HomeMy WebLinkAbout2001-07-11 Civil Review F fro. -24-01 01 : 54P lDJK & Associates . Inc .
Land De mlapmsnt
S e F V 1 [ e s
i
Magirwrtio".xee.34a[ras� rtr ate* Cnwhsve"niv wrdl&nm andtamfw kz ow rcmfminilco
j4,, aY I4,2001 LI?2L CCE I21Z E7t B77, xWu-- Lac. �
M' 06716,52
Mi. 110di A. Griffin •To—n PLvv az
Community Development sSeaviceo
Tawn of'North Andover
27 Cha�res��m�t ,
Norio Andover,MA 01845
Re, Roue III Cu Wish
North Andover,�YiA
Elea:Held!
V #$e HMSen B sdin,Fstc- (NTH$)has received 00 Traffic Imp act 5:udy ReFuLrE
prepared by phrmot J- eity"5o ates,ins,(dated May 16,2002) fvr the above refesea d
ps-c e&t.A thorough traffic review has been canducted and V'HB finds no sigsfte:ant sues
with dais report,VHB"s conrama in ttus m,attar are sadsfix%d&nd no l+uther engineering
revitw is required at this time.
U YM have any questions Or CaruerrLs,Please cau meat your convenierKe-
UYY trWY youxs.
VA AS E a&Q EN Sft€7STL '. VC,
T'irnathy B%1 to h'FE.
Projeet MAn akger-Highway&Murldpal Engineering
cc Dermot Kelly,DTK Associates,fnc.
Robe t C-Daley.Merrkmack Engmneering Sejv cis
Foss Office dox 91$1
r-kcaX+.3t; uw :�i�r*a.,,o-.toawla.x 61T.924-37" . FAX d1?',%Z4,ZZ56
amoiF, 'nf*49Ytbb.rern
'ar�vr�.itib.cDAi
MERRIMACK ENGINEERING EEI ING ERVI E , INC.
PROFEMONAL Eta GMERS + LAND SURVEYORS * PLANNERS
66 PA K SMEfT +ANDOVER.MASSACHUSETT5 61810•TEL(97�1)47&3555,3735721 •FAX(97$)475- 418 E-MAIL-marrortg400tcom
May 30, 2001
Mr, Timothy Willett
Town of Noah Andover
Division of Public Works
3 84 Osgood Street
North Andover, MA 0184
TEE: Route 114 Car Wash — Sewage Flow Estimation
Dear Mr. Willett.:
We spoke with Mr- David Bruno of McNeil Wash 8yrsterns in T'rovidence, Rhode island On
Thursday, May 24, 2001- He is a consultant and sales representative of car wash system
components, and lie may be given the order to supply all of the equipment for this car Wash-
"TUNNEL" VOLUME
Fie indicated that between 1 and 1,5°a of vehicle trips on Route 114, estimated at
30,000 pei- day, could conceivably use this cat-wash "Tunnel" at this Route 114
location. This would be between 300 and 450 car washes. At a tninimum, 70% of
the car wash water is recycled. Approximately 6 gallons per wash is est.iniated to be
discharged, This would amount to 2700 gallons per day of discharge to the Town
sewerage system. Assume a sic (6) hour day for pear flow rate purposes, the rate o�
discharge would be 7-5 gpm over the six hour period.
"COIN-OP" V(}i.1;1ME
He indicated that the 5 bay-, could use 7 gallons per cycle (air average of 2 eycles per
washed vehicle). This could conceivably generate water usage oC 1400 gallons per
day, based on 200 cycies per day. This would amount.to 1400 gallons per day which
would be dischar cd to the sewer 3-9 gpm over a six (6) hour period -
Mr_ Timothy Willett
May 3 0, 2001
Page
SUMMARY
The estiinsted total discharge volume to be anticipated would be 2700 + 1400, or
4100 gallons per day_ Based on these quantities, it is recommended that a 7000
gal ton "recycling? taiik and a 5000 gal[on "overflow" tank should be provided_ The
I "overflow" tank would be pumped out daily, during off-peak or specified times, into
thec Town sewer, This would he necessary if the,Town sewerage system could not
handle the total of 11.4 (say 1 Spin, during peak flow periods (weekends).
Given all of the above, please feel free to contact us should you have any questions or
com ments_
Very truly yours,
NLBR TM ACK Y, 1EER-ING SER ICES
Robert C. Daley, P.E_
Civil Engineer
cd
co; Mr. William Hinurciak
Mr. Thomas Laudani
Mr_ Louis M inicucci ,
M PQJMACK ENGINEEMNG SEROC[ S. INC. 66 PAN STREET AN[X)VF..I?. MA'SAC,HUSE175 09811]
MERRIMACK ENGINEERING SERVICES, INC.
PROFESSIONAL ENGINE # LAND SURVFYORS PLANNERS
66 PARK S ZffT+ANDOVER,MASSACHLrATrS 0101❑•FEL(975)475-3 is 3T 5721 • FAX(978)4715r144$ -FMAIL:mef'enomj.aam
July 5, 2001
Mr. Thomas D. Laudani
Atlantic Rcalty Trust
342 North train Street
Andover, MA 0 18 10
RE; Proposed Rte, 114 Car- Wash
Dear Toni,
We have computed the C,B.A. (Contiguous Buildable, Aria) 1'ox the subjeet project site. it is
detemined that thcrc is 7 2,47 8 square feet of C.B.A. The minimum required C.B.A. is
computed to be 67,500 8gaare feet, which is based on 75% of the minimum lot area allowed
in the V C— ' iilage Canxmercia] Zojie( 0,000 square feet)_ This information is includcd On
the Title Shect of thf,Plan Set.
Please contact our• office should you have any questions or comments.
Very truly yours,
MERRI ACK ENGINEERING SERVICES
1�0 C, Daley, RE.
Civil Engineer
oil
MERRIMA K ENGINEERING SERVICES, INC.
PROFESSIONAL ENGINEERS * LAND SURVEYORS • MANNER
66 PAR14 STREET*ANMVER.YIAI SACHUSETTS 01810• TEL(97$)475-1555.373-5721 • FAx(9T8)475-1445•&MAML.mumng0aac-PM
Novembel7, 2001
1r. Ken ravioli, Permits Hnginepr
Massachusetts Ehghway Depam-nent NOV 0 9 200,
519 Appleton SLreet _
Ariingtou, MA. 0 174 , n t-r;
RE: Route 114 Car Wash
forth Andover, MA
Permit t 4- 001-0186
Dear Ken-
As per our discussion on Wednesday, November 7, 2001, relative to the subject permit for a
driveway access opening,on Route 114 in Noilb Andover, a rNuest is hereby inade that the
retaining wall for drive ay, a portion heing praposed within the State High way Layout
(Route 1 t4), is permissible ar,d is included in tN� permit, as originally intended aTid implied,
based on the Site Development PeiTrt t Plans. This request is 1; ode in response to concerns
raised by Tow n Officials which mquims this clarification be expressed in writing from MHD,
For yGur review, t have enclosed photocopies of the portions of these plans which depicts the
construction limits of the&vc ay entrance. Picase review this inforniation at your earliest
oppoilunity, and contact me should you have any questiorns or c:ommeTiLs.
Very truly yours,
MERRIMACKENGI 1 aRI G SERVICES
0ob
, 407
C.
Daley, RE.
Civil Engineer
ed
Enclosure
CC: Mr, 'Thomas Laudani
r. Dermot 1, Kelly
MERRIMACK ENGINEERING SERVICES, INC.
PROFESS ONAL ENGINEERS * LAND SURVEYORS • PLANNERS
LIQ I bb FAA$1 RE£T •At,.DOVER MASSAC:HUSP113 01 M*1 EL(479)475-3555,373-57-2 1 • FAX(97B)475-1448- E-MAIL:merreiYggUdxxirn
October 26, 2001 hy y
OCT 2 001
Ms. llcidi ri#'fin, Tc3wu. 1�1�11�11er
Town of North Andovcr k6hO -'1-i
Coax munily Development and Planning
27 CharlesS tree€
Nai-tit Andover, MA 01 45
RE: Routo 114 Car Wash at 740 '1"urnpike Street
Deiar Mr. GriffdT1;
Rd at]ve to the subject project, please be aware that lbi�re have bet!rn seveT�al Modl1-icadons to
'he approved plans. The 64-(Tges ai-e, as follows,
The, buiI(iing ha,,k charged in size and location, to allow for an increase in the length of the
tunnel from 84' to 90', which rvy,, ted in a Tact dcctcasc iri tlac building footprint from 5326
square feet to 5296 square fee Yt. efer- to a print 0l-9 revised situ plan, wiaich
depicts €hesc buslding changes. Refer to a letter'from Christiana I inicucci to the P14nning
Moore! dated 0(:L )her 22, 2001, which dcsci`bed ill detail these changes,
11 i s noted that these changes have not affected the capacity of the, dn�irtage, 5ewel-age, and
water system.,; to bt- cc ri,�.I awled on the site.
Also, a manor ehangc in the retaining %val1, showing a 450 coot-r iTlstead r)f 99LI cnTYre�`, t�� case
Ehe turn;ng 1-c dili5 froal 01C.CA 110i-11 die a411. cl *0 thc .-gie'ss driya, IUn 5k^wa-dT rtiSi� �
'lease contact me, silo U1d you h1 Ive an y questions or comments.
Very truly yours,
ME'Rl2TMAC K ENGINEERING SERVICES
Robert C.'Daley, P-E.
Civil Engineer
ed
En,cAosl>:re
ce; Thu n�is: Laxidnpi
MAp�
jape swift Kevt�J. ulNv&rl wthevr,1-Amom
IGHWAY G'OVemof socralmr �nPolissror�er
November 0, 2041
l enimack Engineering Services, Inc.
66 park Street }
Andover, MA 01810 �
e_ North,Andover- R.ottte 114 jumpike S tr"O
Curb cut foy Car Wash
Permit#4-2001-0186
Atim, Robert C Dailey,P-E,
Civil Engineer 3
Dear Mr. Datey:
f
This letter is being v > in rasponse to your letter requesting your inodificatie6 to[
Plermit #4-2001-0186 to pjace riprap in lieu of L mtaining wall oji Massachusetts highway
WassHk way) property.
'rhe District has reviewed your submittal and is in agreement with yourr plan ias revs ed on
November 13. 2001 showing the removal a£the wall from taCe High ay proper#}, the wr;])i ng
of guard j a1i fTom the cxisting gourd raiI into the driveway to meet rbr. wall at the northe€ly'
]ucatiojb Ciiie afld III pja�errmcrtt of riprap 1 d)nd the guard rail as shown on the attar-hed p1a�-
If you have any quesxions concemhlg tli_i.t corresponderi,e, please�:oFjtact tht Distri t
Roux perrnits Engineer, Kenneth Ravioli at(781) 641.845�-
inceTel x
r'
��
�t�ph�rr 1. O �7onnell
District Highway Dizector
A Hlrnh
Massachusetts Highway Oapartment• District 4• 19 Applel n Striget, Arlington, MA D2476 (78 641 40
PRC) F
:1 , f
" _
{��[['' y A Cl( a'y2 �Or y
CD
�'j �
X= kf
PROP- 4101
PR"CT
P
PROP. TES 7AMW* G `
OF PW. G4 tpRA %kL '
FtELQGIl110a! 1O 11t►
M. WAJ
_.
�W AM wE GRAV
EXIS � ` 7E ��1. o
PROO. -RIP kT 1: EXSI. SIT. COK, am
PROP,"` 0V Sof
(70 W REOpy )
& P•-5 POSY Pam, RIP—RAP At 1
R.QN PUBUC 7946 LAYOUT) STREET PROP. cam. cam,
—'"ST'K EDGES of aAvE..WPAT