After having reviewed the plan for the proposed retail and
office building for Rte. 114 3 have the following comments ,
l,. I had reviewed our files and askyd the previous Fire
Prevention Officer,, nrepardi,nng this plan and to the beet of our
knowledge the fire department was never asked for nor allowed to
provideinput into this plan.
R. "d"'he dumps ter site Is too close to the building the fire
department would require a twelve fyyt from the
Wilding . to the
dn,w.mpster, Mr.-. Kaminski In tvlophone conversation with me stated
that this adjustment could be made.
. The buildir n should have 360 dv4ree access but does not as
shown. It is my understanding that there Is a problem with lint
lines. Since the fine department was loft out of tho process and
the plans approved, the department would want to maximize the
access within the scope of the site.,
fin. The building will be required to h8vo it Internal fire
Alarm, detection and suppression systems tied In to the fire
department via a master connected fire alarm box. Arrangements
should be made with the fire department on the particulars ar-nd
specifications for tlhiz tie in.
If th r e are any ues t i n regarding this project f please all .
William V.. I n
Firm Chief
"I N UDKE DE EC[ORS W ;:gin
v.. .
120 MAIN STREET TEL
y 2-y— 8�pp
ep R,�ir�"`,�°? �"E.�., 4.�P.J�G—itP�Lra�
. �u��� DTI-1 ANDOVER, MASS, 01845 ExL 32 oy 3
Tom Planning -o rd
From= Health Dept /-
January 10 1990
P f
= Johnston Last, Turnpike St.
Our November 20 , 1989
The Septic System design for this 2 story building which is a
combination of commercial and residential webs was approved .,
The Septic System is adequate for the proposed use.