Loading...
HomeMy WebLinkAbout1989-10-02 Correspondence sasaki Associates, Inc. Mernarandurn 64 Pleasant Streel, W;,ilenowii, Massachu5elts 02 1�72 617P)26 3300 felex 92/2471 Re:: Merrimack College Science Building SA#8489 Minutes of �Mtg. 10/27/88 @ 10:00 am Town Hall, N. Andover, MA Q; T. Meyer " EAK November 18, 1988 100T�h All Attendees, D. Vitters, W. Smith, G. Yaari, J. Hollywood, J. Buhl ATTENDEES: D. R. Wicetta Building laspector Lt. Melnikas Fire Department S. A. Stocking Town Planner 1 achum Town Conservation A. E. Brooks Merrimack (Physical Plant), S. Cote, Merrimack (Physical. Plant), R. Gain. Merrimack (Security) K. Sheehan BRA (Medhanical), W. Du Ross BR+A (Plumbing) T4 Meyer Sasaki (Architect) Meeting was opened with introductions and a brief description of the proposed project; discussion continued around the following poiats: 1. Project should be filed with Town Planning Board as soon as an accurate site plan. with known setbacks can be submitted (application plus submission requirements attached), 2. Project must be checked for impact on wetlands, including drainage along highway (no construction within 100 ft. ) . A check of wetland maps after meeting showed no recorded wetlands in immediate site area. Conservation Commissioner will contact A. Brooks for verification and site visit. 3. Project does not represent an increase in enrollment and therefore will utilize existing parking to the East. 4. Building in classified as W occupancy (schools), 2C construction, sprinklered to allow 3 stories. Area most be split in half vith 2 hour separation wall; SA proposed that in lieu of 2 hour wall at only one side of lobby and 4th enclosed stair, 2 hour walls be placed both sides of lobby, utilizing the lobby stair for egress since it needs only a one hour enclosure for 3 stories, and distance to stairs at either ead of building is within sprinklered allowable 200 ft. Building Inspector replied that he preferred the two walls and that details would be worked out in future meetings, Unless iiotice is received Un wrifing vddiwi teii,da),s, we assume flie partic:Jpajils agree lhat We StWerne&S condaked heron are a tme rccuml. ,AppRed linage 140-V Sasaki Associates, Inc, Merrimack College Science Building - SA#8489 Minutes of Ntg. 10/27/88 @ 10:00 are November S, 1988 Page At a following meeting with the Structural Engineer (Nov. 2> he was instructed to provide independent structures with a 2 hr. masonry fire wall at each side of the lobby. 5. Building ace-tipancy will be figured on actual occupancy for labs if larger that figuring population at 1 occupant, per 50 sq. ft. ; other spaces will be figured by Occupancy Load Table 606. 6. BR+A discussed standpipes, sprinklers and asked whether the s at;ems could be pressurized by truck via the siamese or whether a fire pkimp would be r !quirf�d. Lozal Fire Department to review (refer to attachment correspondence from BR+A confirming Fire Dept, requlrE-men.t for Fire pump) . 7. Sewer tie-in to existing UnEx was disr:ussed; meeting will be required with Town of Andover. S. Fire Alarm - local only - College to meet with Fire Department Re: tie=I-A into master box system. 1107Y/mai MEN Ll CONSULTING ENGINEEA INC, 4320 SOLDIERS FIELD ROAD BOSTON,MASSACHUSETTS 02135 �iT2�4.0'pl$ �A1S+$17kM144a�0 Elldfk2 WCHA±L 6aR4 AplaJ�8.R14 THt43 WA1IC4IHANO UPIALD 4-1V"f 49 IESf116 1.7 XGUIRaK15 ` xeYiN 7Kflil4M .�do-Nl 1.1FkEl1 wuiew 4.O1inospi PHFLIP 8.ANNirUh , 6TIPHN F.Mt IAN # JCE4n+IAFfA 1166EA7 T.ReCgk November 2 , 1988 Mr. Gabriel Hari Sasaki Associates 64 Pleasant Street Watertown , Massachusetts 0 172 RE: MERRTM CK COLLEG8 Science Building Dear Gabriel : On Thursday , October 27, 1988 , BR+A attended a meebing at North Andover 'down Full concerning the above project . ' At this meeting? the subject of standpipes and fire pumps was dicUased . The representative from the fire department asked BR+A to call ]aim after the first of this week to determine whether the firs chief will require a fire pump for the standpipe system. Ili+A telephoned the fire department on November 2 , 1986 and spoke with the fire chief . A mire pump will be required. To size the fire Pump, a flow test will be needed. A flow test should be run by someone approved by the focal water department and the fire department at a scheduled time under the Department of public Works supervi8lon. The cost of doing this can run between 4800 . 00 to BOOM& depending upon local conditions $ and is normally considered survey information . Please do not hes kate to 0all our office if there are any questions . Very truly yours , BR+A CONSULTING E GJIQ , S, INC . William T. Duross Associate WTD tp , OFFICES OF; Town of APPEALS V w . NORIT11 ANDOVER ME,1t,9Z1d I L ISCI iS 4)1845 BUMING CONSFRVATION ])tV1str)'q ol: (6 17)f 585-4 7 7�-3 P1-ANN IN(., PLANNING & COMMUNITY DEVELOPMENI' KAREN HT, NELSON'. L)MLCT()R November 29 , 1988 Mr. Meyers , Architect Sasaki AsBaciates, Inc , 64 Pleasant Street Watertown, HA 02172 Re . Herrimack College science Building Dear Mr. Meyert I am in receipt of your memo dated November 18, 1988 regarding the above cited subject. I have no issues regarding the information contained in the memo, and I am awaiting your submis8ion to the Planning Board for Site Plan review. This building should prove to he a great addition to both the college and the Town. Tbank You for your time and effort in this project and if you have any questions, please call me, Sincere Y. Scott A. Stocking,/Klcp Town Planner / Ile