HomeMy WebLinkAboutConstruction Notes - Consultant Review - 45 SUGARCANE LANE 6/1/2022 North Andover Health Department Community Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 45 Sugarcane Lane MAP: LOT: INSTALLER: Boraczek DESIGNER: Osgood PLAN DATE: 2/15/22 BOH APPROVAL DATE ON PLAN: INSPECTIONS TANK INSPECTION: 04/19/2022 – S. Casey DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 4/28/22 – D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 5/18/2022 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) 20” inch cover to within 6” of finish grade installed over one access port Boots at inlet & outlet Comments: 04.19.2022 @ 11:00 am 6” stone in hole – S. Casey DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 04.22.2022 – 30 x 48’ cleared out a couple spots of B Layer while on site – S. Casey FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 148.00 HR = 1.32 HI = 149.32 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 4.31 144.68 144.79 Septic Tank IN 4.67 144.32 144.25 Septic Tank OUT 4.88 144.11 144.00 Distribution Box IN 5.15 143.84 143.84 Distribution Box OUT 5.33 143.66 143.67 Lateral 1 BEG 5.49 143.50 143.50 Lateral 1 END 5.66 143.33 143.31 Lateral 2 BEG 5.35 143.64 143.50 Lateral 2 END 5.67 143.32 143.31 Lateral 3 BEG 5.45 143.54 143.50 Lateral 3 END 5.64 143.35 143.31 Lateral 4 BEG 5.46 143.53 143.50 Lateral 4 END 5.64 143.35 143.31