HomeMy WebLinkAbout2017-6-6 Monitoring Report 1 _.< EOCUSEO KNOWLE06E. REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: February 2, 2018
Subject: FINAL Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this FINAL weekly site inspection report for the
Wheelabrator North Andover Ash House Replacement project. The observations below and attached
photos represent the inspection on: anuary 31, 2018.
General Project Progress Developments: Met with Wheelabrator team to conduct final weekly
inspection of Ash House project. Met with Gary Collette, Plant Manager, Tom Penna, Project Manager
and R.H. White, site contractor, to confirm the project was considered complete and the facility is under
the control of Wheelabrator. Reviewed open items to be completed that included commissioning of wet
scrubber.
Work in progress noted during the inspection: All construction activity has ceased and contractors
have demobilized. Equipment, building materials and C&D waste have been removed from the site.
Facility and housekeeping have been restored to pre-construction conditions.
1. Construction Phase—COMPLETE
2. Remaining Schedule — Finish paving of former clarifier area and building detailing to be
completed in spring. No material impact to facility operation.
3. Nuisance Conditions—No nuisance conditions, site housekeeping in excellent condition.
4. Areas of Non-Compliance — Ash house air scrubber not yet back in operation but no
fugitive emissions were observed from ash stockpiling and hauling operations.
5. Corrective Actions — Execute repairs on wet scrubber water supply system and put back
into service. Scrubber relocation was completed and ready for commissioning but a water
leak has delayed its operation.
6. Dust Mitigation—New building and doors intact, ash area confined.
7. Material Stockpiling—NONE
8. Erosion Control—N/A
9. Scrubber In/Out of Service—Scrubber temporarily out of service.
10.Next Major Activity — Completion of water leak repairs on wet scrubber, Wheelabrator
will confirm when it is back on line. Expected in February. Normal operations of the
facility have resumed.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover— Site Inspection Photos 01/31/2018
no
r
r � r
1
i
t
i
r
t
„r.
r
Site Inspection Photos (cont.) —01/31/2018
r � 1
r
s
rY3�
'i
� Y
Site Inspection Photos (cont.) —01/31/2018
ur
r.
3
7� A
V'
Y`
l
:
_ 41YYfa YY b
i'
3 x
r
4
�,=3=.
Site Inspection Photos (cont.) —01/31/2018
r l 'may
Y
G'
e.
h
Y s
i
r
�v
r +r ,
a
a"
ram,
Y +
�f#g,
Site Inspection Photos (cont.) —01/31/2018
------------
..............
..............�"",
...............
M-11""'I
Site Inspection Photos (cont.) —01/31/2018
v
.r w
,,ry
r�r ✓`
3
f
y
r, ..
i,
1
l r'
M �
Y
Y
r
1, r~
„w
-ter
�s
, r
TeCH
FOCUSED KNOWLEDGE. REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: January 8, 2018
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on jlanuary 2, 2018. The activity base has been identical
for several weeks.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Tom Penna, Project Manager and R.H. White, site contractor.
Work in progress noted during the inspection: 1)Ash conveyor extended to new building, routine ash
stockpiling and loadout in progress; 2) Completion of truck bay; 3) Completion of wet scrubber
relocation and enclosure. "Work in progress includes Commissioning and Punch List finish items.
1. Construction Phase — Phase II: Truck bay building construction completed (walls, roof,
tied into original building enclosure) with all doors installed; air scrubber relocation,
plumbing/ductwork and enclosure are nearly complete. Main ash house operational.
2. Construction Schedule—Project schedule for completion by 12/31 has generally been met.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were clear and cold, snow.
4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier
pad) is OK. Temporary truck bay divider wall still in place until final commissioning.
6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service -
relocation in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3)
lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth.
9. Scrubber In/Out of Service—Ash stockpiling in progress, scrubber not operational.
10. Next Maior Activity — Continue with building commissioning and final detail activities to
complete the entire ash house facility w/emission controls in service. January 19th is the
target date for new facility to be `turned over' to Wheelabrator.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover— Site Inspection Photos 01/02/2018
? / f
I
E
t
r..
,I
V
i
m §
t ^r ar=r�
Q9 9I
�� I
Site Inspection Photos (cont.) —01/02/2018
x� f
Y
Y�
III�1�II��I II III I� I I111Y III�iw I���III�i��I��la �.•iIIIf,:. I�O�uI F
IIII�� I ilii lli Ili it
� f
r
L
!a
e
x
Site Inspection Photos (cont,) —01/02/2018
Ij
9°
1 �
a5
Y
r
�V� fir
PH,[
� M
w
tt
� s
i
€4rgc
.e
a
�s
} r
Site Inspection Photos (cont.) —01/02/ 01
91
�I
i
a
r
i
r
4
3 �
l i}
ti�,�
TeCH
F01USE0 KNOWLE_OGE. REAL SOLLITIONb.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: December 21, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on December 18, 2017. We did not complete an in person
inspection during the week of December 11 th but did communicate with Wheelabrator site management
and the Town to confirm progress on 12115. The activity base has been identical for several weeks.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Kevin Beauregard, EHS Manager and Tom Penna, Project Manager.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II building construction of truck bay; 3) wet scrubber
relocation/rebuild.
1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction,
air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were overcast, cold and dry.
4. Areas of Non-Compliance— No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier
pad) is OK.
6. Dust Mitilzation — Ash conveyor stockpiling was in operation, scrubber not in service -
relocation in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3)
lift equipment; 4) heavy construction crane
8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pads are
constructed by timber cribbing, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity — Continue with truck bay panel/roof construction and air scrubber
move, all currently in progress. Truck bay to be functionally enclosed— 12/22.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover—Site Inspection Photos 12/15 & 18/2017
12115118 (from Wheelabrator)
<; �4
1YT,
i
a
z r%
f
s
r~
r
r-,
F
S �k.
s
t
Site Inspection Photos (coot.) — 12/15/17 from Wheelabrator
l C I
i-
I
jl
Y'
1'
Site Inspection Photos (cunt,) — 1 /18/17
All
4
rr
i' r` _r �`-r�s �t r� :� � �� -r� r "r`,r✓` � .�
a
Vr^ c r
-P
rr a
r
r
r
r
r
Site Inspection Photos (cont.) — 12/18/17
Site Inspection Photos (cont.)— 12/18/17
l 41i
�s
a3 I gii�y�kr9 j
a
F �
r
c p
' CCtia a;
y
k �
�V
l
rg�
H
��F� r
Site Inspection Photos (coat.) — 12/18/1
� � f
1
.F
-F
1
=s.
12/8/2017 Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-December 4
® eV
�9assachuse##s Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Fwd: Weekly Inspection Report - Wheelabrator Ash House Project - December 4
1 message
Jean Enright <jenright@northandoverma.gov> Fri, Dec 8, 2017 at 8:38 AM
To: Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Bonnie,
Will you please print and put in the project file. Thank you
Jean
---------- Forwarded message----------
From: Tim Jones <tjones@techenv,com>
Date: Fri, Dec 8, 2017 at 8:31 AM
Subject: Weekly Inspection Report-Wheelabrator Ash House Project- December 4
To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov>
Good morning Jean and Brian,
Please see the attached weekly inspection report and photo log from 12/4. The wet scrubber relocation and truck bay footing work were the prime activities in
progress. Project is going according to expectations/schedule and plans are to have project completed by 12/31, that schedule is firm based on progress and
balance of work. The truck bay building panels are scheduled to arrive the week of 12/11 and will take —2-3 days to build.
Routine ash conveyance and loadout in progress. Essentially no change from last week.
Please let me know if you have any questions.
Thank you,
Tim
https://mail.goog le.com/mai I/ca/u/O/?ui=2&ik=a2debacb 1 a&jsver=]6nPkDapvPO.en.&view=pt&sea rch=i nbox&th=160365a385b5b347&si ml=160365a385b5b347 1/3
12/8/201/ Town or North Andover Mail-Fwu:vvooxly|nnpectionnoport mmeelaumtor Ash House Project December
Tim Jones, PN1P
Associate
TECH ENVIRONMENTAL
Focused Knowledge. Real Solutions
3O3 Wyman Street, Suite 2A5
Waltham, K4AU2451
(0) 781.890.2220X32
(C) 8D2278�8418
Fax: 781.89O.94G1
tjonee@TeuhEnuoom
www.TechEnv.uom
`
Sincerely,
Jean Enright
Planning Director
Town of North Andover
120 Main Street
North Andover, MA 01845
hups:Vmoi|e000|e.00m/mai|/oa/u/u/rui=2mx=a2debaou1uaVovor=i6npkoapvpo.en.uviow=ptuuoam»=inuoxum=100365a385u5u347anim|~160365a385u5u347 2/3
Site Inspection Photos (cont.)
�y
f
r
� t
4 �S
C
m
{ W
nr"
J
uy
y-.
i r
Y
e4
w,�
Site Inspection Photos (cont.)
�.ary
E
_ Y
�Y
s
,11
1-11-`-q7r
AV-
1 ip�
r
Ya _
Site Inspection Photos (cont.)
r z
``mot
o- 4
N.
o �
194ij y
k r
K
F
yr 4s�y°
i
4.,
ra
12/8/2017 Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-December 4
Phone 978,688.9533
Fax 978.688.9542
Email: jenright c@northandoverma.gov
Web: www.TownofNorthAndover.com
cid:image001 Jpg@010EOF52.F68A5980
WNA_SitelnspectionReport_12042017.pdf
2197K
https://mail.google.com/mail/ca/u/O/?ui=2&ik=a2debacbl a&jsver=16nPkDapvPO.en.&view=pt&search=inbox&th=160365a385b5b347&siml=160365a385b5b347 3/3
Site Inspection Photos (cont.)
77
;
I�
f
a
t
x
p _
Site Inspection Photos (cunt.)
t
IZA
a
�la
i
� a
k
Ifi °Y I i V i��sYg,,t
i
ii
V �
8
i
a;
Y �
Site Inspection Photos (cont.)
f
i
i
m� ISM
i ± _
i
?Y
y v
s
�f3
ig t
I
a
I
}
/1/27o017 Town or North Andover Mail Fwu:Weekly Inspection Report wmoemumto,Ash House Project wovemu°ru1
^
NORTH ANDOVER
Bonnie VVolstronmer<bxvolstnomer@northandovenna.gov>
Massachusetts
Fwmd: Weekly Inspection Report ~ Whee0abrator Ash House Project - November 21
1messue
Jean Enright <janhQht@northandovemna.gov> Mon, Nov 27. 2U17at0:48AM
To: Bonnie VVo|atromer<bwobtrom*r@nurthunduvanno.gov>
Bonnie,
Please print the attached and put itin the file folder. Thank you
Jean
------ Forwandodmoouaga ------
Fnum: TimnJonao <Uonea@techenxoom>
Date: [Won. Nov27. 2017 at8:00AM
Subject: Weekly Inspection Report-VVhue|abrahor Ash House Project- November 21
To: Jean Enright<jenright@northandoverma,gov>, Brian LaGrasse <bIagrasse@northandoverrna.gov>
Good morning Jean and Brian,
Please see the attached weekly inspection report and photo log from 11/21. The wet scrubber relocation and truck bay
footing work were the prime activities inprogress. Project ia going according to expectations/schedule and plans are to
have project completed by 12/31, that schedule is firm based on progress and balance of work.
Routine ash conveyance and |oudoutinprogress.
Please let ma know if you have any questions.
Thank you,
Tim
Tim Jones, PK8P
Associate
TECH ENVIRONMENTAL
Focused Knowledge. Real Solutions
303 Wyman Street, Suite 2A5
Waltham, yWAO2451
({}) 781.890�2220X32
httpn:8mai|.guug|o.00m/man/oa/u/u/mi=oam=a2ueuaob1aaJvvo=ooa7msuonx^.on.&vi"w=ptmvearch=inuoxouo=1oMdf uoo4osoon&sim|=1snxoueu4 1C2
................ FOCUSEO KNOWLEOGE. REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: December 8, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on December 4. 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Kevin Beauregard, EHS Manager and contractor R.H. White during and
following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber
relocation/rebuild.
1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction,
air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were sunny, dry.
4. Areas of Non-Compliance — No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier
pad) is OK.
6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service -
relocation in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpilin a— Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3)
lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has
been removed for this phase, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber
move, all currently in progress. New building panels to arrive the week of 12/11.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover—Site Inspection Photos 1 /04/2017
r
G
g � 4
4�
i
l
FOCUSED KNOWLEDGE. REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning& Health Departments
From: Tim Jones
Date: November 27, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on November 21, 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Tom Penna, Project Manager, Kevin Beauregard, EHS Manager and contractor
R.H. White during and following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber
relocation/rebuild.
1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction,
air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were sunny, dry.
4. Areas of Non-Compliance— No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Refresh of boom around catch basin adjacent to new wet scrubber area
(former clarifier pad) is complete.
6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service -
relocation in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment
and supports; 3) lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has
been removed for this phase, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber
move, all currently in progress. New building panels to arrive—week of 12/11.
Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
heelabrator North Andover—Site Inspection Photos 11/21/2017
ME
a
F
Site Inspection Photos (cont.)
€ t w
,o
y
r
n
9
y ay
a
r � /
x=c,
� N
4 t
4
n,
r-
r
HOCH
FOCUSED KNOWLEDGE. REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: November 30,2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on November 29,2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Kevin Beauregard, EHS Manager and contractor R.H. White during and
following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber
relocation/rebuild.
1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction,
air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were sunny, dry.
4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier
pad) is OK.
6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service -
relocation in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3)
lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has
been removed for this phase, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10.Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber
move, all currently in progress. New building panels to arrive the week of 12/11.
Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
eelabrator North Andover— Site Inspection Photos 11/ /2017
a
sf�
3 tf u
la
j
�#J
5.
l
� 1
Site Inspection Photos (cont.)
i
i(
E M1SP
L'
Y� }
' s
9
xw$r p
y
`2
y}<pt�s
s
Site Inspection Photos (cont.)
"r
�,.—., � �✓. ���r"��+fit +'��.' ��,.„''°
� � r
o-
w
f
a
x.
i
Y
V'
e
t'
8
a
Site Inspection Photos (cont.)
.t Y o2'r
AM
NO
H
f
4` l
Site Inspection Photos (cunt.)
Ali i
1
x
�4r}
yam,�`� h �S ::.t. •r' 'ate,
t
o-tR6�
s u
k 9� fj
r
f ik M
S
TeCH
FOCUSED KNOWLEDGE REALSOLLBT'IONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning& Health Departments
From: Tim Jones
Date: November 17, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on oves firer• 15, 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Kevin
Beauregard, EHS Manager and contractor R.H. White during and following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II demolition, foundation footing and reconstruction of truck bay; 3)
wet scrubber relocation.
1. Construction Phase — Phase II: Truck bay demolition, footing installations & building
reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were sunny, dry.
4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — Housekeeping in good condition and support materials are staged in
good order. Requested cleanup of accumulated sediments and refresh of boom around
catch basin adjacent to new wet scrubber area (former clarifier pad).
6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service -
relocattion in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment
and supports; 3) lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has
been removed for this phase, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity — Continue with truck bay demolition, foundation reconstruction and
air scrubber move, all currently in progress.
Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
heelabrator North Andover— Site Inspection Photos 11/15/2017
�v
NZ
r
+ r
„
,..
PAN
w sF
t
F
4,�
Site Inspection Photos (cont.)
t �V
� 3,i Ifs
I
it
1
,Y
II ii III
z
t�
a
p�
c_
7.
FOEUSEO KNOWLEDGE. DEAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning&Health Departments
From: Tim Jones
Date: November 10, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on November 8, 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Kevin Beauregard, EHS Manager, Tom Penna, Project Manager and contractor
R.H. White during and following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash
stockpiling in progress; 2) Phase II demolition and reconstruction of truck bay; 3) wet scrubber
relocation.
1. Construction Phase — Phase Il: Truck bay demolition, footing installations & building
reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were sunny, dry.
4. Areas of Non-Compliance — No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
S. Corrective Actions —None required, housekeeping in good condition and support materials
are staged in good order.
6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service -
relocate in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment
and supports; 3)lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad
has been installed and compacted, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10.Next Major Activity — Continue with truck bay demolition, foundation reconstruction and
air scrubber move, all currently in progress.
Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover—Site Inspection Photos 11/08/2017
k $
az
9,F
o �
Site Inspection Photos (cont.)
f
p T
t r•�"='2nef�w
i
_ w✓
i
4 �X
ri
3
y } 9
t
X 6
it i illf
If �
t
a
5
R
7 f
r^^ r
a�
4
t
Y 1 }
1
�estt t.
}
tI} fit}
i S
{t 7 !
i 41t S 'v
t
y t
F
i
t�; 1
i lu
}
i
t � s
Site Inspection Photos (cont.)
m
MROF
y
I.
WI f
I Will!�
.rem' 4
tk
r
Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-October 31
,NoRT , NOCIVER
Massachusetts Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Fwd: Weekly Inspection Report - Wheelabrator Ash House Project - October 31
1 message
Jean Enright<jenright@northandoverma.gov> Mon, Nov 6, 2017 at 12:34 PM
To: Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Please print and put in hard copy file.
Thank you, Jean
---------- Forwarded message----------
From: Tim Jones <tjones@techenv.com>
Date: Mon, Nov 6, 2017 at 8:42 AM
Subject: Weekly Inspection Report-Wheelabrator Ash House Project- October 31
To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <biagrasse@northandoverma.gov>
Good Morning Jean and Brian,
Apologies for not submitting this on Friday. Please see the attached weekly inspection report and photo log from 10/31. Main section of new ash house is
complete and ash conveyor extension into new building has allowed resumption of ash stockpiling. The truck bay demolition and air scrubber moves are works-in-
progress.
Other than leftover stormwater, which will be recycled, the site weathered the storm well and site controls are working. There was some standing water but the job
site was workable.
Project is going according to expectations/schedule. Phase 2 demolition and reconstruction of truck bay area, air scrubber relocate is in progress.
Please let me know if you have any questions.
Have a great day,
Tim
https://mai1.google.com/mail/ca/u/0/?ui=2&ik=a2debacb1 a&jsver=ZOgYGgvFjfY.en.&view=pt&search=inbox&th=15f9266f3dacd719&siml=15f9266f3dacd719 1/3
11/6/2017 Town uv North Andover Mail Fwu:Weekly Inspection Report'vvxoolaummr Ash House Project October 31
Tim Jones, PK8P
Associate
TECH ENVIRONMENTAL
Focused Knowledge. Real Solutions
303 Wyman Street, Suite 205
Waltham, MA0245i
(0) 781.898.2220X32
(C) 8O227Q�9418
Fax: 781.8QU.94S1
dones@TeohEnxcom
www.TechEnxuom
_
Sincerely,
Jean Enright
Planning Director
Town of North Andover
1xo Main Street
North Andover, MA 01845
,'-qi|.uoog|o.com/ma|»ta/u0/?ui=2G|k=a2deba:h1a8j,v*=z0gYGgvFjfY.on.@v|ew~pmnoamh=mboxatx~1m9uOm0uacd7ls&o|m|=1m9csamuauu710 z/o
TeCH
FOCUSED KNOWLEDGE, REAL SOLUTIONS.
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning& Health Departments
From: Tim Jones
Date: November 6, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on October 31, 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Richard Falk, Air Quality Manager, Kevin Beauregard, EHS Manager, Tom
Penna, Project Manager and contractor R.H. White during and following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extension to new building; 2)
reconstruction of temporary containment wall between new ash house and temporary truck bay; 3) prep
for Phase II demolition and reconstruction.
1. Construction Phase — Phase II: Truck bay demolition, footing installations & building
reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in good condition. Conditions were partly sunny, dry.
Remnant stormwater still infiltrating to closed drainage following weekend storm.
4. Areas of Non-Compliance—No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions —None required, housekeeping in good condition and support materials
are staged in good order.
6. Dust Mitigation—Ash conveyor stockpiling was in operation, scrubber not in service -prep
to relocate in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpster for construction debris/construction debris; 2) concrete/steel building erection
staging equipment and supports; 3) lift equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad
has been installed and compacted, housekeeping in good condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity —Continue with new truck bay demolition, foundation reconstruction
and air scrubber move, all currently in progress.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover— Site Inspection Photos 10/31/2017
� r
r
p
x..
a
e y. I
R
x ..
�a
Y {
r
�$ g
iu
Y
P
C of
�f
Site Inspection Photos (coot.)
_
i
;emu
t 3��
4Y �
x
r
a
Site Inspection Photos (cont.)
- rrx
�r.
r r
rs
r
r r
<r
waspv-
a ✓
s^,
,. f,;
Site Inspection Photos (cont.)
r
r r
y� w
� W
r w �
w
F ,
� r
-NGf
t �
F
K
v
w'
10/30/2017 Town of North Andover Mail-Weekly Inspection Report-Wheelabrator Ash House Project-October 26
OUH ANDOVER Jean Enright<jenright@northandoverma.gov>
�ri�xSS�7CIiUS^c1t�.
Weekly Inspection Report - Wheelabrator Ash House Project - October 26
1 message
Tim Jones <tjones@techenv.com> Fri, Oct 27, 2017 at 11:44 AM
To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov>
Good Morning Jean and Brian,
Please see the attached weekly inspection report and photo log. Main section of new ash house is complete and ash
conveyor extension into new building has allowed resumption of ash stockpiling. The live loading of trucks ceased on
Sunday 10/22.
Project is going according to expectations/schedule. The main ash house and ash conveyor move (Phase 1) are
functionally complete. Phase 2 demolition and reconstruction of truck bay area, air scrubber relocate to begin week of
10/30.
Please let me know if you have any questions.
Have a great weekend,
Tim
Tim Jones, PMP
Associate
TECH ENVIRONMENTAL
Focused Knowledge. Real Solutions
303 Wyman Street, Suite 295
Waltham, MA 02451
(0) 781.330,2220 X32
(C) 802,279,94 18
Fax: 781,89 . 451
t-iones@Teci Env,co
www.TechFn,r.com
https:Hmail.google.com/mail/u/0/?ui=2&ik=7c2eff6265&jsver=19n8NvMEael.en.&view=pt&search=inbox&th=15f5e815c1 b94f37&siml=15f5e815c1 b94f37 1/2
10/30/2017 Town of North Andover Mail-Weekly Inspection Report-Wheelabrator Ash House Project-October 26
WNA_SitelnspectionReport_10262017.pdf
2260K
https://mail.google.com/mail/u/0/?ui=2&ik=7c2eff6265&jsver=19n8NvMEae1.en.&view=pt&search=inbox&th=15f5e815c1b94f37&siml=15f5e815c1b94f37 2/2
TeCH
I IJLLISED Ir:NIOWLEDGE, 1�EAL SOLLII IE)NS
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning& Health Departments
From: Tim Jones
Date: October 27, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on October 26. 2017.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Richard
Falk, Air Quality Manager, Kevin Beauregard, EHS Manager, Tom Penna, Project Manager and
contractor R.H. White following the inspection.
Work in progress noted during the inspection: 1) ash conveyor extension to new building; 2)
reconstruction of temporary containment wall between new ash house and temporary truck bay; 3) prep
for Phase II demolition and reconstruction.
1. Construction Phase — Phase I: New construction of main ash house substantially complete
with three (3) walls, roof and rollup door installed. Ash conveyor extension to new ash
house and relocation of temporary containment wall in progress. Next phase transition to
truck bay demo/reconstruct to begin week of 10/30. Stockpiling of ash resumed 10/27.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment
functioning as designed and no material track-out from ash house facility. No fugitive
emissions. Site housekeeping in excellent condition. Conditions were rainy.
4. Areas of Non-Compliance—No areas of non-compliance noted, ash house air scrubber not
in operation but no fugitive emissions were observed from resumption of ash stockpiling.
5. Corrective Actions — None required, housekeeping in excellent condition and support
materials are staged in good order.
6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service - prep
to relocate in progress. New building and conveyor seals intact, ash area confined.
7. Material Stockpiling—Staged materials currently on site within defined construction zone:
1) dumpster for construction debris; 2) concrete/steel building erection staging equipment
and supports; 3)heavy equipment. Heavy crane removed from site.
8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad
has been installed and compacted,housekeeping in excellent condition.
9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational.
10. Next Major Activity — Relocation of temporary containment wall and ash conveyor
extension complete, ash stockpiling in new building. New truck bay demo, foundation
reconstruction and air scrubber move beginning week of 10/30.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
Wheelabrator North Andover—Site Inspection Photos 10/26/ 017
* r
y
µ
r,
�rcr
j
k'
r '
as
j
� r
r�
e
r
Site Inspection Photos (cost.)
fj
r
y4
lily
I
L vY t k k, ✓
F.
k �
i °
t } f r U 4
4 n k
t
�i
t� fsd
y i {'t}t 7 e z i#h1.yAnkq at s 4 s �' ,s 1
o
cn
CL
y � t taz
}�,�_z ft.. i;;" ..,y �si`�tif€t}y�'r���.�F }z, y,<7}.r{ ^.,:• ��j73;;" "� t .�2�i��.zy{4�,�"w+si u}'i}� `��s�,. t��t_ `�
mill
�
Site Inspection Photos (cont.)
x
1
r �
c.
FOILISEG KNOWLEOGE.. REAL SOLUTIONS,
SITE INSPECTION MEMORANDUM
To: Town of North Andover—Planning& Health Departments
From: Tim Jones
Date: October 20, 2017
Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1
Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator
North Andover Ash House Replacement project. The observations below and attached photos represent
the activities observed during the inspection on _ �, 7.
General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection
of Ash House project. This week's inspection was self-guided and included check-ins with Gary
Collette, Plant Manager, Tom Penna, Project Manager and contractor R.H. White following the
inspection.
Work in progress noted during the inspection: 1) construction/installation of main ash house pre-cast
building walls; 2)preparation to begin install of main roof panels.
1. Construction Phase — Phase 1: New construction of main ash house substantially complete
with three (3) walls installed, roof installation to follow immediately. Ash conveyor
extension to new ash house and relocation of temporary containment wall to begin 10/20.
Next phase transition to truck bay demo/reconstruct to begin week of 10/23. live loading
of ash will cease and facility will revert to ash stockpiling and loadout in new building.
2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31.
3. Nuisance Conditions —Igo nuisance conditions noted, ash loadout containment functioning
as designed and no material track-out from ash house facility. No fugitive emissions. Site
housekeeping in excellent condition. Conditions were sunny and dry.
4. Areas of Non-Co — No areas of non-compliance noted, ash house air scrubber in
operation and no fugitive emissions were observed from ash transfer.
5. Corrective Actions — None required, housekeeping in excellent condition and support
materials are staged in good order.
6. Dust Mitigation —Ash conveyance and truck loadout was in operation, scrubber in service.
New partition seal intact,Ash loadout area confined.
7. Material Stockpiling— Staged materials currently on site within defined construction zone:
1) dumpster for construction debris; 2) concrete/steel building erection staging equipment
and supports, 3) heavy equipment.
8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad
has been installed and compacted, housekeeping in excellent condition.
9. Scrubber In/Out of Service—Ash loadout in progress and scrubber operational.
10. Next Major Activity —Relocation of temporary containment wall, ash conveyor extension
and ash stockpiling/loadout from new building to commence. New truck bay demo,
foundation reconstruction and air scrubber move beginning week of 10/23.
Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com
eels rat r North Andover®Site Inspection Photos10/19/2017
zg
l
j f '
T
_w
w.
x
,
a }r
S I ryF "
"✓ 6
r•ry
4$
k # W e•
r
w
`
!
a
N
� w4
Site Inspection s (cont.)
pg�
E '}
Y
t
�M
AS
i
v
t
...
A j
,y Ifr � y Slyt,. }Jy
i
�r
_s
Site Inspection Photos (cont.)
r
r
y
y
fir�9.
r.-
tg, �
�f
f
s
CC OF 9FNT5
�Mr
n
SiteInspection Photos (cont.)
t r
iy
ptf i f v
'sN��y4'fir} 4
x
fli
•`P
y
f ! 1
f
r
xx x
�r
r
9
d
� r
J
jr vs,4"
E gg
$ b�
s�
Site Inspection s (cont.)
WAIT Aw To to
41 UT
ly
w- j
v
too
ARA
-mikul
r
x
Nam: t
a
3 �
ruv_.
v c
Y
t-
:
er
x
... ,.....................
.
................
:,............
..............
U�
lot,
OR ii
o „
I
r
r
r
r
F
�ey
r �