Loading...
HomeMy WebLinkAbout2001-07-11 COnstruction Control Form OFFICE OF BUILDING M PE TOR TOWN OF NORTH A DOVEP CONSTRUCTION CONTROL i ewo PROJECT NUMBER: PROJECT TITLE: PROJECT LOCATION: NAME OF BUILDING: NATURE OF PROJECT: r-- IN ACCORDANCE WITH ARTICLE 116 OF THE MAS ACHU ETTS STATE BUILDING CODE, REGISTRATION O, 0) . . BEING A REGI STERED PROFE SS IONAL E NG I NEE PJARCHI TECH HEREBY C ERTIFY THAT HAVE PREPARED OR €}IRECTLY SUPERVISED TIDE PREPARATION OF ALL DES I G N PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ' o ENTIRE PROJECT ARCHITECTURAL STRUCTURAL LMN M A �b uZP172 w ME PROTECTION ELECTRICAL � OTHER (SPECIFY) FOR THE AHOVE NAMF=D PROJECT AND THAT, TO THE BEST OF MY KNOWLEOE, SUCH PLANS, COh+PUTATIONE AND SPECIFGATIONG MEET THE APPLICABLE PROVISION OF THE MAS SAC HUSETT STATE SUILDING CODE, ALL AC EPTA13LE ENGINEERING PRATI CES. AND APPLICABLE LAWS ANO OMINAN I S FOR THE PROPOSED USE AND OCCUPANCY. FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PER1001C BASIS TO DETERMINE THAT THE WORT{ IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVE D FOR THE BUILDING PERMIT AND SMALL BE; R2SPONSISLE FOR THE FOLLOWING A5 SPECIFIED IN SECTJON 116.0 t 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with ft requirements of the constaiction ; docur-nents. . Review and approval of the quality oontral procedures fur all code-requ€red contmtled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar Wth6the progress and quality of the work and to deti�rmjne, in general, if the work is being � performed in a manner consistent with the construction documents, � PURSUANT TO SECTION 116.2 ,2 i SHALL SUBMIT WEEKLY , A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER 8UlLDING INSPE TOR. UPON COMPLETION OF THE WORK, t SHALL S URMIT A FILIAL REPORT AS TO THE SATISFACTORY COMPLETION AND READWESS OF THE PROJECT FOR OCCUPANCY. IG W€ E Ifl _SUBSCRIBED AND GR;%; 1-0 BEFORENIE THIS_... � � DAY OF �"� :�' L4 Zj- 20{} l NOTARY PUBLIC MY OMMIS I ON E PIKE S � °�•+ �' `-_'� i� r .