Loading...
HomeMy WebLinkAbout1995-04-05 Traffic Analysis CINCH PEAS VERSION 2-14-92 LAST DATA SET 1985 HCM Chapter 10: Unsigx lined 3 Approaches volume: Analysis by:David J. Friend Date: 01-30-1995 Time: 1: 6; 09 Int: Site Drive #1 Sheet I of Alt: 1998 PH Peak Hour GENERAL CHARACTERISTICS KEY: A- -B POPULATION GREATER THAN 50, 000: YES CONTROLS : FROM C; STOP C PREVAILING SPEED: 35 MPH MAIN STREET # OF LANES: 2 LANES MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: NO MINOR STREET LANES APPROACH: C SHARED TURN LANE: No LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: No RIGHT TURN ACCELERATION LANE ON MAJOR: NO SIGHT DISTANCE RESTRICTIONS (in seconds} APPROACH A: Rte 114 NB B: Rte 114 SB C: Site Drive LEFTS 0. 00 0 . 00 0. 00 THRUS 0. 00 0 . 00 0. 00 RIGHTS 0. 00 0 . 00 0. 00 VOLUMES APPROACH A: late 114 NB B: Rte 114 SS : Site drive TH RT LT TH TAT TH VOLUME 1388 47 60 1390 72 44 PHF 0_95 0 . 95 1. 00 ADJ VOLUME 1461 49 63 1463 72 44 PERCENT GRADE 0. 00 0 . 00 0. 00 PASS CAR/HR 69 79 48 S iRY OF LEVEL OF SIRAVICE BY MOVEMENT MOVEMENT DEMAND CAPACITY RESERVE Los A G DEL(SEC) A G Q LT FROM B. 69 245 175 D 16- 09 O . 42 LT FROM c: 79 1 -78 F %30504 . 263671873 20.52, RT FROM = 48 lss 139 D 20 . 76 0.75 CINCH PLEA VERSION 2-14-92 LAST DATA SET 1985 §CH chapter 10 : Unsig=alisea J Approaches volume: Analysis by;David J. Friend gegs; . Date: 01-20-1995 Time: 21■16= 08 Int: Site Drive #1 sheet 2 0f 2 alt■ lgga PM Peak Hour CALCULATIONS STEP I RIGHT TURNS FROM C: Site Drive @1 CONFLICTING FLOWS 1486 CRITICAL GAPS 5. 2 CAPACITY 183 CAPACITY USED 26% 1"EDANCE FACTOR 0. 81 ACTUAL CAPACITY 1a3 STEP 2 LEFT TURNS FROM a:Ste 114 SE CONFLICTING FLOWS 1511 CRITICAL GAPS 4 . 6 CAPACITY 245 CAPACITY USED 28% IMPEDANCE FACTOR 0 . 79 ACTUAL CAPACITY 245 STEP 3 LEFT TURNS FROM C: Site Dive 01 CONFLICTING FLOWS 3012 CRITICAL GAPS 6. 3 . CAPACITY 2 ACTUAL CAPACITY I