Loading...
HomeMy WebLinkAboutTraffic RFP Correspondence 1997 NorthTown of Andover 0MICE O r North Andover,, Massaclause s 0. ToGeorge Bezkorovaimy, Bruce Campbell & Associates, lrae. 451-9904 Paul Hajee, Hajec & Associates (508) 557-1185 David D,e aie, P.E. Volmer Associates, Inc,, (617) 4 1-3423 David J. Friend ( i 7), 275-4 4 Fr on. Kathleen Bradley Colwell, Town Planner Date, March 7, 1997 Re: Request uest for Proposals r Tr•aa1l"se Stud leer R viitw� relative to prop s �l rresialentia'l development Turnpike Street (lit. 114) North Andover, MA Attached please find request for proposals fbr° traffic stUdy peer review concerning the potential, iniip act of,a proposed commercial rlevelop,mermt on at existing state highway y (lit, l 14) In 1 or-tla rm over, MA, 1f YOU have, any questions please do not hesitate to gall raze at (5 6 - 5. BOARD OFAPPEALS88- 54a BUILDNO 688-9545 CONS RRVA'TIO 6:8&- 530 WAa,.TH 6 -95,Q) PLANNING 9535 Town of North Andover -1 COMMUNITY DEVELOPMENT AND SERVICES 0 �146 Man Street w North moor„ Massachusem 0 184 Memorandum To` Doris Elliott, Town m Accountant Froi n:' Kathleen.Bradle Colwell, Town Planner Date; March 18, 1991 Re: Contract for review f traffic issues associated with tine Stop loop project Attached is an original contract for the review of the traffic steady completed 1ny the applicant and submitted to the.Planning;board as pert of time application for site plan review flag t.lne proposed constniction o f a S tope & Shop on rt, 114. The contr et is between Pau 11aJec o fT-TaJe Associates eisates rnd ' illiann"n, Scott , the CommunityDevelopment Director, The total project cost is$'975 winkle will one paid from the 593 account held for this project. According to, our records, we area, currently holding $$5,000in that account. Please let ine knowif you, need any additional infornrnati p„ n3O rF APPEALS S8 54n B ING 688- 3,4.3 CONSERVATION ERVATnrn'N Q;t�-sa 530 HEALTH 688-9540 PnA 'G G 68"5 5 REQUEST FOR PROPOSALS TRAFFIC STUDY PEER REVIEW RELATIVE TO PR PO ED_RE I E. f.TE 1_.DEVELOPhiENT Stop & Sinop TURNPIKE STREET (Route 114) NORTH ANDOVER, MA March 7, 1 97 1. INTRODUCTION A. OVER IEW AND 0BJECTIVES The North Andover Planning Department is seeking proposals from qualified Traffic Consultants for a Traffic Study Peer Review, concerning the potential impact of a proposed SF commercial development on the existing State Highway, Turnpike Street (Route 1 1 ) in North Andover, MA. In addition, the Planning Department is seeking recommendations of required improvements to the adjacent roadway infrastructure impacted by the proposed development. B. BUDGET Although there is no specific project budget, the Planning Department is seeking competitive proposals and fees. Payment to the Consultant will be made by the Town. , APPLICANT'S INFORMATION Copies of the Applicant's Traffic Impact and Access Study submitted to the Planning Department in March 1997 are available in the Planning Office for review on Monday through Friday between the hours of 8: 0a.m. & 4:30p.rn. D. SCHEDULE The Consultant shall complete the study within fourteen (7) calendar days of receipt of written Notice to Proceed. li. SCOPE OF SERVICES A. The study area includes the intersections of Turnpike Street at the Existing Site and along the project parcel frontage. B. The study should inclUde at a minimur but not be #invited to: ( 1) Methods of existing daily and peak hour traffic volume data acquisition. (2) Level of Service analysis and determination for the above referenced intersections. ( ) Reference of the Institute of Transportation Engineers (ITE) latest traffic generation rates for the most appropriate land use code. (4) The basis and foundation for direction flow splits estimation at the referenced intersections in the study area, C. Additionally, the study should make specific findings and recommendations with regard to any improvements required to the study area intersections and roadways. Ill. SELECTION CRITERIA A. The selection of the Consultant to accomplish this study will be based upon the quality and depth of the Consultant's experience and expertise in providing similar studies. The Consultant should provide related type studies experience in his proposals. The minimum gears experience for the Project Manager should be b yrs. B. Appropriateness of the Consultant's fee and the ability to perform~ the study within the specified pal-Forman a schedule shall be considered during selection. IV. DU_E-DA .E A. All proposals should be submitted in triplicate in a sealed envelope addressed to: Kathleen Bradley Colwell, Town Plannner North Andover Planning Department Community Development & Services 146 Main Street North Andover, MA 01845 ( 08) 688-955 S. All proposals should be received in the Town Annex no later than 1 o'clock, noon on Friday March 14, '1997.