Loading...
HomeMy WebLinkAbout1990-06-29 Department Review w m p�m� IIp ll4 V4,wA �n �A i1M'�'IIER .. SAT :11 iP;l(m'kii r"J'DO, artlmon Tot Mr. Chris Huntress, Town Wannot- Promi Fire Chief Dolan DateiJanuary 16, 1990 After having reviewed the plan for the proposed retail and office building for Rte. 114 3 have the following comments , l,. I had reviewed our files and askyd the previous Fire Prevention Officer,, nrepardi,nng this plan and to the beet of our knowledge the fire department was never asked for nor allowed to provideinput into this plan. R. "d"'he dumps ter site Is too close to the building the fire department would require a twelve fyyt from the Wilding . to the dn,w.mpster, Mr.-. Kaminski In tvlophone conversation with me stated that this adjustment could be made. . The buildir n should have 360 dv4ree access but does not as shown. It is my understanding that there Is a problem with lint lines. Since the fine department was loft out of tho process and the plans approved, the department would want to maximize the access within the scope of the site., fin. The building will be required to h8vo it Internal fire Alarm, detection and suppression systems tied In to the fire department via a master connected fire alarm box. Arrangements should be made with the fire department on the particulars ar-nd specifications for tlhiz tie in. If th r e are any ues t i n regarding this project f please all . William V.. I n Firm Chief "I N UDKE DE EC[ORS W ;:gin v.. . 120 MAIN STREET TEL y 2-y— 8�pp ep R,�ir�"`,�°? �"E.�., 4.�P.J�G—itP�Lra� . �u��� DTI-1 ANDOVER, MASS, 01845 ExL 32 oy 3 Tom Planning -o rd From= Health Dept /- January 10 1990 P f = Johnston Last, Turnpike St. Our November 20 , 1989 The Septic System design for this 2 story building which is a combination of commercial and residential webs was approved ., The Septic System is adequate for the proposed use.