Loading...
HomeMy WebLinkAbout1994-08-16 Traffic Report iq T � ° M. NWRA" DT,f M ,J II P . "aI , MEft:ftlltfAf'.K TO- Kathleen Bradley Colwell, Town.Plaarlaer l I.f. ". FROM, Arrtsory Koinlorilick, Transportation po t do Program Manager IIA I 114 ° ,.. �w COMMISSION DATE: June 20, 1994 In. response to your request., I have reviewed the ra c:Irrrin)cxf mW Av,e"v°w° Sludy axaaa°r ence S.spiw gl " gar° the Pi-oposed Commercial m rc ial it in North ndoaye) 'asscwhuseus which.was (Amdmim moan prepared by CDW C onSLrl,tnrrrts, Inc. lest cto,b r. In. r-eviewing thk audy, I. r.urher E.,6wrtr1w.,--rrrr nm ra;r t r fina Nur ' pits Llft:h p l� il tilrrt yrl"lw t,1W 1 , sq iu rti: foot wRce hGtlTmPf , johla sruuorarn CVS Pharmacyrartd not the proposed reuse, of this wchurrch,as a 1:: ostrara Rotisserie sWirrlmy Cliia ken outlet since it is my understanding that this cornponent ofthe pr<sjiec't has, ww"rrriiami n S1uxm;roam been �" "raa,asuge R ay morucn LaVoie Assi..MrICamm'VA 6 ayuord atu reke I xccufi,v,Dmrrammr B,ac'If.groun d T°rafric; se'rviingthe 1 was unable!to exactly quantity how this background traffic from,the surrounding arrubummremuulfio ar, residential and industrial develo pmenwts was loaded onto the lcrc°,rul roadway network Awmit-,sbm y to deterimine the 19,98 No-Build and Build traffic volumes- More detailed Andnv r nud.mamrmmm'd information would be required bef`bre we can make a decisions on whether too (:ion rgr.town Groveland rrru ch or tool kale tr° 17ie f'roni these developments eats, is assigned to study area Have 1l irut rscCtirrrrs: Lawreme Mcun,mA, h4elh mere ;"DW claims that intersections around the stud site wwrrruald largely be unaffected Nomblun NmbuTypo"n by the d v lopmetit, Nevertheless,, this development will add traffic to these 11ro Nndwlcy°v:u inter ctiom; and will use sorne portion of available capacity, CDW does, propose siruosbwr'y restriPing and reffining the Route 114/Rouat 125 Icy-ParSS intersection to urrrprov W'm:Nr. P~ua:VrJt}klry °. both, existing and pr �paas d LO .,. H wwever, it is unclear fiom the report whether the developer r will fund these inrupr-overn nts. It should salsas be kept in mind that (.DW assumed that a Specialty alty Detail Center would OCCUPY the retail :site on Route ➢ 14 when estimating future truly, generation. This type of tand use has ra fairly low trip rs r',IdOnr arts. It is very possible that ra. more intensive tdrP generator could, occupy this location creating increased trance in the area. Given the a i agniturde of the plaanned/anficip ated residential dcvetopriie ats in this area.and flee l osa ilrulity of"inure intensive use of this commercial site, there rnaay be gust:ufucation of requesting these developers to f`und. additional required r°oadlwvay improvements, u a cm�u:i t uoiaN,TMv6inr ra r��{u CV Proposal Page oJ' SfF'kIi13E�1'1: ..................... June 20, 1994 Ff_11lXftii; CYx1111 P�glrkx VS Trip Gener2tion Figures Trip gencration data from a algrcen's and a CVS obtained by Elie consultant appears consistent- It would, however, have been preferable to have additional locations used to develop the Pharmacy trip generation rates- An a"urnption oC25°o pas-,by trips for this site assurning its use as a Pharmacy is also not um-easonable.- Such an assumption for a developinent of f1}is size will not gi-cstly affect Level of e,rvic e, (L at the site drive. Delays for vehicles exiting the site drive will still be lengthy because of the high traffic voltiine5 on Route 114. AM Peale Hour CnIculations The report shows that AM Weak volumes ors both Route 114 and 125 are higher Ihan those Shown dui-ing the so-called Midday Peak- Delays facing motorists leaving the site, in the AM Weak will therefore be longer than those encountered during the Midday Peak. Trip generation data for th,e AM Peak and LOS aculations should therefore have been includce l in the analysk since many drugstores are open during the AM -Peak period. Access to Route 125 By-Pass It makes wrist that access front the site to the By-Pass would signif€canny reduce III nu nib er 0f vehicles attempting to make left tunes from the site drive onto RouIe l 14- However, providing a direct connection between the site and the By-Pass may be irupossible due to tht access corEtrol nieuure in place on the By-Pass- This Iiinitation could he avoided if it were possible to create a connection between the site and thc dead-end section of hillside Road- 'Traffic could then use this roadway to reach the lay-Pass. A complicating factor in considering this latter scheme is the farts-ly high ac:cideuj rate at [lie Hit isiJde l oad/Route 12 5 interscctioii. This issue should be e aniincd before this access scheme is itriplctnented. Please reel lrtee to contact nie if 1 may be of fuillicr assistance. TECHNICAL MEMORANDUM ADDENDUM TO TRAFFIC REPORT TO- ]vDW consultants, lnc. PATV: Jorie.20, 1994 1 I 1 Speen Street FrFmiinghAm, 1vlassaulnkselIs 01701 Ref: 146 FROM: MODauokigh & Scully, Inc. Itf:: Sipe Re(luction 111 Sheen Strut,Suitc 407 PfXge)secl Osco DAig Store Framingham. Massachusells 01701 North Andover,MRs nchusetts Irlfrodutt�nrt . Subsequcut to Ilit prelkaration of this Iraffic study,like sift.has been redesigned and the size of the prolx)' c Osco Dnig Store has been roduced from 19,900 to 14,960 square feet. 1n addili€sti, the proposed Bo-,Ion Chicken restaurant of 3,40O square feet has htxn rttractund ailed will not be a part of tliis prniect_ Tho pmPoPAxt reduction in project Azu will resell in leas trips being geueratetl and less impact to study area inads and inlerw'ctioas. This addeadum swnniarizes the projects' impacts on key snidy iulersections, giveek the reduction in projed size and the additional Yaffe assriciatad with the Meadow Woods (phase thrCe,) and MOM Lune subdivisions. No-Build Condition ubsexjacnE it)4he original sitidy,#lies Meadow Woods(phase tltrcx4)and N4a€ltne Lane subdivi6o7 Mpofials have come before the planning b=rd. The No-Build peak hour traffic eslimates have been revised to reflect the Rciclitioa of traffic from both subdlivis3ions. Phaw.Ilirce,will be.conmracteJ on Eillside Roa4 adj;acenl to t1-eC€xisting Meadow Womh subdivision and will Consisf of281ots_ Nadine Lane will be ixinstrnktcxl off of Willow Street and will consist of20 lots, 7lie add n of Meadow Wonds;(phasu three)traffic resulEs in m Ftdditiond 18 (5 entering, 1.3 exiling)trips during the midday pmk- hour And 24 (16 entering,8 exltjng)trelxs duf3ng the af?efannn peak: hour. The new trigs will eater tkud exit hillside Road from Routr 12.5, The addition of Marline Lane traffic ruse is in sai additional 20 (13 encoring, 7 exiting) trips during tleu issfclday peak hour and Ib (4 entering, 12 ezituig) trips during the a{lernooFi peals hoar_ The new trios will enter and exiE Willow Strfmt from Route 125, 'ifle Traffi r. The J3eiiId peak hour traffic eMimalex have 1xvn ruvised to reflect nol only the rodijvt ion in project size but also the a(khtion of Mffic ass€x.iatud wide the MeAdow WrAXIs and l+ladiue Latev subdivision. A revisr) trigs geuer:Rtion estiniale for the s rnaller projru.t (14,960 Nquare foot Osco)is prowniod in Tablc 1 A_ Cin as average weekday,the total number of daily trips is estirtial J to be 980 with I15 trips for tlke tuidday pest:hour and 130 trip6 for the ttftcrn4xvn i houn TARLF JA McDonough & Scully, Inc. Technical Memorandum , Ito: Size Redualon - Proposed Osco 1kog, Norlb .Andover, Massachauselfs Page SUMMARY Y OFF ESTIMATED TRIP GENERATION HA,RA I'14'HISTICS* (Vehicle Trips) ToW Trips Total Fxi linlr weekday Daily TtkW 980 490 490 N idday leek Faux 115 58 57 Aft rramn Peak Hour 1310 65 65 * &ucd on ubscrvationx of existing drug stores of camparablc aizc The project, an revised,will generate approximately halfof the traffic that the original project would have. grwerated. Project Impacts The i.ntessectiou rapacity and level of service r"ulls as u>rapaled in the original repc)rl rellucl an O'iea bui Ice ing gi=of 19,800 square feet and a Boston Chicken remtaumat of 3,400 square fee#, With the propowd right-tum out unto Route 125,the results showed that dw driveway inter tion with Roule 114 would be. at level of service"V for bolh the midday and afternoon peak hours. With the proposed project changes, and the addi tioaal subdivision traffic,the level s of service would remain at"F"and for Wh the raid"y and aftemum ;reek hours, mspectively. All of the movements al the intersection opf'rate at levels of service greater than"E"witlu the exception of the loft-turn cfxking the site onto Roate 114, With the proposed right-turn out onto Route 125 front the site:and tiro improved signal timing and tone use madifications, the signahzed intersection of Roide 114 at Route. 125 is expected to operate at lever of service"C'° Rod'Er,dwing the midday and afternoon peak 6nurs,respectively. 134 Ab the pm*1 changes, the Level s of smim will remain at'C"artd"D"for the midday and afternoon prsk hours,respectively, Concluvivas The reduced pmject size results iv approxiirately Uf of the generafed his of the[anginal pr(ject. Thu key study int ec:tions will remain at the same levels of scxvicc as a result of the pn)jcct downsizing, even with the additional tmffac from the Meadow WoeAz and Nadink-Jane subdivisions. The mMjan island on the site drive will be moved back from the edge of roadway for safety. 'the edge of Route 114,xocuth of the site drive will bo cut back to provide n short acceleration lane for vuhiclex tinning righl onto Rou W 11.4 f'roin the seta drive. hlrponotigh & Scully, Inc. TECHNICAL MEMORANDUM ADDENDUMTO TRAFFIC REPORT Tfitt CDW Co nsaultarnts;,Inc. DATE" June 24, 1994 111 Speen Street Framingham, Maasur chuussells 111 1 Ref, 14 FROM: McDonough&Scully, lnc, R V, Size Reduction 111 S peen Street, S aaity 401' P olmwd t sees Drug Store. Framingham,Massach usetts 01701 North Andover,Massachusetts il'ra t'raara�di'ua at °u bNequueuut to the Preparation of dais traffic:Fhtd ',the,rile Us been redesigned and the sip of the profm,n edi Osoo Drug Store has been reduced l'uoauau 19,0) to 14,96 square,feel, In addition,the proposed Boston Chi teen restaurant of 3,400 GquFtre feet has been retraacted and will not be as part of this project. The proposed rasdauetion in project size wri I I r%ult in less trips being generated and less impact to study A"roads ,and inters ti(insx. This addendum sus ruses than projects' impacts on key study intersections,givers the du ctacara in puxu-jee t siw And they additional traffic associated with t w Meadow Woods (phase three) and Nadine Lane Bub'divisions., sieaus. ,, ru-Oarfila'i Condition Subsequent ent to the cniginal shady,the Meadow Woods,(phase )Eared Nadine-Laurin subdivision Taa'oposaailas have corrnu,before the lalsa^aaulrug board., The No-Build ulc hour traffic a tirr aw,have been revised to reflect the addition of traffic from bath gu bddiviasiuns. Phase three will be roanstru ded on Hillside Road adjacent to, the existing Meadow'k cods subdivision And will consist of 28 leas. Nadine,Laney will Im u.anstruaeted off of Willow ;street and will consist caf lots, The aackliticanu of MeadowWocxts(pl asses thr4m)traffic results in,an additionrd, 18(5,entering,13 exiting)trips during the midday peak hour arnd,,24(16 entering,8 exiting),trips during the auf or noo n peak hour. 'The new trips,will enter and exit 11M, side Road f oin l saute 125., The addition of Nadine Une traffic results in an additional'20(13 entering,7 exiting)trips during die midday peak hour and 16(4 entering, 12 exiting)trips d uririg the aft -auoon peak hour. Mae new trips will enter and exit Willow Street from Route, 125. 'Then revised No-'1luuild nelwworks,are shown in the aapperudiaa as Figures AI iand,A2,for the aaaidsilauy send aft aruc nn peak hours,Tegjwtively, J y Site Traffic The Build peak hour traaffi,c estimates have b iu revised to reflect not rarely tht,reduction in project size,but also the addition of traffic Associated aaaa^ith the Meadow Wocxls and Nadine 1Ane asu badivirsicauurs. "1'ie revise Build networks am them in the appendix as Figuaa^es A3 and A4,for the euuiulelaay and afternoon peak hours, respectively. A revised trip generation estitnatas for the snuiller,project(14,960 square feast t e )is presented in Table IA. On an average weekday,the total mummer of daily trips is eslirnated to be9,80,with 115 trips fin°the midday peals hour and 130 trips for the Afternoon peak ho ur. mcdonwgh& scullyw Inc. Technical Memorandum ice: Size Reduchon - Proposed Darn Drug" Now Andover, Mossachuselts TABLE 1A TRIP GEN VRA"I'IONI CHARACTERISTICS* (Vehicle"Tnps) Totaal'Tri s 19,181 Entering afting Weekday Daily Total 9'80 490, 490 Midday Peak Hour 115 Afternoon Peak:Hour 13?0 65 6 * Based on,a;bscivaaions of existing drug slorcs of a,omparab sine '11epraject,as nevi sed,wi11 ge ncranlc anpaprarsimata ly half of the traffic that the arriptiraarl project would hava gear ated. Project Impacts 'Thai iante necti(m capacity a d level of service results as computa d in than r'ari iraaal report reflect an ata as building size,of 19,800 sgnnanne feet and a Roston Chicken restaanaraaat of 3,400 square.feet., With the pn"rarpn sed right-taaa-ar,OUt rTRO R4 UIC 125, the results showed that the driveway inntcrsec.tianra with Route 114 would he at level of service"�E" for,N)th the widdaay and afternoon peak hoitr& Witb the prrap txd paranject changes, and thy::additional AdWivision traffic, the levels of service would)rennud n aat '"pi'," f+oar l th the midday and afternoon peak hours, respectively. All of the movements at, theinfersection operate at levels of service greater than"E"with the exception,of the left-turn exiting the site onto Route 114. With the prep used right-turn mast onto Route 125 from the site and the improved signal timing and lame,use ranaaadif cations, the signalized intersection of Rowe 114 at Routs 125 is expecled, to operate at levels 0f service" '"'aaanal"U",dnring the n i>dday and afternoon p»e uk.hours,respectively,. With the parogect ch ng'ass, the levels of service avtll reniftini at C"and,"D"for the naaidd y and a4f'hcriu)o a p eA'hraaars; res f iver^. The computer parinntonat sheets for the revised analysis Are inclu"- iian the app nd,iaa„ Conclusions The reduced project si resuldnisnaVpaparoxi:nnaately°halfof the gerneratt trips of the original project. . The key study intersections,will remain at the sa e,levels of service as a ren+ult of the paraapa t downswng, even with the additional traffic om the M,ea low Wood's and Nadine Lane arubdiw"isia cnse The,median island on thp,site drive will N,moved hack fnnran than edge ofmadway for Kafet,y. '"l"he edge of Route 114,sraaath of the site drive will,he cast back to provide a short acceleration lane,for veMcles taming right onto Route, 114 from the site drive... Technical Memorandum ke: Sire Reduciron - ftposecf Osco Drag, NorM Andover, WssaahuseM Pane 3 APPENDIX no Y build networks build networks level of service analysis mcdonough & Scully, Inc. no - #wild networks Royal Crest E3tr�tes 8 10 f 4 1455 49 �4 4 1456(7) 1044 ►� 1 1210 .11 (g)152 �243(7) lx� (7)1455 1 3 SITE Route 114 72{1) Hillside Road Rollie �26 73(6) Dead End 24(1) c°4i �3(1 11ii1sEdc Road (1)13--PP- t3 (16' —Meadow Woods Phase 3 And Nadine belle Trips 1 Evening No-Build Pak Hour ORTH Proposed Commercial Site North Andover, Massachusetts NOT TO SCALE MCDONOUGH & SCUUM, INC. FrnmiVS13.&fii, M06&fkehU8=fi F7GURE A 1Roy171(WJ9 biffles �16 13 4 l $QS 89f1 (7)333� 201(7) I (6)91 9 eq 3 13 2 SITE Raule 114 .— Illlls3de Road Ro ke 125 ��3g 59(10) DeaAW 17 #? (1} Hillside Road 20 C2 i 7 t 20__P_ 9- (d1j---Meadow Woods Phase 3 And Na&rie Lkuie Trips 1998 Midday No-Build Peak Hour NORTH ,proposed Commercial Site Norlh Andover, Massachusetts P OT J ALE MCI1ONO G-i & SCULLY LNC. I~IOMinghliM, MaHSACAVEMS build networks Crest ES-fares § � S !4 48 �4 1058 1223 01449 ( )k 2 2(k7) 2 � 14520 27 f 15 7 7 \ \ R,me !!# Hillside Road �\ 2§> 26 Rout(- 12 — �k R_ A 2@> DeaaELd E 2 7 ) it m e Read t n 2§ 9 DD ƒ D ( >! 1 !O— 7� (,MmAw WoG&Phase 3T p Aad Nadiae LameTA& 1998 Evening Build Peak Hour NORTH Proposed Commercial Site North Andover, Massachusetts NOT TO SCALE MCDONOUCH a SCULLY, INC. FraMI]IShRM, M21_0,h.�� GURE&4 cresl Estates 16 !3 / 14 4 � 10 823 9w @pm 0#3 211(7) 38 666(7) 20 3� f 2 CIL 2 % Route 114 -\ \ § 3a y» liliwe Road d . . .. � ,_, . .,.. . .. Q94 Q � �39 Route 12 � m ƒ� E (! )0 DeM Ead m # k 22(') HmQA ■ k 70 21-Aph� k 9-4 ,mow Woods PbR34Nadine I-am T�iA 1998 Midday Build Peak Hour NORTH Proposed Commercial Site North Andover Massachusetts PSOT To SCALE MCDONOUGea §CU£LY, MC. ,_@A_, P&_a_lts level of service onalysls HCM-' SIGNALIZED ll�TEI�2'ECDTIOI� SUMmkf-,_Y C:�-mtLn, For Irl Transportation Streets; (E--fly F.,oute 125/Apartmr-nt- Route llel Analyet : 1--i ! E Name; Arp-a Type— Cithpi- 9-22-92L Flidday COMMENtj 98 Build With T4.ming lfnprovomp-nt7 & PuLl Lefts ED WFstbcourid s H.--,r t I�b o k-in d f f'3-u t h b o Lt n d L T f F L T P L T R I L T Fl, ---- ---- ----- ... ...--- No. 'Lanr-.^ 2 L .4 %C 121 Lane Width 13 12 12. 0 1 2 0 RT 0 R V o 1 13 i C? i 5i tit-ra I Ct T3 E- t i C'n T; PhaF.. f�ir-,mhination 1 2 ED Left N I; Left k. T h r u Thru R'I CAI S t 3 E- W P L E I t CT: L F f 1: 4 Thr;j -Y.- T h r u iE. Pi g h-t- R Cj[It PLids f-.,e d S NE', F,J.g h t EP Ri Q h t SP Pi ght Pi 1;ht F::i Y'�C- r r 1'7A i Gy een S 5A 2 5 P, YE-1 I ow/A-F- 5 1 Yrl 0 5 I-Qf7t Ti me 3. 0 3, C; 3 Los-,t T i rf,cl 2 Ci 4 9- PhRsr comLinaticin ordert #1 #','.. ff5 V lntu�rvection Fr-,rf,'nroiz ce Suiwiiar v Lknu- Group; Ad.i tat v/I-- Ci/C AppFoach; llvm t S r-'ap F I �w R at J.C, P.�t i 501 4ay LUS DC] ay Lo!3 ----------- ........ ----- B L I 17 6 C, LT i 7 F-�4 C.. 4�11 29 31 . E f C 21 J. . P, C iQ I f�: 4tj 4 9 E 20. 1 5,5 ID 0. 7E fit. 45 1511) C lVr'LE,V-- L-CtiLAT-5 -'Ie'- ay = 22. 0 spc- /vc:-h If-,t e-r-sect i on L.0 S HCM: SIGNALIZED IN7ERSE-CTION SUMMARY t_:enter For Microcomputers In Tronspartation S#'e-L,L ;f= : Route 125/Apartfnrnt (N--S) Route 114 Analy--t : J'P'r: Fi. I2 Name: 1. 14F'EDMD. �C Area Type. Other FM Crmmc--nt : 99 Ptai. ld W/Ti. rning lmpyovements Dunl Lefts ELF FAT -:.125 I r c I o I I_; ' Ficz kt}�t]�yund I �a�t�YY=lLlnd I �',fE�EitF?•..[.tnC� I ��r-t�3F�_r.�n� I .-s. L T R t l-. T � L, T F;; L T F1' I [ I N,--, �-. Lane-E, 1 'r 1 1 f F 1 2 {{ ;t V o mes I •1 C}LD 59 1 1�Y 1 � a { 250 1 t 0f:� r1 I f C1 8 Lztnr- Width i3. 0 12 0 t 1'! 0 ; 12- 0 12. 0 0 Signal OPE Y-2-A i c12�m Phase C{7frebi I nat i r-'rt 1 1_ ] 4 L 7 F.P Left : NB Left � Y Thru 9 Thru PiQht F''icht k. Pt:dG . F PL�d P Le 1 t ` ' i 3L� Left -X- ThrLl i Thru Right 'n i Ri ght fir. PE,dT Fpdsr NB Pi ht !EEC Fr k Qht Gr eery 0A 0 A r_jr een 2.,0A 12'2A Yf?11 ow/A--k' S tYo11QwrfA-F Q 5 Lost Ti rfiz2 3. 0 IS. 0 Lust Time :3. 0 0 i:yc 1 e Lon Li h : 1 0 i secs Phase c om i n at i c.n or der- : Al #2 t'"I' #C S r 4 r_Y erect i on Per fo-r marice ,S ummar Lane CjF coup 1 Ad j Sat /c� g/c Approach: mvmt s Caf F? F I w F'at i I_, Pa t i u Dc 1 a LOS DC.-i E y LESS LT 17%6 541 fix. ` 6 {_}, 30 41 . 0 E NFL L I G91 x74 Cl. 93 0151 44. 8 E F= TR 35G1.1 i f7. -J0 Cr. �j1 1S. 9 C 5F3 3 71 1 . Q13 t=f. �= 4C - E 4L. 2 E Inter sec tioi DLla4y — 35, 3 1r-iteF sec tion LO'S' = U UNS G-NALI ZED !NTEF'SE=CTIDN�� F'arje- 1 #'-3c�'3;--}=1..",.'K'X•`�.y.-k 3E�=�����-#'.z ;,�.�����x�'��'i��..�..x.-}�i-'X-}�..�..}F$`r k.�{-�{.�-�,.x-L' X k i?�iE iz'��3F���-]S#:�-�:.�{ X.� TDENTIFYIF+-6 rNFUPNATION ----------------- AVERAGE F:'UNh!T NC; ""FED. NA J�F. STREET . . ;"ti PEAK' HOUF . . . . . . . . . . . . . . _ . . . . . . � AP'LA F-'U ULA TF-N. . . . . . . . . NAME 0V THE E-A4? ,'WEE�Tf STREET. Site Drive NAMcE Or- THE hIORTH/SnUTH S T REFT. . . . . . . PC, E.. 1 14 NAMF OR THFF ANALYSE'. . . . . . . . . . . . . . . . . . JF E DATF OF THE mm/dfJr'YY) - . . . . . 0'�r'-27-1':�' TIHE PERIOD ANALYZED. . . . . . . . . . . . . . . . . hidd0-Y 'I F'�E:: INF=ORMATIQ - - - 199 Bui It' Wh t' Rir3l3t Turd Out cr F*,��u t2s INITERSEC T r ON TYPE AND i.=ON T POL ----------------- rhoTEPSECTION TYPE. T--INTER'SER_;T IONI i' r5t Lrf' 3 pE,j= r CONTROL TYPE LAS T EK-11-NP. STOP SIGN E ; rF' l F CTHRU -'.0 .,- J.096 13 i N 11 HL� R Or LANE LANES 2 -- 2 r: � ADJU8TMENT FACTORS Page-2 -------------------- PER2ENI RlBHT ] ORS COk§ kA»!Hg ( ft > ACcELL"ATION LANE Bl:ABE 41lf48[--E DOE RIBH7 ] LIPMS FOR' RI 4T TURNS EASTPOUND O. DO 50 20 N wESTP-!Mo ----- --- --- - N0rTH PIgD 0. o0 9G w BOUTHB[3UNb 0. 0o a0 20 m VEHICLE COMR05ITItN . % 5,111 TRUE ES % COMBIRA7I0] AND Rv S VEHICLES MOTORCYCLE? --- NORTHBOUND O 0 D SD1t HDOUND 0 0 0 CRITICAL aARB TABULAR VALUE@ ADOU:jE§ BIGw] Elba . FINE (Table l0-2> VALUE ADJOg%MENI CRITIC&, OAF MINOR RIGHTS ED 5. 70 5, 70 0. 00 5. 70 MAJOR LEFTS NB 5. Eo If.. GO e. 00 »LED MINOR LEFTS EEL, 7. 30- 7. 20 0. 00 7. SO IrgI1P'YING INFORMATION NAME OF THE EAST ZQE [ STREET. . , . . . site DriyR NAME OF THE NORTHZGDUTH STREET. . . Route 114 DATE AND ] IMF OF THE AHALY§lG. . . . . D9-27-1g93 midday OTHER INF0RMAT10H. . . . 1992 Build Wi+h Right Tern OGt on Routa !25 CAPACITY AND LEVEL--QF-SERVICE Page-3' I..'CITEW. A(:TUAL FLOW- TIAL MOVEMENT SHARED RESERVE VATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v<pcph > c (p.cphk c (p :-p h ) (pcp-]-,) v EnR p m EH p SH NTNIDF: STREET ER LP-FT 1 t; FIG, 61-1 4 B E RIGHT x:- FIC15 L05 BOS 5 P.2 A MAJOR STREET NR LEFT TDF--N'TjF--YjNG INFORMATION' NAME OF THE EASTIWEST yYRLLT. . . . . . Site Drive NAME DF THE NORTH/SOUTH STREET. . . , Route 114 DATE AND TIME OF' THE ANALYSIS. . . . . 09-27-19a% CITHEP INFORMATION. . . , 1998 PLLild With Right TLtfr-r Out on Route 125 1985 H'- t. UN-c3IGNAL ILED INTEPSE(-=TIQN5 Page .,1 U)FNT I I=Y I Nl3 A CE .A RLJNN g N1 ; PFF Fr, I-VI.JOR STRI: L•J' . . 35 Efi;CTDR:. . . . . . . . . . . . . . . . . . . . . 1 AREA POPUL_AT I C3N. . . . . . . . . . . . . . . . . . . . . . b0f)00 NAME OF THE CAST/WEST STREP-T. . . . . . . . . Sii-.e Drive NAME OF THE NORTH/SOUTH STREET—� . . . . . RcjL.;te 11 }TAME 0[7 THE ANAL.Y' T. . , z . . . . . . . . . . . . . . JF F' IRATE i1}=- THE ANIALYSYz- Cmcn/dd/yyx . , . . . . 0:7,-2,7-1'v�� T,:11-E- f':'E_]',,,IliD A.NALYZEr7 � . . . . . . . . . . . . . A Lk_}-1,C?O;t OTHER icv. . . . 1999 lBui l d With R`Lght Turn Out on Route 1'2 I NTL� RSECT 1 DN TYPE_ AND CONTROL --------------------------------- I NT ERLISLLT F ON TYPE. 1---I NTEFF SECTION !.]A U UV. - F'�E. L D I€.'7-T I ON- h4CiF?TH fS'11TH U]N7-F:OL. TYPE EASTBOUND, GT05-f SIGN. TRAP7"-1 C V0[_LJMES ER wp_ NEl sLcI.-t is 20 144 i NUMBER OF LANES ED RJR N B IsS LAMLS 2 - - 2 �- FAD jLJS-rmEN'r F AGTUR'S o P # —2, FERC_EINI RIGHT TLJPN CURE, FADIU�; ( ft ) ACCELLPATION LAN GF2ADL Ai*QGLE FOR RlT ! iT TURNS FOR 1*I GI fT TUPNIS -------------- "'OUTil-D' UND 0. 00 =ocp r C E11TO1._F COMPOSTTION AND RV: 51 VEHICLES % € DTORC CLES --- ---.-..-. NORTHPOUND 0 BOUT€-1>ryOUND n co s Cl;,11-IC:AL QAPS TABULAR VALUEi} AD,TU'L-T£=D SIGHT LIST. I= 1€` AL- f' t ab t e i �••f'x f,1.-Ui= Al �L L_rl " l' C F''I•:I C:AL GAP MINOR RIGHTS EB 70 `. 'ls 0. 00 if= MAJOR 1-.EFTc N I E URR I-EFTS' I DENT I FY I Wi T NrC7RMAT i QN ------------------------ NA E OF T HL P-ASI /WES G'1 REE—1 . . . . . . .Sk t E Dr 1 ve NAME OF THE NORT€ /3-OLITH STREET. - - . RQut .q 114 DATE AND TIME OF THE ANALYSIS 0 —27-1993 AftprnoCrrt OT€ EP l KIP'OPMAT I ON. _ . . Build With Ri gl-t '€um Out 6n 1*Dut e 1'215 CAPACITY AND LEVEL-OE-SERVICE ------------------------------------------- ------ -------------------- POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE PATE CAPACITY CAPACITY &APACITY CAPACITY M0VLMLN1 V&POph) c (pcph) c (pcph) c (pcph ) c = c v LOS p m 1A 11 F. EIA ------- -------- --------- ------------ ------------ --- MINOR STREET ES LEFT Q EL 62 E2 51 E RIGHT 17 INS 439 42S 420 A MAJOR STREET ND LEFT 17 166 166 1LL 110 -D IDENTIFYING INFORMATION ------------------------------------------------ ----------------------- NAML OF THE EAST/WEGT STREET. . . . . . SitR DrIvQ NAME Or THE NORTH/ROUTH STREET. . . . Rauto 114 DATE ANU TIME OF THF .ANALYSIS. . . . . 00-27-1SQ3 ; Afternoon OTHER INFORNATION. . . . 19% Build With Right Turn Out on Route 125 McDonough & Sculli Inz. Yf Poitl6Vest Place 5"L I ilt,40'°' 0 111 Speel I St reet Te[epl wn(508)875,1720 IIN ni ng I i,a n), a,4;-sach.n�,ens 01701 FAX (50 'J 875,K�94 ri June 27F 1994 Ref- 146 Mr.Anthony Kornorniick Transi,A)rtation Piogn m Manager Menimack Valley Plaming Conunission 350 Main Street Haverhill,Massaebuselts 0,1830 Re, Addendum Io ftrnfficwq)ort Dear Mr.,Xamxirn,ick Please find enclosed one(1)copy of the addendu mL to the traffic rprKyrt prepared fbr the.pToposal Osamu drug Moret in North Andover. As we discussed in our telephone convemtkvn on June 24,the smire AW has been reduced to 14,960 squ;tre feet ftom 19,800, fn addition,,the Baston Chicken restaumnt fuss beea dropped ftom the propoW. Aloag with these reductions we bave updated our No,-Build and Bui Id traffile ndworkg to include tin areas6hdivisions which have been pn'Ypa&-LA since the rein rt was written. 'The addiendurn to injo amnm(rail of these changts and includes&R appendix conmi the mvind traffic networks and level olf service cidculations. A furnialrespans&to(lie comments you mRde regRUh ng the Original trafric study i%,,Ixi ng pruparcd arid will be submitted to you and the North Andover Planaing Boud in the near future. Should you need to,di scu is any inatter Or if You have,any quest ions:,,please Contact me at(50 ) 875-1720 Very,truly yours, MCDONOAJOB & SCULLY, INC. Olul.F, EAIWffds '0 Transp-ortation Engineer A oic-, Kathleen Bradley plwell George Pema Jr. Mc"Donough & Scully, Inc. "�x"saw,1 ���.°�t �'"Lar - uoatt� 1C� l��' c�,�, ,�aa Te�lel41o,vir�&.)tN8"� "'75 fi2: Nfl P ,* w "yp '� FV June':28, 1994, Ref: 146 W Mr.Anthony K ouu,uomick 'Fra nsp oltatiuunn Program Manager Merrimack uack galley Planning t onmEis;sionn 350 Main Street Haverhill,Massnur;himetta 01',8301 Re: Response,to Comments Please find enclosed one(1)copy of the responses to the:Mierriamck Valley 1'"laurnnri:ra,,g Commission VPC.) a:urnments regaiding the traffic report prepared for the pn')jxYmA Osco,drupe astrnre in North Andovm As we discussed in our t lep ho ne convtgmtion on June 24,the store size has been reduced to 14,960 sqyare fect l=rom 19,800. In ad°ditionu,tht,Houston CMcken,restaaur t has been dropap?ed from the prop,O. aL Along with these reductions wo have ugx1atcd our No-Build and Build traffic networks to,include two area suub4ivisiorus which have been proposed l siiu.ze the report was WTittamru, The responuses taa your eommmts inirrryr those given over the phone on June 24. Should you need to discuss any matter mar if you have any quire tiouus,palease myntaact me at(508) II75-1720� Very truly yours, w 1Jobn waurds Transp)rtation Engineer '1#; "-.. n:u a Kalb lee a'Bradley Colwell p'T,:1 -,1'��Ttrrtia:H1 b Flgft n-eering I FI king a 0[-ca'uution + C rt";'ngn TECHNICAL MEMORANDUM RESPONSE TO MVPC P ENT TO: Mr,Alothony Ki mornick DA`l'I<?: )Lmt1 27, 1994 Try Todatioa Prugrnm Manager Merfinmek Vsdley Planning Commission 350 Main Stret Hav€whlll,Ma;sswikuse#ts 01830 Ref: 146 FROM; WDDuougb& Scully,ble. RE: Response to Comments 111 SywAm StrwA, Suite 407 l IFOPOSM Osaco Drug Mom Framingham,Massachusetts 017GI North Andover,Massachusetts M'D{mough & Scxflly, Inc, has weeived The comments on the origiwd traffic report prepared tax tho pmposad OKo Drug slum in North Andover,Massadia-seats. The following responses to theme c mmenis lako into srcnunt the subsequent rediielioit in project size and the updated no -build traffic resulting koin ffie addition of two area subdivisions. t17ERRIMACK VALLEY PLANNING COMMISSION ommenr: More detailed infamweiorr oval}be required before we can nurke a derision on whether Soo parr b or ioo litrk t,xr�ie fraorrm these developmews is assigned ro study area intersections. Response: The traffic from each development was assigned to the local midway system in'w' ordancti with Ow trip distributimi pnwide d in the traffic report aftd as follows: Meadarw W(mmhs(Phasys 1 to 3) Assigned to Route 125 from Hillside Road Guth Andever Estates Assigned to Routu 114 €corn Clxztnut Str€wt and Mill Road Wagon 1WhMs Assigned to Route 114 from Grfly Street (Poston Street) 'Free Acre ReWl Site Ax9i&mtml to Routh 114 dirwily and from Hillside Road Willow Industrial Park Assigned to Acute 114 from Willow Street Nadinel.ane AssigntA to Route 125 from Willow Street Comment: 1i is u►ekar,fimn t1w repori whether the developer will fund the restrip ng and retim ing ar Aw Route 1141Rowe 125 intersection. Response: • The proponent for tba proposed Qsow drug morr.will pay for throe improvements. . Comment: lie rase of Specialtyt Retail Cewiff as She laud use,for Me va cam d ree acre resail site could mull is a low traffic gerrernrian,given otherposNible racer for Me site- r»cdwough &scu , Inc. Technical Memorandum Re: Response to Comments- Proposed osco Drug, N. Andover. Massachusetts Page Response- • The usa of Specialty Retail for the laiduse type in generating traffic for the three acre retail gigs was bawd on discussions with the Mortar Andover plmning board which indicated that this type.of use is likely. Comment: ?Mffic data for she AN peak hour wick LOS calculwions should have been included in rho analpis s bxe many dr agstores open during the AM prak hoar. Response- The proposed OSOO drugstore will have operating hoar%of €O.00 AM to I O:OO PM which does not encowpass the roadway AM Peak hnar;dr Arfore this period was not studied. ommeni: Pruuidirig a connection,1D Houre 125 to provide a righr-runt oar may be impossible due!v the access cotawl rrreasures in place on the,By-Pass. We)nave Fabmitted the application for pea it to kecew;Stute Highway irw sconrdwice with phis project. ne appl"tion ccnztainW not only the primary access on Roue 114 but a€so the right-turn out onto Route, 125. Discussions with odficiEds at District 4 of the s.;sachusetts Highway Depwtmenl indicate that the Route 125 east is desirable and would improve safety by reducing left-turns onto Rollie 154. mcdonough& scull , Inc.