Loading...
HomeMy WebLinkAbout1999-08-04 Engineer Review SPR LANTON1 AT+JO 5G'cNT4575 June; 22, i 9 Planning Roard C/o Heidi Gnffin °° Town Hall Annex RECEIVED 7 Charles Stet North Andover, MA 01845 JON 2 3 1999 Y : En 'r=rin Review F�S AF-PARTM 1� 8 P�.A�9�1C�C�DE=PAH�MT-N7 Mer imi ck Co lege Site Plan Dear Mr. Scott: In response to Yortr request, Coler & CalftntoWo, Inc. has reviewed the 6upplernental submittal package for the above re femnred site. Our efforts inr-luded a comparison of info€Mation subraitted with respect to the mquil ments of the forth Andover Zoning Bylaws. Ile submittal package included the following inforrnataon, Plans Entitled * "Site Plan of Merrimack Colle~gee*Cilde Hall", located to Forth Andover, Kass." consisting of ten sheets slated May 28, 1999, Fmpttred by Sasaki Assoc. Inc. R eivewd tune; 8, 1999, • "Site Flan Application and report" dated June 4, 1999, Prepared by Sasaki Assoc. Inc. Received June 8, 1999. Our commenLS Ups fv 11Pwa: The site is within the Merdniack College Campus and located entirely witbin the cmpomte bauudarits of North Andom. The campus hay been observed and reviewed several times previous fox various other expansion& and additions.This project involves the renovation and expansion of the Student Union-tiildea Hail, It is our understanding that a comprehensive drainage;study is presently being performed to treat and detain the vormwater runoff from the eofire campus. However, the status of this study has not been disclosed to this office. Also, the submitted uti€it plan is not complete. 101 Accord Paik Drive 701-98 -8400 Nowell, MA 02061-16t Pax: 79,1.902.6490 i I i Zonfoe Bylaw, 1. Section 83) .) e,)i.)A locus map was not submitted, however we were We to locate the site. 2 S iion 8.3) 5.)e,) H.) The existing conditions plant was Trot stamped by a professional land surveyor. 3, Section 8.3) 5.) a-)iv.) Utility casements, if any,were not indic�awd on the plans. 4. Sectkin 8.3) 5.) e,)v.) ' hir,topography was not clearly labeled. � 5. Section 8-3) 5.)e.) vi.) A zoning legend should be inOuded. 6, Section 8.3) 5- a-) vii.)A storm water analysis has not!Seen submitted. It is our understanding that a cornpmhensive plan for sfort water is being prepared and 6 as cvordiriat,ed witty the Town of Andoyet. The status of these improvements is not clear at this time. 7, Section 8.3)5.)e, xi.) Reportedly, the project does not fall within the 1 ' buffer of a Bordering Vegetated Wetland- 8. Section 8.3) .)e.)xvi)The method of screening for the proposed trash ertclosum should be indicidW on the plans. - Section 8.3) 5,)e.) xnrii,) See consent#b, We appreciate the opportunity to assist the Planning Bowed on this project and hope that this info=atiun is sufficient for your needs. If you !nave any iquestions please do not hesitate to contact Sys. f ee�'r�y yrytruly you , f �IYLF,R W COLANT } OF . C4 C ae'-4� ok�ry C.Cheasia,PS }Lc: Sa5ald Associates Inc. Jim hand,DPW