HomeMy WebLinkAbout2001-07-11 Decision SPR Town of North Andover i40RTbp Office of the Pla iin Department � �#iT4F� ±;�� Community Development ment and Services Division 7 Charles Street Tartu Andover,Massachusetts 01845 t� MP& HeU Griffin Telephone( 78)688-9535 Planning Director Fax (978)688-954E2 Notice Of Decision ! , Any appeal shall be filed , ' Within ( 0) days after the 0. IS I-I QM;Fy 2haf Mt;nty�201 i�hp AI;psed frcmi data ofdeGS;un,fi' z: t Date of fling this Notke +ILMLEt Milo Of an appear. -�- In the ( ce of the Town Daio J'U f r .JV F,L A. Br3duhau$ O Clerk Town Clwk <�� Date: July 11, 2001 Date of hearing: July 10, 2001 Peta#iort of: Atlantic Realty Trust 342 North Main Street Andover NJA 01810 Premises Affected: 740 Tumpi e Street Forth Andover, MA 01845 Referring to the above petition for a special permit from the requirements of the North Andover Zoning Bylaw Section 8.3 and 10.3, o as to Dhow: the construvtion of 5,326 square foot car wash facility Vcated in the Village onmierc 1 Toning District. After a public Dearing given on the above state, the PlanniiRg Board voted to APPROVE, the Special Permit for Site Plan Review, lased upon the following conditions: Signed: tn l ins, 1 airman Cc; Applicant erto Angles, Mice Cbairman Engineer Richard Nardella, Clerk Abutters Richard Rowen DPW Alison Lescarbeau = Buildlug Department Conservation department Health Department ZBA ATTEST* ESS"EX NORTH PEG ISTRY OF IDEFI)S A True COPY A TRUE COPY. AT TEST; Towr� Clerk BOARD OF■■AFFI M 9 6&t-9541 BIRL IMOUAMbr VAS' N 68 MI9 HEALTH 68&45 PLANNI i,�688A533 740 Turnpike Street-Car Wash Faidlity Site Plan Review - Special Permit The Planning Board herein approves the. Special Permit/Site, Ply Review for the c,onstractibn of a 5,326 square foot car washy facility located in the Village Co nercW Zoning District..Tlvs Special Penult was requested by Atlantic Realty Trust, 342 North Main Street, Andover, MA 0184 . This application was filed with the Planning Board on mute 25, 2001. The appUcmit subrnitted a complete application which was noticed and reviewed in arcordame with Section 8.3, 10.3, and 10.31 of the Town of North Andover Zoning Bylaw and MGL CADA, Sec. 9 The Naming, Board makes the, hollowing findings as required by the North Andover Zoning Bylaws Section 8.3 and 10.3: FINDINGS OF F,A T- I. The specific site is an appropriate location for the project as it is located in the Village Commercial Zone and involves the construction* of a car wash facility which is an appropriate use as deemed by the Building Commissioner in his )etter dated September 25, 2000 (attached). 2. The use as developed will not adversely affect the neighborhood as a sufficient buffer has been provided. Extewive landscaping has been provided along the ingress/egress point to the oar wash facility and along Route 114 and will be planted in accordance with the recommendations from Mchael D. Howard, Environmental Scientist and his letter d ed March 20, 2001 (attached). Furthermore, the car wash 1 61ity will be comprised of'a combination of split face cement block, cedar wood- siding and architectural designed roof shingles and has been designed to street the architectural standards ofthie Village Commercial District. 1 "There will be no nuisance or serious hazed to vehicles or pedestrians. An Ons3te Traffic Management Plait has been submitted by. DJK Associntts, Inc. and reviewed and approved by the Outside Consulting Engineer,V.mwse. flangm Btustlin,Inc. 4. The landscaping approved as a part of this pleat Meets the requ malts of cf; n ,4 as amended by the Planning Board, of the North Andover Zoning Bylaw, , The site duaimge, system is designed in accordauce with the Town Bylaw requirerttents and has been reviewed and approved by the Outside Consultkig Engineer, Vanasse,Banger Brustlin, Inc; . The applicant has met the requirements of the Town for Site flan Review as slated in Section 8.3 of the ZDning Bylaw; 7, Adequate and appropriate facilities will be provided for the proper operation of the proposed use, l Finally the Planning Board finds that this projeat generally complies v4th the Town of Forth Andover Zoning Bylaw requirements as list?d in Section 8.35 but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the applicant provided the followiug conditions are md. SPE IAA CONDITIONS. x. Prior to the endowment of the glans by the Planning Board, the applicant must comply with the following conditions— a) The foal phm must be reviewed and approved by the DPW mid the Town Planner and subsequently endorsed by the Planning Board. The final plans must be submitted for review within ninety days of filing the decision with the Town Clear , b) A bond in the amount of five thousand ($5,000) dollars must be posted for the purpose of insuring that a final as-built plan showing the location of all on-site utilities, structures, curb eats, parking spaces, topography, and dralriage facilities is submitted. The bond is aho in place to insure that the site is constructed in accordance with the approved pima. The form of security must be acceptable to the Planning Department. c) The applicant gust supply a copy of the approved Massachusetts Highway DepWtn nt permits necessary for construction of the site to the Planning Departrr�ent. . d) The applict must supply a letter from Dennis Bedrosian, Drinking WTI' Superintendent for the Town of Forth Andover, stating that all of his concerns in his memorandum dated 15101 have been addressed satisfactorily. attached Z. Tbroughoat and During Construction. a) Dust mitigation and roadway cleaning must be perforirred weekly, or as deem necesswy by the Town Planner, throughout the oonsttuction process. b) . A construction schedule shall be submitted to the Phwning Staff for the purpose of tracking the conAruction and informing the public of anticipated activities ors the site. c) Hours of operation daring consliuction are lialited from 7 a m. to 5 p.rm, Monday through,Friday and 8 a.m.—5 p.m. on Saturdays. d) During construction, the site must be kQpt clean and swept regularly 2 3. Prior to FORM IT vertrication (Build' ig Permit issuance); a) The Plamiing Board must endorse the final site plan mylars and three (3 copies of the signed puns must be delivered to the.Planning Department. b) One certified copy of the recorded decision must be submitted to the Planning Department, c The applicant is required to pay sewer mitigation fees in accordance with the current and prescribed policies at the Department of Public Works. Proof of payment must be supplied to the Pkmt i Department. s , 4. Prior to verifeation of the Certificate of 0ecupancy: a The applict must submit a letter l'rorn the architect and enneer of the project stating that the building, sighs, landscaping, lighting and site layout substantiaDy coMly widi the plans references) at the end of this decision as endorsed by the Pbnv3ng Hoard. b) The Planning Staff shR approve all artificial lighting used to illuminate the site. All lighting shall have underground wing and shall be so arranged that all direct rays from such lighting falts entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Planning Sty` shall review the site. Any changes to tlw approved ligh#ang plat as may be reascimbly required by the Plamming Staff shall be made at the owner's expense. All site lighting shall provide 'security for the site and stmotures however it must not create any glare or project any light onto adjacent residential properties. c) The applicant will post a sign outside of the building that states. "No loud music from 7:00 pm- 7:00 am - police take notice." d The applicant will be responsible for planting a hemlock or arbor vitae . evergreen vegetation buffer spaced between 4 and 6 feet, or as ne ded to provide sufficient scr'eerr, insuring between 6 and S feet In}height. This buffer will purr along the repahiing wall on the northern side of the property for approxiately 1 t 0' or as needed to provide sufficient screening from the abutter's PropeAy. The screening will be approved by the Planning Staff before release of final bond, and any changes to the screening as niay be reasonably required by the Planning Staff shall be made at the o'wnees expense. The owner shall be responsible for promptly maintaining and repairing such retaining wall and promptly replacing any such evergreens as rnecess ry, e) The applicant wilt be responsible for creating a 3 foot berm wax a hemlock or arbor vitae evergreen vegetation(measuring between 6 and 8 feet in height, for a total height of not less than 9 feet) buffer behind the durapster to the north of the property running to the northeast corner of 3 the stone wall for approxi t ly 0'. The applicant will also i iolude a five foot vinyl clad fence tied to the stone wail behind the dompster for ' approximately 601 and tying inn to the northeast stone wall. The planting, berry, and fence wiH be approved by the Planning Staff before release of final bond, and any'changes to the planting, beral, and fence as may be reasonably required by the Plaming Staff shall be made at the owner's expense. The owner shall be responsible for promptly innaintaining and repairing such wall and fence and for promptly replacing any such evergreens, as necessary. 5. Prior to the fmal release of security: a) The Pluming Sty' shall review the site. Any screening as may be reasonably required by the Pluaiuig Staff wifl be added at the applicant's expense. Specifically after the detention pond is completed, the Town flamer will review the 'site and any screening..as nl%y be 'reasonably required by the Town Planner wilt be added at the applicant's expense b A final as-but plate showing &Rd topography, the location of all on- site utilities, structures, curb cuts, parking spaces aid dr inago facilities must be submitted to and reviewed by tine' Plarroing Staff and the Division of Public Works. . Any stockpibg of materials dirt, wood, construction niaterial; ebcj must be shown on a plan and reviewed and approved by the Pk ni g Staff. Any approved piles must remain covered at all times to ininimize any dust problems that may omur with adjacent properties. Any stock piles to remain for longer than one week roust be fenced of and covered. 7. During construction, In an effort to reduce Noise levels, the applicant sIM11 keep in optimum working order, through regular r internancc, any and ail equipment that shall eauanate sounds from the structures or site- S. Any plant, trees or shrubs that have been incorporated into the Landscape Plan approved in #his dcoision that die within one year from the date of planting shall be replaced by the owner. . The contractor shall contact Dig Safe at least 72-hours prior to commencing any excavation. 10. Gas, Telephone, fable and iJl ctric utilities shall be installed undergrom as specified by the respective utility companies. 11. o open burning shall be. done except as is permitted dung burning season under the Fire Department regulations. 4 12. No underground fuel storage shall be installed except as ray be allowed by Town ,Regulations, 13. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and €ll successors and assigns in Merest or control. 14. Any action by a Town Road, Commissioi4 or Department, which requires changes is the ply or de.s of the building, as presented'to the Planning Board, may be subject to modification by the Phmning Board. t 15. ,A.iy Tevisiom shall be submitted to the Town Purer for review. If these revisions are deed substantial, the applicant must subrnit revised plans to the PLmaing Board for approval, 16. This SpeQial Permit approval shall be deemed to have lapsed after (two .years fiom the date permit granted) unless substantial use or construction, has commenced. Substantial use or conrstruoion w1 be determimd by a majority vote of the Plwming Board, 17. Trash pickup will occur between lam and 7prn only. 19. The Qwrent appfioant is the ovmer acid any prior applicant is no longer in control of the property. } 19. The Mowing information 4md be de ned part of the decision: Flan 'Titled: Site Development Permit Plan Proposed Car Nash Faclq Plan of Land hi North Andover, Massachusetts Prepared for: Atlantic Realty Trust 342.North Main Street North Andover, Mass. 01845 Prepared By: l erxin=k Engineering Services 66 Park Street Andover, MA 01845 Scale: 1"=4.0' Date: Jerre 22, 2001 Plan Titled. Onsite Traffic Maas a ent Flan Prepared for: Atlantic Realty Trust, North Andover, Massachusetts Dated; 7.1510.1 Scale: Prepared-By: DJK Associates, Ino, Two Dundee Park, Suite 301, Andover, MA 01810 Report Titled: Traffic In)pact & Access Study, Proposed Car Wash Prepared By: DJK Associates, In. Two Dundee Park, Suite 301, Andover, MA 01810 Date: 7/5101 Report Titled: Drain4ge Deport Atlantic Realty Trust North Andover, IAA Prepared By; Merri=ck E leering Se czs, Inc. 66 Park Street Andover, MA 01810 Dale: July 6, 2001 cc: Applicant Engineff He } 6 TOWN OF NORTIT A DOVER OFFICE Or. COMMUNITY DEVELOPMENT AND SERVICES 27 CHARI ES STREIET NORTH AN DOVE P, MASS ACHUS ETTS 0I845 a FAX (978)688-954 . } I' . #{ F.d SePternber 25,200D John 1--eman 45 Pkne Ridge Road North Andover MAO i 845 Re, Proposed tsar Wash - 74D TuTnplke Street Dear Kr- be advised that since a far wash isana cessory use under Section 4,131 o t g'.` er mI Bus[nc*$ D'sstrict" and sirSCe SCCtfarl 4,130"ViJIage COMMereial D'astrir r'w�jq adopted nt the t9 €n "Main tairE all the aEfowAnces, n on-Al€aware and sPee�al Permit designa#Earls slrn 87�overt Meet caEurnn entitled General busEr=except the foilowing: EEar to those kd under the } Auto Service Station-- insert the ward No Y Auto Vehicle Ropajr, Body Shop—insert the wart! Iqo * Bus Garage—insert tiro word No * Storage 4�r ContTactors Yard—in58 the word No • New, Car Sales—insert t€ to work No • Room ing Molise—insert the word Ne In my opinion 'hat a car'wash fs an a]10 Erse 3n the Vif€s questions please calk me at 688-9S43, ge Cu ratrrtetckal District. Efyou €raye any Very truly yours, D. Robert Tlicetta, Building Cornnitssianer D ,gym Fla- Tumpfke Ss,F-Ia 03a47P P . 02 f�. �. ri+��,c1 Atvi fez a Ora qj 16, 1,9AJ;RI 0 VIA T'owN rxr NOM Ajw Dmp-, c v errs 'rtri Treat�neat Flan ,f AM Cat POM4 Rd v �# ram# . . To: 'Tin VillkM DP R�ftff Eagie ��.r7.l;lu' vJ q# viakiat ab o t. Cqmmalms and-4and-4 OjDmrft reprdin;the'prod Car-, be �mattd oWRt. 114 [a Nartle, over. Plow char* eao pirvVi a th*fm o� tkc fix" 114 ar+aa o conaKv paearbk+end r di si`b�slraa avcragc PIODUM u 4�pi;} hsx �egr[i+hs irnp�rt cnui c wsh b( o; The tar ,,i4 � �}-x4e suxrrvkkndiog dis�s�iFgp sY ? ' '� ' '� Au sWWmOTQ val v use as wd 37,`oaa"W k w"?. c ifs,t�Mra1 the CMlW tWMA nnUl be kapttorK{�Y nepgra=cd by kiWr arcs Sitm irete"tr pubuc Wares $;+gloat aw a privatrL Wes or suixt c are pso [td, . tf the TVML xsYc r�c sysem 4# S?Ctc �d � ni QU mow- "`, - +A :,. dovkm mgT be built i4 soh tha*40 xrVf o To- M barb" Pjjr elwaer[ =MOd, ft="-r+cdw-cd PnP*L a toac Type devkAo s4-iM." fray mu%be vod by I'r*v r ofNoTsh AA&AWprior sW,Uw > Y! wii rfl #t lf1at the '$p>n.Ap"Tm5kV 10 dam.is.rgimmM Le be .1 plq (Ly6iC C+�15{7 IJ i�f13(q{ 047tt W1 al� rk#rAd#YLr „y 4 J rr- S-Q 03 : 47P Ali wtmMg %) be rre# DID r peekPC6Nb. 4100 mhor o f wasmwA p� i . if 1 $a ow talc rs t4 47. ' }p: s _ n. P.TOV d tben .Ira w l'vwat,.r C be nd of d f ' - . � 4 G4�rtp,L' �JOii�'S Vu��J71C`YiuA .- ' kA• _ WiD-tkw fir,*and have . Vvive LnVa4C on thC #Zr! I 1409p�1WR34 d moar. w ,� ry thz co W pro msa t eve Suf ' � }'� scr{1 -nt=6 bf Fr] ms.fvin [fob t strclml to prcvm dwo i irXg'the co G tit _ What' is the pion fbr r"WVa1 of'Ffi ftoW the Wage *aM Will t A.: lit ko-ila iott .gyp uta mzd�e TmCificlay for cQ1kctjftq -- ±{ Very IT*: a u s ; h DYW Vkioor x_ { To it of North 1 iidover gbRx!{ �+ O 1�LED 8 W Office of the Planning Department ommui>:ify Development and Services Division M 4 27 Cliarlps Street 1.1eicii CTiffill Trlcpbone (978)688-9535 Planning Direrto)- Fax(978)688�9542 0cwbLr 23,2001 Clrristbia Minicticei, Pizgject Manager Atlantic fealty Trust P.O. Box 3039 Andover, MA 01 S 10 Re- 740 Turnpike Street Ma. i inicacci, The Planiii ig Ueparim"t has received your i'finzl site plsn", This PIR11 is not the"final site pIan",the suhmitted plan dated,tune 22,2001 endorsed August 1, 2001 are the final plaps of record for this project. Ire your letter you are statiW that revisionn need to be mado to the primary building and adj��I Eeuts to&uKqur1'ace drainage s€ ctures,water and sapitary utility layout. In aczordanuc with the Town of North Andover Zoning Bylaw Section 9.3.8 Revisions to Approved Site Plan a) Any revision to a developm .t that has sew red site plan approval shall he submitted to Me Town Flatuier for review. No revisions shall be approved until the Town Phinaer receives three(3) copies of the revi&2d plan =d the revisions on the plan fal I into the fol€okwing categor iuNj f) A diange of location and layout of any park hig area(s),219n,5,storage or accessory buildinp, Provided that au Town Bylaws are violated by the change; i i) The ch wige in the proposed laudscaping plan which does not violate any Town Bylaw iii) A change of egress and ingress provided the salve is in compliance with Town Bylaws and the requirements o€'the Communwealth The Town Planner cau.uot approve the revisfons as you are suggesting is your ielter dated Octoher 22,2001- You nee to provide the Plarming.Board with a Iist of the clxauges and delsiI as to why the changes Eirf,necessary to the plan. Wo have scheduled you to mne bicfure the Planning board on October 30,2001. At that thne the P Iariniug Board wi I€ determine if th a Changes call bo mEted. 1 f you have any que4ions please contact]he Planning Department at(978) 688-9535. StCeroiy, Heidi Griffin Town Planner cc:; Planning Roard f3�7A��F}[]�:SA'3'L,.1I_SGRR�}5•E1 �E.1�L.DZT!{TlaR3S-95+�3 Ci}\tiE';E21'r17TOA'G�R{)53Q] fI�.r:I:�7Ef.7�$•.`}3�`0 �'3.A1l�lEi�[}GS�-9535