HomeMy WebLinkAbout2017-6-6 Monitoring Report 1 _.< EOCUSEO KNOWLE06E. REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: February 2, 2018 Subject: FINAL Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this FINAL weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the inspection on: anuary 31, 2018. General Project Progress Developments: Met with Wheelabrator team to conduct final weekly inspection of Ash House project. Met with Gary Collette, Plant Manager, Tom Penna, Project Manager and R.H. White, site contractor, to confirm the project was considered complete and the facility is under the control of Wheelabrator. Reviewed open items to be completed that included commissioning of wet scrubber. Work in progress noted during the inspection: All construction activity has ceased and contractors have demobilized. Equipment, building materials and C&D waste have been removed from the site. Facility and housekeeping have been restored to pre-construction conditions. 1. Construction Phase—COMPLETE 2. Remaining Schedule — Finish paving of former clarifier area and building detailing to be completed in spring. No material impact to facility operation. 3. Nuisance Conditions—No nuisance conditions, site housekeeping in excellent condition. 4. Areas of Non-Compliance — Ash house air scrubber not yet back in operation but no fugitive emissions were observed from ash stockpiling and hauling operations. 5. Corrective Actions — Execute repairs on wet scrubber water supply system and put back into service. Scrubber relocation was completed and ready for commissioning but a water leak has delayed its operation. 6. Dust Mitigation—New building and doors intact, ash area confined. 7. Material Stockpiling—NONE 8. Erosion Control—N/A 9. Scrubber In/Out of Service—Scrubber temporarily out of service. 10.Next Major Activity — Completion of water leak repairs on wet scrubber, Wheelabrator will confirm when it is back on line. Expected in February. Normal operations of the facility have resumed. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover— Site Inspection Photos 01/31/2018 no r r � r 1 i t i r t „r. r Site Inspection Photos (cont.) —01/31/2018 r � 1 r s rY3� 'i � Y Site Inspection Photos (cont.) —01/31/2018 ur r. 3 7� A V' Y` l : _ 41YYfa YY b i' 3 x r 4 �,=3=. Site Inspection Photos (cont.) —01/31/2018 r l 'may Y G' e. h Y s i r �v r +r , a a" ram, Y + �f#g, Site Inspection Photos (cont.) —01/31/2018 ------------ .............. ..............�"", ............... M-11""'I Site Inspection Photos (cont.) —01/31/2018 v .r w ,,ry r�r ✓` 3 f y r, .. i, 1 l r' M � Y Y r 1, r~ „w -ter �s , r TeCH FOCUSED KNOWLEDGE. REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: January 8, 2018 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on jlanuary 2, 2018. The activity base has been identical for several weeks. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Tom Penna, Project Manager and R.H. White, site contractor. Work in progress noted during the inspection: 1)Ash conveyor extended to new building, routine ash stockpiling and loadout in progress; 2) Completion of truck bay; 3) Completion of wet scrubber relocation and enclosure. "Work in progress includes Commissioning and Punch List finish items. 1. Construction Phase — Phase II: Truck bay building construction completed (walls, roof, tied into original building enclosure) with all doors installed; air scrubber relocation, plumbing/ductwork and enclosure are nearly complete. Main ash house operational. 2. Construction Schedule—Project schedule for completion by 12/31 has generally been met. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were clear and cold, snow. 4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier pad) is OK. Temporary truck bay divider wall still in place until final commissioning. 6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service - relocation in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth. 9. Scrubber In/Out of Service—Ash stockpiling in progress, scrubber not operational. 10. Next Maior Activity — Continue with building commissioning and final detail activities to complete the entire ash house facility w/emission controls in service. January 19th is the target date for new facility to be `turned over' to Wheelabrator. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover— Site Inspection Photos 01/02/2018 ? / f I E t r.. ,I V i m § t ^r ar=r� Q9 9I �� I Site Inspection Photos (cont.) —01/02/2018 x� f Y Y� III�1�II��I II III I� I I111Y III�iw I���III�i��I��la �.•iIIIf,:. I�O�uI F IIII�� I ilii lli Ili it � f r L !a e x Site Inspection Photos (cont,) —01/02/2018 Ij 9° 1 � a5 Y r �V� fir PH,[ � M w tt � s i €4rgc .e a �s } r Site Inspection Photos (cont.) —01/02/ 01 91 �I i a r i r 4 3 � l i} ti�,� TeCH F01USE0 KNOWLE_OGE. REAL SOLLITIONb. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: December 21, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on December 18, 2017. We did not complete an in person inspection during the week of December 11 th but did communicate with Wheelabrator site management and the Town to confirm progress on 12115. The activity base has been identical for several weeks. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Kevin Beauregard, EHS Manager and Tom Penna, Project Manager. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II building construction of truck bay; 3) wet scrubber relocation/rebuild. 1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were overcast, cold and dry. 4. Areas of Non-Compliance— No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier pad) is OK. 6. Dust Mitilzation — Ash conveyor stockpiling was in operation, scrubber not in service - relocation in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3) lift equipment; 4) heavy construction crane 8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pads are constructed by timber cribbing, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity — Continue with truck bay panel/roof construction and air scrubber move, all currently in progress. Truck bay to be functionally enclosed— 12/22. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover—Site Inspection Photos 12/15 & 18/2017 12115118 (from Wheelabrator) <; �4 1YT, i a z r% f s r~ r r-, F S �k. s t Site Inspection Photos (coot.) — 12/15/17 from Wheelabrator l C I i- I jl Y' 1' Site Inspection Photos (cunt,) — 1 /18/17 All 4 rr i' r` _r �`-r�s �t r� :� � �� -r� r "r`,r✓` � .� a Vr^ c r -P rr a r r r r r Site Inspection Photos (cont.) — 12/18/17 Site Inspection Photos (cont.)— 12/18/17 l 41i �s a3 I gii�y�kr9 j a F � r c p ' CCtia a; y k � �V l rg� H ��F� r Site Inspection Photos (coat.) — 12/18/1 � � f 1 .F -F 1 =s. 12/8/2017 Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-December 4 ® eV �9assachuse##s Bonnie Wolstromer<bwolstromer@northandoverma.gov> Fwd: Weekly Inspection Report - Wheelabrator Ash House Project - December 4 1 message Jean Enright <jenright@northandoverma.gov> Fri, Dec 8, 2017 at 8:38 AM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Bonnie, Will you please print and put in the project file. Thank you Jean ---------- Forwarded message---------- From: Tim Jones <tjones@techenv,com> Date: Fri, Dec 8, 2017 at 8:31 AM Subject: Weekly Inspection Report-Wheelabrator Ash House Project- December 4 To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov> Good morning Jean and Brian, Please see the attached weekly inspection report and photo log from 12/4. The wet scrubber relocation and truck bay footing work were the prime activities in progress. Project is going according to expectations/schedule and plans are to have project completed by 12/31, that schedule is firm based on progress and balance of work. The truck bay building panels are scheduled to arrive the week of 12/11 and will take —2-3 days to build. Routine ash conveyance and loadout in progress. Essentially no change from last week. Please let me know if you have any questions. Thank you, Tim https://mail.goog le.com/mai I/ca/u/O/?ui=2&ik=a2debacb 1 a&jsver=]6nPkDapvPO.en.&view=pt&sea rch=i nbox&th=160365a385b5b347&si ml=160365a385b5b347 1/3 12/8/201/ Town or North Andover Mail-Fwu:vvooxly|nnpectionnoport mmeelaumtor Ash House Project December Tim Jones, PN1P Associate TECH ENVIRONMENTAL Focused Knowledge. Real Solutions 3O3 Wyman Street, Suite 2A5 Waltham, K4AU2451 (0) 781.890.2220X32 (C) 8D2278�8418 Fax: 781.89O.94G1 tjonee@TeuhEnuoom www.TechEnv.uom ` Sincerely, Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 hups:Vmoi|e000|e.00m/mai|/oa/u/u/rui=2mx=a2debaou1uaVovor=i6npkoapvpo.en.uviow=ptuuoam»=inuoxum=100365a385u5u347anim|~160365a385u5u347 2/3 Site Inspection Photos (cont.) �y f r � t 4 �S C m { W nr" J uy y-. i r Y e4 w,� Site Inspection Photos (cont.) �.ary E _ Y �Y s ,11 1-11-`-q7r AV- 1 ip� r Ya _ Site Inspection Photos (cont.) r z ``mot o- 4 N. o � 194ij y k r K F yr 4s�y° i 4., ra 12/8/2017 Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-December 4 Phone 978,688.9533 Fax 978.688.9542 Email: jenright c@northandoverma.gov Web: www.TownofNorthAndover.com cid:image001 Jpg@010EOF52.F68A5980 WNA_SitelnspectionReport_12042017.pdf 2197K https://mail.google.com/mail/ca/u/O/?ui=2&ik=a2debacbl a&jsver=16nPkDapvPO.en.&view=pt&search=inbox&th=160365a385b5b347&siml=160365a385b5b347 3/3 Site Inspection Photos (cont.) 77 ; I� f a t x p _ Site Inspection Photos (cunt.) t IZA a �la i � a k Ifi °Y I i V i��sYg,,t i ii V � 8 i a; Y � Site Inspection Photos (cont.) f i i m� ISM i ± _ i ?Y y v s �f3 ig t I a I } /1/27o017 Town or North Andover Mail Fwu:Weekly Inspection Report wmoemumto,Ash House Project wovemu°ru1 ^ NORTH ANDOVER Bonnie VVolstronmer<bxvolstnomer@northandovenna.gov> Massachusetts Fwmd: Weekly Inspection Report ~ Whee0abrator Ash House Project - November 21 1messue Jean Enright <janhQht@northandovemna.gov> Mon, Nov 27. 2U17at0:48AM To: Bonnie VVo|atromer<bwobtrom*r@nurthunduvanno.gov> Bonnie, Please print the attached and put itin the file folder. Thank you Jean ------ Forwandodmoouaga ------ Fnum: TimnJonao <Uonea@techenxoom> Date: [Won. Nov27. 2017 at8:00AM Subject: Weekly Inspection Report-VVhue|abrahor Ash House Project- November 21 To: Jean Enright<jenright@northandoverma,gov>, Brian LaGrasse <bIagrasse@northandoverrna.gov> Good morning Jean and Brian, Please see the attached weekly inspection report and photo log from 11/21. The wet scrubber relocation and truck bay footing work were the prime activities inprogress. Project ia going according to expectations/schedule and plans are to have project completed by 12/31, that schedule is firm based on progress and balance of work. Routine ash conveyance and |oudoutinprogress. Please let ma know if you have any questions. Thank you, Tim Tim Jones, PK8P Associate TECH ENVIRONMENTAL Focused Knowledge. Real Solutions 303 Wyman Street, Suite 2A5 Waltham, yWAO2451 ({}) 781.890�2220X32 httpn:8mai|.guug|o.00m/man/oa/u/u/mi=oam=a2ueuaob1aaJvvo=ooa7msuonx^.on.&vi"w=ptmvearch=inuoxouo=1oMdf uoo4osoon&sim|=1snxoueu4 1C2 ................ FOCUSEO KNOWLEOGE. REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: December 8, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on December 4. 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Kevin Beauregard, EHS Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber relocation/rebuild. 1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were sunny, dry. 4. Areas of Non-Compliance — No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier pad) is OK. 6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service - relocation in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpilin a— Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has been removed for this phase, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber move, all currently in progress. New building panels to arrive the week of 12/11. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover—Site Inspection Photos 1 /04/2017 r G g � 4 4� i l FOCUSED KNOWLEDGE. REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning& Health Departments From: Tim Jones Date: November 27, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on November 21, 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Tom Penna, Project Manager, Kevin Beauregard, EHS Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber relocation/rebuild. 1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were sunny, dry. 4. Areas of Non-Compliance— No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Refresh of boom around catch basin adjacent to new wet scrubber area (former clarifier pad) is complete. 6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service - relocation in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has been removed for this phase, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber move, all currently in progress. New building panels to arrive—week of 12/11. Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com heelabrator North Andover—Site Inspection Photos 11/21/2017 ME a F Site Inspection Photos (cont.) € t w ,o y r n 9 y ay a r � / x=c, � N 4 t 4 n, r- r HOCH FOCUSED KNOWLEDGE. REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: November 30,2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on November 29,2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Kevin Beauregard, EHS Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II foundation footing and reconstruction of truck bay; 3) wet scrubber relocation/rebuild. 1. Construction Phase — Phase II: Truck bay footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were sunny, dry. 4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Boom around catch basin adjacent to new wet scrubber area (former clarifier pad) is OK. 6. Dust Mitigation — Ash conveyor stockpiling was in operation, scrubber not in service - relocation in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has been removed for this phase, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10.Next Major Activity—Continue with truck bay foundation reconstruction and air scrubber move, all currently in progress. New building panels to arrive the week of 12/11. Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com eelabrator North Andover— Site Inspection Photos 11/ /2017 a sf� 3 tf u la j �#J 5. l � 1 Site Inspection Photos (cont.) i i( E M1SP L' Y� } ' s 9 xw$r p y `2 y}<pt�s s Site Inspection Photos (cont.) "r �,.—., � �✓. ���r"��+fit +'��.' ��,.„''° � � r o- w f a x. i Y V' e t' 8 a Site Inspection Photos (cont.) .t Y o2'r AM NO H f 4` l Site Inspection Photos (cunt.) Ali i 1 x �4r} yam,�`� h �S ::.t. •r' 'ate, t o-tR6� s u k 9� fj r f ik M S TeCH FOCUSED KNOWLEDGE REALSOLLBT'IONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning& Health Departments From: Tim Jones Date: November 17, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on oves firer• 15, 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Kevin Beauregard, EHS Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II demolition, foundation footing and reconstruction of truck bay; 3) wet scrubber relocation. 1. Construction Phase — Phase II: Truck bay demolition, footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were sunny, dry. 4. Areas of Non-Compliance —No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — Housekeeping in good condition and support materials are staged in good order. Requested cleanup of accumulated sediments and refresh of boom around catch basin adjacent to new wet scrubber area (former clarifier pad). 6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service - relocattion in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, gravel crane pad has been removed for this phase, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity — Continue with truck bay demolition, foundation reconstruction and air scrubber move, all currently in progress. Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com heelabrator North Andover— Site Inspection Photos 11/15/2017 �v NZ r + r „ ,.. PAN w sF t F 4,� Site Inspection Photos (cont.) t �V � 3,i Ifs I it 1 ,Y II ii III z t� a p� c_ 7. FOEUSEO KNOWLEDGE. DEAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning&Health Departments From: Tim Jones Date: November 10, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on November 8, 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Kevin Beauregard, EHS Manager, Tom Penna, Project Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extended to new building, routine ash stockpiling in progress; 2) Phase II demolition and reconstruction of truck bay; 3) wet scrubber relocation. 1. Construction Phase — Phase Il: Truck bay demolition, footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were sunny, dry. 4. Areas of Non-Compliance — No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. S. Corrective Actions —None required, housekeeping in good condition and support materials are staged in good order. 6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service - relocate in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpsters for construction debris; 2) concrete/steel building erection staging equipment and supports; 3)lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad has been installed and compacted, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10.Next Major Activity — Continue with truck bay demolition, foundation reconstruction and air scrubber move, all currently in progress. Address: 303 Wyman Street,Suite 295 1 Waltham, MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover—Site Inspection Photos 11/08/2017 k $ az 9,F o � Site Inspection Photos (cont.) f p T t r•�"='2nef�w i _ w✓ i 4 �X ri 3 y } 9 t X 6 it i illf If � t a 5 R 7 f r^^ r a� 4 t Y 1 } 1 �estt t. } tI} fit} i S {t 7 ! i 41t S 'v t y t F i t�; 1 i lu } i t � s Site Inspection Photos (cont.) m MROF y I. WI f I Will!� .rem' 4 tk r Town of North Andover Mail-Fwd:Weekly Inspection Report-Wheelabrator Ash House Project-October 31 ,NoRT , NOCIVER Massachusetts Bonnie Wolstromer<bwolstromer@northandoverma.gov> Fwd: Weekly Inspection Report - Wheelabrator Ash House Project - October 31 1 message Jean Enright<jenright@northandoverma.gov> Mon, Nov 6, 2017 at 12:34 PM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Please print and put in hard copy file. Thank you, Jean ---------- Forwarded message---------- From: Tim Jones <tjones@techenv.com> Date: Mon, Nov 6, 2017 at 8:42 AM Subject: Weekly Inspection Report-Wheelabrator Ash House Project- October 31 To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <biagrasse@northandoverma.gov> Good Morning Jean and Brian, Apologies for not submitting this on Friday. Please see the attached weekly inspection report and photo log from 10/31. Main section of new ash house is complete and ash conveyor extension into new building has allowed resumption of ash stockpiling. The truck bay demolition and air scrubber moves are works-in- progress. Other than leftover stormwater, which will be recycled, the site weathered the storm well and site controls are working. There was some standing water but the job site was workable. Project is going according to expectations/schedule. Phase 2 demolition and reconstruction of truck bay area, air scrubber relocate is in progress. Please let me know if you have any questions. Have a great day, Tim https://mai1.google.com/mail/ca/u/0/?ui=2&ik=a2debacb1 a&jsver=ZOgYGgvFjfY.en.&view=pt&search=inbox&th=15f9266f3dacd719&siml=15f9266f3dacd719 1/3 11/6/2017 Town uv North Andover Mail Fwu:Weekly Inspection Report'vvxoolaummr Ash House Project October 31 Tim Jones, PK8P Associate TECH ENVIRONMENTAL Focused Knowledge. Real Solutions 303 Wyman Street, Suite 205 Waltham, MA0245i (0) 781.898.2220X32 (C) 8O227Q�9418 Fax: 781.8QU.94S1 dones@TeohEnxcom www.TechEnxuom _ Sincerely, Jean Enright Planning Director Town of North Andover 1xo Main Street North Andover, MA 01845 ,'-qi|.uoog|o.com/ma|»ta/u0/?ui=2G|k=a2deba:h1a8j,v*=z0gYGgvFjfY.on.@v|ew~pmnoamh=mboxatx~1m9uOm0uacd7ls&o|m|=1m9csamuauu710 z/o TeCH FOCUSED KNOWLEDGE, REAL SOLUTIONS. SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning& Health Departments From: Tim Jones Date: November 6, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on October 31, 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Richard Falk, Air Quality Manager, Kevin Beauregard, EHS Manager, Tom Penna, Project Manager and contractor R.H. White during and following the inspection. Work in progress noted during the inspection: 1) ash conveyor extension to new building; 2) reconstruction of temporary containment wall between new ash house and temporary truck bay; 3) prep for Phase II demolition and reconstruction. 1. Construction Phase — Phase II: Truck bay demolition, footing installations & building reconstruction, air scrubber relocation. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in good condition. Conditions were partly sunny, dry. Remnant stormwater still infiltrating to closed drainage following weekend storm. 4. Areas of Non-Compliance—No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions —None required, housekeeping in good condition and support materials are staged in good order. 6. Dust Mitigation—Ash conveyor stockpiling was in operation, scrubber not in service -prep to relocate in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpster for construction debris/construction debris; 2) concrete/steel building erection staging equipment and supports; 3) lift equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad has been installed and compacted, housekeeping in good condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity —Continue with new truck bay demolition, foundation reconstruction and air scrubber move, all currently in progress. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover— Site Inspection Photos 10/31/2017 � r r p x.. a e y. I R x .. �a Y { r �$ g iu Y P C of �f Site Inspection Photos (coot.) _ i ;emu t 3�� 4Y � x r a Site Inspection Photos (cont.) - rrx �r. r r rs r r r <r waspv- a ✓ s^, ,. f,; Site Inspection Photos (cont.) r r r y� w � W r w � w F , � r -NGf t � F K v w' 10/30/2017 Town of North Andover Mail-Weekly Inspection Report-Wheelabrator Ash House Project-October 26 OUH ANDOVER Jean Enright<jenright@northandoverma.gov> �ri�xSS�7CIiUS^c1t�. Weekly Inspection Report - Wheelabrator Ash House Project - October 26 1 message Tim Jones <tjones@techenv.com> Fri, Oct 27, 2017 at 11:44 AM To: Jean Enright<jenright@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov> Good Morning Jean and Brian, Please see the attached weekly inspection report and photo log. Main section of new ash house is complete and ash conveyor extension into new building has allowed resumption of ash stockpiling. The live loading of trucks ceased on Sunday 10/22. Project is going according to expectations/schedule. The main ash house and ash conveyor move (Phase 1) are functionally complete. Phase 2 demolition and reconstruction of truck bay area, air scrubber relocate to begin week of 10/30. Please let me know if you have any questions. Have a great weekend, Tim Tim Jones, PMP Associate TECH ENVIRONMENTAL Focused Knowledge. Real Solutions 303 Wyman Street, Suite 295 Waltham, MA 02451 (0) 781.330,2220 X32 (C) 802,279,94 18 Fax: 781,89 . 451 t-iones@Teci Env,co www.TechFn,r.com https:Hmail.google.com/mail/u/0/?ui=2&ik=7c2eff6265&jsver=19n8NvMEael.en.&view=pt&search=inbox&th=15f5e815c1 b94f37&siml=15f5e815c1 b94f37 1/2 10/30/2017 Town of North Andover Mail-Weekly Inspection Report-Wheelabrator Ash House Project-October 26 WNA_SitelnspectionReport_10262017.pdf 2260K https://mail.google.com/mail/u/0/?ui=2&ik=7c2eff6265&jsver=19n8NvMEae1.en.&view=pt&search=inbox&th=15f5e815c1b94f37&siml=15f5e815c1b94f37 2/2 TeCH I IJLLISED Ir:NIOWLEDGE, 1�EAL SOLLII IE)NS SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning& Health Departments From: Tim Jones Date: October 27, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on October 26. 2017. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Richard Falk, Air Quality Manager, Kevin Beauregard, EHS Manager, Tom Penna, Project Manager and contractor R.H. White following the inspection. Work in progress noted during the inspection: 1) ash conveyor extension to new building; 2) reconstruction of temporary containment wall between new ash house and temporary truck bay; 3) prep for Phase II demolition and reconstruction. 1. Construction Phase — Phase I: New construction of main ash house substantially complete with three (3) walls, roof and rollup door installed. Ash conveyor extension to new ash house and relocation of temporary containment wall in progress. Next phase transition to truck bay demo/reconstruct to begin week of 10/30. Stockpiling of ash resumed 10/27. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions — No nuisance conditions noted, ash stockpiling and containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in excellent condition. Conditions were rainy. 4. Areas of Non-Compliance—No areas of non-compliance noted, ash house air scrubber not in operation but no fugitive emissions were observed from resumption of ash stockpiling. 5. Corrective Actions — None required, housekeeping in excellent condition and support materials are staged in good order. 6. Dust Mitigation —Ash conveyor stockpiling was in operation, scrubber not in service - prep to relocate in progress. New building and conveyor seals intact, ash area confined. 7. Material Stockpiling—Staged materials currently on site within defined construction zone: 1) dumpster for construction debris; 2) concrete/steel building erection staging equipment and supports; 3)heavy equipment. Heavy crane removed from site. 8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad has been installed and compacted,housekeeping in excellent condition. 9. Scrubber In/Out of Service—Ash stockpiling in progress and scrubber not operational. 10. Next Major Activity — Relocation of temporary containment wall and ash conveyor extension complete, ash stockpiling in new building. New truck bay demo, foundation reconstruction and air scrubber move beginning week of 10/30. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com Wheelabrator North Andover—Site Inspection Photos 10/26/ 017 * r y µ r, �rcr j k' r ' as j � r r� e r Site Inspection Photos (cost.) fj r y4 lily I L vY t k k, ✓ F. k � i ° t } f r U 4 4 n k t �i t� fsd y i {'t}t 7 e z i#h1.yAnkq at s 4 s �' ,s 1 o cn CL y � t taz }�,�_z ft.. i;;" ..,y �si`�tif€t}y�'r���.�F }z, y,<7}.r{ ^.,:• ��j73;;" "� t .�2�i��.zy{4�,�"w+si u}'i}� `��s�,. t��t_ `� mill � Site Inspection Photos (cont.) x 1 r � c. FOILISEG KNOWLEOGE.. REAL SOLUTIONS, SITE INSPECTION MEMORANDUM To: Town of North Andover—Planning& Health Departments From: Tim Jones Date: October 20, 2017 Subject: Weekly Site Inspection Report—Wheelabrator Ash House Reconstruction Ref 1949:1 Tech Environmental, Inc. (Tech) is providing this weekly site inspection report for the Wheelabrator North Andover Ash House Replacement project. The observations below and attached photos represent the activities observed during the inspection on _ �, 7. General Project Progress Developments: Met with Wheelabrator team to conduct weekly inspection of Ash House project. This week's inspection was self-guided and included check-ins with Gary Collette, Plant Manager, Tom Penna, Project Manager and contractor R.H. White following the inspection. Work in progress noted during the inspection: 1) construction/installation of main ash house pre-cast building walls; 2)preparation to begin install of main roof panels. 1. Construction Phase — Phase 1: New construction of main ash house substantially complete with three (3) walls installed, roof installation to follow immediately. Ash conveyor extension to new ash house and relocation of temporary containment wall to begin 10/20. Next phase transition to truck bay demo/reconstruct to begin week of 10/23. live loading of ash will cease and facility will revert to ash stockpiling and loadout in new building. 2. Construction Schedule—Project is on accelerated schedule to be completed by 12/31. 3. Nuisance Conditions —Igo nuisance conditions noted, ash loadout containment functioning as designed and no material track-out from ash house facility. No fugitive emissions. Site housekeeping in excellent condition. Conditions were sunny and dry. 4. Areas of Non-Co — No areas of non-compliance noted, ash house air scrubber in operation and no fugitive emissions were observed from ash transfer. 5. Corrective Actions — None required, housekeeping in excellent condition and support materials are staged in good order. 6. Dust Mitigation —Ash conveyance and truck loadout was in operation, scrubber in service. New partition seal intact,Ash loadout area confined. 7. Material Stockpiling— Staged materials currently on site within defined construction zone: 1) dumpster for construction debris; 2) concrete/steel building erection staging equipment and supports, 3) heavy equipment. 8. Erosion Control—No erodible material piles on site or exposed earth, new gravel crane pad has been installed and compacted, housekeeping in excellent condition. 9. Scrubber In/Out of Service—Ash loadout in progress and scrubber operational. 10. Next Major Activity —Relocation of temporary containment wall, ash conveyor extension and ash stockpiling/loadout from new building to commence. New truck bay demo, foundation reconstruction and air scrubber move beginning week of 10/23. Address: 303 Wyman Street,Suite 295 1 Waltham,MA 02451 1 Phone:781-890-2220 1 Fax:781-890-9451 1 Website:www.techenv.com eels rat r North Andover®Site Inspection Photos10/19/2017 zg l j f ' T _w w. x , a }r S I ryF " "✓ 6 r•ry 4$ k # W e• r w ` ! a N � w4 Site Inspection s (cont.) pg� E '} Y t �M AS i v t ... A j ,y Ifr � y Slyt,. }Jy i �r _s Site Inspection Photos (cont.) r r y y fir�9. r.- tg, � �f f s CC OF 9FNT5 �Mr n SiteInspection Photos (cont.) t r iy ptf i f v 'sN��y4'fir} 4 x fli •`P y f ! 1 f r xx x �r r 9 d � r J jr vs,4" E gg $ b� s� Site Inspection s (cont.) WAIT Aw To to 41 UT ly w- j v too ARA -mikul r x Nam: t a 3 � ruv_. v c Y t- : er x ... ,..................... . ................ :,............ .............. U� lot, OR ii o „ I r r r r F �ey r �