HomeMy WebLinkAbout1985-1986 Corespondence RICHARD F . KAMINSKI AND AssocIATES, INC,
IENGINEERS PARCHITECTS a LAND FIAMNERS SURVEYORS
451 ANDOVE R ST R IF,f T
NORTH ANDOVER,MA S S-01845
T 1:1 E�WOW 601 OW
January 17, 1985
Ms. incNy Barker
Executive Office of Environmental Affairs
Leverett Saltonstall Building
20th Floor
100 Cambridge street
Boston, MA 02202
ATTN: M. E,P.A. Unit,
Re: E.O.E,A. NO. 5243
Dear Ms. Barker:
Enclosed please find copies of the revised plan titled:
1. "Proposed office Complex, Route 114, North Andover,,
massaphusetts"
2. "Bass Corporation, Office Complext Locus Plan in North Andover,
Massachusetts"
These two plans have been revised to incorporate the suggestions made on
the correspondence of Mike Karas to J. D'Angelo which was made available
to us Py District 5 of the Massachusetts D.P.W.
District 5 of the Massachusetts D. PvW. , the North Andover Planning Board
and the Merrimack Valley Regional Planning Commission have also been sent
this information.
If I may be of further service to you in this matter, please do not
hesitate to contact mei
sincerely yours,
R chard F. Kaminskh & Assoc. , Inc.
aw
Joseph B. Cush"ing
X�Environmental Biologist
JBC/lab
Enclosure
oct North Andover Planning Board
Merrimack Valley Regional Planning Commission
Hass Corporation
y��yy
OFFICE O HIGHWAYSURVEYOR
- 384 OS GOOD STREET
TOWN OF NORTH ANDOVER, MASSACHUSETTS 01045
Acwu+[{
WILLIAM A.CYR Tom. HONE 6S",f- 50
fthway Surviiyar August 8 , 1985
Ms . Christine Smith , Chairman
Board of Selectmen
120 Main St .
North Andover, Ma . 81845
Re : Impact Report on Route 114
Curb Cut by Hass Corp.
Dear Chris
This letter is to make you aware of what 3 consider
a situation that should get immediate attention . I am
in receipt of a certificate from the Secretary of
Environmental Affairs . (Copy Enclosed )
I believe that the letter clarifies the intent r
the State to suggest that Chestnut St . and or MD '
be used as an alternative to Fite 114 for access
egress from the development now under constrcuc y
the Hass Corp .
This department had stopped Hass Corp. fall
from using Chestnut St , for access to their site . we
even went , as far as , putting up a snow fence barricade ,
to get our point across . Eventually , with conditions ,
we did give them a temporary curb cut to accommodate some
of heir construction vehicles , but made them very much
aware that Chestnut St . would not be considered , as far
as this [department was concerned , for any permanent
solution to their traffic flow.
in my opinion , the only alternative that should be
considered , at this time , is that the State ,should accept
their responsibility of upgrading RtP_ 114 and get this
antiquated highway up to the standards that will be
necessary to accommodate the immediate and future trans-
portation needs of this area .
I think it is ridiculous that the State would deny
access from Willows Industrial Park onto Rt 125 By Pass
and then torn around and recommend putting this added
traffic flow from the Hass Project , onto Chestrlut St .
or Mill Road , which are both presently nothing more than
country lanes with road widths of less than 20 feet .
Impact Report P,2 .
I would recommend that this be put on the agenda of
all departments associated With the impact that this would
cause within 0ur community and that we meet and plan out
the proper strategy that the Iown s hDuld plan tO get the
best solution possible.
Very truly yours ,
• William A . Cyr
Highway surveyor
cc : planning Boafa
WAC/m
�
TOWN OF NORTH ANDOVER. MASSAC,HUSETTS
OFF OF
D CO F S E L E ' '
own"
TELEPHONE 682-6483
INTEROFFICE MEMO
V
ORD
TO; William A, Cyr, Highway Surveyor
FROM Board of Sele LUSH
DATE: A:august 15, :1985
SUM1. Rte. 114 Curb Cut: Hass Corp.
Please know that the Beard of Selectmen has discussed your letter of August 8tpu
relative to proposed curb cuts: can Chestnut St. for Hass Corp. The Board vhole-
ha, srtcdly supports your denial of curb duets to Ctucstput St./Mill. hid. as solution
to H a,ss.Corp. "s access/egress problems .
/chi
cc; Sherman Eidlln sn�e",
Pl.a nnin Board,��
t DRI
4
OFFICE OF HIGHWAYSURVEYOR
* i 384 OSGOOD STRUT
' TOWN OF NORTH ANDOVER, M-ASSAMUSETTS 0184
WILLIAM A.CYR TELEPHONE 685.0950
Highway surveyor August 8 , 1985
MS . Christine Smith , Chairman
Board of Selectmen
120 Main 5t .
North Andover , Ma . O1845 0
Re. : Impact Report an Route
Curb Ciit by Hass Corp.
Dear Chris
This latter 7.s to make you aware of what I consider
a situation that should get immediate attention . I am
in receipt of a certificate from the Secretary of
Environmental Affairs . ( Copy Enclosed )
I believe that the letter clarifies the intent of
the State to suggest that Chestnii t St . and or Mill Rd .
be used as an alternative to Rte 1.14 for access and
egress From the development now under conE5truction b
the Hass Corp.
This department had stopped Kass Corp. last fall
from using Chestnut .fit . for access to their Si.te . We
even went, as far as , putting up a snow fence barricade ,
to get our point across . Eventually , with conditions ,
we did give them a tempora3i7y curb cut to accommodate some
of their construction vehicles , but made them very much
aware that Ctrostnut St . would not be considered , as far
as this department was concerned , for any permanent
solution to their traffic flow.
In my opinion , the only alternative that should be
considered , at this time , is that the State should accept
their responsibility of upgrading Otte 114 and get this
antlquated highway up to the standards that will be
necessary to accommodate the immediate and future trans-
portation needs of this area .
I think It i.q ridiculous that the State would deny
access from Willows Industrial Park onto Rto 125 By Pass
acid then turn around and recommend putting this added
traffic flow from the Mass Project , onto ChestPut St .
or Mill Road , which a-re both presently nothiDg more than
country lanes with road widths of less than 20 feet .
Impact Report P. 2 .
I would recommend that this he put on the agenda of
all departments associated with the impact that thiq would
cause within our community and that we meet and plan out
the proper strategy that the Town s�uld plan to get the
teat solution pDs5ible .
Very -truly yours ,
VV 0, C It.
{zzWilliam A . Cyr
Highway Surveyor
cc . Plannijig Board
WAC/m
jeer 1"'d
eo;�mn i o i i,e a re,4(/k o/ Illevi o
JIG}��{�7f[l7 � e�lEG'
GOVERNOR
.1AME5 S. HOYTE
SF.CRk.-Fa7RY
CERTirI ATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS
ON THE
r
FINAL ENVIRONMENTAL IMPACT REPORT
PROJECT RAME Route 114 Curb-Cut
PROJECT LOCATION North Andover
EOEA NUMBER 5243
PROJECT PROPONENT Hass Corp.
DATE NOTICED IN MONITOR: June 26, 1985
The Secretary of Environmental Affairs herein issues a statement that the Final
Uriv i rGnMen ta 1 impact Report submitted on the above-referenced project does not
adequately and properly comply with Massachusetts General laws , Chapter 30,
Section 6 -62H inclusive, and the regulations imple�mnting MEPA.
According to this report, the project will generate approximately 1960 Average
Daily Traffic (ADT) , which will account for about a 9 percent increase in A€lT along
this section of Route 114. Peak hour traffic has been estimated to increase by
17 per cent for the eastbound morning traffic and 14 percent for westbound evening
traffic. It should be painted out that this project° s traffic generation estimates
have varied considerably during the review of this development. The original E€ F
filing showed 290 ADT, are underestimation of the traffic by a factor of about 7 . A
comparison with the Route 114 Traffic turfy_,- May 1985 , by the Merrimack Valley
Planning Commission s�i'll ^shows a discrepancy between the project traffic generation
rates given in the FEIR, The MVPC traffic generation estimates are about 40 percent
higher for the evening peak hour.
r
EOEA #5243
ROUTE 114 CURB-CUTAORTH ANDOVER
PAGE 2
Despite some improvement, the final EIR has failed to address a key issue--
an alternate driveway onto Chestnut Street. Clearly , a requisite of the scope
was , "(a ) thorough assessment of an alternative access/egress onto Chestnut
Street and Mill Road. " The importance of that analysis was restated in .'-.the
Secretary ' s Certificate on the draft EIR.
Agencies , including MDPW, MUPC , and the town planner maintain that there can
be significant improvements in traffic flow, if the developments in the area
channeli�e their traffic through the Route 114/Mill Road/Willow Street intersection ,
when the intersection is signalized. Furthermore, the FEFR has shown that there
is a need to improve the Route 114 site driveway, since traffic delays will be
experienced by left-turning move3nents. (The draft. EIR shfewed are LOS E at the
Route 114 , site driveway; the final E I R showed LOS D, C at the same locus . )
Therefore, it follows that a supplemental analysis of this possible alternate
driveway is necessary before a state curb cut permit can be issued. Consideration
should be given to a Chestnut Street driveway in addition to a Route 114 driveway.
The possibility of limiting the driveways to right-turning movements could enhance
traffic flow patterns. Further, this would restrict the volume and distribution
of the traffic on local reads , which is objectionable according to the FEIR.
The fall build traffic scenario incorporated the two existing buildings and
the two proposed buildings (pp 10) . Table 3 shows that this project will not in
and of itself contribute to the deterioration of the level of service along this
section of Route 114. However, the traffic impacts of other proposed projects in
the area do not appear to have been considered in the full build capacity analysis .
Consequently, this report gives the impression that Route 114 capacity will not
decrease under future conditions . The FEIR should have included the project
expansions of the Willows Tech Park , the Willow Condominiums , the North Andover
Business Park, the development at Watts Regulator and possibly the proposed
commercial development at the present site of the Wok Restaurant. Conceivably , the
compound effect of these developments and the proposed office park will result in
a decreased level of service on Route 114.
The final traffic report requires further clarifications of the commitments the
proponent will be raking toward controlling and improving the traffic mvefents
into and out of the site. The supplemental information should unequivocally state
the mitigation activities for which the developer will take fall responsibility.
These remedial actions should provide a basis for the required Chapter 30, Section
bl finding.
Finally, a general observation has been made that it has been a ,year since this
project review was initiated. This far exceeds thie average time necessary to complete
a traffic study for a project of this magnitude.
}I
#ugust 198
DATE d AM -. `HO E Y E
J HfNBfbk
goo 6; r xi?
MICHAF� 5_ DUKAK45
eaver�r�v#2
JAfN4-=8 2�;, HOYTE
SrC-R ETARY
CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFWAIR�
ON THE
SUFPLEMENTAL FINAL ENVIRONMENTAL IMPACT REPORT
P D.IEC'T NAME : notate 114 - Jefferson Office Para
PROJECT LOCATION North Andover
EOEA NUMBER 5243
PROJECT PROPONENT HASS Corp.
DATE NOTICED IN MONITOR October 9 , A9s5
The Secretary of Environmental Affairs herein issues a
statement that the supplemental Final Environm4,, rntal impact Report
submitted oa the above project adequately and properly complies
with the Massachu8etts Environmental Policy Act ( C . L . , 0 . 30 ,
s . 62-6 H) and with its implementing regulations ( 3O1 CMR 10 . 00 ) .
mNoeber :i L 181�a t
Date es . HW secretary
J H/NF3/bk
,oRra
•`{ . , ., OFFICE OF HTGHWA SURVEYOR
i � 184 OS GOOD STREET
TOWN OF NORTH ANDO'VER, MASSA HLJ3UTS 01845
WILLIAM A. CYR TELEPRONP 6M4958
fthwey Surveyor
IVEWAY VIOLATION NOTICE
WE: Sept. 3,1986 ADDRESS: Jefferson Office Park-Chestnut St.
North Andover, bass.
This notic? is tea inform yvu that your driveway is in violation and
the entry, as built, is unaccept xle.
Article 111 Section 11 of. the NUrth Andover T -Latta requires that
prior tc the entry into a public way, or a way approved under Sub-division
Control by means of a Driveway, permission and a Driveway Entry Permit for
such entry must be obtained from the highway Surveyor.
I would suggest that y u give this matter your immediate attention.
If prompt response is not forthcoming then I must, of course, PrOceed to
effect compliance with the By,aw. The result could be blockage of said
driveway at entrance to public way.
ere are also other problems with your site as far as Chestnut Street
is concerned.
William A. Cyr
am.
USA 2
aver, AAA 01845
.............
Baas Broth rs
280 Pleasant Street
Ashland, Piss
0171
f
hHIN Mfl
I-OW 1 OFF NORT14 ANDOVE
120 Main Street
North Andover, .. MA. OIK45
± 5-4775
Ot rtOFH'[y
z September 4 , 1986
........ .................................
Haas Brothers
280 Pleasant Street
Ashland , MA 01721
Re : Chestnut street/Jefferson 'ark/Barn Property
Gentlemen:
The purpose of this letter is to request that you contact
the Planning Board offic-e regarding your intentions of develop-
ing the barn on Chestnut Strr:et . The property is zoned
Induatriai I and therefore will require Site Plan Review under
Section 8 . 3 of the Zoning Bylaw_
Any construction, renovation o�7 alterations inade on the
site without Planning Board approval violates the loom.
regulations.
Immediate compliance on- your part is expected.
Yours truly,
Kaaren Nelson, Town Plans ier
K :ns
ec : Highway Surveyor
Board of Selectmen
Zoning Inspector
r
Richard F Kaminski & Associates,, Inc.
Karen Nelson
Town Planner
Town of Norton Andover
Main Street
North Andover, MA 01845
Re: Jefferson Office Park
Dear 'Ms. Nelson:
n behalf of our client, Hamilton Realty, I am requesting a slant
on the agenda for October 61 19B6 .,
This request est being initiated a result of inquiries o
beingthe work done associated with the ,barh on Chestnut Street.
If there are any questions, please advise.
Sincerely,
Richard F. Kaminski & Assoc. , Inc.,
1. William Place, P.E.
Tnc
n Hamilton Realty
11
Architects n Engineers n Surveyors 0 Land Planners
t orn S,t.., N o rt h A rnd o ve n", M A 01 , ( 1 ) 6 87-14
„y�+fA Th7
OFFICEOF HIGHWAY SURVEYOR
M
$ 4 TOWN OF NORTH ANDOVER, MASSACHUSETTS 01845
A7
Highway survoyor
Oct. 6, 1986
Erich W. Nitzsche, Chairman
Planning Board
120 Mai n St.
N rth Andover, Ma. 01845
Re: Jefferson Park
Rte 114 Barn Property
Dear Erich:
T am very concerned about this development, in rogards to
driveway'a entries onto Chestnut St. I have on file letters to the
Board of Selectman and also a driveway violation notice 1'on work
donne recently, when hottop pavingV"��e this area was dune.
Ibis department is very opp sec:1 to any vehicular units using
Chestnut St. access from Jefferson Office Park or any pz pose
development of the Barn Area. Any traffic generated into Cbostnut
St . , in my upinic,'in, is unwise, and wuuld just add to the roble�m'S
now existing on Rea St. aind tho Mill Rd. tareaa. Fe,a St. µ;hurt.1d not
be subjected to eith'ner, more traffic in general, as more from
persons using Jefferson Park as a short cut to avoid the Mill Fed
intersection.
s I have stated 1 for: ,-, this is a situation that leave;
a lot: to be desired prior to any driveway entry as presently laid:
ou;u t.
In my opinion I have been ignored, as fare as any res once 0.1
the driveway violation and I am Ju st aliting to see what Hass Bros.
dui. next, I ma,ke my net muve..
I will be at your meeting this evening to discuss this fmart.her,,,
it yuu wish.
Very truly yours,
William A. 'r”
i
TOWN OF NORTH ANDOVER.
120 Main. tr t
North Andover, MA. 01845
6 -477
� mY
R M'
b�
October 9 , 1986,
Hamilton Realty
Mr. Mike ducker
39 Brighton Ave.
Allston, KA 02134
Re : CHESTNUT STREET BARN SITE
Dear Mr. Zucker:
t the meeting of October 6th the Planning Board along
with Mr . dill Place discussed the paving work that was done on
the site, as r fcrcnced .in our letter to you dated 9/14 8
and plans dated 3/ 15/85 prepared by Richard F. Kaminski Associates .
o construction or excavation ';~pork 5h uuld have been mime
without prior approval of the Planning g o'a3rd. During the site
Review of icffors n Park it was agreed upon by the Town and
Stat.e. Officials, developer and engineer that no a wQess/egress
would be provided onto Chestnut Street. Therefore, the i u' nin .
Board is requiring you to immediately remove the cur cua 5
from Chestnut Street. The issue that remains W the required
50 foot_ green setback from the abutting Residential-3 Zoning
g
District on the North property line and from Chestnut Street..
It is evident that under zoning this pavement rust be removed
as well.
e will be addressing rasing this ummanL,t,er with, the entire Boanr ,
at our Novembcr Ad meeting.
sincerely,
PLANNING BOARD
yr
Erich W. Nitzsche ," 'Chairman
EWN :nrs
Attachment
cc : Highway Surveyor
-oar 8oard of Selectmen
Bill Place , Richard Kaminski Assoc.,
Richard E Kaminski & Associates, Inc.
October 20 , 1986
Erich W, Nitzsche, Chairman
North Andover Planning Board
120 Main Street
North Andover, MA 01845
Re: Jefferson Office Park ,
North Andover, MA.
Dear Sir:
With regard to your letter dated Octob,6r 9 , 1986, and addressed
to Michael Zuker of Hamilton Realty, please be advised that this
office has been authorized to pursue this matter in detail in
order that a resolution be reached between our client and the
North Andover Planning Board.
Additionally, we have advised our client to barricade both
anon trancesf placed without authorizationt on Chestnut Street.
At this writing stone barricades have been installed.
We ask that we be placed on the agenda for your November 3p 1906
meeting at which time we would like to explain Inct circumstances
surrounding the installation of the upper parking lot, and also
our proposed resolution of same.,
Respectfully,
Ri -hard F. Kaminski & Assoc. , Inc.
Richard F., K!''i:i, P.E.
President
RFK/ncr
cc; Bud Cyr
Board of Selectmen
Michael Zuker
Paul Stewart
KA.
RFK925
Architects ElEngineers 13 Surveyors [I Land Planners,
200 S utton St, N orth A nd,over, MA 01845, (617) 687;1483
TOWN OF NORTH A DOVE
120 Main Street
North Andover, MA. 01845
85-477.5
s�c�us
December' 9 , 1986
Board of Appeals
chairman Frank Serio, Jr.
120 Main Street
North Andover , I4tA D1845
RE: Jefferson Office Park/Variance and Day Care Special Permit
Dear Members of the Board:
At the Pla-ririiiig Board ' s meeting of Deeemb(�r lst, Mr. Joseph
Cushing of Kaminski Associates represented Hamilton fealty and informed
the board of their intentions regarding the ,1eff(�rson Office Park.
it is our understanding that the applicant, Hamilton Realty, intends
to raise the barn, remove some of the pavement within the fifty (50)
foot buffer and plant a landscaped buffer along the property abutting
Chestnut Street.
The Planning Board recorunends their proposal, , subject to the
following being incorporated into a written covenant:
1 . Thl�� property will remain in strkdt compliance with the plat
dated November 12 , 1986 , by Richard F. Kaminski Associates,
entitled "Parking" Plat of Land in North Andover, Ma prepared
fQar Hamilton Realty;
2 . Prohbit any future access onto Chestnut Street; and
3 . Strictly adhere to the plan detailing the landscaped
buffer designed to protect against further encroachment of
any pavement into said buffer.
din ere.ly,
), X;WL--,
f rich W. Nitzsche, Chairman
Karen H.P. Nelson, Town Planner
c : Karninski Associates