MEft:ftlltfAf'.K TO- Kathleen Bradley Colwell, Town.Plaarlaer
l I.f. ". FROM, Arrtsory Koinlorilick,
Transportation
po t do Program Manager
IIA I 114
° ,..
�w
COMMISSION DATE: June 20, 1994
In. response to your request., I have reviewed the ra c:Irrrin)cxf mW Av,e"v°w° Sludy
axaaa°r ence S.spiw gl " gar° the Pi-oposed Commercial m rc ial it in North ndoaye) 'asscwhuseus which.was
(Amdmim moan prepared by CDW C onSLrl,tnrrrts, Inc. lest cto,b r. In. r-eviewing thk audy, I.
r.urher E.,6wrtr1w.,--rrrr nm ra;r t r fina Nur ' pits Llft:h p l� il tilrrt yrl"lw t,1W 1 , sq
iu rti: foot
wRce hGtlTmPf ,
johla sruuorarn CVS Pharmacyrartd not the proposed reuse, of this wchurrch,as a 1:: ostrara Rotisserie
sWirrlmy Cliia ken outlet since it is my understanding that this cornponent ofthe pr<sjiec't has,
ww"rrriiami n S1uxm;roam been �"
"raa,asuge
R ay morucn LaVoie
Assi..MrICamm'VA
6 ayuord atu reke
I xccufi,v,Dmrrammr B,ac'If.groun d T°rafric;
se'rviingthe 1 was unable!to exactly quantity how this background traffic from,the surrounding
arrubummremuulfio ar,
residential and industrial develo pmenwts was loaded onto the lcrc°,rul roadway network
Awmit-,sbm y to deterimine the 19,98 No-Build and Build traffic volumes- More detailed
Andnv r
nud.mamrmmm'd information would be required bef`bre we can make a decisions on whether too
(:ion rgr.town
Groveland rrru ch or tool kale tr° 17ie f'roni these developments eats, is assigned to study area
Have 1l irut rscCtirrrrs:
Lawreme
Mcun,mA,
h4elh mere ;"DW claims that intersections around the stud site wwrrruald largely be unaffected
Nomblun
NmbuTypo"n by the d v lopmetit, Nevertheless,, this development will add traffic to these
11ro Nndwlcy°v:u inter ctiom; and will use sorne portion of available capacity, CDW does, propose
siruosbwr'y restriPing and reffining the Route 114/Rouat 125 Icy-ParSS intersection to urrrprov
W'm:Nr. P~ua:VrJt}klry °.
both, existing and pr �paas d LO .,. H wwever, it is unclear fiom the report whether
the developer r will fund these inrupr-overn nts.
It should salsas be kept in mind that (.DW assumed that a Specialty alty Detail Center
would OCCUPY the retail :site on Route ➢ 14 when estimating future truly, generation.
This type of tand use has ra fairly low trip rs r',IdOnr arts. It is very possible that ra.
more intensive tdrP generator could, occupy this location creating increased trance
in the area. Given the a i agniturde of the plaanned/anficip ated residential
dcvetopriie ats in this area.and flee l osa ilrulity of"inure intensive use of this
commercial site, there rnaay be gust:ufucation of requesting these developers to f`und.
additional required r°oadlwvay improvements,
u a cm�u:i t uoiaN,TMv6inr ra r��{u
CV Proposal
Page oJ' SfF'kIi13E�1'1:
.....................
June 20, 1994
Ff_11lXftii;
CYx1111 P�glrkx
VS Trip Gener2tion Figures
Trip gencration data from a algrcen's and a CVS obtained by Elie consultant appears consistent-
It would, however, have been preferable to have additional locations used to develop the
Pharmacy trip generation rates-
An a"urnption oC25°o pas-,by trips for this site assurning its use as a Pharmacy is also not
um-easonable.- Such an assumption for a developinent of f1}is size will not gi-cstly affect Level of
e,rvic e, (L at the site drive. Delays for vehicles exiting the site drive will still be lengthy
because of the high traffic voltiine5 on Route 114.
AM Peale Hour CnIculations
The report shows that AM Weak volumes ors both Route 114 and 125 are higher Ihan those Shown
dui-ing the so-called Midday Peak- Delays facing motorists leaving the site, in the AM Weak will
therefore be longer than those encountered during the Midday Peak. Trip generation data for th,e
AM Peak and LOS aculations should therefore have been includce l in the analysk since many
drugstores are open during the AM -Peak period.
Access to Route 125 By-Pass
It makes wrist that access front the site to the By-Pass would signif€canny reduce III nu nib er 0f
vehicles attempting to make left tunes from the site drive onto RouIe l 14- However, providing a
direct connection between the site and the By-Pass may be irupossible due to tht access corEtrol
nieuure in place on the By-Pass- This Iiinitation could he avoided if it were possible to create a
connection between the site and thc dead-end section of hillside Road- 'Traffic could then use this
roadway to reach the lay-Pass. A complicating factor in considering this latter scheme is the farts-ly
high ac:cideuj rate at [lie Hit isiJde l oad/Route 12 5 interscctioii. This issue should be e aniincd
before this access scheme is itriplctnented.
Please reel lrtee to contact nie if 1 may be of fuillicr assistance.
TECHNICAL MEMORANDUM
ADDENDUM TO TRAFFIC REPORT
TO- ]vDW consultants, lnc. PATV: Jorie.20, 1994
1 I 1 Speen Street
FrFmiinghAm, 1vlassaulnkselIs 01701 Ref: 146
FROM: MODauokigh & Scully, Inc. Itf:: Sipe Re(luction
111 Sheen Strut,Suitc 407 PfXge)secl Osco DAig Store
Framingham. Massachusells 01701 North Andover,MRs nchusetts
Irlfrodutt�nrt .
Subsequcut to Ilit prelkaration of this Iraffic study,like sift.has been redesigned and the size of the prolx)' c
Osco Dnig Store has been roduced from 19,900 to 14,960 square feet. 1n addili€sti, the proposed Bo-,Ion
Chicken restaurant of 3,40O square feet has htxn rttractund ailed will not be a part of tliis prniect_ Tho
pmPoPAxt reduction in project Azu will resell in leas trips being geueratetl and less impact to study area inads
and inlerw'ctioas.
This addeadum swnniarizes the projects' impacts on key snidy iulersections, giveek the reduction in projed
size and the additional Yaffe assriciatad with the Meadow Woods (phase thrCe,) and MOM Lune
subdivisions.
No-Build Condition
ubsexjacnE it)4he original sitidy,#lies Meadow Woods(phase tltrcx4)and N4a€ltne Lane subdivi6o7 Mpofials
have come before the planning b=rd. The No-Build peak hour traffic eslimates have been revised to reflect
the Rciclitioa of traffic from both subdlivis3ions. Phaw.Ilirce,will be.conmracteJ on Eillside Roa4 adj;acenl to
t1-eC€xisting Meadow Womh subdivision and will Consisf of281ots_ Nadine Lane will be ixinstrnktcxl off of
Willow Street and will consist of20 lots,
7lie add n of Meadow Wonds;(phasu three)traffic resulEs in m Ftdditiond 18 (5 entering, 1.3 exiling)trips
during the midday pmk- hour And 24 (16 entering,8 exltjng)trelxs duf3ng the af?efannn peak: hour. The new
trigs will eater tkud exit hillside Road from Routr 12.5,
The addition of Marline Lane traffic ruse is in sai additional 20 (13 encoring, 7 exiting) trips during tleu
issfclday peak hour and Ib (4 entering, 12 ezituig) trips during the a{lernooFi peals hoar_ The new trios will
enter and exiE Willow Strfmt from Route 125,
'ifle Traffi r.
The J3eiiId peak hour traffic eMimalex have 1xvn ruvised to reflect nol only the rodijvt ion in project size but
also the a(khtion of Mffic ass€x.iatud wide the MeAdow WrAXIs and l+ladiue Latev subdivision.
A revisr) trigs geuer:Rtion estiniale for the s rnaller projru.t (14,960 Nquare foot Osco)is prowniod in Tablc
1 A_ Cin as average weekday,the total number of daily trips is estirtial J to be 980 with I15 trips for tlke
tuidday pest:hour and 130 trip6 for the ttftcrn4xvn i houn
TARLF JA
McDonough & Scully, Inc.
Technical Memorandum ,
Ito: Size Redualon - Proposed Osco 1kog, Norlb .Andover, Massachauselfs Page
SUMMARY Y OFF ESTIMATED
TRIP GENERATION HA,RA I'14'HISTICS*
(Vehicle Trips)
ToW Trips
Total Fxi linlr
weekday
Daily TtkW 980 490 490
N idday leek Faux 115 58 57
Aft rramn Peak Hour 1310 65 65
* &ucd on ubscrvationx of existing drug stores of camparablc aizc
The project, an revised,will generate approximately halfof the traffic that the original project would have.
grwerated.
Project Impacts
The i.ntessectiou rapacity and level of service r"ulls as u>rapaled in the original repc)rl rellucl an O'iea
bui Ice ing gi=of 19,800 square feet and a Boston Chicken remtaumat of 3,400 square fee#, With the propowd
right-tum out unto Route 125,the results showed that dw driveway inter tion with Roule 114 would be.
at level of service"V for bolh the midday and afternoon peak hours. With the proposed project changes,
and the addi tioaal subdivision traffic,the level s of service would remain at"F"and for Wh the raid"y and
aftemum ;reek hours, mspectively. All of the movements al the intersection opf'rate at levels of service
greater than"E"witlu the exception of the loft-turn cfxking the site onto Roate 114,
With the proposed right-turn out onto Route 125 front the site:and tiro improved signal timing and tone use
madifications, the signahzed intersection of Roide 114 at Route. 125 is expected to operate at lever of
service"C'° Rod'Er,dwing the midday and afternoon peak 6nurs,respectively. 134 Ab the pm*1 changes,
the Level s of smim will remain at'C"artd"D"for the midday and afternoon prsk hours,respectively,
Concluvivas
The reduced pmject size results iv approxiirately Uf of the generafed his of the[anginal pr(ject.
Thu key study int ec:tions will remain at the same levels of scxvicc as a result of the pn)jcct downsizing,
even with the additional tmffac from the Meadow WoeAz and Nadink-Jane subdivisions.
The mMjan island on the site drive will be moved back from the edge of roadway for safety. 'the edge of
Route 114,xocuth of the site drive will bo cut back to provide n short acceleration lane for vuhiclex tinning
righl onto Rou W 11.4 f'roin the seta drive.
hlrponotigh & Scully, Inc.
TECHNICAL MEMORANDUM
ADDENDUMTO TRAFFIC REPORT
Tfitt CDW Co nsaultarnts;,Inc. DATE" June 24, 1994
111 Speen Street
Framingham, Maasur chuussells 111 1 Ref, 14
FROM: McDonough&Scully, lnc, R V, Size Reduction
111 S peen Street, S aaity 401' P olmwd t sees Drug Store.
Framingham,Massach usetts 01701 North Andover,Massachusetts
il'ra t'raara�di'ua at
°u bNequueuut to the Preparation of dais traffic:Fhtd ',the,rile Us been redesigned and the sip of the profm,n edi
Osoo Drug Store has been reduced l'uoauau 19,0) to 14,96 square,feel, In addition,the proposed Boston
Chi teen restaurant of 3,400 GquFtre feet has been retraacted and will not be as part of this project. The
proposed rasdauetion in project size wri I I r%ult in less trips being generated and less impact to study A"roads
,and inters ti(insx.
This addendum sus ruses than projects' impacts on key study intersections,givers the du ctacara in puxu-jee t
siw And they additional traffic associated with t w Meadow Woods (phase three) and Nadine Lane
Bub'divisions.,
sieaus.
,, ru-Oarfila'i Condition
Subsequent ent to the cniginal shady,the Meadow Woods,(phase )Eared Nadine-Laurin subdivision Taa'oposaailas
have corrnu,before the lalsa^aaulrug board., The No-Build ulc hour traffic a tirr aw,have been revised to reflect
the addition of traffic from bath gu bddiviasiuns. Phase three will be roanstru ded on Hillside Road adjacent to,
the existing Meadow'k cods subdivision And will consist of 28 leas. Nadine,Laney will Im u.anstruaeted off of
Willow ;street and will consist caf lots,
The aackliticanu of MeadowWocxts(pl asses thr4m)traffic results in,an additionrd, 18(5,entering,13 exiting)trips
during the midday peak hour arnd,,24(16 entering,8 exiting),trips during the auf or noo n peak hour. 'The new
trips,will enter and exit 11M, side Road f oin l saute 125., The addition of Nadine Une traffic results in an
additional'20(13 entering,7 exiting)trips during die midday peak hour and 16(4 entering, 12 exiting)trips
d uririg the aft -auoon peak hour. Mae new trips will enter and exit Willow Street from Route, 125. 'Then
revised No-'1luuild nelwworks,are shown in the aapperudiaa as Figures AI iand,A2,for the aaaidsilauy send aft aruc nn
peak hours,Tegjwtively, J y
Site Traffic
The Build peak hour traaffi,c estimates have b iu revised to reflect not rarely tht,reduction in project size,but
also the addition of traffic Associated aaaa^ith the Meadow Wocxls and Nadine 1Ane asu badivirsicauurs. "1'ie revise
Build networks am them in the appendix as Figuaa^es A3 and A4,for the euuiulelaay and afternoon peak hours,
respectively.
A revised trip generation estitnatas for the snuiller,project(14,960 square feast t e )is presented in Table
IA. On an average weekday,the total mummer of daily trips is eslirnated to be9,80,with 115 trips fin°the
midday peals hour and 130 trips for the Afternoon peak ho ur.
mcdonwgh& scullyw Inc.
Technical Memorandum
ice: Size Reduchon - Proposed Darn Drug" Now Andover, Mossachuselts
TABLE 1A
TRIP GEN VRA"I'IONI CHARACTERISTICS*
(Vehicle"Tnps)
Totaal'Tri s
19,181 Entering afting
Weekday
Daily Total 9'80 490, 490
Midday Peak Hour 115
Afternoon Peak:Hour 13?0 65 6
* Based on,a;bscivaaions of existing drug slorcs of a,omparab sine
'11epraject,as nevi sed,wi11 ge ncranlc anpaprarsimata ly half of the traffic that the arriptiraarl project would hava
gear ated.
Project Impacts
'Thai iante necti(m capacity a d level of service results as computa d in than r'ari iraaal report reflect an ata as
building size,of 19,800 sgnnanne feet and a Roston Chicken restaanaraaat of 3,400 square.feet., With the pn"rarpn sed
right-taaa-ar,OUt rTRO R4 UIC 125, the results showed that the driveway inntcrsec.tianra with Route 114 would he
at level of service"�E" for,N)th the widdaay and afternoon peak hoitr& Witb the prrap txd paranject changes,
and thy::additional AdWivision traffic, the levels of service would)rennud n aat '"pi'," f+oar l th the midday and
afternoon peak hours, respectively. All of the movements at, theinfersection operate at levels of service
greater than"E"with the exception,of the left-turn exiting the site onto Route 114.
With the prep used right-turn mast onto Route 125 from the site and the improved signal timing and lame,use
ranaaadif cations, the signalized intersection of Rowe 114 at Routs 125 is expecled, to operate at levels 0f
service" '"'aaanal"U",dnring the n i>dday and afternoon p»e uk.hours,respectively,. With the parogect ch ng'ass,
the levels of service avtll reniftini at C"and,"D"for the naaidd y and a4f'hcriu)o a p eA'hraaars; res f iver^.
The computer parinntonat sheets for the revised analysis Are inclu"- iian the app nd,iaa„
Conclusions
The reduced project si resuldnisnaVpaparoxi:nnaately°halfof the gerneratt trips of the original project.
.
The key study intersections,will remain at the sa e,levels of service as a ren+ult of the paraapa t downswng,
even with the additional traffic om the M,ea low Wood's and Nadine Lane arubdiw"isia cnse
The,median island on thp,site drive will N,moved hack fnnran than edge ofmadway for Kafet,y. '"l"he edge of
Route 114,sraaath of the site drive will,he cast back to provide a short acceleration lane,for veMcles taming
right onto Route, 114 from the site drive...
Technical Memorandum
ke: Sire Reduciron - ftposecf Osco Drag, NorM Andover, WssaahuseM Pane 3
APPENDIX
no Y build networks
build networks
level of service analysis
mcdonough & Scully, Inc.
no - #wild networks
Royal Crest
E3tr�tes
8
10
f 4 1455
49 �4 4 1456(7)
1044 ►� 1
1210
.11
(g)152 �243(7)
lx�
(7)1455
1
3
SITE Route 114
72{1) Hillside Road
Rollie �26
73(6) Dead End
24(1)
c°4i �3(1 11ii1sEdc Road
(1)13--PP- t3
(16' —Meadow Woods Phase 3 And Nadine belle Trips
1 Evening No-Build Pak Hour
ORTH
Proposed Commercial Site
North Andover, Massachusetts NOT TO SCALE
MCDONOUGH & SCUUM, INC. FrnmiVS13.&fii, M06&fkehU8=fi
F7GURE A
1Roy171(WJ9
biffles
�16
13
4 l
$QS 89f1
(7)333� 201(7)
I (6)91 9
eq 3
13
2
SITE Raule 114
.— Illlls3de Road
Ro ke 125 ��3g
59(10) DeaAW 17
#? (1} Hillside Road
20
C2
i
7 t
20__P_
9-
(d1j---Meadow Woods Phase 3 And Na&rie Lkuie Trips
1998 Midday No-Build Peak Hour NORTH
,proposed Commercial Site
Norlh Andover, Massachusetts
P OT J ALE
MCI1ONO G-i & SCULLY LNC. I~IOMinghliM, MaHSACAVEMS
build networks
Crest
ES-fares
§
� S
!4
48 �4
1058 1223 01449
( )k 2 2(k7) 2 � 14520
27
f 15
7 7 \ \ R,me !!#
Hillside Road
�\ 2§>
26
Rout(- 12 — �k
R_
A
2@> DeaaELd E
2 7 ) it m e Read
t n 2§
9 DD
ƒ D
( >! 1
!O— 7�
(,MmAw WoG&Phase 3T p Aad Nadiae LameTA&
1998 Evening Build Peak Hour
NORTH
Proposed Commercial Site
North Andover, Massachusetts NOT TO SCALE
MCDONOUCH a SCULLY, INC. FraMI]IShRM, M21_0,h.��
GURE&4
cresl
Estates
16
!3
/ 14
4 � 10
823 9w @pm
0#3 211(7) 38 666(7)
20
3�
f 2
CIL
2 %
Route 114
-\ \
§ 3a y» liliwe Road
d . . .. � ,_,
. .,.. . .. Q94
Q � �39
Route 12 �
m
ƒ�
E (! )0 DeM Ead
m # k 22(') HmQA ■ k
70
21-Aph� k
9-4 ,mow Woods PbR34Nadine I-am T�iA
1998 Midday Build Peak Hour
NORTH
Proposed Commercial Site
North Andover Massachusetts PSOT To SCALE
MCDONOUGea §CU£LY, MC. ,_@A_, P&_a_lts
level of service onalysls
HCM-' SIGNALIZED ll�TEI�2'ECDTIOI� SUMmkf-,_Y
C:�-mtLn, For Irl Transportation
Streets; (E--fly F.,oute 125/Apartmr-nt- Route llel
Analyet : 1--i ! E Name;
Arp-a Type— Cithpi- 9-22-92L Flidday
COMMENtj 98 Build With T4.ming lfnprovomp-nt7 & PuLl Lefts ED
WFstbcourid s H.--,r t I�b o k-in d f f'3-u t h b o Lt n d
L T f F L T P L T R I L T Fl,
---- ---- ----- ... ...---
No. 'Lanr-.^
2
L
.4 %C
121
Lane Width 13 12 12. 0 1 2 0
RT 0 R V o 1 13 i C? i
5i tit-ra I Ct T3 E- t i C'n T;
PhaF.. f�ir-,mhination 1 2
ED Left N I; Left k.
T h r u Thru
R'I CAI S t
3
E-
W P L E I t CT: L F f 1: 4
Thr;j -Y.- T h r u iE.
Pi g h-t- R Cj[It
PLids f-.,e d S
NE', F,J.g h t EP Ri Q h t
SP Pi ght Pi 1;ht
F::i Y'�C- r r 1'7A i Gy een S 5A 2 5 P,
YE-1 I ow/A-F- 5 1 Yrl 0 5
I-Qf7t Ti me 3. 0 3, C; 3 Los-,t T i rf,cl 2 Ci 4
9- PhRsr comLinaticin ordert #1 #','.. ff5 V
lntu�rvection Fr-,rf,'nroiz ce Suiwiiar v
Lknu- Group; Ad.i tat v/I-- Ci/C AppFoach;
llvm t S r-'ap F I �w R at J.C, P.�t i 501 4ay LUS DC] ay Lo!3
----------- ........ -----
B L I
17 6 C,
LT i 7 F-�4 C.. 4�11 29
31 . E f C 21 J. . P, C
iQ I f�:
4tj 4 9 E 20. 1
5,5 ID 0. 7E fit. 45 1511) C
lVr'LE,V-- L-CtiLAT-5 -'Ie'- ay = 22. 0 spc- /vc:-h If-,t e-r-sect i on L.0 S
HCM: SIGNALIZED IN7ERSE-CTION SUMMARY
t_:enter For Microcomputers In Tronspartation
S#'e-L,L ;f= : Route 125/Apartfnrnt (N--S) Route 114
Analy--t : J'P'r: Fi. I2 Name: 1. 14F'EDMD. �C
Area Type. Other FM
Crmmc--nt : 99 Ptai. ld W/Ti. rning lmpyovements Dunl Lefts ELF FAT -:.125
I r c I o I I_; ' Ficz kt}�t]�yund
I �a�t�YY=lLlnd I �',fE�EitF?•..[.tnC� I ��r-t�3F�_r.�n� I .-s.
L T R t l-. T � L, T F;; L T F1'
I
[ I N,--, �-. Lane-E, 1 'r 1 1 f F 1 2 {{ ;t
V o mes I •1 C}LD 59 1 1�Y 1 � a { 250 1 t 0f:� r1 I f C1 8
Lztnr- Width i3. 0 12 0 t 1'! 0 ; 12- 0 12. 0 0
Signal OPE Y-2-A i c12�m
Phase C{7frebi I nat i r-'rt 1 1_ ] 4 L 7
F.P Left : NB Left � Y
Thru 9 Thru
PiQht F''icht k.
Pt:dG . F PL�d
P Le 1 t ` ' i 3L� Left -X-
ThrLl i Thru
Right 'n i Ri ght fir.
PE,dT Fpdsr
NB Pi ht !EEC Fr k Qht
Gr eery 0A 0 A r_jr een 2.,0A 12'2A
Yf?11 ow/A--k' S tYo11QwrfA-F Q 5
Lost Ti rfiz2 3. 0 IS. 0 Lust Time :3. 0 0
i:yc 1 e Lon Li h : 1 0 i secs Phase c om i n at i c.n or der- : Al #2 t'"I' #C
S r 4 r_Y erect i on Per fo-r marice ,S ummar
Lane CjF coup 1 Ad j Sat /c� g/c Approach:
mvmt s Caf F? F I w F'at i I_, Pa t i u Dc 1 a LOS DC.-i E y LESS
LT 17%6 541 fix. ` 6 {_}, 30 41 . 0 E
NFL L I G91 x74 Cl. 93 0151 44. 8 E F=
TR 35G1.1 i f7. -J0 Cr. �j1 1S. 9 C
5F3 3 71 1 . Q13 t=f. �= 4C - E 4L. 2 E
Inter sec tioi DLla4y — 35, 3 1r-iteF sec tion LO'S' = U
UNS G-NALI ZED !NTEF'SE=CTIDN�� F'arje- 1
#'-3c�'3;--}=1..",.'K'X•`�.y.-k 3E�=�����-#'.z ;,�.�����x�'��'i��..�..x.-}�i-'X-}�..�..}F$`r k.�{-�{.�-�,.x-L' X k i?�iE iz'��3F���-]S#:�-�:.�{ X.�
TDENTIFYIF+-6 rNFUPNATION
-----------------
AVERAGE F:'UNh!T NC; ""FED. NA J�F. STREET . . ;"ti
PEAK' HOUF . . . . . . . . . . . . . . _ . . . . . . �
AP'LA F-'U ULA TF-N. . . . . . . . .
NAME 0V THE E-A4? ,'WEE�Tf STREET. Site Drive
NAMcE Or- THE hIORTH/SnUTH S T REFT. . . . . . . PC, E.. 1 14
NAMF OR THFF ANALYSE'. . . . . . . . . . . . . . . . . . JF E
DATF OF THE mm/dfJr'YY) - . . . . . 0'�r'-27-1':�'
TIHE PERIOD ANALYZED. . . . . . . . . . . . . . . . . hidd0-Y
'I F'�E:: INF=ORMATIQ - - - 199 Bui It' Wh t' Rir3l3t Turd Out cr F*,��u t2s
INITERSEC T r ON TYPE AND i.=ON T POL
-----------------
rhoTEPSECTION TYPE. T--INTER'SER_;T IONI
i' r5t Lrf' 3 pE,j= r
CONTROL TYPE LAS T EK-11-NP. STOP SIGN
E ; rF' l F
CTHRU -'.0 .,- J.096 13
i
N 11 HL� R Or LANE
LANES 2 -- 2
r: �
ADJU8TMENT FACTORS Page-2
--------------------
PER2ENI RlBHT ] ORS COk§ kA»!Hg ( ft > ACcELL"ATION LANE
Bl:ABE 41lf48[--E DOE RIBH7 ] LIPMS FOR' RI 4T TURNS
EASTPOUND O. DO 50 20 N
wESTP-!Mo ----- --- --- -
N0rTH PIgD 0. o0 9G w
BOUTHB[3UNb 0. 0o a0 20 m
VEHICLE COMR05ITItN .
% 5,111 TRUE ES % COMBIRA7I0]
AND Rv S VEHICLES MOTORCYCLE?
---
NORTHBOUND O 0 D
SD1t HDOUND 0 0 0
CRITICAL aARB
TABULAR VALUE@ ADOU:jE§ BIGw] Elba . FINE
(Table l0-2> VALUE ADJOg%MENI CRITIC&, OAF
MINOR RIGHTS
ED 5. 70 5, 70 0. 00 5. 70
MAJOR LEFTS
NB 5. Eo If.. GO e. 00 »LED
MINOR LEFTS
EEL, 7. 30- 7. 20 0. 00 7. SO
IrgI1P'YING INFORMATION
NAME OF THE EAST ZQE [ STREET. . , . . . site DriyR
NAME OF THE NORTHZGDUTH STREET. . . Route 114
DATE AND ] IMF OF THE AHALY§lG. . . . . D9-27-1g93 midday
OTHER INF0RMAT10H. . . . 1992 Build Wi+h Right Tern OGt on Routa !25
CAPACITY AND LEVEL--QF-SERVICE Page-3'
I..'CITEW. A(:TUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
VATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v<pcph > c (p.cphk c (p :-p h ) (pcp-]-,) v EnR
p m EH p SH
NTNIDF: STREET
ER LP-FT 1 t; FIG, 61-1
4 B E
RIGHT x:- FIC15 L05 BOS 5 P.2 A
MAJOR STREET
NR LEFT
TDF--N'TjF--YjNG INFORMATION'
NAME OF THE EASTIWEST yYRLLT. . . . . . Site Drive
NAME DF THE NORTH/SOUTH STREET. . . , Route 114
DATE AND TIME OF' THE ANALYSIS. . . . . 09-27-19a%
CITHEP INFORMATION. . . , 1998 PLLild With Right TLtfr-r Out on Route 125
1985 H'- t. UN-c3IGNAL ILED INTEPSE(-=TIQN5 Page .,1
U)FNT I I=Y I Nl3
A CE .A RLJNN g N1 ; PFF Fr, I-VI.JOR STRI: L•J' . . 35
Efi;CTDR:. . . . . . . . . . . . . . . . . . . . . 1
AREA POPUL_AT I C3N. . . . . . . . . . . . . . . . . . . . . . b0f)00
NAME OF THE CAST/WEST STREP-T. . . . . . . . . Sii-.e Drive
NAME OF THE NORTH/SOUTH STREET—� . . . . . RcjL.;te 11
}TAME 0[7 THE ANAL.Y' T. . , z . . . . . . . . . . . . . . JF F'
IRATE i1}=- THE ANIALYSYz- Cmcn/dd/yyx . , . . . . 0:7,-2,7-1'v��
T,:11-E- f':'E_]',,,IliD A.NALYZEr7 � . . . . . . . . . . . . . A Lk_}-1,C?O;t
OTHER icv. . . . 1999 lBui l d With R`Lght Turn Out on Route 1'2
I NTL� RSECT 1 DN TYPE_ AND CONTROL
---------------------------------
I NT ERLISLLT F ON TYPE. 1---I NTEFF SECTION
!.]A U UV. - F'�E. L D I€.'7-T I ON- h4CiF?TH fS'11TH
U]N7-F:OL. TYPE EASTBOUND, GT05-f SIGN.
TRAP7"-1 C V0[_LJMES
ER wp_ NEl sLcI.-t
is 20
144 i
NUMBER OF LANES
ED RJR N B IsS
LAMLS 2 - - 2 �-
FAD jLJS-rmEN'r F AGTUR'S o P # —2,
FERC_EINI RIGHT TLJPN CURE, FADIU�; ( ft ) ACCELLPATION LAN
GF2ADL Ai*QGLE FOR RlT ! iT TURNS FOR 1*I GI fT TUPNIS
--------------
"'OUTil-D' UND 0. 00 =ocp r C
E11TO1._F COMPOSTTION
AND RV: 51 VEHICLES % € DTORC CLES
--- ---.-..-.
NORTHPOUND 0
BOUT€-1>ryOUND n co s
Cl;,11-IC:AL QAPS
TABULAR VALUEi} AD,TU'L-T£=D SIGHT LIST. I= 1€` AL-
f' t ab t e i �••f'x f,1.-Ui= Al �L L_rl " l' C F''I•:I C:AL GAP
MINOR RIGHTS
EB 70 `. 'ls 0. 00 if=
MAJOR 1-.EFTc
N I E URR I-EFTS'
I DENT I FY I Wi T NrC7RMAT i QN
------------------------
NA E OF T HL P-ASI /WES G'1 REE—1 . . . . . . .Sk t E Dr 1 ve
NAME OF THE NORT€ /3-OLITH STREET. - - . RQut .q 114
DATE AND TIME OF THE ANALYSIS 0 —27-1993 AftprnoCrrt
OT€ EP l KIP'OPMAT I ON. _ . . Build With Ri gl-t '€um Out 6n 1*Dut e 1'215
CAPACITY AND LEVEL-OE-SERVICE
------------------------------------------- ------ --------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
PATE CAPACITY CAPACITY &APACITY CAPACITY
M0VLMLN1 V&POph) c (pcph) c (pcph) c (pcph ) c = c v LOS
p m 1A 11 F. EIA
------- -------- --------- ------------ ------------ ---
MINOR STREET
ES LEFT Q EL 62 E2 51 E
RIGHT 17 INS 439 42S 420 A
MAJOR STREET
ND LEFT 17 166 166 1LL 110 -D
IDENTIFYING INFORMATION
------------------------------------------------ -----------------------
NAML OF THE EAST/WEGT STREET. . . . . . SitR DrIvQ
NAME Or THE NORTH/ROUTH STREET. . . . Rauto 114
DATE ANU TIME OF THF .ANALYSIS. . . . . 00-27-1SQ3 ; Afternoon
OTHER INFORNATION. . . . 19% Build With Right Turn Out on Route 125
McDonough & Sculli Inz.
Yf
Poitl6Vest Place 5"L I ilt,40'°' 0 111 Speel I St reet Te[epl wn(508)875,1720
IIN
ni ng I i,a n), a,4;-sach.n�,ens 01701 FAX (50 'J 875,K�94
ri
June 27F 1994
Ref- 146
Mr.Anthony Kornorniick
Transi,A)rtation Piogn m Manager
Menimack Valley Plaming Conunission
350 Main Street
Haverhill,Massaebuselts 0,1830
Re, Addendum Io ftrnfficwq)ort
Dear Mr.,Xamxirn,ick
Please find enclosed one(1)copy of the addendu mL to the traffic rprKyrt prepared fbr the.pToposal Osamu drug
Moret in North Andover. As we discussed in our telephone convemtkvn on June 24,the smire AW has been
reduced to 14,960 squ;tre feet ftom 19,800, fn addition,,the Baston Chicken restaumnt fuss beea dropped
ftom the propoW. Aloag with these reductions we bave updated our No,-Build and Bui Id traffile ndworkg
to include tin areas6hdivisions which have been pn'Ypa&-LA since the rein rt was written.
'The addiendurn to injo amnm(rail of these changts and includes&R appendix conmi the mvind traffic
networks and level olf service cidculations.
A furnialrespans&to(lie comments you mRde regRUh ng the Original trafric study i%,,Ixi ng pruparcd arid will
be submitted to you and the North Andover Planaing Boud in the near future.
Should you need to,di scu is any inatter Or if You have,any quest ions:,,please Contact me at(50 ) 875-1720
Very,truly yours,
MCDONOAJOB & SCULLY, INC.
Olul.F, EAIWffds
'0
Transp-ortation Engineer
A
oic-, Kathleen Bradley plwell
George Pema Jr.
Mc"Donough & Scully, Inc.
"�x"saw,1 ���.°�t �'"Lar - uoatt� 1C� l��' c�,�, ,�aa Te�lel41o,vir�&.)tN8"� "'75 fi2:
Nfl
P ,* w "yp '�
FV
June':28, 1994,
Ref: 146
W
Mr.Anthony K ouu,uomick
'Fra nsp oltatiuunn Program Manager
Merrimack uack galley Planning t onmEis;sionn
350 Main Street
Haverhill,Massnur;himetta 01',8301
Re: Response,to Comments
Please find enclosed one(1)copy of the responses to the:Mierriamck Valley 1'"laurnnri:ra,,g Commission VPC.)
a:urnments regaiding the traffic report prepared for the pn')jxYmA Osco,drupe astrnre in North Andovm As we
discussed in our t lep ho ne convtgmtion on June 24,the store size has been reduced to 14,960 sqyare fect
l=rom 19,800. In ad°ditionu,tht,Houston CMcken,restaaur t has been dropap?ed from the prop,O. aL Along with
these reductions wo have ugx1atcd our No-Build and Build traffic networks to,include two area suub4ivisiorus
which have been proposed l siiu.ze the report was WTittamru,
The responuses taa your eommmts inirrryr those given over the phone on June 24. Should you need to
discuss any matter mar if you have any quire tiouus,palease myntaact me at(508) II75-1720�
Very truly yours,
w
1Jobn waurds
Transp)rtation Engineer
'1#; "-..
n:u a Kalb lee a'Bradley Colwell
p'T,:1 -,1'��Ttrrtia:H1 b Flgft n-eering I FI king a 0[-ca'uution + C rt";'ngn
TECHNICAL MEMORANDUM
RESPONSE TO MVPC P ENT
TO: Mr,Alothony Ki mornick DA`l'I<?: )Lmt1 27, 1994
Try Todatioa Prugrnm Manager
Merfinmek Vsdley Planning Commission
350 Main Stret
Hav€whlll,Ma;sswikuse#ts 01830 Ref: 146
FROM; WDDuougb& Scully,ble. RE: Response to Comments
111 SywAm StrwA, Suite 407 l IFOPOSM Osaco Drug Mom
Framingham,Massachusetts 017GI North Andover,Massachusetts
M'D{mough & Scxflly, Inc, has weeived The comments on the origiwd traffic report prepared tax tho
pmposad OKo Drug slum in North Andover,Massadia-seats. The following responses to theme c mmenis
lako into srcnunt the subsequent rediielioit in project size and the updated no -build traffic resulting koin
ffie addition of two area subdivisions.
t17ERRIMACK VALLEY PLANNING COMMISSION
ommenr: More detailed infamweiorr oval}be required before we can nurke a derision on whether Soo
parr b or ioo litrk t,xr�ie fraorrm these developmews is assigned ro study area intersections.
Response:
The traffic from each development was assigned to the local midway system in'w' ordancti with Ow trip
distributimi pnwide d in the traffic report aftd as follows:
Meadarw W(mmhs(Phasys 1 to 3) Assigned to Route 125 from Hillside Road
Guth Andever Estates Assigned to Routu 114 €corn Clxztnut Str€wt and Mill Road
Wagon 1WhMs Assigned to Route 114 from Grfly Street (Poston Street)
'Free Acre ReWl Site Ax9i&mtml to Routh 114 dirwily and from Hillside Road
Willow Industrial Park Assigned to Acute 114 from Willow Street
Nadinel.ane AssigntA to Route 125 from Willow Street
Comment: 1i is u►ekar,fimn t1w repori whether the developer will fund the restrip ng and retim ing ar Aw
Route 1141Rowe 125 intersection.
Response:
• The proponent for tba proposed Qsow drug morr.will pay for throe improvements. .
Comment: lie rase of Specialtyt Retail Cewiff as She laud use,for Me va cam d ree acre resail site could
mull is a low traffic gerrernrian,given otherposNible racer for Me site-
r»cdwough &scu , Inc.
Technical Memorandum
Re: Response to Comments- Proposed osco Drug, N. Andover. Massachusetts Page
Response-
• The usa of Specialty Retail for the laiduse type in generating traffic for the three acre retail
gigs was bawd on discussions with the Mortar Andover plmning board which indicated that
this type.of use is likely.
Comment: ?Mffic data for she AN peak hour wick LOS calculwions should have been included in rho
analpis s bxe many dr agstores open during the AM prak hoar.
Response-
The proposed OSOO drugstore will have operating hoar%of €O.00 AM to I O:OO PM which does not
encowpass the roadway AM Peak hnar;dr Arfore this period was not studied.
ommeni: Pruuidirig a connection,1D Houre 125 to provide a righr-runt oar may be impossible due!v
the access cotawl rrreasures in place on the,By-Pass.
We)nave Fabmitted the application for pea it to kecew;Stute Highway irw sconrdwice with phis project.
ne appl"tion ccnztainW not only the primary access on Roue 114 but a€so the right-turn out
onto Route, 125. Discussions with odficiEds at District 4 of the s.;sachusetts Highway Depwtmenl
indicate that the Route 125 east is desirable and would improve safety by reducing left-turns onto
Rollie 154.
mcdonough& scull , Inc.