HomeMy WebLinkAbout1999-08-04 Engineer Review SPR LANTON1
AT+JO 5G'cNT4575
June; 22, i 9
Planning Roard
C/o Heidi Gnffin °°
Town Hall Annex RECEIVED
7 Charles Stet
North Andover, MA 01845 JON 2 3 1999
Y : En 'r=rin Review F�S AF-PARTM
1� 8 P�.A�9�1C�C�DE=PAH�MT-N7
Mer imi ck Co lege
Site Plan
Dear Mr. Scott:
In response to Yortr request, Coler & CalftntoWo, Inc. has reviewed the 6upplernental
submittal package for the above re femnred site. Our efforts inr-luded a comparison of
info€Mation subraitted with respect to the mquil ments of the forth Andover Zoning
Bylaws. Ile submittal package included the following inforrnataon,
Plans Entitled
* "Site Plan of Merrimack Colle~gee*Cilde Hall", located to Forth Andover,
Kass." consisting of ten sheets slated May 28, 1999, Fmpttred by Sasaki
Assoc. Inc. R eivewd tune; 8, 1999,
• "Site Flan Application and report" dated June 4, 1999, Prepared by Sasaki
Assoc. Inc. Received June 8, 1999.
Our commenLS Ups fv 11Pwa:
The site is within the Merdniack College Campus and located entirely witbin the
cmpomte bauudarits of North Andom. The campus hay been observed and reviewed
several times previous fox various other expansion& and additions.This project involves
the renovation and expansion of the Student Union-tiildea Hail, It is our understanding
that a comprehensive drainage;study is presently being performed to treat and detain the
vormwater runoff from the eofire campus. However, the status of this study has not been
disclosed to this office. Also, the submitted uti€it plan is not complete.
101 Accord Paik Drive 701-98 -8400
Nowell, MA 02061-16t Pax: 79,1.902.6490
i
I
i
Zonfoe Bylaw,
1. Section 83) .) e,)i.)A locus map was not submitted, however we were We to
locate the site.
2 S iion 8.3) 5.)e,) H.) The existing conditions plant was Trot stamped by a
professional land surveyor.
3, Section 8.3) 5.) a-)iv.) Utility casements, if any,were not indic�awd on the plans.
4. Sectkin 8.3) 5.) e,)v.) ' hir,topography was not clearly labeled. �
5. Section 8-3) 5.)e.) vi.) A zoning legend should be inOuded.
6, Section 8.3) 5- a-) vii.)A storm water analysis has not!Seen submitted. It is our
understanding that a cornpmhensive plan for sfort water is being prepared and 6 as
cvordiriat,ed witty the Town of Andoyet. The status of these improvements is not clear
at this time.
7, Section 8.3)5.)e, xi.) Reportedly, the project does not fall within the 1 ' buffer of
a Bordering Vegetated Wetland-
8. Section 8.3) .)e.)xvi)The method of screening for the proposed trash ertclosum
should be indicidW on the plans.
- Section 8.3) 5,)e.) xnrii,) See consent#b,
We appreciate the opportunity to assist the Planning Bowed on this project and hope that
this info=atiun is sufficient for your needs. If you !nave any iquestions please do not
hesitate to contact Sys.
f ee�'r�y yrytruly you , f
�IYLF,R W COLANT } OF .
C4 C ae'-4�
ok�ry C.Cheasia,PS
}Lc: Sa5ald Associates Inc.
Jim hand,DPW