Loading...
HomeMy WebLinkAbout288 Foster RDA SP 05 09 22 - Plans - 288 FOSTER STREET 5/9/2022 No TES { 1.SEE TOWN OF NORTH ANDOVER ASSESSORS MAP lD4D BLOCK LOT 68 AND �sr 4r 134.14' DEED BOOK 5266 PACE 109 E.N.p.R.p.FOR SITE. 2,DATUM BASE IS ASSUMED_,BENCHMARK IS TOP OF FOUNDATION OF 288 FOSTER STREET, SITE F cu quoON`G DE�c ELEVATION=100_a uIREMENTI 3.SEE SUBSURFACE SEWAGE DISPOSAL PLAN PREPARED BY MERRIMACK ENGINEERING SERVICES 1 11 sTacEs DATED SEPTEMBER 8,2021 FOR DETAILS AND SPECIFICATIONS OF CONSTRUCTIONPITH IIAI 4_WETLANDS DELINEATED BY NORSE ENVIRONMENTAL SERVICES,TYNGSBDRO,MA Fa51 P st max- CL=_�'l>>_ LOT 6 (PI,Tn E.F. LOCUS XTS, CONSTRUCTION NOTES 1.EROSION CONTROL STRAW WATTLE SHALL BE INSTALLED AND INSPECTED BY THE NACC PRIOR TO ANY WORK ON SITE, 2,THE EROSION CONTROL BARRIER SHALL BE INSPECTED AND MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL SITE STABILIZATION OCCURS. 3,ANY SOILS IMPORTED OR EXPORTED SHALL BE PLACES BY END OF EACH WORK DAY. ALL EXPORTED SOILS SHALL BE LOADED AND REMOVED FROM SITE BY THE END OF EACH WORK DAY,NO OVERNIGHT STOCKPILING OF SOIL SHALL OCCUR, 4 NO DEWATERING IS EXPECTED.IF DEWATERING IS REQUIRED,THE PUMP DISCHARGE SHALL BE APPROVED BY THE DESIGNER AND THE NACC BEFORE THE ACTIVITY BEGINS, 5.ALL DISTURBED AREAS SHALL DE LOAMEp AND SEEDED IMMEDIATELY UPON COMPLETION OF THE WORK. PUMP T^NH A C—THN RAL MNO0 FTI'HOME eFFLE URO ST I"?. T IF) ILIMIT OF EXCAVATION (E E a)R SE r I )Lo'�`ATON erowNEa) PROP,PSO PORT IM � s STRAW EROSIONr CONTROL SITE PLAIN 00.97 W S;R a LAND/N o g OT WATTLE LONTR NORTH ANDOVER, MASSACHUSETTS PREPARED FOR p STREET TIMOTHY GOLAND r p5T�1\ 288 EUSTER STREET NORTH ANDOVER,MASSACHUSETTS 01845 0 DATE APRIL 2O 2022 REVISED' MAY 9,2022 AD M SCALE, 1"=20' Mimi v) - G rIFMCHFrIOK C 0" 10" 20" 40" 60" MERRIMACK ENGINEERING SERVICES 66 PARK STREET n t.. ANDOVER,MASSACHUSETTS 91610 PHONE (978)475-3555 FAX, (978)475-1448 EMAIL MERRENG®AOL.COM