HomeMy WebLinkAboutSeptic - New - Correspondence - 115 OGUNQUIT ROAD 5/11/2022 NORTH ANDOVER
Massachusetts Stephen Casey <scasey@northandoverma.gov>
115 Ogunquit
1 message
Benjamin Osgood <bosgood@rangereng.com> Wed, Apr 27, 2022 at 10:54 AM
To: Stephen Casey<scasey@northandoverma.gov>
Cc: Innis Bob <robertinnis@yahoo.com>, David Innis <daveinnis@gmail.com>
Stephen,
Attached are the certification documents for 115 Ogunquit.
Ben
Benjamin C. Osgood, Jr., PE
Senior Engineer
978-435-1324
Ranger Engineering Group,Inc.
bosgood rangereng.com
13 Red Roof Lane,Suite 203,Salem, NH 03079
O:978-208-1762
C:978-435-1324
2 attachments
2022-04-28 As Built Plan 115 Ogunquit.pdf
191 K
2022-04-28 certification 115 Ogunquit, North Andover.pdf
715K
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
115 Ogunquit Road final construction inspection
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Oct 20, 2021 at 11:01 AM
To: 'Brian Lagrasse(blagrasse@ north andoverma.gov)" <baagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfend en @north andoverma.gov)" <twolfenden@northandoverma.gov>
Attached please find report of construction inspection at 115 Ogunquit Road. No issues were identified of concern. A few
small items were discussed with site contractor which I am confident he will implement.
Dan
Daniel Ottenheimer, PE
President
V MILL RIVER CONSULTING
Creative Solutinm for laud Development
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
Construction Notes -115 Ogunquit Road.doc
378K
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
Revised plan review - 115 Ogunquit Road Lot 4
Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Mar 25, 2021 at 4:20 PM
To: 'Brian Lagrasse (blagrasse@ north andoverma.gov)"<baagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Revised plan submitted for this location has addressed all open items and a suggested plan approval letter is attached for
your use.
Any questions, do let me know.
Dan
Daniel Ottenheimer, PE
President
A.,
, L RIVER CONSULTING
Ctrative Soltttitms for 1=d 1k-k-dopment
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
Member: National Society of Professional Engineers, New England Water Environment Association, Yankee Onsite
Wastewater Association, Massachusetts Environmental Health Association
Approval Letter-115 Ogunquit Road, Lot 4(3-25-21).doc
cj 398K
The Morin-Cameron
GROUP, INC.
FZ� 0.�
March 22, 2021 �� �NP�vuN1EL
N�
Mr. Brian J. LaGrasse
Director of Public Health
120 Main Street
North Andover, MA 01845
Re: Subsurface Sewage Disposal System Plan — Lot 4 - 115 Ogunquit Road (Map 105A, Lot 1)
Dear Brian:
We are in receipt of your review of the septic design for the above referenced property dated
March 12, 2021. On behalf of Peter Breen, The Morin-Cameron Group, Inc. has prepared the
following responses to your comments. Please find enclosed 3 sets of the revised Sanitary
Disposal System Design Plan for your review/approval. For convenience, the responses are
numbered in the same order and correlate to the numbered comments in your letter:
1. The plan view (Sheet 1 of 2) has been revised to show benchmarks within 50-75 feet of
the proposed facility.
2. The plan view (sheet 1 of 2) was revised to show a foundation drain with rip-rap outfall.
3. Note 17 was added to the General Notes (sheet 2 of 2) to read "THE BUILDING SEWER
SHALL BE 4" PVC (SCH 40) PIPE WITH WATERTIGHT JOINTS LAID ON A COMPACT BASE
IN A STRAIGHT LINE AT A CONTINUOUS GRADE WITH A MINIMUM SLOPE OF 1.0%".
4. Note 17 was added to the General Notes (sheet 2 of 2) to read "THE BUILDING SEWER
SHALL BE 4" PVC WITH WATERTIGHT JOINTS LAID ON A COMPACT BASE IN A STRAIGHT
LINE AT A CONTINUOUS GRADE WITH A MINIMUM SLOPE OF 1.0%".
5. Note 4 was added to the Septic Tank Detail to show "ACCESS RISERS BROUGHT TO FINAL
GRADE SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS" (sheet 2 of 2).
6. Note 2 was added to the Septic Tank Detail to show "ALL JOINTS, PENETRATIONS, AND
RISERS SHALL BE MADE WATERTIGHT(I.E.:TANK SHALL BE MADE WATERTIGHT)" and note
4 was added to the Distribution Box Detail to show "INLET AND OUTLET PIPE WALL
PENETRATIONS AND RISERS SHALL BE MADE WATERTIGHT' (sheet 2 of 2).
CIVIL ENGINEERS • LAND SURVEYORS • ENVIRONMENTAL CONSULTANTS • LAND USE PLANNERS
66 Elm Street, Danvers, MA 01923 978.777.8586 FAX 978.774.3488
Providing Professional Services Since 1978
www.morincameron.com
Mr. Brian LaGrasse March 22, 2021 Page 2
7. Note 3 was added to the Distribution Box Detail to show "DISTRIBUTION BOX SHALL BE
LAID ON A LEVEL COMPACT BASE AND ALL OUTLIER INVERTS SHALL BE SET AT THE SAME
ELEVATIONS" (sheet 2 of 2).
8. The soil evaluator has discussed the submitted soil testing forms with Mill River
Consulting. It has been agreed upon that the submitted forms are sufficient and DEP
forms 11 and 12 will not be required.
9. The leach bed detail shows "9" LOAM AND SEED (MIN.)" over the pea stone in the Typical
Cross Section and Typical Longitudinal Section (Sheet 2 of 2).
10. A Sand Fill Specification was provided on sheet 2 of 2.
11. The perforated pipe shown on the leach bed detail has been revised to show "ORIFICE
SIZES TO BE BETWEEN 3/8" - 5/8" (Sheet 2 of 2).
We trust these responses address your comments/concerns. If you have any additional questions
please do not hesitate to contact our office.
Sincerely,
THE MORIN-CAMERON GROUP, INC.
John M. Morin, PE