BIOCLERE SYSTEM
ROUTINE INSPECTION
ADDRESS: 1468 Salem Street,North Andover OWNER: Najarian
DATE: May 23,2022 OPERATOR: Mark Cottrell
SYSTEM STATUS
Septic Tank
Filter: None
Scum Depth: 3"/36"
Sludge Depth: 751/36"
(Measured on May 23, 2022)
BioClere Dosing Pump
Pump H-O-A Setting: Auto
Pump Cycle Timer: 1 minute on,5 minutes off
Spray Nozzles Clean
Pump Amp Draw: 2.7
Bioclere Recycle Pump
Pump H-O-A: Auto 3
Pump Cycle Timer: 2.5 minutes on, 3.0 hours off
Pump Amp Draw: 2.7
Dosing Tank
Pump HOA Setting: Auto
Elapsed Timer Meter: N/A
Alarm Selector: On,normal level
Exercise Pump: Yes, 8.4 amps
Test&Clean Floats: O.k., clean
Tank Condition: Good
Effluent Quality
Visual Inspection: Clear,no odor
Sample: pH=6.7,Dissolved, 2.61 mg/L, Turbidity= 8.72 NTU
Comments:
Signature: Certificate# 11739
PO Box 825,Ipswich,MA 01938. 978-356-0779 • Fax 978-356-5500 • www.clearwaterindustries.com
CLEAR WATER INDUSTRIES
P.O. BOX 825
IPSWICH,MA 01938
Telephone(978)356-0779/Facsimile(978)356-5500
BIOCLERE FIELD REPORT
Date: May 23,2022 Installation: Tested:
Client: Steven Najarian Service: Commissioned:
Address: 1468 Salem Street,North Andover Other: Scheduled Maint.: X
Inspector:
BioClere Model Number(s)
1) Odor around site? Y/N Source of Odor?
Check all that apply: Mild: Med: Strong:
2) Take influentleflluent samples as required.
3) a) Measure sludge in primary tanks and grease traps as required:
b Sludge depth in primary tank: Scum depth: 3"/36" Sludge depth: 7"/36"
c Does grease trap need pumping? Y/N
UNIT 1 UNIT 2-not applicable
4) BIOCLERE VENTS
a) Is air passing through the vent? Y N
If in doubt put a small plastic bag around vent and allow to fill
5) GENERAL
a) Any external damage to the unit(s)?If yes,then provide details on back
b) Are cover,fan box and control panel securely locked? Y/N Y/N
Anv filter flies in the unity n many
d) Locks/Latches/Handles,OK? Y/N Y/N
e) Lid Gasket,OK?Installed new gasket on Bioclere cover. Y/N Y/N
f) Does the fan box contain standing water? Y/N Y/N
If yes,then remove water and clean drain holes if necessary.
6) BIOMASS CHARACTERIZATION
a) Color of biomass?
l)white 2)white/grey 3)grey 4)grey/brown 5)brown 6)red/brown 7)black 8)other
b Thickness of biomass 6—12 inches below media surface
1)light 2)medium 3)heavy
7 NOZZLE SPRAY PATTEN
a) Does spray cover the entire surface area of media? Y i N Y N
If not then clean each nozzle with a bottle brush
Does the spray now cover the entire surface area?
If not then:
1)remove nozzle-and soak them in q bleach sohifin
2)manually engage both dosing pumps for 2 minutes
3)replace nozzles
If not then consult AWT Environment,Inc.
3) PUMPS AND CONTROL PANEL
a) Record dosing and recycle pump timer settings from control panel
Dosing pump 1 and 2: 1 minute on/5 minutes off minutes on/minutes off
Recycle pump: 2.5 minutes on/3 hours off min on/min off
In BioClere control panel set dosing and recycle timers to a test cycle:
a) Measure amperage of dosing pump 1: 2.7 amps amps
b) Measure amperage of dosing pump 2: amps amps
c) Measure amperage of recycle pump: 2.7 amps amps
Are the doing pumps alternating? Y/N Y/N
Are the timers operating properly? Y/N Y/N
Visually inspect relays for wear and record problems below. None
*If spare components are need contact AWT Environmental,Inc.
If an ammeter is not available,set the timers to a test cycle as above and
physically at the Bioclere,check the pumps operation as follows:
Dosing pumps:check that pump(s)are operating,alternating and the pump 1:OK?Y/N pump 1:OK?Y/N
designed rest cycle is occurring. pump 2:OK?Y/N pump 2:OK?Y/N
Recycle pump(s):check that pump(s)are operating and the designated
rest cycle is occurring. OK? Y/N OK? Y/N
*If pumps or control components are not operating properly record below
and consult AWT Environmental,Inc,
RESET TIMERS TO ABOVE SETTINGS: Note any changes here: min.on/ min.off min.on/ min.off
s
9)PLUMBING
a) Are the unions in the Bioclere leakinar } }°
If yes,then tighten with pipe wrench
0)FINAL CHECK
a) Main power"on"and toggle for all pumps set to"normal'position Y/N Y/N
b) Alarm toggle set to the"on"position Y/N Y/N
c) Lock control panel,Bioclere cover and fan box
d) If possible,record the water meter reading:
11)REPORT SUMMARY:
SIGNATURE:
Massachusetts Department of Environmental Protection
" Bureau of Resource Protection - Title 5
DEP Approved Inspection and O&M Form for Title 5 I/A
Treatment and Disposal Systems
A. Installation
Important:When Steven Najarian _
filling out forms --
on the computer, Owner
use only the tab 1468 Salem Street
key to move your Facility Street Address
cursor-do not North Andover 01845
use the return
key. City Zip
Mailing address of owner, if different:
Street Address/PO Box:
/ City State Zip
( ) - ext.
Telephone Number
B. Authorized Service Provider
Clear Water Industries
O&M Firm
P.O. Box 825
Street Address
Ipswich MA 01938
City State Zip
(978)356-0779 ext.
Telephone Number
Mark Cottrell 11739
Certified Operator Name Certification Number
C. Facility/System Information
DEP ID Manufacturer ID Model Number
Installation Date Start of Operation
Approval Type: ❑ General ❑ Provisional ❑ Piloting ® Remedial
Seasonal Residence—used less than 6 mo./year: ❑ Yes ® No
D. Operating Information
May 23, 2022 May 14, 2021
Inspection Date Previous Inspection Date
Sludge Depth(to be checked yearly)
— — Pumping Recommended El Yes ® No
t5aiom.doc•rev.11-07-05 Page 1 of 3
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Title 5
DEP Approved Inspection and O&M Form for Title 5 I/A
Treatment and Disposal Systems
E. Field Testing
Field Inspection:
Color: ❑ gray ❑ brown ® clear ❑turbid
❑ Other(specify):
Odor: ❑ musty ❑ earthy ❑ moldy ❑ offensive ❑ turbid
Effluent Solids: ❑ no ❑ some
pH 6.7 SU DO 2.61 mg/L Turbidity 8.72 NTU
6 to 9 2 or greater 40 or less
Should a Remedial or General Use system fail the Field Testing, effluent samples shall be collected
per Standard Methods and analyzed for BOD and TSS.
F. Sampling Information
Samples Taken: ❑ Influent ❑ Effluent
Commercial systems or systems with a design flow of 2000 gpd and greater, and General Use
nitrogen reducing systems:
gpd
Parameters sampled: ❑ pH ❑ BOD ❑ CBOD ❑ TSS ❑TN ❑ Other(list below)
Other 1 Other 2 Other 3
G. Inspection and Maintenance
Description of any maintenance performed since previous inspection &during this inspection:
Notes and Comments:
Field sample was clear with no odor.
t5aiom.doo•rev.11-07-05 Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Title 5
DEP Approved Inspection and O&M Form for Title 5 I/A
Treatment and Disposal Systems
H. Certification
I certify: I have inspected the sewage treatment and disposal system at the address above, have
conducted the required Field Testing and/or sample collection in accordance with Standard Methods,
have completed this report and the attached technology operation and maintenance checklist, and
the information reported is true, accurate, and complete as of the time of the inspection. I am a
Massachusetts certified operator in accordance with 257 CMR 2.00.
May 23, 2022
Operator Signature Date
System owner must submit this report, technology O&M checklist, and any required sampling results
to the local board of health and DEP as follows for each inspection performed:
Remedial Use—by January 31 st of each year for the previous calendar year
Piloting Use-within 45 days of inspection date
Provisional Use—by March 31th of each year for the previous 12 months
General Use—by September 30th of each year for the previous 12 months
Send to:
Department of Environmental Protection
Attention: Title 5 Program
One Winter Street, 6th Floor
Boston, MA 02108
t5aiom.doc•rev.11-07-05 Page 3 of 3