May 31, 1994
Mr. Gaylord Burke
Merrimack Valle Planning Co issio t
164 z4ain street
01830
Haverhill , MA
Re*
Review of a affie Study - Rt 114 Rt 12 Inte�secticr�
Dear Mr. BurRe, review of the
{o to nick today regarding cu alar�q
spare with Tony He suggested that I send it tc
enclosed traffic study- roTh
ect the
offs coal request for review and asp n On th is planning
Frith an Opening the public hearing
Board will be
t of dune 7 . 1 would k�.}�e to have some sense of the validity
nigh that date.
of this report by
ou be able to review the report b
please let Ta shave questions or need Vkora information
next �aeel . Y
ou please call me at 82- 483 ext. 24 .
SincerelyCgtlylu
l �clwell
Kathleen Bra
Town planner
cc. IC. Nelson i] r PCD
. Smolak
i
i
M'erriLmack
C 0 �+ G E
North nmdowi: Massachusetts 01 5, - 3-711J
Office u1 1a°are Planning nand Project Mauua euuveunt �„,,u� iP„��,n a J f
June 6,19-94
�w rl Kiehaard Naarrlellwa
Chairman, North Andover Maiming Board
Town of North Anndlover
'120 Main St,
North Andover,Man, 01845
Dear Mr. NQardn_lllan;
Enclosed,you will fiend as icopy of it letter and as list of concerns presented to the North. rkdovu r,.
Conservation Commission r'n',gcarding th,e aroranas ul Qqu°n Drug project aL the cu rrennt site, of. the
Pu'allonn ship Bibb cluan�a1,
I"tea not. certain as to the relevance the l i u.ted cu¢mC rrn-,� will have regarding the PlanningBoard's
review of this, project. However, N felt the Planning l.iauanrd �qhouald he aware that Mlerrira:nack
Cu lege has several concerns with the overall impact ni this proposed project. 1'erein-laar:k is
riow awaiting as resperunse fruannn the applicant and Llae C nns rvan.taonn Cunirnjs5ion regarding our
concerns. If you nwlsla,I will fornaaraxd Qa ClOpy OfthC rCSPCnamsO,S t() the PlaanaumuunF, oard when they
Ineconnne available.
On behalf of Merrimack�c.`rllral��, thank k oun fear your finie and.service to our cu]nnnrna annit, . Should
you require any aanlclititarW innfrrrrnnation, please don't Inesilate to, contact nnrn.v office,
arauaan�uu. „
Scott A. CoL6
Director of Space Planning
Project Maannda enaenat
SAC/hs
Attaclnanaennt,s
cc; Mr. John Palnnnuncci, Vice President, l' errinaarck College
i
Mernmack,
North Andover, Massa chuusetts 011845, -683 111
ff jCe 0f S Pj'@'Cer Planrnauniurg and Project t' aaanagemerat
J'au w 6,,19,94
^➢r, Gicurge Reich
Chairman,t~o ns�wva!tiaaar Corr'unnnss:iiw'aru
➢'oww n of North Andover
'120 M aaira St,
North Andover,Mi�. 01845
De,ar Mr. Reich:
On Wednesullaay,J une 1, 79ct a� pra'blk ➢ ewarrin was held regarding g the proposed construction
of a new 14,900 squaarc foca,t facility at the currerml site of the FcllO slaap ltlble SCIII001,
Following the Presentation of the parruaject, t➢ac floor was opened, for con—imenuts annd cu ncernn,
rggarcli apt the project, l was present for this nnarr'"tirng ars the cle$iIl'nra,tn:!al relrre--kMtaative for
Merrimack College and I prr;ser7tt"u;l as list r.rt ulut!,0anun anwr:i vonCerrus regarding the project.
As requested,l have aasscaaalaled the questions and concerns,in as written forrrnat for the
Conaaaaaissucau-a's waled the Appliumts review and rumsp n,t-e- As 1 r;napl a i.rued cluring nvey presentation
of the i;ssuuc°s, Merrimack College is not anti-clevelopn iiennt, we su F:n')art prrojeds that are.,
benacficiaI tua the entire c°cauaauaannnity. Hs�wwr�wru r, air°43r��rl�ata�:u�a°h�°uwrrru u�i a➢rtau�t �car��Ut �wrj wrae
believe this is evid ent in the may ive maintain our buildings wrnrc➢ grouruulsaaaucl the way in which
e approach all development usua campus.
By copy (if this letter and the wawa^�➢ed doc urraerut, tlrc Apapenlicauruts representative %vil:l. be
notified in writing of the ollege's concerns. On bwt haH of Merrinaaaack College, thank.you fur
your time. an(] servir tca our cuunua-n'ruunnaitlyr„ aluuauald you require any aclduticanaa.l ivaformadon, please
don't lresitstc to, canrtact my if fice.
Sincer .1y
Scutt A. Co-16
Director of paau�e t'laan,n,irul
Project tw'larn7 sga.'rnent
SAS/las
.ttaa:chn—mcuais
°, Mr. John Paluaauucci, "ice President, Merriniack College,
Mr.John Walker, CDW Consultants, ll1 paeent' t, write 119, Fraarrain ghaam,Ma. 01701
1. In the run off calculations, why is the T of C (Time of Concentration)
the same for post construction as it is for existing conditions when you are
proposing to install 825' of under drain and 7 catch basins on a site
where no structured drainage currently exists. All of the calculations are
used on a sheet flow drainage over grassy areas when over 2% of the site
is proposed to be impervious areas. ( roofs & asphalt )
2. The drain system proposed is designed on a 1 in 25 year storm event that
will now carry storm water to one central location that is adjacent to the
wetlands and a 21" culvert (not asp 18" "lver't as reflected on the
drawings) that drains to errimack's campus. The adjacent area for
collecting the storm water is not a retention area by design, it is an area
designed for the purpose of slowing the water flow down prior to the
water entering the wetlands. The proposed control system will cause a
concentrated flooding of the wetlands that we believe will cause erosion of
this area and change the distribution of water into the wetland (x>mpared
to the current .existing conditions.
3. Within the drain calculations for the system design you are estimating an
average of 7.2 inches per hour to fall over the paved areas feeding the
catch basins, however, over the roof areas you are calculating a maximum
of 4" per hourN What happened to the 3.2" per hoer that is falling over
the paved areas and not over the roof? The calculations for the roof run
off should be provided as real numbers, not based on a 4" per hour max a
suggested within the Massachusetts SLate Plumbing Cade.
4, In order to further study the proposed plans for this project in detail, the
college would request the following information be provided,
A. What is the routing calculations at the proposed outlet. This
information would be helpful in determining the the effect on the
wetlands and the box culvert that dumps water onto Merrimack
College,
B. We would request the calculations for tho existing catch basins on Rt,
125 ( a total of 3 ) be factored into the total run off for this area because
they currently dump water into the wet lands.
C. Provide the flow path usod for calculating the T of C for the entire site
including the proposed under drains.
KAREIN HT-NELSON Town of
120 Main Street, 01845
Dim Irff
NORTH ANDOVER
. {ONSERVAI I{3AJ +"" i D]S eSIGN OF
HEAITH
E'LkNNING PLANNING & COMMUNITYDEVELOPMENT
June 22 , 199
Mr. Tom Kennedy
Kennedy bevelopmept Group, Inc.
500 Broadway
Everett, MA 0 149
Re: 525 Salem Turnpike - Osco Drug
}ear Mr. Kennedy,
Due to the lack of a quorum at the last meeting the Planning
Board will continue to discu88 the site plan review application
for 525 Salem Turnpike on June 28, 1994 . The meeting will begin
at 7 : 00 pm and will be held in the Library conferenr-e Room at
'own Hall .
sincerely,
Kathleen Bradley dolwell
Town Planner
CC. K. Nelson, Dir PCD
R. Nardella, Chair PB
i
KENNEDY DEVELOPMENT GROUP
t INC.
54YO Broadpvqy
ft'Ll �f, , f R55Y:iuXx��s 02149
Boo- (617) 387-1 m
FIRM ;. �.
PAX
TRAWK12TSD By :
3 J STRU& - ONS
Wjrarn--��---- ---,...-_...------ -- ------Map �----�--=-�•�'—�r�r't�reF�t �r $err= o�� �4�t�+i
F 32^ Ld—m Ls--t dl Lfd
if you r:a1.'4Q anyproblemsobls or que8ticjjj�:L C�`Teardi 1g h Mew
ago,
Pax Mu o,
r ���
h" � Y p �" w u � Ln t 8 118, ...
I I)E,A L:T 11k
I
a rch 27, 99
r, Sherman Eidelman, District Highway director
MASS Highway Department, District 4
519, Appleton. Street
Arlington, MA 02174
e: 525 Turnpike Street (Route 114 and Route 1 5) North Andover
Right-turn, out only access to Route 125
Dear Mr. Eldelman,
The North Andover Planning Board reviewed and approved the
proposed 0180o, Drug store located at 525 Turnpike Street (corner of
Route 114 and Route 1 ) based upon the assumption that a right-
turn out only access on Route 125 would he allowed. 1t has come to
my attention that this, access point may not be approved by the MASS
Highway Department.
This right-turn out only access is extremely important to, the
develo uuuent of this site. A.r-Qordinig to the traffic study submitted
to the Planning Board, approximately thirty-six ( ) percent of the
traffic exiting the site will use this access point. This access,
will reduce ]Left turn exit delay at the site drive and reduce
conflicts, on Route 114 . More importantly, this improvement will
make it more convenient for vehicles exiting the site, while
improving safety by eliminating the number of left-turns from the
primary site drive, and reducing potential conflicts.
The reduction in the number of left-turns onto Route 114 has
inQreased in importance due is the proposed development of .a retail.
complex across Route 114 from this site. Without 'this right-turn
access out onto Route 125, there will he serious left-turn exit.
delays fear :both sites, and potentially dangerous, conflicts in Route
114 .
1 urge you our behalf of the applicant and the Town of North
Andover to grant the right-turn out, only emit onto route 125 for
this proje.ct., if you have ,any questions or need any additional
in£oxmaticn, please 6o not hesitate to Call me at (508) 688-9535 .
sincerely,
Fathleen Bradley Colwell
Town planner
cc. K. Kahony, Dir CDS
Planning Board
P. Shab@@n
T. Kennedy
D. hammer, USDO?
R. Dutil , ES DOT
KEN N EDY DEV ELOP MENT GRO 0 P, INC.
50014vadwy
Way
Evereu, Massachusetts 0.21'49
Bus. (617) .187-1700
tioc (617) 3870152
May 10, 1995
Ms. Kathleen E. Bradley Colwell
Planning & Community Development
North Andover Town Hall
120 MAQ Street
No. Andover, MA 01845
�Re: 525 Turnpike Str NpXth Andover, �RA
Dear Ms. Colwell :
Enclosed herewith please find approved plan with curb cub permit
for your review. I have also noted on the plan where the chang8s
were made.
Upon your review, please call my office,
Vle' ry truly yours,
10ma' s G .
President
TGK:pdm
Enclosures
MA
��
� � William F Weld Argea PaulGOi eliucci Jamps J. Keraslotes �.atrdgda T.C�FAFAfS$+8+7 Bedingficld
�70VEfA0f tftrl$ARlff+Af Sfelafy r
Permit No. 4-2 719
PERMIT-NORTH ANDOVER
Subject to all the terms, conditions, and restrictions printed or
written below, and on the reverse side hereof, permission is
hereby granted to the First Street Development to enter span the
State Highway known as Route 114 or the Salem Turnpike far the
purpose of constructing a driveway approach to their property on
the we.Pterly side of the highway bettzeen stations 33+12 and 37+ 5
as shown on the attached plans titled:
0SCo ]DRuG
NORT111 A lY[ i, 7 A
dated 5/13/94 revised 7/07/94
The existing opening at approximate station 36+25 shall be
closed.
Permission is also granted to construct a one way, right turn
only drive to Route 125 between stations 34+00 and 35+00 as shown
on the attached plan titled:
Route 125 Access
dated 5 f 5 f 95
The Grantee shall install R3-1 (No Right Turn) , R3- (No Left
Tern) , R5-1 (Do Not Enter) , RG-•-I (One Way) , and R3-2 6 (Rigbt Turn
only) signs and painted directional arrows at the locations
indicated on the plan,.
The following condition �puluber e3.ght (8) shall be- added to the
seven (7) established conditions:
a. The requestor shall have prepared at his---he..r pwn ..expense, a
Highway --Alteration Play:, -written instrument, legal
description and reset highway bounds if recgired, to
Department specification. Said plan shall be completed
and sub3pitted within 90 days following_nMt fi anon_. of
approval hV the Massachusetts Highway DMartment. l- .
WORK HOURS: 9:00 A.M. thru 3=DD P.H. Monday thru Friday
The work will be performed as per plans on file at the
Massachusetts Highway Department District Four Permits office,
MassaGhuseIts #ffghway Departmoill • Tun Park Plaza, 6oston, MA 0 71 -,397,7 •(617) 973-7500
- PERMIT CONTINUED
The Grantee shall submit to the District 4 Permits office "As
Built" (MYLARS) upon completion of.- the work.
The Grantee shall notify the District Permits Engineer at (617)
648- 61GO, two (2) days prior to the start of work.
The Grantee skull notify Dig-Safe - at 1-800-322-4844 at Yeast 7
hours .prior to the start of work for ,the purpose of identifying
the location of underground utilities.
Dig--Safe #
A copy of this permit must be on the job site at all times for
inspection. failure to have this permit available will result in
suspension of the
rights granted by this permit.
All work shall be in compliance with the current edition of the
"Massachusetts Department of Public Works Standard Specifications
for Highways and Bridges" .
No work will be perforated on the day before or the day after a
lone week-end which involves a holiday on any highway, roadway or
property under the control of the Massachusetts Highway
Department or in areas where the work
would adversely impact the normal flow of traffic on the State
Highway System, without permission of the District Highway
Director or his Representative.
There shall be a Reimbursable Dumber for State Engineering
Personnel while inspecting this job.
This permit is issued with the stipulation that it gray be
modif ied or revoked at any tine at the discretion of the District
Fox.ir Highway Director or his representative withox]t rendering
said Department or the Commori�,realth of Massachusetts liable in
any way.
Uniformed Police officers shall be in atteridance at all tames
while work is being done under this permit ,
All personnel who are working on the traveled way or breakdowrk
lanes shall wear safety ire,5ts and - hard hats.
The fx=ishing and erecting of all traffic safety devices shall
be the responsibility of the Grantee.
Cones 'and non-reflecting warning devices shall riot be left in
operating position on the highway when the daytime operationp,
have ceased. If it becomes necessary for this Department to
remove any construction warning devices or their appurtenances
from the project due to negligence by the Grantee all costs for
this work will be charged to the Grantee.
i
i
PEFUMIT CONTINUED
Flashing arrow boards will be used at all times when operations
occupy the roadway and shall be available for use at all times.
Necessary signs, barriers, cones, etc. shall conform with the
Qtirrent Manual on Uniform Traffic Control DeviQes.
Free flow of traffic shall be -maintained at all times .
Two war traffic shall be maintained at all times.
When in the opinion of the Engineer, this operation constitutes a
hazard to traffic- in any area, the Grantee may be required to
suspend operations during ceictain hours and to remove his
equipment from the roadway.
Care must be taken not to interfere with underground structures
that exist in the area.
Care shall be exercised so as not to disturb any existing Mate
Highway Traffic Duct Systems. If said system is disttirbed, it
shall be restored immediately to its original condition. Also
all damaged Traffic limes shall be repainted.
The Grantee will be responsible for any damage caused by his
operation to curbing, structures, roadway, etc. .
The Grantee shall be responsible for any settlement which may
occur as a restilt of the work dome under this permit,
The Grantee shall be responsible for any ponding of water which
may develop within the state Highway Layout, caused by this work.
Water jetting of the trench area is prohxkited.
When a snow or ice condition, exists during the progress of this
work, the Grantee shall keep the highway well sanded to a point
not less than two hundred ( 00) feet beyond the limits of the
barriers and signs .
if directed by the Engineer photographs shall be taken prior to
the start of Mork to insiore restoration of designated areas to
their former conditions within the limits of the work areas .
Copies of the photographs shall be delivered to the Arlington
office Pex-mits Section.
The Highway surface shall be kept clean of debris at all times
and shall be thoi.-aughly cleaned at the completion of this permit.
At the Completion of this, permit, all disturbed areas shall be
restored to a. condition equal or similar to that which existed
prior to the work.
PERT-11T CONTlNUED -
Driveway drives shall be surfaced with Bituminous concrete, 'Type
l and shall be Comprised of a 3" Class I Bituminous Concrete Base
Course and two ( ) 1 l f " courses of Cass I SitQminous Concrete
Pavement for a total depth of 611 with a foundation of at least 611
of compacted gravel.. The finished surface shall butt into and
not overlap the existing highway grade at the road edge.
The driveway drives shall be so graded that no water shall enter
the layout nor pond or collect thereon, including the roadway.
The curb cornet's or radii may be painted at the time of
installation. Said ctirb shall be painted yellow only.
The curb shall be placed in conjunction with or immediately
before the completion of the driveway surfacing.
The part of the drive drives located within the limits of the
state highway shall be maintained by the Grantee, at his own
expense and to the satisfaction of the District Highway Director
or his representative.
Whenever trenches are cut in the travelled way the surface shall
be cut in straight lines using a concrete saw or other accepted
methods equipped to cut the full surfacing and including the
reinforcing steel on concrete roadways . The excavation shall
only be between these lines. The cutting operation shall not be
done with a bac hoe, gradall or any type of ripping equipment.
All utility companies whose services are located within or
adjacent to the proposed installation areas shall be notified in
writing of the proposed installation at least 48 hours prior to
the start of any excavation in said areas. This is independent
of the required dig safe notification.
it shall be the responsibility of the Grantee to contact the
District Highway Director regarding th.a field location of any
underground traffic control devices on this project.
The Grantee shall indemrify and save harmless the Commonwealth
and -it's Highway Department against all snits, -claims or liability
of every name and nature a2isi.ng at any time out of or in
consequence of the acts of the Grantee in the performance of the
work covered by this per-mit and or failure to comply with terms
and conditions of the permit whether by themselves or their
employees or subccntractors.
This permit s 1994 .
APPLICANT ' S REPRESENTATIVE. John F. Edwards
TELEPHONE DUMBER: (508) 875-170
PERL41T CONTINUED
(SEE OTHER SIDE FOR ADDITIONAL CONDITIONS)
No work shall he done under this permit until the Grantee. shall
have communicated with and received instructions from the
Dxstri t Highway Director of the !Massachusetts Highway Department
at 519 Appleton Street, Arlington, - Ma. 02174 .
This permit shall be void unless the vrork herein contemplated
shall have been completed before 5 May 1996.
Dated at Arlington this Sth day of May 1995_
Massachusetts Highway Department,
By
Sherman Eidelman
District Highway Director
CB%b
Ac C- C-
PROP, RAT. GONG.
ET. + .
f L7. POLE R5.00,
i
' V£RT GRAN. CURS' PROP. VER7 GRAN- :URI
! V4 TYPE V4
ROUTE 125
8 +ulq
[C. tip -rulrzV O.QL`
MAIL All REQUIRED
OICES To JATE 1,0/ 95
CAPITAL ASSETS DEPARTMENT THE ABOVE DATE IS SPECIPIC
ANPRXCAN STORE5 PROPERTIES, 3NC Page I
P-0- BOX 30658 PUR AS CHE ORDER DATE 08/31/95
SALT LAKE CITY, UT 84130
801-539-0140 F.O.B, DESTINATION
TERMS PREPAID & CHARGE
VIA V '
—PURCHASED FROM-_
CONSOLIDATED SIGNS - 0783 ------
TIM MARCHESE' CO D RUG 0330
5 TURNPIRE STREET
1118 NORTH 18TH STREET RTH ANDOVER, MA 016fS''
IVIMAIJAr NE 68102 N
ATTENTIQN., FIXTUAt lNtTALLER
UANT. UNT PPIT EXTENDED
DESCRIPTION C100-T COST
tl
INSTALLATION
�1,list
RK THE ABOVE ITEMS ATTENTION: INSIALLATION LABOR
EXTERIOR SIGNING FOR .OSCO/SAVON
TO INCLUDE ANY COMBINATION OF THE FOLLOWING:
OSCO/SAVON PYLON SIGN
EXTERIOR OSCO/SAVON SIGN
EXTERIOR FOOD MART SIGN
EXTERIOR LIQUOR SIGN
EXTERIOR PHARMACY SIGN
nRrVE "ENTZR"I"EXIT" SIGNS
a,t
PER YOUR OUOTH DATED:
CA�
PERMIT CHARGES
RK THE ABOVE ITEMS ATTENT100 EXT. SIGNS
3-Sc!
k57-7 Ob
SA e)
4;
So
-p,Y\s
Town of North Andover 4kOFMCE OF
xoRTM
COMMUNITY DEVELOPMENT A_ND SERVICES
l a
� F
KENO 1 R_WAr ONY North Aadover, Massachusetts 01845 y icK�54
D+{acfaf (508) 698-9533
November 1 , 1995
Mr. Wendall Orton
Construction Management & Builders, Inc.
121 Conifer Hill Drive C A4
Danvers, MA 01923
NOV 100,
Re: 525 Turnpike Street RECEJV
Dear Mr. Orton,
This letter is to eoiifirm our conversation of yesterday regarding
the Planning site inspection for Certificate of Occupancy.
Although I authorized the Certificate of Occupancy, The followiflq
ite must be addressed:
Paint fence along Route 114
Re-Hydros ed the entire site
3� stabilize the slope zilong Route 125
P-t�ov�.de�a" �as-built plan
5 . Resolve walkway issue with Chestnut Green
I also suggenst that plantings be added to the island adjacent to
the drive-tip window. I understarid that some of these items may
need to be completed in the Spring, The Planning Board will hold
bend money to cover these items. If you have any questions or
corranents. please do not hesitate to call me at (503) 688-9535 .
sincerely, COPY TO =LZ-J_f
Cathleen Bradley col ll -- �--
Town Planner FROM. JFFF ' -O
au ;
CO. B. Nicetta, Building Inspector .1A 01923
J. Mahoney, Chair PB tDATE
UDARD Or APPLkLS fi68-9541 BtJTi3OT G 6ab-934S CONSERVAMN b88-9370 HEALTH 688-9540 f LANN NG 688-`#SAS
rude Pairimo I}-R;sb}t N;xtla hV ichxcl Howard SM3JM span KaLWom wadit y Co€wok!
� �91111�� IY 'i4„8
AME1,T91E;JaN STUB :S PROPERTIES, INC.,
WEFRES E IJ71'W2
, d,n`
AWL PJARKE 1',S r JEWE L FRQQP 570RES l JEWEL OSGO y
LUCKv ',Y S70R[G y w;SCO CP�P'uG r 5ar.V.U.mu-i97lrRuri,� r" supiFiR F,:Ay'iFR
Sa'nrehn 3,, 199
Planning Boardoi`North Andover
'1'ewpu Hall Annex
']'own of North Andover
146 I Ginn Street
o1 rtin Andover) 1 a, 0 18,45
tdtrn: Kathleen Colwell,Town nn Planner
Dear Ms, Colwell,
On behalf()tl"C sco Dnig Store, t am requesting rciease of au bond posted ,1unnwe
1995 in the amount €f$135,000. The bond was posted to insure the coo npletiorn of the
Items of Condition set t' rth by the Planning Board .for the Osco Drug Store project , 525
'V'uararpii~.e fit.
The store has been nv 1 un for over r� year a:und gull itennn ;yet one rug' Onnn.l�le1t .
The outstanding iterrn is a bridgeto be constructed coo unectinn tine Ct ern ri�pert iti� the
KFBB property, This item is being handled by 0 ce ReaJ Estate Manager, Robert Stack.
Mr. Stack has,aujsurred me that the bridge will be completed ithirrn 6 months.
T understand that release of the hnernd weeds to be approved by the, Platuring Board.
t, sera "I eunld apprI consideration and a vote on this matter during the March 1 tin
Planning Board meeting., I am available to assist in anywayto bring closure this issue.,
On anppro:vand of reieause of the bond, please seed the bond deposit to:
meric.an Stores Properties, 111e„
P.O.Box x 30,658
Salt Lake City,Utah 84111
,4 ttn: DeAnn Ill,
Check payable to. American Store's Properties, Inc.
Reference. North Andover project H DO,03,30
(-'O uar'210 f.?f'Twcus
346 FAST"B UTI I TTiT P U GAU LAKE CITY,UTAJ-1 84111
fair~•X:1i0&: 8/SALT L AK F.C'4 4 Y, IJ 1'AH rT4ViO-()M,,0
TELEPHONE 0,01)G39-0140/FAX:�901)1,39-W 46
111tn¢'c'iUarSl 01 ,unwrVc nrr I"Gmms company
Thank, youfbr you help. We look forward to the continued success of the Osw
Drug Store in the town of North.Andover. If you, need to, reach nic iny number in Saft
Lake it is 801-961-39,60.
Sinc,prely,
De. lui Ilg, Entitlements Coordinator
American Stores Properties, Inc,
C., Don Scherer
Mike Mallon
Robert Stack
Robert Strandt
Arnold (.'Tentfle-/;a
i
�onstrucfiori ManageiTient & Builders, Inc.
A 9 Ki
May 29, 1. 16
Ms. l allnleeun Bradley Colwell
Town. Plannuner..
Town of North Andover
lover
Offic�c ofC nnnnnnuunnityP Development and Services
146Main Street
Noir- la Andover, MA 011.845
R F Oscan Drug 113,30
525 `p"unrnnpike ircet
North Andover, MA
Dear s- C.otwwell-
e have, heenn requested by American Stores Properties, Inc. to replace the existing asphalt
Curbing w illniuu ilwe limits of the sabJect property with new ertticaal granite curbing., As You may
recall, we disc ur peal this work earlicr in the month nth of May. °l°c ownnex has elected to n aake this
im.proveraneant as as ae ullt O' those extensive darnage. incurred by this past wirnter"'s snow r nnioval
operations. A copy" of this silts plan Oiowing the lian'aits of curb replacement nt is aattaclneel RIT your
re:l'�nmennee,.
The site landscaping waas also damaged extensively by snow rennnoval and. Anicrican Stores
would like to, proceed with plant rep hA!QeTm antS coneurrendy with than carinirn warn°k,. Our- l:nroJect
fandscaper has suggested tlnaat,ju nipaer nn-my bt as better chc,aiQe (ban i,nkberr ° for to nge rty,, and, raw°e,
resp ctfidlwy request y ou,r consideration and approval of this change in palaunt species.
With regard to other outstanding, itennns at the site, C' m & B will re-lay°clrosee,d and ensuri'e that the
slope along Fbaaate 125 is staablil ized in accordance with your letUer to us ofm aaveinher 1, 1 995.,
Co nfiflniung our telephone conversation of May 10, yFcaun have suggested lb at the walkkvay issunc
with Chemnut Green be kept rapm until this Fall to fuartlner ewa°aaluualle paeu.lestrlan tndfic between the
two 11169ities.
'11 1 Conifer Drive lhon l 8 - ., 5 - 8111
rtv r „ Massildtu well',s 011923 I'M: 5 - 777 - 38,71
cm & b
Ms. Ka:thleen Bradle otwell
Ma:y29, 199,6
Page 2
We will request a firial site inspection when the itenis outfined above arc conipleted. III the
meantime, we would appreciate a prompt respw:ise on the landscape substitution to ensure that
th,c plants, are [nstalled under favorable weather conditions.
Should you have questions, or require, additional information, please contact nic at (508) 750-
8 11. 1.
Respectfullyo
Jrfe.f.14, L Anderson
Pro"Ject [�Xccutivc
cc: Mr, Je fT Loclietto
American Stores Properties, Inc.
f own of North Andover
OITICE O 4 a*itta +#
COMMUNITY DEVELOPMENT AND SERVICES
30 School Strckn � F
north AiRdovct_ Massachusetts 01845 �*`°�.t.o -•''"��
1F.ILI.ir1.A J. sc(y-1' 3iC US
tr�?eyar
MCLmorandu try
To- Robert Ni e#ta, Buildhig Inspector
From: Kathiten Btadley Colwel€, 'Town Ylamier
Date, April 24, 1998
e: Sign% on the fence at Osco Dug
i aril writuig at the reediest of the Planning Board regardhig the cotitiqued rise of banners on the
fence at 0sco Drag. The Plarniuig Board ,,pent a significant aniount ofthne and energy
revie,wiug this project and working with the applicunt to make tiro site m asset to the Yawn- The
Board does not �Yanl [he1r e fforts ruined with ba nners. huug on the R t_ 114 side of the fence.
Tbtr Boe ird wouId lice you to take whAttever sEeps arc necessary to have. tN e banners removed
ftom the fifnee permanently. If you i}eed guy lance the 13oard wouId be more than happy to
help. If you € ave any gaestions please call me at 8 -9 35.
CC. 1 , Scott, lr_ CD&.S
Planning Board
f-L0tUDoF:4FFF, j-s HUILDENG 6R8.95.E5 C0NSLRVX1'10 629.57530 H AR:PH 688-95441 P[ AL+'z1LN('3 (M-9535
�, AN hr� o �
TRANSMITTAL � � � Devonshire Street
i�r
�k Boston Massachusetts
setts
012110,
i t l 6 1I7- -00, ,
w� fax 6 17 0068
TO,: Kathleen Coldwell DATE: 1 May 1998,
Town of North Andover'
Planning Department nt PROJE T NO.
.&Gh oll Street
u� .,,I A 1 4 if enclosures are not s noted,, p 1le se.
inform sender in�urruedi tel .
P J T: a If checked below, please;
;
III. Andover,r, I A 0 Acknowledge ledg receipt f n llos,ur ..
Return nobs.tr t us.
WE
IH r itl n _ [I In accordance with your requi t
[I Forwarded rde under r se crate cower via:
FOR YOUR,:
ppro ap n Signature 0 Inform tiDn
® Review and comment I[I Distribution r-1 Record
In 'Use
THE FOLLOWING;
El Drawing originals n Specifications 01 CADD Disks
* Print r-1 Change orders, Chi Samples,
Sepias ® §hop drawings B Oth,en
QUANTITY DATE, REV, DESCRIPTION
K-1, Partial Site Plan (as-built),
REMARKS., Per u.n nit ter our telephone, conversation, we are, forwarding ing the enclosed Partial' Site Plan (as-
built), indicating the landscape llkw y between the sin property as forwarded fr rn the contractor. Please
note, the orlk Kraus performed up to the property line.
ORIE TO: (WITH ENCLOSURES)
File
Game Je pn (A PI) 0
0
0
BY: Kenneth, Hys,zcza,k AIA
107'24tr 02,do
04/2W1919 1 1: 51 �w617 220557 111111CCOU T PAGE, 2.
10, " ,L -T E)TI4
T. M,LOT COVIRACF
loll
FLOOR AREA, RATIO
S1 Tr k NOTE
FIF-RIMETE�R, UGH
. "
5.0 �" AM ISTI
UA
T 1,
Ip
L T POLE
5p oPoo-
Y y,
b
1 ,0 .
Memo
To, Tile
From. Kathleen Bradley'Colwell, Town Planner
Date, gone 10, 1996
Re: Osco Drag Plaint ings
Discussion with Jeff Anderson of CMB. 0sco will keep the ink berry plantings as shown on the
plan and will not change to Juiriper as previously discussed,
rown of North Andover
OFFICE O ., +•
COMMUNITY DEVELOPMENT AND SERVICES p
t
30 School Street t",
ff.�.IA i c:C1Ti Nardi And0vcr, Massachusetts 0184-
f}�r�cJor
JL'ne 33 1998
s- Roberta McGowan
Assistant Treasurer
120 Main Strcct
orth Andover, MA 01845
Re- Bund Release, for 525 Turnpike Strect (0sco Drug)
]ear s- McGowan,
The North Andover Planning Board held a regular niecting on June 2, 1998. At that meet-Ing tht'.
Board members voted LmaF)iTn0us1y to RFLFAS the rer cinder amount of funds plus interest.
bona money being held foj-:
Applicant, American Stare Properties, TTiu.
10 Osco Drug
348 Fast South Te-mple
Salt Lake CiLy, UT 84130
Type ofBorid; Fui-rn G Performancc Bond
Thank you for your attentlorL to tfi3s Ernatter,
,}a�scerely,
Amy IVY' Chongris -
plawi'u'ig-board Sccj-ctaiy
t
BOARD Or VPEALS 68EJ)54] RLIZI,DMrJ 688-S545 CO NSLh`VATTON HEALTII 683 -9) 4Q P�4�t4I1Ce GS8;J53S
FORM G
PERFGRMANCI! BOLD
DEPOSIT OF HONE7C
NORTH ANDOVER PLANNING BOARD
5 Tune
Rorth Andover, Mas5achurett2�
AGREEMEN71" is :jade thins date bet-,men the Town cf Ncrth AndcvE�r-
arid Amer-?.can Store p roper t ies , inc . _ hereinafter
with his or itn exe�Tutor5 , devisees , adminlst:ator5, he i�-_s ,
succe�scrS and ass-igns , refp_��ed to as the "Applicant" Qf
sco Drug, with mousiness address of
348 Zast 5ou6th Tem�)Ze , Salt Lal[e Ci ty, UT and/or, for individual
rE�sidenQe address of tc
secure ccnGtraction of Dsc() Drug
as shcern on a plan entitled Osco Drugs
La of and Materials Plan � L-43„}
prepared -by 0-DW Consultants , Inc . _
dated, 5-6-95 ( re;rised
o n8d jt f - _ , with husinass ELddrasz of
11I sheen St . , Framipqhhara, KA _ and/or, for individual . reside-ncr_
address of toy` land located a t .
535 Turnpike Street
I{VGW ALL MEN by these presents th2.- the AppLicart h ruby bind;
and ob7.i sates himself , to the Fawn of North Andover, .4
Ma�sachusern's municipal cozparaticn, acting through its Planninq
BQard, in the si.;m o_; I35 , 000 . 00 dollars , and has
s c:;lr�d this o):Ii aticr� by deDcsit�ng with she Treasurer of the
Town cf Noz7th Andcvez, a deposit of MoneV Ln the abc;re SIZri to be
deposited in an ;n ewest-bearing accoun7_ as designated by the Town
Treasurer ir, the name i�f the 'Fawn. The derosit of mcr:e.y is to be
ussd tc it s-d2 a the performance by the AQnlicant o;: a}l covP-nants ,
co7ndit yQns , agreements , terms an6 p}4 is1c37s G:ntained in the
Ap 1_cat,c� for A�prcval Of Cef- n tiv8 Plan (Fo= G) , data
i�!A
2 , The Ccr.trQl �aw a:id thEe PlanWing Bcard r s Rules and
Rec•,�ations gcverning the subdi"ris _on of _and d,,L
N/A
, �.P.ditions ,,-icluded in the L.Li ti -fficate Qf Appl7ova i ssl;er. bV
the Plan zing Bcard and dated }2 May 1994
4 , The Dlef nitive Plan a� quallfied by the Gen-ificate ci
ro V a 1 .
G'c':1mES nC , r. ti i 1 �( s} sp�c�f���ng cor.� t� ac},�cn ❑ nst,���4t-an t.::;
be compl-8wed, namely Construction Documents dated 5- 15-95
( 1) Prepared by Cute,T ��s & AE3scr rates , {nc
Town of North Andover
OFnCEO g
COMMUNITY DEVELOPMENr AND SERVICES
o On
s
30 Schwf SEreet r {
North Andover, h+'1t wkchusett5 01 45 � �-..ao •r°`�9
Wa,LIAM T. SCOTT ZacHLU
Director
June 5, 1998
11fr. efuleth H szcza€c
Cubef11s & Ati otaWs, Tnc.
9 Drvorksh}re Sheet
Boston, MA 02110
Re. Osco North Andover— landscape walkway
Demme Mr, Hyszc7ak,
At their m ct ing of June 2, 1"8 the Planning Board approved the laTidwape walkway and
released the final bond money held for Ns project, Thaiik you for all of your efforts to see thds
rMal required item completed.
If you have any questions please do not hesitate to c oritact me at (978)698-9535.
Very tnily yours,
Kathleen Bradley Colwell
Town P1amier
CC. gene Jewell
130ARDOf=APPPALS 6RS.5}5-@l BU LDJNG 6a8-LP345 CONSERVATION GH-9330 f:EALni rsss-95•i0 PLANNING 6k8-1535
CUBELLIS & ASSOCIATES, INC.
+TRANSMITTAL ��
U_
--: �` �" Devonshire Street
J '� ;'
Boston, Massachuseffs
02110
lel 617-338-0009
fax 517 338-0088
TO: Kathleen Coldwell h ~� DATE: 'I May 1998
'own of North Andover
Planning Department PROJECT NO.:107 4,6
� o� street
CENDI
l ov A 0184 If enclosures are not as rioted, please
inform sender immediately-
PROJ # )MA
If checked below, please:
ndove 0 Acknowledge receipt of enclosures.
p Return enclosure to us.
E AROU,
0 Herewith Ll in accordance with your request
If Forwarded under sep arate cover via
FOR YOUR,
0 Approval 0 Signature p Information
❑ Review and comment ❑ Ustribution 0 Record
® Use
THE FOLLOWING:
0 Drawing originals ❑ Specifications E3 CADD Disks
❑ Prints El Change orders [3 samples
C1 Sepias El Shop drawings [a Other;
QUA€VTCTY DATE REV, OESCRIPT€Off
I -1, Partial Site Plan (as-built)
REMARKS: Pursuant to our telephone conversation, we are forwarding the enclosed Partial Site Plan (as-
built) indicating the landscape walkway between the Osco property as forwarded from the con#ractor. Please
note, the work was performed up to the property lime,
COPIES To: (WITH ENCLOSURES)
File 0
Gene .Jewell (API) 0
Cl
BY: Kenneth Hyszczak AEA
10724trs02.d
04J28I1998 11: 51 61'622055' MCCOURT PAGE 02
.o ` IDTu
T.
POLE Ea'T COVERAGE
�L oR AREA RATIO
OFF SMECI PARKING
'TC47 ((c. 1. PERNETER UGH
,00'
� - POLES SHkL B
XTL
`.01
Qlg{
EXTERIOP
2,00' ,