HomeMy WebLinkAboutConstruction Notes - Consultant Review - 115 OGUNQUIT ROAD 5/11/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 115 Ogunquit Road MAP: 105.A LOT: 0001 INSTALLER: Robert Innis 978-663-6006 permit # 59894 vp DESIGNER: John Morin 978-777-8586 permit submittal # 58042 vp Ben Osgood 978-435-1324, bosgood@rangereng.com PLAN DATE: final revision date – 03.22.2021 BOH APPROVAL DATE ON PLAN: 04.02.2021 INSPECTIONS TANK INSPECTION: 9.21.2022 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 10/19/21 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 10/19/21 – House not yet constructed, foundation only. D. Ottenheimer SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) _____ inch cover to within 6” of finish grade installed over one access port Boots around inlet & outlet Comments: 9.21.2021 S. Casey 6” stone ok, Tank Coming 9.25.2021 according to installer 10/19/21 – Small bit of supporting material needs to be provided beneath the building sewer pipe. Reviewed need for one riser to within 6” of finished grade with contractor. Contractor will implement, no need for re- inspection. D. Ottenheimer DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 10/19/21 – Reviewed need for risers on d-box to within 6” of finished grade. Contractor will implement, no need for re-inspection. D. Ottenheimer SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: L. Vlasuk inspected sand on 9.8.2021 and got receipts. Passed. 10/19/21 – One arm of leaching pipe was slightly off, contractor will adjust. No need for re-inspection. D. Ottenheimer FINAL GRADE Loamed Seeded Cover per plan n/a within 6”grade Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 114.40 HR = 8.56 HI = 122.96 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 3.40 119.23 118.20 Septic Tank IN 3.86 118.77 118.00 Septic Tank OUT 4.04 118.59 117.75 Distribution Box IN 5.86 116.77 116.73 Distribution Box OUT 6.05 116.58 116.55 Lateral 1 BEG 6.16 116.47 116.42 Lateral 1 END 6.32 116.31 116.23 Lateral 2 BEG 6.18 116.45 116.42 Lateral 2 END 6.42 116.21 116.23 Lateral 3 BEG 6.18 116.45 116.42 Lateral 3 END 6.45 116.18 116.23 Lateral 4 BEG 6.18 116.45 116.42 Lateral 4 END 6.45 116.18 116.23 Lateral 5 BEG 6.17 116.46 116.42 Lateral 5 END 6.48 116.15 116.23