May 29, l 998
lttdccrt C01W101
Town planner
Town Hal€Annex
30 School Street
North Andover, MA 01845
RE: Engineering R.evicw
Stop& Slop
Proposed Modifications
Dear M8, Colwell:
As per your request, we have my€e ed the fnformatioxt provided regarding the above
referenced Project, It is ow understmuibv that it is proposcd to u od4 thr, subsurface
detention structures and flood PWn storage Aractures due to tinm constraints with
production of the originally proposed unim Vic )3avt reviewed the following
information:
Plan Entitled:
0 "Site Development Permit plan of Land in l anh Andover, l asswhus is
Stop and Shop Retail Facility", Sheets 5, 7 and 12 of 13 and the Flood Storage
Facility Plan revision date 717/97, Pnpared by Merrimack Engineering
Services.(the approved plans)
"Plan of Load in North Andover, i+ ussachusetts for Stop and Shop ReWl
Facility", dated MgLy 15, 1998, and Prepared by Menmimack Engineering
Services, received May 22, 1998.
1. TItc proposed area and volumes Of the detention facilities are somewhat different than
the approved design. We Performed quick calculations for these sys ms based on the
dimensions of the approved and cuzrendy proposed drywella. Overall the total
volume of durage for the Bete ion facilities is approximately 800 cubic feet srnaMr.
NQ irrfaramation for the flood storage facility 1, 2, 3 & 4A was provided. This axes is
.not listed as revlise& WO also calQuIaW the storage for flood storage facility 4B,
which is approximately 2DO cubic feet smaller. We rccommnend, to avoid the need for
furthim analysis, thm the areas and volumes be equal or greater than the approved
design. providing stage storage tables consistent with the appwvcd design would
expedite ruvic ►r.
101 Accof0 Paek Olive 781 �82-54(10
fVorweli, MA p2 1-115 5 Fax: 78 1-%2-54
The latest plan indicates a different invert and pipe siw at DMH I than the approved
puns. This should be corrected.
We appreciate the 'DPPO uiuity to assist the Pimining Board on this project mid hwpe that
this inf'ormmion is sufficient for yow needs. if you havr- any questions .please do niDt
hesitate to contact ups.
"Very trwy yours, r
OLER&COLA TONIO,INC,
r
John C. Chessia, P.E.
Xc. Merrimwk Engineering Services
r 10. 069 ktl
CL
COLANTON102
NCxn MV35 AND Ur-11Vn1'n7 l
July 73, 1997
Pluming Board cln dill Scolt Post-It- sand fax#Eansmit#8k mememo7671 *a�"ga -
'own Hall Annex �� `--
30 School Street �r e`14
North Andvve[, MA 01845
MkL AfeFax 0
RE, Engineering Review
Stop& Sloop
Site Plan Speciai Permit
Dear Mr- .Scott:
As per your request,,we have reviewed the information Provided regarding the about,
xeferencv projeet- tsar review is based on Plaw)ing Sowd's Conditional Appsovai
for the above noted Special Fcrmil Site Pfau- We have reviewc€# the follu ing
info mati(m;
Avis Entitled;
"Site Devrlopinent Permit Purl of Land in North Andovcr, Massachuscus
Stop and Shop M tail Facility", Sheets 5, 7 and 12 of 13 and the Flood Storage
Facility Plan revision date 7/7197, Prepared by A+mimack Engineering
Services.
• Drainage Report for Stop & Shop Rowe 114 NoM Andover, MA Revised
July 7, 1997,Prepared by Merrimack Engineering Services-
Fax € f Read vs Flow for pipes dated 7/14197.
Th6 correspondence follows tlic f lan numbering in the conditional approval letter
format. According io the conditional approval letter, the following design conditions are
to be addressed prior to eudorscment of the plam
f,of i) In ormation as cited in the ietter dated Atay 19, 1 997from John C C he -vla, PF O,f.
C'o 2r car C l rrrf nir, which is rtltcrc red hereto and rfircorporated herein by
reference.
l,b)i.). As cited in the fellerdatudMay 19, 1997fromJohn C:, Chessia, PE ofCo1cIr-
Colantonio. which is alWhsd her-etc and Dreor prated herein by reference.
for Acowd Park Drive 617-9d2-5400
f%[QnV91],MA 0�06I.16B5 Fax: 617-$Q2.549G
i U`.--,I NO.Oef9 902
a, )ti.) 7}ie parking s arcs ailjjAcent to the proposed building me Me Willow Stre.(l
entrance mrtsr he designated as employee parkbig only.
f d) The f nal pl4n musl be revic wd and approved by the drainage con,sujtttrrr, DP
and the Town Planner and,,ntbs eguemly endorsed by the Planning Board ire
final plan musrbe aubmittedfor reviow within ninety days off ling the decision
with the Town Clerk
We have reviewed our previo(ss Correspondence on this project. It appe s that our
comments relative to the drainage design have been adequately addressed. We Hatt that
That we have remmnended a test p _be di.g to determine groundwater e�ev��ans at the
front of the sate io E detenti*n mea. a also the proposed grease trap sewer
liar, is vary c e to tie draw dine and may need to be fa Bred.
We appreciate the opgorhuwity to assist the PlwmLng Hoard on this project and hope that
this itwf'armatiM is suff"ieient for your rter,-ds, If you have any questions please coo not
he6lue to contact us.
Very uwy you ,
C.
John C. Chezia, IDS
xc: c ,irack i;ngineeriug Services
r
+f
.l
r LE R ►.
COLANTON102
FACSIMILE COVED. SHEEN`
To: Kathleen Colwell
Company: Town of Forth Andover
Phone: 50 ) 88-9535
Fax: (5 ) 88-9542
From: John Chessia
ompan : Coles- & Cot tonio,Inc.
Phone: f 7 982-544:3
Fax; 17 982-5490
Date; April 16, 1997
Pages isiduding this
Correa• page: �
Comments:
lCa��ll�e�:
i knave ruyitwed the Old Venter Lane i�ie and recommend a 15 hich pipe at the i-',a 1e slop+ 2% as
pro posed for the 8 inch pipe, This pipe will haw the capacity to pass the peak 100 ycar iifioiv
easily, 1f oivy wakit to route tile, #lour t11rough t1le outlet Manhole €o jufifv a i2l Erich pile this €s
I have discussed Stop and Sloop at length wiih Bob Dalcy at Rrrimaclk Engineering and f lbink
we arc nuking progress. As vve discus,'Xd, he, is gc;lerating gmphs to Calu rate €die si[Q outflow
�,%-zth the stre- xmi flows levels to allow us to come [o agn t'tnent on a tailwater elevation fbr the
various storm events. W11Qn the, tatfivater elevation is agrccd upon tie caiculatio ns can then be
generatted:to check the. peak Fates. I'll keep you pose-d oii our progress,
.-AN'T I'
March 10!, 1�97
Ms. Kathleen Colwell
Planning D i reckm,
120 Main Street
nghieerin Review
t()x) & Shop
Proposed Retail DevOopment
Dear Ms, Coh yell:
In response irr our request, Caller& C lant rnio, Iona, has reviewed the suabmitwl package
for the above r fere need site. We have not visited. this site to date. This p.)rojieet has been,
reviewed Carr conformance taw the requirements,od'the "Zoning, By Law" in North Andover
as we] as stanud,ard err ineeri,rr„g pr•aetiee. the suulnrunittal package irreluude-d the following
iurfZwru�matrn:
Plains Entitle&
e "atop and Shop,Retail Facility" thirteen sheets dated /1 /97, Prepared by
Merrimack Filginezring Services.
Report Entitled
a Buttress,El"wF,'raffle, Impact &Access Study, dated February 1,4, 19197,
prepared by Dertrr t J. Kelly Associates,, 1nue.
u port catitled "Drainage Analysis for Stop & Shop", dated February, 1 9,97., prepared
by Merrimack Engineering Services was reeeiwv d on February 1, 1997. "l`lne rwur-situ;:
drainruu,ge a,rral sis was not submitted with this report but it is o�urr understanding that it will
be forthcornnnry ,
The proposed project is located adjacent (o and west of Turnpike Street approximately
1,000 feet north ofthe TurnpikeStreet/WillowStreet/Mill Road intersection,. The
proposed project is a commercial/retail huilding with a fibot print area,of 614,2,45 s , l'1.
j sited on uppp�ro inn°uatel 9,259 sip. ft„ of land, The lopuw raphy of the site is relatively
level; Qu nsis,tinug of existing buildings and a subdivision roadway.. ppro innnately three-
quarters arters of the site is graded toward," the existing, suabdiwFisio n roadway. The remaining
area is graded with a gentle slope from a high point in the northwest eorncr to the low
paint in the northeast co»er adjaccait to an existing catch basin located on Turnpike,
Stree, The site pyv-,candy includes greenhouses and ether baildings, The remajiider of
the lot consists of crarnpacted soil, stockpile mataial, grass and light vegetati(in. The,
frontage area adjacent to Turnpike Street is located within the FEMA Zone A 11ood plain.
e offer the following coirnnents;
1. It is our understanding that Sections 9,3 5. e) iv, xix, xx, xxH sand xxiii, are typically
reviewed by Town Staff.
2. It is our understanding that an ENF has been Bled for the site.
3. Section 8.1.)1 4, Ground mounted signs for Nindicapped parking spaces should he
shown on dhe plans.
4, Section 8, S, e. i. North Arrows me missing on sheds 5 through S.
5. Section 8, 5.}e.}iv, A 20' utility easeinesit is shown on sheet two of the plan. The
rights associated with this casement and how this easement impacts the devel���rr�tent
should be addressed. The existing sewer nwhole located in the Ality easement
should lave invert data. Existing and pyoposed utility crossings sho0d he checked to
avoid conllicts.
. The "Table of Zoning egulatious" is inoornplcte and incon6istrnt. It appears that
} this silt! fronts on two streets acid therefore does not have a i-ear yard. The required
number of'parking spaces based u1x>n Section 8.1)2. is not in compliance with the
required number of spaces listed in the srxsning table. The •r.oning, table should include
inf'oiTnatiuia on the size of any proposed signs as required by Section S.3 5.)c.)vh
These disci t pancl es should be addreSSCd.
7. Section 8,3)5. e.)viii. The overall height ;ml gross floor areas of the exiNting
structmts his no been shown on the plaits.
8. section I . S. e. ix. Building elevations were nrA provided in this package. The
Plannin- Board may want to review the prop)scce appearance of the bL iIding from
Turnpike Street,
9. Section 8,3) .)e,)xii. The location,height and materials of Emy signs should be shown
on the plaits.
t(1. Section 8.3 5.}e.}xvi A fence should Ue shown adjacent to the i)ttfWe compactor
and/or cantainers.
11. Additional inlorrnation should be prewided to illustrate sulficien€ turning radius for a
tractor trailer entering the loading dock areas enteriixg fto n Willow,Street.
12.. The proposed grease trap appears to be within the area to he dedicated for
coinpensatory volume Cor 100 year flood plain I1lling.
13. 'I'lie: maxitnuin.distance between weep h(Acs should be noted on retaining wall detail.
It is une I car where the note speci J`yi in the distance between j o hits is located.
114. A sidiewal k hand ic apped rarnp detail, sho al d be i ncluded in the: plan s.,
151. It is unclear if the site, lighting schedule applies, to this project. 'rhe schedule on Sheet
3 contains a number of columns whioh are crossed out.
16, The proposed, stabilized construotion en(ranee should be longer to wofk ef,] cfively.
17. The relaining,wall camot be constructed as,designed without an easement on both
properties east of the site.
I& Die grading is, incomplete along that ^esterly side of the site.
19,w The grading plan is, difficult to follow withsorne areas having one,(1) fbot cu,ntours
and other areas having two 1(2,), lbot oontours.
M The Utility plan should include drainag layout and cable utility conduit layout.
2L The detail sheets, have a detail of a swale. THs unclear where this structure will be
ust-d"
Drainage Issues
22. It is our undcrstanding' fi-om as discussion, with Merrimack Engineering Services,, lane.
on March 7, 1997 that additional inforniatiori on the drainage design.is fortheorning,
therefore we have no c(,)rnni,ruts on draitiage at this Beene.
Very truly yours,
COLE'R & COLANTONTO', INC.
WP
Jolin C. Chessia,P.F.
XC. Merrimack Engineering Services