kenoway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma. 01810 (978Y-79-5648 nspector's Qualifications Licensed Professional Engineer. Practicing over 15 yews, specializing in construction site monitoring, and reporting. Pre- approved site monitor in the Town of Andover Describe present phase of construction Sat- k-/id T - f Inspection: TRe;lar U Pre -storm event El During storm event U Post -storm event Weather orrnati - asHas there been a storm event since the last inspection? OYes UNTo If yes, provide: Storm Start Date & Time- Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at e ti of this inspection? 13 Clear rcloudy U Rain L3 Sleet U Fog Q Snowing 13 High Winds U Other: Temperature: If yes, describe - SWPPP Inspection Report, Version 1. 1, September 17, 2007 P BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required9 1 Erosion Control- UYes Uf4o Sediment Barriers 2 Tree Protection -Ues No Llyes o 3 Stabilization of aYes ®No UYes NaE Construction Access - Egress 5 Dust Control UYes Cko— UYes No 6 Erosion Control UYes No UYes No Blankets 7 Stockpiles WYes No UYes @No Diversion Channels r Yes ®No UYes Mo Swales Z 9 Sediment basins UYes ®No UYes No 10 Dewatering basins - @Yes L]No UYes U;Ko filter bags. 11 Temporary Slope UYes 2140 UYes 0 Stabilization 12 Permanent slope L]Yes No ®Yes No stabilization -13— interior site hrosion —L3 Y--es-�No Controls Temporary Check Dams UYes No 15 Street Sweeping OYes UNT-t—cwes Mf4o BMP BMP , 1xn'VSLr11ed? BMP Maintename Requir2 Corrective Action Needed and Notes 16 Solid Waste Containers UrYes ®No ®Yes Uf4o 17 Equipment / Vehicle MYes ®No ®Yes No Storage Area. nVPr%11 afiP kulin BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and ®Yes ®No ®Yes LINo disturbed areas not actively being worked properly stabilized? 2 Are natural resource L�Yes ®No OYes U'No areas (e.g., streams, wetlands, trees, etc.) protected with barriers or similar BMPs? 3 Are perimeter controls UYes ®No UYes No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and Q'Yes ®No ®Yes No receiving waters free of any sediment deposits? 5 Are storm drain inlets LdYes ®No ®Yes 21,4o properly protected? 6 Is the construction exit UYes UNo Dyes UNO preventing sediment from being tracked into the street? 7 Is trash/litter from work UYes ®No Yes No areas collected and placed in covered dumpsters? 8 Are washout facilities Mes ®No ®Yes No (e.g., paint, stucco, concrete) available, clearly marked, and maintained. 9 Are vehicle and lidYes ®No OYes No equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? BMP/aetivity Implemented? Maintenance CorrectiveAction Needed and Notes Requi ®No Llyes 10 Are materials that are potential storm -water contaminants stored inside or under cover? I I Are non-stormwater EYVes UNo L3Y discharges (e.g., -wash water, dewatering) properly controlled? 12 (Other) ®Yes QNo Describe any incidents of non-compliance not described above: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons I directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the posAibility of fine and imprisonment for knowing violations." Signature: I Date: .111jr � 1! 11111 jixx�! 11 T �L_�V General Information Project Name Merrimack College North Campus Development" NPDES Tracking No. 12AZ77 Location 315 turnpike St. N. Andover Ma. Date of Inspection 0 C;� Start/End Time Inspector's Name(s) Sdotf l?. Kelloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma. 01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer. Practicing over 15 years, specializing in construction Z site monitoring, and reporting. Pre- approved site monitor in the Town of Andover Describe present phase of construction aK-- -6c77 CY�5r,4 1 P,,, 579&,-� 0CP -60- 7 , Type of Inspection: U Regular U Pre -storm event Q During storm event Post -storm event Weather Information Has there been a storm event since the last inspection? ®Yes UNo If yes, provide: Storm Date�& Time.- Sto9 Storm urati rs): Approximate Amount of Precipitation (in): K, Weither at tine this inspection? • Clear Mloudy U Rain Ll Sleet U Fog U Snowing ®High Winds • Other: Temperature: 1211 I-C9 C�51� Have any discharges occurred since the last inspection? UYes UNo If yes, describe: Are there any discharges at the time of inspection? E3Yes No If yes, describe: 11111ppI111111111 RMP BMP BMP Corrective Action Needed and Notes Instal V Maintenane Required? I Erosion Control- es UNo ®Yes U&o Sediment Barriers 2 Tree Protection !!etsUNjo ®Yes 990 3 Stabilization of ElYes ®No ®Yes No Construction Access - Egress 5 Dust Control UYes UNo Z- QYes Ufjo 6 Erosion Control ®Yes No ®Yes LINo Blankets 7 Stockpiles UYes QNo ®Yes 11JNo 8 Diversion Channels LKes ®No ®Yes WNo Swales X 9 Sediment basins OYes ®No ®Yes No Z 10 Dewatering basins — es ®No ®Yes ONo filter bags. 11 Temporary Slope —Yes IL31—N o ®Yes LUMH Stabilization --12— Permanent —slope ®Yes No ®Yes VINO stabilization — —interior LLYe ®No ®Yes 13 Site Erosion s t m-r Controls 14 Temporary Check Dams es ®No ®Yes UIRO -15 Street Sweeping LdYes ®No Oyes 340 iiiiiiiiiiiiiiiiiii! I I IIII IT 111F, =��-e BM-P BAW) In tied? BMP /, Ar Maint;er' e Corrective Action Needed and Notes 16 Solid Waste Containers Wyes ONO LlYes L6No 17 Equipment! Vehicle LdYes LINO L]Yes AdNo Storage Area" BMP/activits Implemented? Maintena t"vd Action Needed and Notes I Are all slopes and ®Yes No UYes ONO disturbed areas not actively being worked properly stabilized? 2- Are natural resource No ®Yes No areas (e.g., stream, wetlands, trees, etc.), protected with barriers or similar BMPs? 3 Are perimeter controls ErYes ONO ®Yes &&No and sediment barriers adequately installed (keyed into substrate) I and maintained? 4 Are discharge points and U'Yes No Llyes Ja'NO receiving ., waters free of any sediment deposits? 5 Are stonn drain inlets Layes UNO LlYes No properly protected? 6 Is the construction exit OYes No UYes No preventing sediment from being tracked into the street? z 7 is trash/litter from work- Wes ONO ®Yes 9140 areas collected and placed in covered dumpsters? 8 Are washout facilities Q*es LIM ®Yes No (.-.lc,, paint, stucco, concrete) available, clearly marked, and maintained? 9 Are vehicle and UYes UNo UYes P;Klo equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? BMP/activity IMPI nted? Maintenance Corrective Action Needed and Notes 7 Required? es QNo T('ral ®Yes Y 10 Are materials that are potential stormwater contaminants stored inside or under cover? I I Are non-stormwater Yes QNo ®Yes No discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) ®Yes UNo Describe any incidents of non-compliance not described above: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervisionm orc'i d a nee with a system designed to assure that qualified personnel properly gathered and evaluated the informatioC'Eitted. Based on my inquiry of the person or persons who manage the system, or those persons I directly reSP on H1b1 for gathering the information, the information submitted is, to the best of my knowledge and o belief, true ac and complete. I am aware th t t ce are sigpificant penalties for submitting false information, including the ossi ili�ty of fine and imprisonmen r , owing violations." 111912MWIV�_ Em= 0 EPA SWPPP Inspection Report, Version 1. 1, September 17, 2007 9 General Information Project Name aMerrimack College North Campus Development" NPDES Tr2ck-ing No. l R12 77 Location 315 turnpike St. N. Andover Ma. Date of Inspection � (u3l tt�) StartlEnd Time Inspector's Name(s) - � I L S�aoifb. K lloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma. 01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer. Practicing over 15 years, specializing in construction site monitoring, and reporting. Pre- approved site monitor in the Tourn of Andover Describe present phase of construction Type of Inspection: 0 Regular U Pre -storm event ®Miring storm event U Po -storm event Weather Informa aci Has there been a storm event since the last inspection? ®Yes MIlo If yes, provide: Storm Start Date & Time: 1-1 Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at 9FU this inspection? U Clear 5Cloudy U Rain L] Sleet 0 Fog L3 Snowing Ll High Winds Q Other: Temperaturtq Have any discharges occurred since the last inspection? UYes No If yes, describe: Are there any discharges at the time of inspection? L]Yes U&o If yes, describe: B-MP BMP BM Corrective Action Needed and Notes lnstaffr. Maintenance Required?z I Erosion Control- Liles LINo UYes UNo Sediment Barriers 2 Tree Protection Wes ONo UYes 0 3 Stabilization of Oyes M1,40 Construction Access - Egress 5 Dust Control UYes MNo UYes MRo . Z 6 Erosion Control — LlYes Of4c, UYes ONo Blankets 7 Stockpiles U(Yes QNo ®Yes No 8 Diversion Channels I es UNo UYes Qlilo Swales 9 Sediment basins Ui ®No UYes UNT6' 10 Dewatering basins — QrYes LIM ®Yes No filter bags. 11 Temporary Slope ZlYes ®No UYes No Stabilization I / 12 Permanent slope UYes No dyes No stabilization AZYes 13 Interior Site Erosion ONo LlYesd2lio Controls 14 Temporary Check Dams P&es LIM UYes UNo 15 Street Sweeping UYes o E]Yes WNo III I iiiiiiiiiiijil�l I'li 11 ill !!,.I BMP BMP S e BMP Maintena e Corrective Action Needed and Notes 16 Solid Waste Containers Ulles No OYes LMqo 17 Equipment / Vehicle Wes ®No LlYes 0 Storage Area. nvPr%l1 gift- kvat-% BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and UYes UNo Oyes ONO disturbed areas not actively being worked properly stabilized? 2 Are natural resource LfYes UNo ®Yes No areas (e.g., streams, wetlands, trees, etc.) protected with barriers z or similar BMPs? 3 Are perimeter controls Q'Ves L]No UYes Mo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and. aYes ®No OYes No receiving waters free of any sediment deposits? 5 Are storm drain inlets MVes 0 o UYes LINo properly protected? '7 6 Is the construction exit UrYes ONo UYes No preventing sediment from being tracked into the street? 7 Is trash/litter from work es QNo UYes ONo areas collected and placed in covered dumpsters? 8 Are washout facilities &fYes LINo UYes ONO (e.g., paint stucco, concrete) available, clearly marked, and maintained? 9 Are vehicle and Oires UNo ®Yes "UNo equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? BMP/activity Implemented? Maintenance Corrective Action Needed, and Notes Required 13Yes LINO QYes PRO 10 Are materials that are potential storinwater contaminants stored inside or under cover? 11 Are non-storm),vater WYes LINO QYes Wf4o discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) ®Yes LINO Non-uom Describe any incidents of non-compliance not described above: "I certify under penalty law that this document and all attachments were prepared under my direction or supervision in accord c with asyste designed fbassure that qualified personnel properly gathered and evaluated tt ,Based on my inquiry arson or persons who manage the system, or those persons m the information sub aq � 0 the o the i formation submitted is, to the best of my knowledge and to directly responsible or athering the information t l belief, true, accurra comple aware thfre are significant penalties for submitting false information, r)m 'i 1i owing violations." including the pass ili of fine d impri , m fo E-11 111,11111111111111 qJ1111111 mj9�I�� General Information Project Name Merrimack College North Campus Development" NPDES Tracking No. M R14AZ77 z Location 315 turnpike St. N. Are over Ma. Date of Inspection Start/End Time Inspector's Name(s) %ot(d,,kefloway, Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St. Andover, ma. 01810 (978)479-5648 Inspector's Qualifications Licensed Professional Engineer. Practicing over 15 years, specializing in construction Z) 1> site monitoring, and reporting. Pre- approved site monitor in the Town of Andover Describe present phase of construction 04,6_�_ (41011-Al6s pe of Inspection: �tT egular 13 Pre -storm event U During storm event 13 Post -storm event Weather Informa Has there been a storm event since the last inspection? ®Yes No If yes, provide: Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at ti a of this inspection? L) Clear Cloudy 0 Rain Ll Sleet L3 Fog Q Snowing 13 High Winds U Other: Temperature: Have any discharges occurred since the last inspection? UYes UNo If yes, describe: ZZ Are there any discharges at the time of inspection? ®Yes EKo If yes, describe: I 11!111111!11111111111 11 110171 1 111 3�l2; BIMP BMP BMP Corrective Action Needed and Notes mst9l 4? Mahntehancee Z uir:? q 1 Erosion Control- Wes ONO 0 103Yes 0 Sediment Barriers 2 Tree Protection W(es UNTO Dyes NO 3 Stabitization, of es LINO UYes LdNo Construction Access - Egress 5 Dust Control UYes Qf4o UYes, J7-No 6 Erosion Control ElYes GINO UYes ENO Blankets 7 Stockpiles UrYes ONO ®Yes LTMo 8 Diversion Channels J UYes U(No E]Yes qNo Swales A I 9 Sediment basins ZYes LINO Z ®Yes NO 10 Dewatering basins - WYes UNo ®Yes U'N4o filter bags. I I Temporary Slope DYes UfqO Dyes LIAO Stabilization A0 12 Permanent slope UYes No UYes 0 stabilization 13 Interior Site Erosion es LINO UYes ' 04 Controls A 14 Temporary Check Dams OYes LINO _-®Yes NO 15 Street Sweeping WYes, LINO ®Yes No MOM= �, 111 111 11111111 11111 11111 113=1111�� BMP n BINIP Main n �Correefive Action Needed and Notes 16 Solid Waste Containers --Requi es No UYes 17 Equipment/ Vehicle 2-11es UNo C1YesUf\l Storage Area. W=. I&M- V=. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and UYes UNo L]Yes LINO disturbed. areas not actively being worked roperly stabilized? 2 Are natural resource ClYes UNo UYes No areas (e.g., streams, wetlands, trees, etc.) protected with barriers or similar BNPs? 3 Are perimeter controls -E3Yes UNo L3Yes 'tJ'Nlo and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and OYes UNo UYes Wo receiving waters free of any sediment deposits? / A 5 Are storm drain inlets EP(fes UNo QYes No properly protected? 6 Is the construction exit Ulles ®No UYes ONo preventing sediment from being tracked into the street? 7 Is trash/litter from work Wes No UYes o areas collected and placed in covered dumpsters? 8 Are washout facilities OVes ®No UYes No (e.g., paint, stucco, concrete) available, clearly marked, and maintained? 9 Are vehicle and ,.PYes ®No UYes No equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? es ®NoUYe 10 Are materials that are potential stormwater contaminants stored inside or under cover? I I Are non-stormwater QYes UNo UYes No discharges (e.g., wash water, dewatering) properly controlled? 12 (Other) UYes E]No non-4-om Describe any incidents of non-compliance not described above: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in acco '16—jee with a system designed to assure that qualified personnel properly gathered and evaluated the informations mitt . Based on my inquiry of he per n or persons who manage the system, or those persons 71 s o directly re on* le for athering the information, tl* information submitted is, to the best of my knowledge and false information, belief, t ac ate, an complete. I am aware that re ;re significant penalties for submitting f t irl" 0 1yo d including e ssib$it of fine an imprisonment f� kno ing violations." EPA SWPPP Inspection Report, Version 1. 1, September 17, 2007 Wollstromer, Bonnie From: scott kelloway <skellowaype@yahoo.com> Sent: Friday, February 06, 2015 12:55 PM To: Wolstromer, Bonnie Cc: Felipe Schwarz; Lynn Kramer; Ben Saturley; Russell Bennett; Marc Lehoullier Subject: Re: Merrimack College Re -development project December 2014 Monthly Report Attachments: January 2015 Monthly Report to North Andover Planning.pdf Dear Ms. Wolstromer, Attached is a copy of the January, 2015 Monthly Report for the Merrimack College Re -development project at 315 Turnpike St, in North Andover, Ma. It is my finding that all site work is currently in compliance with the project SWPPP, and consistent with best management practices. Please contact me with any questions. Scott D. Kelloway, P.E (978)479-5648 From: "Egge, Matthew" <megge@townofnorthandover.com> To: scott kelloway <skellowaype@yahoo.com> Cc: "Wolstromer, Bonnie"<bWolstromer@townofnorthandover.com> Sent: Thursday, January 8, 2015 8:44 AM Subject: RE: Merrimack College Re -development project December 2014 Monthly Report Thank you Scott. As an update, tomorrow is my last day with the Town. Please send future inspection reports to Bonnie Wolstromer, the Planning Department Assistant (bWolstromer@townofnorthandov--r.com . I am sorry our time together was so brief, but you've been a great pleasure to work with and I appreciate how responsive and on top of everything you are. Also, thank you for the mug/chocolate! I hope you had a good holiday and have a good 2015. Best, Matthew Egge Town Planner, Community Development Division Town of North Andover 1600 Osgood Street North Andover, MA 01845 1 Phone 978.688.9535 Fax 978.688.9542 Email meuae(aAownofnorthandover,com Web www.—f o_of orthAndovercom Scott D. Kellowity, P.E. 07d ERVITOMPBFval L)esfgns and Ifispezvons, 148 North St. -Andover, Ma. 01810 Phone- (978) 682-5054 Mo- Lige 440122 1,13112015 Nlorth Arndo-._�, Plaznming Department. .At,tn- Tuvm Planner 1600 Osgemowd St- Suite 21035 N. And -over, M& 01845 Dean Iwi PIP-nnLngg Dept_ Please refer to the attachled field inspection r-_ports of site monitoHng for the "Menirnack- ConegeTN'Orth C=qpus Develloprnent` project located at 315 T=dike St. in Andaver I N. Andiover�, Ufa_ Pla=ing Decision Dated.- October 7, 2014 This month's ccvynstruction acti-i,-ities on this site include the following: 0 Continued management of topsoil, missse. exth ex-cavatiom stockTilingr same. 0 Continued fol mdation cons—truc-don for.proposed residence building 44, and 92. Inst ie tallafion ofSewer Manholes, (*_A9, A8, A77)� Install associated 8" duct l Iron se-we:r ILne to 0 +50 4V- -to Sty 41-00 Snow rennovi site -oxide, j- Oil U wher N4P' S All e-rosion- controls are peesen-dy maintained Ln suitable con - - d d - BI including sedfirnenq turaps, i=,lide drainagesir-in -tures comezdy Lnstale d, and are in suitable con&don_ ALI, equipment is storez,"L fiaeled and niin a suitable location suffice n-fly outside wedland, resouzce areas. Trash and debHs are be -mg appropriately contained and disposed of Grading is presently consistent iwith, the approved site plan, There has been no er-c-roachL—ne-ut whhmh restricted areas. The - L this month have notreFuled in =y neggative impacts to -iA ettland resource areas_ Pg: 1/2 At this time all Nola on this site is being performed in compliance N-6th the Order of Conditions, the project to Water Pollution Protection Plan and consistent with best management practices. If you have any questions or concerns, please feel free to contact me at address and phone number listed above. rawfrfv�� Mark Lehoullier Feilipe- Schwartz Russell Bennett Stogy titer Construction Site Inspeefien Report NPDES T rat .- g Ntp 3VL ¢unwirm 315 st N, dcv � � fix¢_ of hispecdon Stare -ad Tune �. k scot: t�. Ea"su E V Ins`oT 's nlacInformation = 148Nonm °ISM_ Ancdyr_ IRISIO ( A, 5, 648 � � §tro z and .. site -mot r in, the Tuwn, aF Andes e-r r Desedbe present phase Of ructio` a { I y � Y 4 t"aTa - even, ZI During 3 e'"k"�' Y �S4'2-� .'ate ' 1. . VIVeather lu&rmadoz E $ as therre been a storm event since the last insp §.r, es -If - yes, 'r. $ 1d'':�'` _ t g -t D, ems' t Tf".E c- ta =a -do " iilznssx_. y Olhn)- lVeRth-er at tim, h. inspection? 4 e a2' 4, :Gu,"'E'" _ ± u, .' a :.w . Fog " Sr-amw;,-r�."�., High V TH — azges occurred since the last i ave any aLsmeb NO gg _ 3z ves.describe- Are there any Mscharges,. the time of inspection? If E f i 3 s EPA^- Version lJ,Sqptemberl7,2W7 B-MPs Cormtive Atnon Needed amd Notes lustaLled? Maintenance I a B=,ielm g A 2 Tree L." ti t-¢ �� � :'BYO Construction Acce—ss- n v � 5 DuiControl� �'�s � s `- � � � g 3 A N � s ! $g'-�� l 3' a a.a i,'. 3 bm—brol E, � � +� - 9' q, i u d Blanikets R5 i Lira.,'.' i. e's UNw 6 '.eat S w P i S ¢ s F Diversion s° ems y' j i G wales 9 Se&fnent bins U UNTO y e� uy N-o & ON alter b 93 _ x Y .' UN € k 12 emt ;slit e, Oyes, . ,6Y eg e j F : t t � q EPA SVYPPP lbspeclgon, Version 1.1, September p Corrective Acd . Needed 3,Md' N1,21atefiance Requiedl ,-, _ C a Dlylf2rMNO, _ i F i, OverallSite hims Y � +��n:�a ^ °.�Zz2 y.�..u.^x�m _ �„,��. Y �idt�,: :£o ' F ,y � �$ a L�3r C2 4 s` a c 9 pm Are. rl-SOI- ,f ,tea t I g. c p'd`E'°tk _z Art peak corms , ZN71- f s es --M- ,yy { yea-' preven#''.r.�g .Lary YY S { }} S area's cvqllected and, in zavemai —r— /' S"�'— 5 'tw'S`ees, � o. ,he . ?Le s s 4 EPA Sl,&Ppp ji7specgon Repgant, Version 1, 1, r ° , Implemented? M'Sintemuce ` Cow eefive Action Needed and Notes 10 - Art materials that a -- potential slormwater contam aits stored insidde or under cover? non-Storm-wee-T u\D U-yeS(Q-�N--2 disclhax�,,es (e.v Nv-ash ;ater� i v ing) I proWly controlled? 12 1 (Other) uYes UIN-0 E D,-Scrjar-ly incidents ofnon-co mpliance not descrYbed above. CERTIFICATION ISTATEMEINT 4-1 CeTtIfy Under PeRaIlLy of law fhag &�is docume-m and all arach—ments were prepwred mider my dLrecrmn or -d and eval�t ed supen-i the in-5ormation submi-ned. Based on rn,�; kiqdjy oftht -pe:Iscriar persons .rho mauw Syste , 01 dios— zno 5 ze f-h-, m - P - n directly responsible for gaW,�.nng the M-101-matiOn, the information submined is., to thie best of my knowledg� and belieff, true, accmate. and comP!- I wn amure that thrze ekree sib ifficant pe-na-11jes, for submirfing &Ise including t:,.e pA, Fviuq, of Eme and i= onment for kmc,,inng aiolztfilns-- EPA SWPPP J4 Version 1.1, September 17, 2007 Stormwater sSite o- ' Gem_a 5. ;� ,, l~ — F to � l{{i � O m m', f. spw s myp visit. 1 .oFm,.. �?` , E IW kV Impectoes$ W�"..�`.. Engumeer"_pru 3dici `-'v'z'ss� ff,y?-Mrs, .Jpaciz-Hizi cg im. a.e k*3'�'TT.;7'-"ctu ��. 'mao'='qy and a.�'aal`�. u'%a'xt'E>.she e'_Z� �mr 4 the Town of A?'�",.sc k lWarKe Imseat pbase of f Val -YANY-11,7- tie RV ".�.. Q "yam''. ,. `v*,'y,„ " two �.r" "u✓ "" k *u".d `at I[ E s Is T ZZ can amm onto! Els Env ban 2 arm evestsince the last f 1fe4 (If 3 a.' , y�iT'" Ue: cPL`�'} W €.NVe The; Shan n r nk j 'tea q rq= P`. —."La,�`t' "i prezpa�a'ex (11 e p ub? Weather Q�... ff"a�..:'L "�'`' R.....u. :1 ✓kse:ve Q Fq Q _m'�.r� $e^k.'.k" 4 Y�,w`�ra `#�s �•3.: E ff-;e any discharg--o-marred since thme last `� z. N s I t y thm .«gip. S : EPA WSW ' l$. , R,ram Vemion 1.1 g .; . . '. e ., w';Nwdel and Nub . s cSw t o - i t — ' ee€c _ St-6H ofk -v G r s v aust = F b , y � P 5 r� a�^ $ 'L s ter ap- & u, == c arc L Z :q're„.,:.:�?,'.v' £ c S.'�yh, f4e.. z' vwlv ":.`3'��" "ice e sosio -Conn r am:u' ��' � 'e 3 {{��``�� '�� empeu jr 15$ W ding, t Sms S ui � P ' � F EpASVrpppjnspQ�,-tjcr,?t1. ; r l7, Ca4fec'm on Neafed and Notes �r IONIC?` u `rr s r f , site =�.:..., 3 has Nhoyt 5 i ui r--g NC- 12 An:r2mral r-e-tNu Yvan 7'ed.&.a-Mm <a on) prarecledaltkh Won �.3 Am�".c.ti+.�s..t-'r.4^:..c �.'V x�".4 `a�L`�' tw r_e wuhmma beT_wo e s *� �rY a i•''•• diL -e point` and ''Ulf o of `x 22. �xL`irL 2 'z' ZIN l: 4 s e °`was L:SyiR� admen i S i paii.m StKcow CI unswo us 5 f 19 Ale YANK am! ZIND ON c F rw oPa.w was F m"e"." agy "'.. EPA � � � a Ian! 1 -. p, : l I pte ented! Fi Nfabytemmme"Action -------------------- Neand Notes P w c tmt are � f 11 t E{ i Hs"4.s--c'W 13^1v'^✓'s f"�� at "a Spaes 'e`-,-s.r - wat �.. —,waz Z ` � a f E vx I F Luci&mtso rkS6oin-co pulnot dies ribeed above: ve: ?,,,.•' 9 ,,. .. L✓ �-'. p. r-'w 'S:.x a aYT�j'>.., ?.a+ ew �. il"�✓ e �.7� ... / � ., ,a• y,,s` •-'3 �g °�'p*y0 m_.`z^�,, � � :ro+e..d` .z ,._.-. ` „�.,,"r __r, ,. E �.� �'.' Pn �� +�` �,✓'� 3` ���.. s, ,.?"��t bl.".. CERTIFICATIOLN l4 f-aed and e :4 accu' m, ard comxap ee. I = aw are, ssrfflfizant .m-5=nA-m, Sigmature: Date- ft Version I-�,2007 Stormwater Construction Site 1�on Report General laftrmat!Gn 'Project Name C. ? "L.%''v ''f,:r'-� usfrZ..rLz�3"„�z✓ ':v` r 4. Tracking 4Srt `3LYi1."A e �' $a a `cam.' S ¢s s 'S t R,4y" y.r t K 3 `�t�8r'':. Ma- St of Inspection SarvEnd Time q info 14 z. ��ndo 0 g 4:� z � -5 h'. pector's i ali flans L tells Profs sma1 gam . ~ac t o: i v cdon ske _mo fton g a� pv n&gig Vie- roed site onit-or Lin the ow-ks of Andover { h Describe present phase of construction Lzc,-1 F `� n E kType of Inspection: s uPre-storme eve er H24 there been a storm eTent sinLe the last inspection? QVONE, 1 yes, Provwe: J IN"eathir at this ®`on? Q Clew s.� . Tom-- Have ischh2occurred since the lam ? r Sys, describe- '= se-harges jAre there any dt at the tire 5peE If F be: 6 A l r - % D t � 'a. i T b� se. .Not es .yr I Erosion C n a L �w�l ..�L€t.4f s-if E k # Stabii=don of Blamkets r Y j'<t -u-- $S;"o I S F It —' ~ { 6 g 1-7 i = u C t+ 9 7 s € g t S r ,*' 2 t, ERA SVIPPP hispectibR P.Sport Ywsion 1. 1, , 20071 BNB Correethre Attimand Notes Installed? Maintenance 6 aid Waste COS r F it I Overall Site moues B.N-mactivitv € Implemented? tMaintenan Fk Corr 4chon Needed and Notes d munt-bed areas rot F � t ^— protected ;iffi barriers or similar Br 3 E r p"elcools Z I_ - Oho ad sediment barriers ar C 1 s ainta—wed d re 7i_$h^'ge iLs and Z LN o Ta 3a k z receivike watters fi7ee o tq... 5 '� at nn� lets `s i d e fi Propanly protected? .. d t � z ? Preventm fir z"3' wing eked "tee i �kL�o� /^ Coulazted and f y 1w S a3'�.ia'`9 ! (esg-, Paint.Stucco. concrete, va-ih—hle� pp i „g h Cleari` w'ed- ax^ ggg e r�` f, Am vim. _ v and equip-fueung ;.. x. 3: Es e e IR. f a a 3, s f r_4d',.a delete -off t —L— e EPA SWPPP lnspectfMn RePOM Version 1.. September 17, 2,0077 Imp. e T 'N.12intenance corrective Require�? Yev 10 Are auria s e Potential sV+--x z corm 19 inskk Or Lmzde-z covert E i` Y'v,'""""Ci. $terwater, 9 g dewmateriag"', Property controlled? f a � 12 a { a 9 CO T " .g=y: a d r e soh&- eilawthaz his o-cu-`� t 'd all &ema,h-menus -%i'ere reed mckruly dlrec on Or ed in .�^ccor "�€ce w h a system. tom€ t° '- i n€ g°4 � i , a inform. o'_-` s�' m, Salt Based €� y quirt':' -af the persono persons who �gae the sysakzm t more i,,. e Pees dirardy � _- e for gz ring e i f atia � � 1S est cf -y o l ge a .� b,ehef c-�I� ke. wnd. I a a.wavz� t'here. are significmt erities far subm-ribing f 3 f mark%L ems. of fine and impris-mme-M for know arl.2- Print name a �' EPA M VaF310B 1-1 to Stormwater Construction Side t Traclfmg "a Nu 1 5 � : t _ do° .r Ma - Date j to of Inspeztion % Staff ri x Inspector's Name(s)cam-: _ kel�9 t it KS) n. Insturfs Contact Information Non'm S_. Andoven a. 31811O (1378` " -5, Inspector's Qualifications f Licensed f s mel n ze_P—rac--ngQ�,xet- 15 yearZ gag � ' F Describe present phase 4 _ [. 's""r a ; �' .'f �-'=;.✓^'-- W" -Q i s i -st °,-Yu g a z ". even -Post--w vm 57' Weather Infanga4i4q, s there n 2 storm event since th e last tie ? ZiYes , I f rye provide: f Storm SuaA Date&Uzne- St0=1 _ =,,GR flh_st of P don the at C-0mis hiss _€ -O 3 € � "U Ran Z Size: Z Foy Z3 ffigh Wir Have aky -discharges occurred' skice the ast inspection? Ullfc—s If yes, describe: _ 4 X z Itre there h awes -A the time e ; If y3 describe. G, S t I R EPA SWPPPlnspeCtfOn Rqpolt, Vewl-lon.-1, Sqmt&wber Named and cm z No f rgress, .+.-.Gom SAC } tsii -J �$ f.., {;' w t i F � on controi z' E f- SN c f UNO 1fk Da�vfasemmz Ro U in ps E e> d 1'em Tom`;-.y I-ap : y-r-,- 1 b k4-�5.�`t..=� R.l,rs2e t � p �" � F c. I C 5 4 � is e Tem } ti'wv EPA SWFPP h7SqGcVOn-.VC-17-SiOna- 1, xM F ` `° Not F i i (MAR Sim T-13MSLIMZZI Red aui s yall ^t f ¢ A 3 smash v✓v.�was Maw � ,53d Ste' £ P4 b iR4 u7MrTk g 3: . nopezTea ... arPno rV., Cal ice= f uRac wq. u�ate'�,s in—st1flied CE B } 6 is the exit Is "+ems S«K'' bulutvar 7,5 wtwk IfY'iZINK &'s�.'n3} n Placeti'3 'xuvsi. k F ttl W4 x ? '. ZIY S oA of slK hwK CT amp q EpA Syyppp hwqNuwAwj .J SyMmAs 171 ` , Acham New and Notes 6, Oman WOM&M 12 E f P j e } CERTIMICATION STATE sumarykal in,urdmis;ar' , a ,,� y,.„ a g w��: "eeT„"tu*. nEs �.e r" a z"�� W s.�. g -v. � w 'r: 'a��. gs %.� ..� �.'t . : dl" . an-'-'anlaw.; eda r' .,.p_`:s:y of to eson a- p�"`r.""tms whm u.,the a Z cam' W 'awx agams4e far ges2wriz_..: to kl.3.. sk s In I>Mm:a3�",-.� vuhmk Y„..d iw vi to ben of uy Wwk2�,�a_,5^e Mx1d,' vc ,-ZT-;-.:g:--"',s Campton lam ,, anuesa ham an si�.�"'` ifi��'.� mint". KAI same EPA SMIMPT ilbspection luipcut M g . t symigUmv , � <R I. c° NOW �� �;w Wolstromer, Bonnie From: Egge, Matthew Sent: Thursday, January 08, 2015 8:45 AM To: Scott kelloway Cc: Wolstromer, Bonnie Subject: RE: Merrimack College Re -development project December 2014 Monthly Report Attachments: image001 jpg Planning Department Assistant (bWolstromer townofnorthandover.com). I am sorry our time together was so brief, but you've been a great pleasure to work with and I appreciate how responsive and on top of everything you are. Also, thank you for the mug/chocolate! I hope you had a good holiday and have a good 2015. M Matthew Egge Town Planner, Community Development Division Town of North Andover 1600 Osgood Street North Andover, MA 01845 Phone 978.688.9535 Fax 978.688.9542 Email merge@townofnorthandover.com Web www.TownofNorthAndover.com From: scott kelloway [mailto:skellowaype@yahoo.com] Sent: Wednesday, January 07, 2015 7:25 PM To: Egge, Matthew Cc: Felipe; Lynn Kramer; bsaturley@proconinc.com; rbennett@proconinc.com; mlehoullier@tridentgrp.com Subject: Merrimack College Re -development project December 2014 Monthly Report Dear Mr. Ee, Attached is a copy of the December, 2014 Monthly Report for the Merrimack College Re -development project at 315 Turnpike St, in North Andover, Ma. It is my finding that all site work is currently in compliance with the project SWPPP, and consistent with best management practices. 1 Please contact me with any questions. Scott D. Kelloway, P.E. (978)479-5648 Scott w P.E. s e al C-fl and Efiviropunewad e . 1-48 North . Ande er, �NNIa. 01818 Pho: 7 R 055 Use 4401-72 Dorf Y� g vDepartment. .Aftn- Tovvm Pl e_ -a--)Suite2035 N. Apzdove a- 01 Dear, T ;gig PlyingDept- Please mfer -,,- fie anadhed field hispectiom n--pes of -as: te monito-n-r—g- o: thz "IN-lem,-nack North9 vr- rcJezt located at, 315 Turrnpi-ke St in Andover /_r.. Ma — a, � g- Decision Dated- Oct-ober 7 01 This nss c� :�.: Lruc on act d es on this sip:- m luie dhe '�'ontinued, Prianagenntnt of Topsoil, ysv earte-x-cenvation, stockpiling e. Continued fo "?d o o c_.or, props _e � ence Ems-Md ln�stalllanicn OfSewerzes ,- A, 7m _ as:---d8",durtile Lron E,—,ver lint (St 1 50 - to Sta 4-: 0s-Cy - All gs ;an Cols we pry-,n,,�y av e-sul# l _ over P' includmg sedim : traps p 4 c-la ii ^a t `r`es t°�rn c's, stalled, _ are in, suitable r A G.�ti�- �'>tinr Z3 1++.�."`..ev a�'l.i 5ot.: ,M s s; �i ie ly n`szie %ffi`e and esu= - ,,a . m ash and debmis e bind aqm=s� mttel co,ntaftnedou"frE G-rading is nee u�+ 41 "aa�S ss. s'onti BEYve net s..:`�5; ..�. su,ci3.a"'+. .r"xa-,`£"e i pa-cl t+ Weds �i`d re -so ' ee area:,:- g-IC Pg: 2/2 At this time all work on this site is being performed in compliance with the Order of Conditions, the project Storm Water Pollution Protection Plan and consistent with best management practices. If you have any questions or concerns, please feel free to contact me at address and phone number listed above. CC. (Via e-anal, paper copy upon request): REMEM Mark Lehoullier Feilipe Schwartz Ben Saturly Russell Bennett Stagy - titer Construction General- G Pre C n,p vim. a ='M WDES $rns"Umg 4I,' I A1,.7 "¢¢ 5S.. ry Milne �. � GL's.���Er` �v,'�iv^�cv � 3.,.Yc.£x_..,..�'�+�. �b�w✓'�'�.,. �#s.. 4��<�. z..�1.:,°i".....,.� .� k.mn-.ram d«'h�T"* _ De—,-ea�-Fresemnlp�raase of .,¢".,a'S. v�'z�,'f -� � ,� Y .,�_ x�> � �Y "-� �'' �� i�`a.- Y 3 '�� " �-k..+" - � ' =Y. � rea", o �°:;• p ._+�-+. � ;�,,.,w `'~'"'"�*�$ ..1?t "'";a,,,,,r_ar'�z3 � 9'�-m '�.F"'�.a.✓bd"""�°r'" ... � h FI� I I v F PM-S 3.3 n "'y am. Wing eww,,.^L sus': u eN-anwK gMM'_."g��, Has Barrie bhem swerm^ e2@ea`sr:'. mv,- the 51—ast m-sp'ai`cd yf _ t. If %mbar at J.04115 ;.map-en-L- `m? �g a 2v-e m- dclogy"'ws wur 3"''.e Amy the 12* °'�`,�"a� 3 z £ uIf N ». $tie tons aw =121ges W the UM cc hm-n-c` -wo-E a? UY0 �w 3 EPA MI';' '=: � � RypCuta mswpiurtmw171: g = BAP CorrectiveAction Needed and IN�t � MaInteiiance a e € v g a Erosion, Control- Y s ZINo UYes � � emei Barriers j i ? Tree Protection s �'o Ib � ��sON Egress a 5 Dust Con -trot Yes N Oy } E 6 € Erosion Control � i� yg$ UY f_ � `s ggam�'@@ 3�tanets 6 Stockpiles Z 2 Y UNTO UYes E i Diversion yU o �l 0 i YY?Je+s. � 3 's 9 � Sediment basins ��s N D i es PO ff DeNra'aterring baasia' s _ i�ilter bags, Tenripmarayy Slap Yes UNo i t Yes(�o � Stabilization ¢i � P S 12 Pemm e Yew �t 3 xarer+n�t�slo stw BB jcgit z lay Interior Sne Erosion " Yeo 1y r Control,; Te Check- Dam s o 3 15 QStree Sweepipe � 3i es: QNo Oyes 'O. -0 e { 4 � 1 EPA Inspection Report, Version 1. 1, September 17, 2007 NIP RequL-ed? i 7V a UN6 17 7 ON-CIME Sitte 115alts I wtip"Ran-Ity Impba-m-em1wO f 47-correetun e, -ACdOM -Ne&ded 2rdd NrAeS I Are all slaP&S wtm�-y btLng won, fflimd? a em) prolec� -mth �mam iars simfl B�Tes Qy am-kn seld-untun balrim acoqimetn (k�ved b dischar�ze an zmo zu r--ceiving w—w-m- tb�z- opf- rm � =1— ZIYZ exh NT �3 u Y�s uz& p 7tvei&, sedmnen'- 4 e Street? 7 Is r thm" lwulk 't uyes(t3Nd a-eascalk-cmd M'd placadd in cave -zed 4 ZI Les ZIN-,4,a Z int mc coac'n- clllesnZi, r,=ka,-L amd veE�icie and U Y Eess?"UN a, a: --,as spUls, or mmv EPA -4ZVYPPP Ir t t� SaWfamber -17, 2007 3 I BW-, HN, T led? IV12intenamce I Corrective Actio 'otes a Needed and IN 'al ID I ATe materi. Is that a--,- contamb-mants Stored inside Cc Under Cov—;? 11 Are non- stcmnvii-ateT A ZINN o Z13-Ye-SA(ZINO Nvash water, &-war-ening) jprope��,%, contmiled' (Other) I UYes -UNNO Describe any imicidents; of nor i-complia-ace -tax descrilved -CERTIFICATION ISTAT EMENT "I ce:THN wad-,Z, p, tv -of la-w tbhet thmis dilocument and &111 a—machn-itnZ we-,z prepared under my, &-ecdon nor- n accordmice w ith assy stemni desigkwd te, assmax thatt qua I ifled an, pTvperly gatherred, and evalus-ated- the infbimmation sibm-it,:eaL Based on nrk�--, inquiffy ctlht per -son cT pe-Sons vv',10 mana-ge the syss-terri- or fliose perso'-M'S directly, responsible fiar pa &hcling the theintfor-m-arfien submined is, to the be-st of my- knowledge and :,�T-ajt- an COMP'e�te, I Z -RIX,27 -ahat there amm signi Ic perazities fri submi �wqgg &I'se infib ='-fion! including thit of and impziEanlntom& fbr Imakving i 3 lat-Mons Print'name ME= J, Detv EPA SVY-PPsi In-9. nct-on Rspo4 Version 1. 1, SepIt-mber I Z, 2DO7 Storm& titer Cbms&uctin- n Site hispection Report pfujett N- 'F G-SM-1- i Me=mar osoace Nial -N-PDES Traclumg N� 7 M A 2— turn, N- Amt- ma Date W- Inspec—deam 'T n. me - b-AKe-110-im PM Imsm"'eva"s crmtict luwfzrmalimm �i 14-SN-Naw ®ri 81 o J LL—ems-ed Ptuffesslonal En P-mactikilma cnwef 15 yzc�ans- in canms�--uzlaos S7-�& Tuo-rul"mm-,�M..and 7--, pn- app ved Size mmrmh in the 7 of Descrrihe pres-ew 7'�mse ar Z1, ou, wewu:aer since, the last iW..,eetmm? If yes, idff Sr-c=mn S Time-. mma, Dt=-"'Sm itcl-sl)- A- axi=—ae f Fraccip n,. Zj Clerzzr �a Raha Q Slz— Z- S-, c H X 7 Have any dipeb-af, :2-YeE sezu Since th C- hast imspecrtlim fees dWin- ez Ij W, 17, Z� th-CIT-C 2--V- 4d ffilb-MfMie fL AM EpA, -,zv4-ppp Jo7sp-ce. ion t-t, Saptsaimber 1Z 206-7 e CSTrective n e e and NotE F 3� m- Y Le' Ir S,e N t 2 T-wt 'SZ n^.rp fix, E E ��4 UNTyy j 5 b 'a" ,- CC u E -,4'h' S..°: cur��ii2m.w�i kxa ET, # .'�Y,.mvs^" Na.," w R e `h � r.•_., u k _ SeLi-h-m-m--, basin �T5 es 4 G p 5 d F 12 N, k 4 15 E. Nua EPA t7 e; -� V,i w .r 17, 2W4 7 B-34P N-Neade-d amd jmr2,j!,eo L Equipment aNG W311RILl-I Zfim M-1 Carrw&e Acdm Needed zad!�� ReamireC and k act f� aft, fe-�Ll IS- -u-'as- my h mt - �L, �4 Aze ;,�,,Ils and YTU"�!:ves Z-No levmvi ams ftee oF y 5 Are S�o ak, krakk!S U'V-� 'ZING 714' t= being Z=- inm I's z-ash- _impr:57zmw'on c �Zv-- C Na vallectz!d wd x. a, -va lwi ;e- an mua,- e -=ew ar, do' matm-76,--, t=-P." sw-pr-P, im�mcrlan Repc,.-Z 17, 2,W-7 eh oyis ac zlyes,E o r 1 :-_ , L yaw &� �.^ under w to-x, K E � pYp G, ;i'r "SCyfwK',".0.<." f '✓e`s.- f a. :.�3 ":�,} 3, "i-5,„�. '!:r �+^�n� F Y'?"y'# c �. _ P- <, _ _ and esal s. `'-,.a.z._`,x wa..�`- ,. and '2sa.�>_art S^T,..,.'<;.E�,"r,.>-:. ;' j ,,F F?z' o<,.>.me "a y-ri , fun ,—, ...--g-',.—�;..sic-s:- 4 ` . 1. ec-' 0 Swrinpulter (Amashuction site,es -. .Ctj& I- 1. 5'.,.SP'a.R C Y ....u_.. !--=an s .r^:_. « z.'v�.-i3.. y PH-=g'r�-.nrv' ..L...,_.'C:: .u_x_.....n Ar be 7i m of And_ "'su._ I aw .«.._. of .,..-s...,v- *' ,.. w. I � ;':'� 5�'^'- � f'"'".� rt'�.�°R- ✓ fir' � , _"w �✓"^^-",+',:�. ",a:..✓ i f, ti of .s mayhmswun weal Sao;. --..the Usur� .Y .+ a S,''r OWN TO: D..xxk,.^=': r.71n" .. Soon lyzw6amr._.., A. 'M`�-'- '3 N O My dichargus wzuwred Mee Re lase MgMIA ' ,T Win h 7 ye5,, 'dam _ 4�✓ :'.'Y3e ire an; . KIPS 21 IleMg of XYMNINO I "{lf � If y Sesse .. a^a R ,*: sx9 . 1 S'�i. � §��'W: `�£• -.� 1��� 1.. � `vim v-.w"t iC 7, V�:€� �y r Ram- Em�_'Simn �f 1 e e i i! f ti � 6 F 4 E ? z F p i max-^M uyes ayes SSW 4t4 �.�._. b.. ck D_...w. k f t' ..�+�m �7, �'�''. � �. ma�dc��"�''wz1`e ter""". �� � '�� +r M. �# %ar�.�'"�. `� .} EBOMip B3101p VIMP Ummthe Anton OWN sad TKISMS. Dummm? r. 16 SAW TASM GrWays 71 100-- �zy� J is U&I 17 En Yoko yz�s ZlNo Chumm SIM Wasm—% N4 AWMI MGM lammuld Stef. ME kalo—z- IRIEW was IM 7P .7100p, wet. ilb z a 17 12 Ann manKMI nnumut QSYS"! -WINK", zly-i ax" Fes.": (e—g InOML wnlwk InNow eon) Imnstal w1h ba7hn ruz su— How B'-'Ips'7 3 Art TaTIMs VMwAs Qy—,s -um'n' CaYNSIS Yoe ar-d- -Jfas' U-NO, t5 zAto —z' S-swul dram., inzl 7ml- p7m -"S to; Curvankm exi NO EX 17 UP mas CXAVIR Zvi pond k mand Am OUTMA tham"Ra mm—HM z d m t f An: ie' an-i mmmmmme Imas fat! cc z7; EPA SMqTT kagwWOn 119MV? hNsdan I�t SwImAmOmm 17,12MOMON77 n hm �car ., �:i m &: max'. inside or un ZoNt- i �l I, G k= UN j in e..;x` C.GKd2MZe s _ a a_ i n S x.,. ,.� =;`�s.:.... ,.:»ws �,::_ s. €:....°. a -44 r hackxiing Ike a.�:.r: a....«. 4 fjoeag ®44_ .. .� Bak st 1-Fulpezu;'aa, TkMe Imposes Numsol �,'9778)47 pa—ciffi. K-L!,3al, Elljouni 14MV01; zoo 15 ysynv jPwIdAhg is MAMOMS sat sovark, ani Fit- ZY'ruved Ste =0 1ht Tewn lZAMMOT Dkesswe-BLUe jwemmt Phan R AU i OAACK1101 Y jq QIf! x V nova A 0 Wig Q f fus MV boa 2 3==, thelmst impec"d-enn? Hits, PTOTO ADsmsk Qn- fiAmwswMAW Coo), oTOwnyOks (11 tcS 2—:eh �'s W T-t- any sWalls sm ftekhasr M des-'r-R-m-, Mls�wcdjas Me tome 2MY Zschargel at the &M. VaA impale COS TRY EPA Qpwt Swedwr 14 S19MMUM 171 VWXY7 3`"`�.-max ", ..*}<'s. Actiam'3eod 'x E,L`'%Sce_..."".vim.. M-31,." Y = y r F: UNC "w I. gf zcf —xY wv _ t_ E� ZyNna �I c: So,a:s..,,'2�.�._..0 ,,..ham+. �e.s I '�; ,,r.?:- :- i k I C rR i�i .kta _&." ttl Iel LZ Ems_.. i u I,. EPA SPAWFPF le-VaEtC`'r ', > • v > s >Ko $^ a ME She l g� . r v—"`.�.t� t o i.m>bfar ZRNIPS t is zo M t { :-& -w x 'i z 2 '_ . a e—'s.2.. c r a - EPA . q,=4 Verse 11, September 17, AuxRovay "Ns C1 1 -k STD NAB Tralveda,-.... �.�..�e ,. -ma's'" =` mad erx...... �.;.�.... e-:.. & ban of . " IMOR Wig; ^- �'. a a aimne EEFPA- MCI .s cc"W x*sy !, 11MIOUTY 1. t S�AWM- . VI 12MWNX,-,' Scott A Kellowa P.E. ProfFssional Civil and EnviroRmenraf DeSlgM alld INSP2WORS 148 North St. Amdaver, as 01810 Phone- (978) 682-5054 ,Va. Lisc #401-72 main= North -Andover Planning Department -Attn: Tovm Planner 1600 Osgood It- Suite 2035 N. -Andover, -%,4a. 0 1845 Dear, Town Planning Dept - Please refer to the attached field inspection reports of site monitoring, for the "'Merrimack College North C-=pus Development'`project located at -115 Turnpike St. in Andover / N. Ando-ver, Ma. Planning Decision Dated: October 7. 2014 This months construction acti vities on this site include the follo-"ing: a Continued construction. of proposed residence building * 1, and 9, 2. a Installation of sewer line. * now re-moval and minor site work. All erosion controls are presently maintained in suitable condition. All other BlklFs including sediment traps inside drainage stnictures correctly installed, and are in suitable condition. All equipment is being store:d- fueled and maintained in a suitable location sufficiently outside wetland resource areas. Trash and debris are being appropriately contained and disposed of Grading is presently consistent %;,ith &,-, approved site plan. There has been no encroachment Nvithin restricted areas. The Contractor has proirided me information and plans specif�dng the means and methods that will be used to do the drainage line by ?ass, and the tie in @ D-8. Details of this plan are attached to this report on plan sheets dated January 28, 2015. 1 have revievved this plan and find it an acceptable means of accomplishing this or There have been no significant rain eients this month. kt this time ail work, on this site is being performed in compliance with, the Order o 'L Conditions, the project to Water Pollution, Protection Plan and consistent Yvith Est managernent practices. Pg: 1.12 Pg: 2/2 At this time all work on this site is being performed in compliance with the Order of Conditions, the project Storm Water Pollution Protection Plan and consistent with best management practices. If you have any questions or concerns, please feel free to contact me at address and phone number listed above. . tr- CC. (Via e-mal, paper copy upon request): zm� Mark Lehoullier Feilipe Schwartz Russell Bennett Star water Canstruction Site Ins General Information Project a e College wti Carnpiuz D , nr s s F*12A � €Location Date of Inspection tart Time 1,41, 17 R s { Inspector's it1e(s) Eli-' Inspector5s Contact I `or -manor% r 148 vh St. , ma- 01810(978')479-56-48 Slaspcetoes QuaEfica-fions ° 't 1, Licensed Pnaff sips all E agia r, Practicing OveT 15 Vie in construction sit- morn on % ,. ad reporting, `e- zapproved s l 'i ce ilor in the Town of indov y a � 4 Describer t phase, of co --trust o I a v Y 7 h E i T, of Inspection: ? WaT Pre -storm e -ent s. �w' sst event weather Ifs q Y Has there been a storm event since the last inspection? Nz If yes, pro-virle. St= t. an*,. i.iate &Time- sto k33 Dur a5.3o.-n (h s): t`i .o-1tb Mt of P a'ecipi on (inn): f'g Weather t time of t� inspection? , y g '-Q'Cle �...,$o�zd-5' Rain :3ti-'aet d'ie Have any i li If yes, - ri.1 : n E s re there any `-charges at the time of inspection? a ,r 4 [4 j t 8� �4 EPA SWPPP IrrspecVon'Version 11, Sept1 BMA BMP BMP Corrective Action Needed and Notes Installed? Maintenance Reqmire d7-, I Erosion Control- UYes QNd Sediment Barriers 2 Tree Protection U L3'Nlo L-3yes IN91 3 Stabilization of 0 UNo L]Yel(�-- Construction Access - Egress 5 Dust Control QYe�-J� QYes (®)T Erosion Control EIYCSQ?1 Ellres Blankets 7 Stockpiles es No Yes ®N Diversion Channels 1 l� es UNo ®Yes Swales 9 Sediment basins 9ys&- UNo 11-11, E]Ye<p — DeNvatering basins - 0 — ---- Uil�o ®Yes N � Ater bags. 11 Temporary Slope Llye EE31 by a071, uy�eo Stabilization 12 Perinanent slope -ff eso es (L]N- stabilization —13-- interior SiteErosion�] �3� L 3 —No QYeA U controls —4 T arwy Check Dams El Yes LUI Yes ULk3N LJF -T-5- -Street —Sweeping Dyes Elye VMatmten2nce es NIP Cori ' ' n Notes Requiud?-) P 16 solid ' cuntai-ners Dyles 1 ........... 17 Equip ie t i lii .le `O Stor e zea- Overall SiteL-Sues f`a its tale site' TvWntenance 11 Corrective Aeflon -Needed and Notes I Are all sl p annd O '`ides a. disid meisiat .vely being %V4-Ire4d ; 3 1 properly; stabilized? 2 1 Are natural resulff. Ce uye4 t s iea,streams, y g l '•etlands, ti' & e�`.°c D protectedwithubamers 3 or similar BMIPS`YyS i e i 153a'44Lr controls lb; '+.s � '+� $ e and Sedfl"�"aiei"4i - _ � adequately installed r s Ckeyed iiito substrate) and i ainlamed` 4 1 Are discha--ge Points and s- o 0yes receiving aters fte of � h � S any sedii eat esitsP ' a f s i re sty a n :i le 1 l e TIIQYC� PS jT, eventing sediment Ifro m laming mocked into r the rE---t �y s � w� I:Y 13 d3.3�iiirm:ai3F1 VViii q �{ areas collected and placed in covered 8 1 rt w- a -sh oii. faci1 111-- 3.- U, } (e.g-, paint, stucc , concreteI available, } clearly �� and eeliiie 5 yid izes i, equipment 3 $$ lgeanina and i maintenance weas fee � { f spills, leal3.� Or any othz�r material? � EPA SWPPP hispecdon Report Velsion1. , September 17, 2007 WNIPlactivity F ImplementedT lWaintenance rrective Action Needed and Notes 0 es UNo QYes 10 Are inawrials that are potential storrnwater contaminants stored inside or under cover? 1-1 Are non-stormwater Z3No !U UYe( —'�7o discharges (e.g., wash water, dewatering) property controlled? 12 (0ther) �1 Usees UNo Describe aany ipcidents of non-compliance not described above: CERTIFICATION STATEMENT 'I certify under penaltyy of law, that this document and all attachments were prepared tinder my direction or spa, accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information sokmitted. Based on my inqtliry of the person or persons who n9mage the systen4 or those Persons directly respons' le for gathering the infra nation, the information submitted is, to the best of my knowledge and belie true, and complete. ac. 'Le. , ware that there are significant penalties for submitting false information including the us, ibility u env andZ - �' alq� myrisopment for knowing, violations. - Date: � EPA SWPPP Inspec9on Report, Version 1. 1, September 17, 2007 maintenance corre-ahe 4etmn Needed and Naes R zlyes 10 11 Are mater;.Yls dia"t we P&-vlfial storinwamer conta-minants K-ored inside or uncle-. cover? non'-stormevater C] ONo UY, i propetv corlvolled-7� 12 (Oth-er) ZIY--s QNo Desci-ibe any incideT-8 01- Wn-con-pli-an-ce not dessenbed above- Stogy water Construction Site Imspeefion RePort General information Project 'Name Co NoTfn Campus Development NPREES Traddng No. 1, 31pturknpl�ke S�N- And M,4-M-i OwST Ma- "aite of Inspection stud Time --3y. kD. kellow Inspectoes Titfie(s) Impecto rs aoto.rt llyformetion 7�)479 56448 1", 148 Nut 5-k- AradoveT- ma. 0, 1 10 (97 I Inspector's QualiflMlions L Llcells�-ll P-1011pessional Engin� R-WIll-Ing OlVeT 15 yzaisl Conslmcfian site Mcmnitafin& Prz- approvedshe .i?oo hor in fhe To-,xn ofAndover Describe present ase- of COUStrUttiOn --T 4 FT of Inspection: Pre-st-orm evannt aamna st-orm evtyrt Dust-stmM event - In Has there been a swm event since the last inspectimn, Y Z) e: URO If yes, Provide- Sturin Sta-t Diatt & —1 i7ane- St-o-ran Damu-nor-, Appm-, to! ftatk--1 (in): Z, �l later'at time of this inspection? —71 W-1— 0 clear :lch�urly Q R03n Q sl—=t Q Foy- snow:Mg Q Have no disr-harges mcurred since the I23tmMR,-ZfiOM? If yes, descrlbe,- If yes, describe, EPA SWPPP inspection RePOrt. Version 1. 1, September 17, 2DO7 ' B - -- Action Needed and Notesi Maintenance I Sediment l3prries f I4 u 12 Tree Protection G� U-No Zl E. S � k a-nstruction Access- Egress gk E i 6 Erosion Control Y Ye � n � Blankets z g s ; S=14—Hes 3 D i EINNO' i 0 es i. � x � � 9 n i E Di -version Channels,' as ONo g yes i S-wales 3 4 s -,dent_ basipsC I Ye, 8 $.gyp 9 }.� y,, 2.`-L¢'FL�i'it$8.i+sII L°44 "" [''$ �� � "m$ ate.£ ?�$i'V `i Fy $.ei_ £ Hai 1 i,l�^q fiitea eb I 9 a Ternpomr Slopee e b 3 i Pe, i4erirJI'ie'aCis L stabilization a � 3 13 Interior Site Emsi n ; ! v�S ®Z'No Dye Ll �O Controls S r S b CheckDams �` 'rx'� 1�4.0 15 Street s';q ee—P122 3 k EPA SVIPPP Inspection Report, Version 1. 1, September 17, Overall Site ls5ues BINfWare-fivityrt Ile" Corree&e Action Needed and -Nutes g f Are all slopes and S 3 'disturl'a T' 's 4 F' i P s �, beLn gg worked �. propet, stabilized? i4a 1 '2 z 3` 3 re, ria al ia`.^J�L�3� � . � 'a N, a � q 'S, �; s L s"y dj "� Skaft� q and, r-SaInmiptd? 8 $ b 3 �d imt si3 $Zs poi i �2 S a° �S S S any saardirne-n!, L'o oshs 1 F d pjopea lad:' gaa Y�L'4�. ,'emu "(V-1—Y11151' y is the Con °.� Attu SY.�'."n exi. s, t'�� ' .IDj'Y'O preventingLg p i rto 2ff-5i: C3'2 --Cttd and 3 aced in omweTzL :[ d4 kih 7 Siv'4"?'1:` t L-cLuft #„ p.�S �3 < j g av' { n fe-g-, paint, stucco,arM x r y ainl n ce ame fie y spill Is, Italks, or any f 9 , al? .� � � �I B-N-1plat-dVity Implemenud? Corrective Actio-a Needed and Notes j Requirpv&N D DNO I oyes 10 1 Are m-a-terials That t potential connaminann stored v'eT! imside or under co 11 -Are non-s-toMI'VeRtEr ltD-Ve- -:11tio `1 QY di-schw, ges (e.- -waslh j, watfr, dv'Natering) pruper cora,.,Ued? ,1 12 (Ctffieer) UYes No Dinscribe any inciti-ents of nocompliancePot de-scrilbedd above: CERTIFICATION STATEMENT "l oem"-r-v M-1der mnah,'; of !a-vw da,+- tMis, doctunent and all anac�ments Awere pTepared under my direction or supern,ision in rehm-ce --mith a system, desigr,--d to assuye that gi-aliflod penia-=--1 properly, g9hertd and evalm-ted h, -do -vinuld of the person orpersons who manage the sy�stem� ort osepersom thtinfon-nanor, U.-Mi-M-d-Base -nn direct M info on submitted is, to best of my owhe,dge and befit K t:-a,-- achir'-41reand xmplete.] t there are signifivant penafties for suhm- hmg fillse information, d eq 1�ssplbiH;y of fine --nd inni -for k -20J &ng -L w rig vi 4a inclu eh Vis menj, . i M= Date: EPA SWPPP Irispection Repor4 Version 1. 1, September 17, 2007 Star ester Construedup Site ln7bp,-zfiDn Report.. / 11 Prnl-ed Name Cojlqge 3Nonth Gp- mppus Developmelt ',N'PDES DaMe of laspectioR Inspeezol's -Nnme(s) Inspector's Title(s) Inspector's Contact Information Lomfilon 315 try SI N . Andover NIP— S VEnd dime 71, ta w P,rofes,sional Engft---ff 148 Na--*, St- Andovzr. ran- 01810 (978)479-5648 Ins Pee-orls Qualifimfions Li :nn- pcdcing ,v 15 years- Z mucon t,= pTv I ,,,ty-q: , Pr _tj ,wring� wid ivpe-j-gL-jg --- apq 7z-d site � Tngyr,' --,,T in, I own- of Ando-w—Ca 5�;z—ribe present pbase of C-onstruction T* Z3 Da -run ;j Re�1"a -z even't ZI posl-sto-, M- even� evenf ,*Yeather information Has there beer, a storm eve -at since the last irlspection? QYes UND yes, Provide - Stan. Date &, Tim-c: -a-tion this)- Ap,.,,%Lmatte Amount of PTecipit-2-60 W�her at time of this inspection? QChauRair, ZJ Sl—,-t Z1 FD'2 0 H"OY ' ds U Other- sp -charges occurTed since the last i"S -ZHDD? if ves, describe: Are there anydisch2rges at the tim-e Of insPect!DD? Qy-- Ifdesen-be- EPA SWppp Inspection RepoA Version 1. 1, Septambsr 17, 2007 BMP Corrective Acdon Needed and Notes a F H � 9 x 7 ?f k StImne t z3a L3 i 3 � i t € K2 _ § 2 'j' $yam., t 3r .�1'l'�riect:on Tp� ', { b3�-m N!-, y i "a V M � o + Y'—szl-,\;'t."$. ' � fires x ; s p i 5 Dust convml i Weso j off' .- € d 3 � 3 31 6 Erosion Control Oyes W 0 Oyes UATO Blankets t } 3 g so 44P _e M � i $j4fig p 23 } $"� �^ 11°"i 'L3'L.i`*'L+.sL.`a. 1uyeo s3i'.3 j 3 gg! at? a @ 3, b $ Y+x'., i39r"5 - iil"af Y C es, YN^.3 Q 8 eS Z" No i 3 3 � i a } a'teE5 sl �4 Y 8 i.z0 ° 3.--__C amp f i 14 T a'.3` 'al Check m ( y'vs ZINC# Oyes x 4 S k 3 4 I3 EPA SWPPP Inspaction Report, Vemian 1-1, September 17, CorreeMe ACOOR Needed tand -Notes BMIP BMP WMP lust daten 16 Solid Nhla�ste r1m,31 0 PITT -Equipment, 'VehicIz I ',�Yes UNO 1, Oyes WNTO 1 Storage Axes, Overall Site Issues "WaIntenance 1� Corrective Action Needed and Notes Require ed? Oyes No ZlYes No dis=bed areas not I actively being worked propeft stabilized? LIO y— es u N--o I Oy ,Axe nawral reso es U N-10 L areas (e.g-, streams, i wetlands, des, etc.) han-c-Ts protected tected 1rh1b or similar BMPs? I 3 -��re —perimeter controls Ues DINO Y1, 'yes and sedianent barriers adequately installed (�keyed into subs` Ir,?Aej) and inaintained? 4 1 -Axe dischaige pohaLs an Yes UNo QYes -0 mceivin- waters free Of any sediment depossits? Are strain drain Inlets lzyes -u Ni-, o UYes M-No I properly protected? 6 is th-. E3y-_-s LJYes Preventing Sediment from being tracked into the street? DY Y, 7 Is tra5blittLer froDm woTI, zueas Collected and placed in covered dunipsters? hout milines Oyes 0 Il (e-g., paint Stucco, Concrete) a7vmilable' cleelymarke,-I and Inain-tained" i ul?�es ONNO eyes UNO 9 Are vehizle and equ"PrDent, faelia. clewiiig. and Inaintepance to free of spills, leaks, o7 vibeT &letmous Mubunal? EPA SVjjpPP Inspection Report, V--rsfOn 1.1, September 17, 2007 3 e �.: was �.'l f. a�"a e.. Note i, ".=,r�:s' ee f..a -"tick. .. "' ;. ' € , W and �. I_ rz`': e, k E c qjKb � -Are il"a: !e S i 3 i k I. I E ; 1 Y 3 z 2 y4 f $ t I CERTIFICATION ST---iTEMENT "I ' vM&T Immaig of law 611 BY dacumorl and 11 amulyous Vasa popmed unto py Inyvan cf Syms the- }a`So�°3,�`+.atiols 7 4 dBandin inglii aV t 'fie:- u7pe-T-sa w, r v, immix 3...:M "#"'"r 3, or M`m i .�-15 of -a ar § w __z '£§ MA 3£ and EPA SMATP Ins to-n t version ., r a 1 IS Stormwater Constructiom Site, Gll-:nzrzl Infer `an Pro Miammack", colleg jeect'Name -,a C-aTjpxus Devekapm-erff 7 3,15 tum, I N- And-ovar Ma- NFDES Tr2rkmg NO. '1-, 9 Spe - Z11`1 peejwls Inspector's cofftact Informadc--a 11, (978'4479-51548 jnspect,ar�s Quishfilualions 1 Lice!, - c,,,e-- 15 y�" speziaftg MD- -, of And0vtT pre- approved, Ske miaaimr in, th,-- Tv�- m r_-rlb.e preSen't P, B-,e DT ,--I- j t ME Al vyj� T Dw--m-ga StoT M i ev=l Weather informs Ihs there beem a storrll e-vzut Sirl-ce the 1251 jDsPet-tj"� U if ye -% provide: Dste & Time: staff Dwaaion, A,PPz,l'-l=t - -Alrx7lunt Of kin): X . - c,fi Weather Rt is Mspec 1 un., --I S� Q Clew o,,6rgg U Hi--ji Wind-- zlye,- ��Nr, If ves, desuribe� Are tbre au-v dLwb-Rr9z5 Bt tM t1me -Of :']Yes If ve_,-, descnbt: EPA,Slyppp In-spection Re -part Version 1j, September 17, 2007 1 BmP BNT WMP CorreefiveAeflonand Notes Maint ; Requ I Erosion Control- Yes o jZlYeS ZINO � 1 Sediment Barters 2 Tree Protection wfes zriqo Yes' , =o 9 1 3 Stabilization of Pves o Oyes - Ro Construction Access- ; i Egress ; 5 & Dust Control UYes ZfNo Oyes Mqo b Erosion Control UYes % Uyes CKO Blankets 7 Stockpiles Oyes U1,10 Dyes MINO Diversion Channels ZYes LINo � Yes PIIqo S=gales g i Sedhnent basin Yes UNTO ~ Yes ulko 1 e: ater< a basins — Yes QNo Yes % filter bags. y 11 TemporarySloe es ONO C1Yes ` NN0 � Stabiliza<ior { ; 12 Per ane- slope - 'yes Olio Z31yes EIIN70 f stabilization P Y 4 13 Interior site Erosion Yes -o Yes �o , Controls 3 # s 14 Temporary Check Da -es UNIO QYes o IL to ; street Sweeping 'es t'o 1 Dyes 1 o a ; i EPA SWPPP Inspectfon Report, Version 1.1, September 17, I; BAD Corrective Ate' ,, Tarf She ices Ea*3rwity £. ; W nance -AchGa Needed and Note 2 1 f S' 1A-mez-1-1an 1 dJstuirbed a..d.-aa TIVI ± ! 3 cc 9r y � ''ti..3. «YJ'w" vuii hal 31 r 4 t A ze o`mm "vf_�—.23A a:+.zi. ,i..rk' t 47—ZPY ' � s f z fi Seffi-mona # ro Fag im, f vv z fly i a �'" mnlst i d `4.s z` 'm td. SUM$ J .fix -5 <1 @@ y UP { i S 41 cleaa� an i _ II f 3. fiaw» r L"hG a:f. zri' EPA S VVPPP Inspection RP - port, ¢, Sepi-ember 17, Implemented? Maintenance Correctitizon Needed and Notes Required? 1 UYes QNo UYes UNo 10 Are materials that are Potent starmwater contaminants stored inside or under cover? I I Are non-stormvvater zyes 0 IN 0 'U'es MN10 discharges (e.g., wash water, deNvatering) properly controlled? 12 (Other) UYes No Describe any incidents of non-compliance not described albove: CERTIFICATION STATEMENT "I certi-Ify under penalty of la-vv that this document and all attachments were prepared tmder my direction Or supervision in accordance with a system designed to assure that qualified personne! properly Bathe and eval=ed the information subm imd. used: on ury inquiry of the person or persons who manage the system, or thosee persons directly responsible 7( ,)Tr gataering the information, the information submitted is, to the best of my knowled-ge and 'ingg false informahon, belief ti e,,and complete. I am aware that there are significant penalties for submit t , :q— nt �r 1�? - including dje PU�SiWty of fine and imprisonme f ,owing violations. Date. EPA SWPPP InspacHon Report, Version 1-1, September 17, 2007 i � 3 � 1 v fi x P ✓ d >',.... � 3 3 well nv Y'� r T7 r � t T T? i un i 3 y zz y •.� _ a I � I n r, S 1 t A c fin. _ ( tl