HomeMy WebLinkAbout288 Foster RDA SP 05 09 22 - Plans - 288 FOSTER STREET 5/9/2022 No TES
{ 1.SEE TOWN OF NORTH ANDOVER ASSESSORS MAP lD4D BLOCK LOT 68 AND
�sr 4r 134.14'
DEED BOOK 5266 PACE 109 E.N.p.R.p.FOR SITE.
2,DATUM BASE IS ASSUMED_,BENCHMARK IS TOP OF FOUNDATION OF 288 FOSTER STREET,
SITE F cu
quoON`G DE�c ELEVATION=100_a
uIREMENTI 3.SEE SUBSURFACE SEWAGE DISPOSAL PLAN PREPARED BY MERRIMACK ENGINEERING SERVICES
1 11 sTacEs DATED SEPTEMBER 8,2021 FOR DETAILS AND SPECIFICATIONS OF CONSTRUCTIONPITH
IIAI 4_WETLANDS DELINEATED BY NORSE ENVIRONMENTAL SERVICES,TYNGSBDRO,MA
Fa51 P st
max- CL=_�'l>>_
LOT 6
(PI,Tn E.F.
LOCUS
XTS, CONSTRUCTION NOTES
1.EROSION CONTROL STRAW WATTLE SHALL BE INSTALLED AND INSPECTED BY THE
NACC PRIOR TO ANY WORK ON SITE,
2,THE EROSION CONTROL BARRIER SHALL BE INSPECTED AND MAINTAINED THROUGHOUT
CONSTRUCTION AND UNTIL SITE STABILIZATION OCCURS.
3,ANY SOILS IMPORTED OR EXPORTED SHALL BE PLACES BY END OF EACH WORK DAY.
ALL EXPORTED SOILS SHALL BE LOADED AND REMOVED FROM SITE BY THE END OF
EACH WORK DAY,NO OVERNIGHT STOCKPILING OF SOIL SHALL OCCUR,
4 NO DEWATERING IS EXPECTED.IF DEWATERING IS REQUIRED,THE PUMP DISCHARGE SHALL
BE APPROVED BY THE DESIGNER AND THE NACC BEFORE THE ACTIVITY BEGINS,
5.ALL DISTURBED AREAS SHALL DE LOAMEp AND SEEDED IMMEDIATELY UPON COMPLETION
OF THE WORK.
PUMP T^NH A
C—THN RAL
MNO0
FTI'HOME
eFFLE URO ST
I"?. T IF)
ILIMIT OF EXCAVATION
(E E a)R SE r I
)Lo'�`ATON erowNEa) PROP,PSO PORT
IM
� s
STRAW EROSIONr CONTROL SITE PLAIN
00.97
W S;R a LAND/N
o g OT
WATTLE
LONTR NORTH ANDOVER, MASSACHUSETTS
PREPARED FOR
p STREET TIMOTHY GOLAND
r p5T�1\ 288 EUSTER STREET
NORTH ANDOVER,MASSACHUSETTS 01845
0
DATE APRIL 2O 2022 REVISED' MAY 9,2022
AD M
SCALE, 1"=20' Mimi
v) - G rIFMCHFrIOK C
0" 10" 20" 40" 60"
MERRIMACK ENGINEERING SERVICES
66 PARK STREET
n t.. ANDOVER,MASSACHUSETTS 91610
PHONE (978)475-3555 FAX, (978)475-1448
EMAIL MERRENG®AOL.COM