Loading...
HomeMy WebLinkAbout242-1843, 1761 Salem Street OOC - Permits #242-1843 - 1761 SALEM STREET 6/27/2022 4 �mmmm_............ Mass achit seff s Department of Environmental Protection Provided by Mass DER Bureau of ReSOUrce Protection - WeVands WPA, Form 5 -, Order of Conditions, Mass DEP File# Massachusetts Wetlands Protection Act M.Gi.L. c, '1311, §40 eDEP Transactibn# N orth Anclove r, d ltyfrowpl A. General Information Memo rwla Narth Andover this Fenn has 1. Fron, been modified Conservafion Conim,�ssion with aiddpA 2. This, fssuance is f'or space to .9, Order of Cond it ions b. D Amended Order of Condit Ions accglffimcdat,c (check one)� J.hu Rqgishy of Deeds 3. To- Applicant: Rpquirementg, Jose Viera a.. First Narita b. Last Narno 4nportant:� When F0111ligig OLA forews on c. Organization rthe 1761 Salem Sfi,eet compute,r, d,Wiling Addiress use only Efte tab key to North Andover M.A 01845 1110vo Your e cityll'owfl C State! 0, 4p co(k-', cursor-do flint use the 4. Property Owner cif different from applicant): return key. a. Rist Niargie b. Last Narne r,.Organ zafion ............................................ d. Mailing kidres'S, e. Cily[Town f.State g.Zip Code Plroject LoGation-, 1761 Salem Street North Andover a,. Street Addreab & bity-rl a I Map 106B Lot 89 ....................... c. Assessors MapPlat Number rce Ul-ot Number Latitude and Longitucte, if known: 42cI64rn288,0s 7105m7830s tt LORUJO WR;IftWMIFj ri= rry 5(1 RrIeNAD Pap I ar,13 4 Massachusetts Departnient of Environmen.tal Protection Pruv,ded by M,,q,-5!50FP, Bureau of Rescrurce Protection - Wetlands 2,42-1843 WPA Forir — Order of Conditions MassachUsetts,Wetlands Priatecti'm Act MI.G,L, c 131, §4 �41H 11"1 f arrRadion NbIrtl-t Andover ........... _.................... A. General Information (cont�-) 6. Property recorded at the Registry of IDeecds for(attach additbnall information, if more than one parcel)'. Northern Esslex a,000MY b.Certificate Num,ljer,(if rpqistaft)d lane]) 16482 263 c. B a olk (L Page April 11, 2022 June 8,, 2022 June 27, 2022 7, Date a. Drate Nofice�_f i��ent'F_ille'd b.Date P::31 ubfic Heagitryi Oos(id r. Date of III uan 8. Firtal Approved Plans and Other Documents (attach additional plan or dOicUrnent reference's as needed): Sept)c System epaJr Plan#1761 Saleirri Street Williams,& Sparages Peter Blaisdell, Jr, PE 6. Pre'-pared By c.Siqined and Stamped by Juae 9, 2022 T'=20' 0� FiI Rudision Date See Attached f Additional 11 lari Date B. Findings 1. Findings pursuanit to,the Massachusetts Wotiands Protectilon,Act Foll,awilig the reviews of the above-referenced Nortice of hitent and based on the int6rniation provicled !In this application and presented at the publI hearing, this Cornmis,sion finis that the areas in which work Is proposed is SiginifilGant to 11're fO1IIOWir1g iinterests of the Wetlands Protection Act(throe Act). Check all that apply, E Public Water SUpply tp� I Containing Shellfish c M_ Prevention of P0111,11tiOn ad E Private Water StAII e. Fisheries f. 0 Protection of Wildlife Habitat i. E Groundwater Supply ti� Storm Damage! Preventibn i., M. Flood Control This Commission hereby finds the project, as proposed, is-, (check one of the following boxes) Approved subject to,-, E the following condifions whjch are necessary Ili accordaince with the performance standards set forth in the wetlands regUlati'ans. This Coramis5JI orders that all work shall be performed inn accordance with the Nofice of intent referenced aNwe, the 1`6111b,wing General Conditions,, and any other special conditionis atitached to this Order.. To the extent that the 1`01IOW inn g conditions, modify or dIffer frorn the plans., specifications, or other propo,salis submitted with the Notice of Intent, these cornriftions shall control. wpa rrw M r"'rW'®r ry N I VP a�n Pao,2 or 2 4 Massachusetts Department ofEnvironmentall Protection Provided by MassDEII: Bureau of ReS,l Protection - Wetlands 242-1843 MassDE11 Ike W" WPA Form 5 - Order of Conditions Massachijusetts Wetlands P,rotel AGIr M-G.I. c, 131, §401 eDEPTransal North Andal B. Findings (r cl Denied lbeCaIiise: b El the, proposed work cannot be coin d itibried to nieet the performance standards set forth in the,wetliandregiulatillorls. Theirefore, ,work on this project may not go forward unless and until a new Notice of lil is submitted which provides measures which are adel to, protect the interests of the Act, and,a finial Order of Gondlifians iis issued. A des,cription, of the Performance standairds whilichl'the piropolsed work caninGt meet is attachied to this Order. l El the information submitted by the appficant is riot sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands, Protection Act. Therefore,work on this project may rl go fomard unless and! until 2 revised Notice of Intent is SUbmitted which provides sufficient Information and includes, measures which are aide(jUate to protect the Act I s interests, aii a final Order of Conditions is issued. A descripition of the specific information which is lacking and why it is, neces�sary is attached to th is Order as pe r 310 C M R 1 0.05(6)(c),. 3 El Bluffer Zone Impacts- Shortest d[stance between firrift of project disturbance and the,weitland reS,01,lroe area specified in 310 CUR 10.02(l)(a) a. fiflear feet Inheind Resource Area Impacts: Check all that apply betow, (For Appi-ova[s Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. E] Blank a.finear fiaiat 6. finear feet l 1141l d. knear feet fi. 0 Bordering Vegetated Wet[and a,5quage feet b..&quaro feet c. squaire feet dlsl fem 6. 0 Land Under .............Waterbodies and a.square fee ..t b square feet c.SqUalre fQ,0t d.square feet Waterways e ofy,dredged f.l dredged 7. El Bordering Land ............ ............ . ...... Subject to Flooding a.square feet b,scluare feet c.,square feet d.sl feet Cubic Feet Hood Storage . ..... 0,cohir Riot f.cubilc feet. g,Cubic feet 1). r�ubic feet B. El Isl L and Subject to Flooding a-square feet 655114,w re foot Cubit,IFeet Fill Slam ge In. l feet d.cubic feet le,cxjbic fool f. l feet 2,615 2,615 q- El Ri'verfronlit Area a,totat!sq,feet b.totalt sq.feet 0 0 Sq fl,within 11010 tt c.square feet d.,l feel 0. squalre feet f. square feet Sq R belwal 100- 2:,6151 lawn, 2,615 lawn 2,615 11awn 2,615 law in 200 ft 9,sl foot h.sl feet i,Squaw,feet j-squaro feat Iry S°'i I=. pmjx!3 OF 13 4 Massachusetts Department of Environmental Protection lProv ded by Masssf.)Ell:� WPA m Cons B,Ureal of Resource Protection - Wetlands 242-1843 For 5 - Order of nditio� Massachusetts Wet[ands Prot�e!ction, Apt ML1G.L. c., 131, §401 eDEIF Frans c' nO North Andover ('4yFF,own . ................... B. Findingis (cont�.) Coastal Resotirce, Area Impacts,: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alterationi Alteration oplacement Replacemen4 E] Designated Port Ind[Gate site, under L.an,d Onder the Ocean, be4ow Areas i i. E] Land Undei-the Ocean a square feel T7.q-Lkare feet ­ c dy drediged d d f E?,d'ge d 12. Barrier F3,eaches Indicate size Under Coastal' Beaches a ndlo r Coastal Dtj nes bellow Uu yd cu yd 1,i, El Coastal Beaches a. square feet b"square feet c. nourishnient d.nourish merit Cli Ord Cv.]Yd 14- j Coastal Mine,-, a. square feet b I.square.feet C. noug[Olmlem d. mourishment f5- E] Caastdi Banks a, Hneaf fact...... I O'el b.OnDar feet i F3. [I rocky Intertidal Shores, a-square feet b.square feet 17. El Salt Marshes 8,1 srvore feat, b.square:feet c I s quire feet d -iq I u I a,r e fiat . . i& E] Land Undeir Salt Ponds a.square:feet b,-6quare feel q,%dy dredged d.cty dredged t��, F] Land Contarni'F19 . .. . . ......... ...... ............... Shellfish a. square feet to '"u'arp fart c.square,feet d.square feet 20. F-1 Fish Runs [ndicate size under Coastal Banks, Ini'and' Bank, Land Under thie Ocean, an for inland I-and U nde r Wate rbodies an Waterways, above a.,cJy dredgied b. Cly dredged 21, Ej Lanid Subject,to Coastal Storm 'Rd SqUaro feel b.square feet Flowage 22. [_-] RWerfront Area a'. M'al Sqj-fed b.totat sq.feet o1q ft within 100 ft c.square feet d' square,feet e.square feel if.square feet Sq It between 100- 200 A, 9. square feet Itr.square feet L squvo feet j.square feel V&PSMUm's.doc-rev&I EUMD Paul!4&13 4 MassachiLlSotts Department.of Environniental Protection Provided by MassDEIP': BUireau of Resource Protection - Wetlands 242-1843 MassDEP Fife# WPA Fir Oirder f Conditions Massachusetts Wetlands Protection Act MIL&L c. 131, §40 i5ff "transaction North Andover .................. ........... B. FindIings (coint.) *#23. If the 23. Re-,to,ratio,tilETi,hance �Ie,nit project its for the purpose of r�storing or en hancing a, a.squiare feet of BVVV b."wuaro fool of salt marsh walfarid resource area 24. El Str(-al-n CFOSSing(S) in addition to the square, ...... foolaqge t4at a. number of new stream crosslings b. 1111mbor of replaceni,,5nt streann crossi��ngq has,Man C. General Clonditions Under Massachimsetts Wetlands Protection Act entafed in Section B.5.G (BVVV)or Thc-following co�niditions are only applicable to Approved projects., .1 Tu(S Hit WWI)abrwe' 1, Failure to com lly with aft con ns ditio stated herein, arldwM a ifl related stratute-sand other ploase enter p fire additiona I requlatGry MeasUres, shall be deeMed CaLlSo to revoke or modiify this Order, aniount hefe- 2. The Order does not grant any property rights, or any exclusive, privileges; it does not authorize any iinjury to private property or invasion of private rights. 3. This Order does not relieve the perftittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulaflons. 4. The work auttlorized hiereundier shall be,coryipleted within three years, from the date of this Order untess either of title following app[y: a. The work is a niiainton8nce dredging project as provided for in the Act; or b. I he tibie for conpletion has been: extended toy specified date more than thiree years,:,, but less, than five years, fron-ii the date of issuance. if this Order is intended to be valid for more than three years:, the extension date and the Special circurnstances warranfirlig the extended time period are set forth as a speciAl condition in this Order. c. If the work is for a Tent Project, this, Order of Conditions shall be valid for no more than one year, 6- This Order may be extended by the hssulng authority for one or rriore periods of up to three years each upon application to the issuing authority at least 30 days,prior to the expiration date of the Order. An Order of Conditions for au`feat Project may be extended for one additional year only upon written application by the applicant, subject to tho provisions of 310 CMR 110.05(1 1)(f). 6. If tlfls Order constitutes an Arnenided Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Ftnal Order of Conditions,and the Order will expire on unless extended in writing by the Department, 7. Any fill used in connection with this project shall be clean MIL Ajiiiy fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumbler, bricks, plaster, wire, Ilath, paper, cardboard, pipe, tires, ashes, refrigerators, mrotor vehicles, or parts,of any of the foregoing, EU"2M) Pa3r.S of 12 4 MassachusuAlts Department of Environmental Protection Provided by MassIDEP: B RoePtcticoin - Welllnd 42 $843 u Mass File# WPA Form 5 — Order of Conditions Massachusetts 'Wetlands, Protecti'on, Act M�.G.L. c. 131, §40 D -P t:ransadiori# North Andover C. General Conditions Under MassachUsetts Wetlands Protection Act B- This Order is not final U ritil all administrative appeal period's from this 0 rdler have elapsed, or if such an appeal has been taken until all proceedings before, the Department have been completed.. 9- No,work shall be Undcrtakerl Until the, Order has Ibecorne final and then has been recorded in the Registry of IDoeds or,ttte Land Court for the district in which the land' is, [ocated, with'ITI the chain of title of the affected property. In the case,of recorded land. the Final Order shall) also he noted in the Registry"s Grantor JndeX Under the name of the, owlier of the land upon which the proposed work is to be done. In the case of the registered land, the R11121 Order shall also be noted on, the Land CoUrt Certificate of Title of flie owner of flie, land upon which the Iproposedwork is done. The recording information shall be submitted' to the, (',on-,servation Goininlissiori on the fora) gat the end of this Order,wh[,ch form niust be stampe(f by the Regiistry of Deeds, prior to thie corlirriencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three SqUare feet in size bearing the words, 'Massachust,tts Department of Environmental Protertion" [or, 'MasslDEP] "File Number 242-1843 11� Where the Department oil Environmental Protection is requested to iSSUe a. Superseding Order, the Conservation Comrri ssion shall be a party to all agenoy proceedings,and Bearings before MassDEP, 12, Upon completion of the work described herein, the applif arA shall submit a Request for Certificate of Cornplianoe(WPA,Forni SA) to the Conservation Commission.. 13, 'rhe!work,shall,iconfoirm to, the plans ar,W spedial conditions referenced ism this order. 11 4, Any change to the plans identified in CorWition#113 Above shall require the applicant to ihquife of th,e Conservation Connnnission in writing whether the change is significant enough to require the Ming of ai new Notice of Intent. 15. The Agent or members,of the Conservation CornmJsslon and the Department of Environmenkall Protection shall have the right to enter and inspect the area subject to thiis Order at reasonable hours to evalUate compliance with the conditions stated in this Order, and may require the submittal of any clata deemed necessary by the Conservation Corilimission,or IDepartment for that evatuation. 16. This Order of Conditions shall apply to any successor in interest or successor iris controt of the pfopertyquitifert to this Order and to,any contractor or other person perforr-ring work conditioned by this Order.. wpalufo,Z dbo-rev&MM20 1"arge i,rA 13 4 Massachusetts Departnient of Environmental Protection Provided by Masb[)FF'�� BureaU of Resource Protection, - Wetlands 242-1843 LFJ� Order of Conditions WPA Form 5 Massachusetts Wetlands Protlection Act M.G.L c. 131, §40 North Andover n- . ... ............ ..... C. General Conditions Under Massa rah usetts Wetlands Protection Act (Cont) 1T Prior to the start of work, and if the project involves work,adjacent to a Bordering Vegetated Welland, the bo,ufldary of thie wet.land in the, vicinity of the proposed work area shaH, be marked by wood'enstakes or flagging. Once in, place, the wetland: baundary markers shall Imo maintained until a Certificate of Cornpliance has, been jSSUed by the Conservation coni'mission, '18, All,sedimentation barriers shall be maintained in good repair until all diStUrbed areas have been fully stablilized with vegetation or other means. At no firn[e shall sedirnents, be, deposited iin, a wetland or water body. During construction:,, the applicant or his1herdesignee shall inspect the erosion,controls on a dafly basis and shall rernove a=mRflated sedfinents as needed:, The applicant shall iminediately control any erosion problbrns that occur apt the site and shall also irnmedlately notify the Conservation Coimrnission:, which reserves the right to rOqLdre additionall erosion and/or daniage prevention controls uit may deern nocossary. Sedi4nentation barriers shall serve as,the limit of work unless another firrift of work line has been approved by thi,,q, Order, 19. The work associated with this Order (the"Project (1) F-1 is subject to the MassachAisetts Storrawater Standards (2) 0 is NOT subject to, the Massachu;setts StOrMW2ter Standards If the work Is,subject to the Stormiwater Standards, then the project is subject to the following condiflons: a) All work., intlading site preparation, land:dis[Urban,ce, construction and rede-velopment, shall be implernented in accordance with the construction period pollution pirovontiort and erosion and sedirnein,18tion corWal plan and, if applicable,, the Stormwater POIlUtiOn Prevention Plan required b,y the National Pollution Discharge Efiniination ystern ConStftlCti3On General Permit as required by Storm water Condition B. Construttion period erosion, sedirnientafion anid pollution control measures and best maniagerneflt practices, (13MRs) shall rernain iln place until the site [s fully stabilized- b) No stormwater runoff may be discharged to the post-construct[on storniwater BMPs armless and until as Repistered Professional Engineer provides a Certification 'thaL L all construction period BMP's have been temloved or wwilll be ire,muoveld by a date certain specifiled in the,Certlffcafio;n- For any constrUCtiOn period BMP,s intended to be converted to,post constructlon operation for stormwater attenuation, recharge, andlor treab-nent, the conversion, is allowed by the MassDEP Stormwater Handbook BMP specificati'Ons and that the IMP has been properly cleaned or prepared for post constrUction operation, including removal of all constrticti'on period sediment trapped in inlet and outliet control structures; fi., as-buil't final Gonstruclion; BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; W- any illicit discharges to the starmwater management system have been rernove!d, as per the reqUirernents of Stormwater Standard 10, wr*qrmr"Olr m050 W269D Pug--7&113 4 NOW* Massachusetts, Department of Environmervtal Protection, hcwidnd by MassDEP: Bureajui of Resource Protection - Wetlands 242-1-1543 -'- "-'Mass DEP��Je WPIA Formi 5 - Order of Condition�s MlassaChUsetts W nsacfion# eftands, Protection Act KG-L. c.. 131., §40 7D E:-PT ra Ll North Andover . .. ......... C. General Coniditions Under Massachusetts Wetlands Protection A& (cont.), iv, all post-construction) stofrrrwater BlMP's are installed iin accordance with the plans, (including,all planting plans) approved by the iSSding authority, and have teen inspected to enstire,that they are not damaged and that they are in proper woWng condition; v. any,vegetation associated with post-coflstriactibil[ BMPs is,suitably established to w[thstand erosion. c) The landowner is responskite for BMIP maintenance until the issuing aLlthority is notified that another party has, logally assurned responsibility for BW rnaifltenance. Prior to requesting a Certificate of Compliance, or Partial Certificate rat Cornphance, the responsible. party (defined in General Condition 18(e)) shall execute and submit to the issuing authorlity an Operation and Maintenance Compliance Statement ("OW Statement) for t`he Stormwater BMPs identifying the party responsible for implementing the storm water BMP Operafion and Maintenance Plan C'O&M Plan") and certifying the f0bw ing:. i.)the O,&M Plan is cornpliete and will be implemented upon receipt of the Gertifibate of Compliance, and ii.) the fUtUre,responsible, parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater n-tanagernent BIVIRS and implement the Storrnwateir PollLftion, Preventi011, Plan. d) Post-construction pollution pfeven,fijo,n and source control shall be implemented in accordance with the long-terra pollution prevention plan section of the approved Stofrnwater Report andl:, if applicable, the Storrnwater Pollution Prevention Plan required by the National P011LIU011 Discharge Elimination System Mufti-Sector General Perrnit e) unless and until another party accepts, responsibility, the landowner, or owner of arly drainage easement, as,surries, respon�sibifity for niaintainliag each) BIVIR To overcome t:his pfe:suimpfjon, the landowner of the propertyrniti9t sub,mit to the issuibg authority a legoEly binding agreement of record, acceptable to,the issuing quithority, evidencing that anothear entity has,accepted responsibility for riiaintaining the OOP, and that the proposed responsible party shall be treated as,a permiffee for purposes of implementing the requirements of Conditions 18(f) througfi, 18(k) with respect to that:WR Any failure of the proposed responsible party to,implemieritthe reqUirernents ol"Conditilons, 118( through 18(1)with respect to that BMP shiafl be a violation ol"the Order of Conditions,or Certifficate of Compliance, In the case of stoiraiw-atior IBMP's,that are serving more than one lot, the legally binding agreement shall also idiefltify'the, lots that will be serviced by the storniwater B,M Ps. A plan and ea,se r-nen t deed that gran4s, the responsible party access to perform the required operation and maintenance Must be subrnl1ted along with the legally binding agreenient, f) The responsible party shall operate and maintain ,611 storarwater BMPs in acxofdan;ce with, tare design plans, the OW Plan, and the requiremerrts of the Massachusetts Stormwater Handbook, vWpahmS dkir, mv IWI W27W.0 4 Mass ach usetts Department of Environmental Protection, ProlAded by MassDEP: Bureau of Resot,lrce Prole,don - Wetlands 242-1843 WPA Form — Order of Conditions L�Ik Massa chiisetts Wetlands Protection Act K.G.L. , 131, §40 eDEPI-Tansacflurl; �Nortli, Andover (NtylTown C. General Conditions, Under IMassachusefts Wet,lands, Protection Act (cont.) g) "'I he responsible party sh2lL 1, Maintain an operation and rri,8,41 teiria rice logfor-the last three (3),consecutive calbnd'ar years of inspections, repairs, maintenance and/or replacernent of the stormwater managernient systen-1 or any part tfiiereof, arid disposa] (for disposal the, log shall inft2te the type of material and the disposal location), Z, Make the rnajintell2nce log availabite to MassDEP aind the Conservation Commissib,n ("Commissilofl") upon reqUeSt' arid 3. Aflow members and'agents of the MassDEP and tti�e Cornmission to enter and inspect the site to evaluate and ensure that the rosponsible party is, in compliance with the requifer-nents for each BMP established in the OW Plan approved try the issuing authority. h), All sediment or other contaminants, removed from stormwateir BIVIP's,sball be disposed of in accordance with, all applicable federal, state, and locall [aws and regulations. i) lllli,Gi't dischiarges,to the storm water management 5ystrern as defined in 310 CM 10.04 are, prohibited. J) The!9t0FMWatF,,'T mana.genle,nt system approved in the Order of Conditions shall not be changed wfthout the prier written approval of the issuiibg authority. k) Areas,designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as,defined in the MassDEP Stormwater Handbook, Vo4ume 3, Chapter 1, Low Inipact Development Site Design Credits) shialll not be altered without the prior written approval of the Issuing authority. 1) Acce,,-35 for maintenance, repair, and/or replaGenient of BUIPs shall not be withheld. Any fencing, constructed around s,tormwater BIVIPs shall include access gates and shall be at least sip inches above grade to,aflow for wildIffe passage. Specia,J Conditions (if you need mofespace for additional conditions, please attach a text dbr,Urneint): 20. For Test Projects subject to 310 CWIR W.05(1 1)„ the applicant shall allso, implenienit the nio,nitoring plan Land the restoration plan submitted with the INotice of Intent. If the conservation commission or Department determines that the Test Project thTeatens, the public health, safety or the eirivironment, the applicant shall implenient the removal plan submitted with the Notice of Intent or modify the, project as directed by the conservation commission or the Department. ,&pnAwrn5 d4m:,i mv 51 WM20 P.-,uyn q of M 4 Massachusetts Department of Envirominental Protectioni Provided by MassDER Bureau of Resource Protection - Wetlands 242-11843 MassDEP Ffle.N w . WPA Form 5 — Ordler of Conditions Mass,adlLfsetts Wetlands Protection Act M.G.L. c. 131 §40 e1DEP TramgzrwlGon# North Andover Cilyffown D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a rriunicipal vieflands byl�aw or ordInance appHcable? H Yes E] No, 2, The NorthAndover hereby finds (check one that appl![es), Conservation Commission a. 0 that the proposed work cannot be coaditioned to meet the standards set forth in a rmlrfi,cipal ordinance or bylaw, sped,ftcally-, ....................... . ..11- —------- ...............--- 1. Municipal Ord haince or Sylaw 2. CRKflolli Therefo,re, work on this project may not go forward UnAess and until a revised Niofic`e of I I ntent its submiftted which provides, measures,which are adieqJLORD ft) rneet these standards, and a final Order of Conditions is iSSILled. b. 0 that the following additional conditions are necessary to comply wiith a mun[Cipal ordina,rice or byla°wn , North Andover' etlands Proltection Byllaw & Regulations Chap. IN r.M uni c1pal Ordlinance or Byh,w et. seq. s. The Commission orders that all work sha,111 be performed iin accordance with the following conditions and with the Notice of Intent referenced above, Tea the extent that the folly wiii�g conditions modify or differ froni the plans:, specificatiotis, or other proposals submitted with the Notice of Intent, the conditions shafl controL The speciall conditions relating to rnunicipa[ordki,arite or bylaw,are as follows (if you need more space for additiona.11 conditions, attach a text docurnenl)' North Andover Conservation Coninijission FiDdings,& Special Conditions (see attached) 4 Pirovided tyy PylassDER� Massachusetts Departm enit of Etivilroninenlal Pratection 242 W43, Bureau of Res0UJrCe Protection - 'Weflands - WPA Form 5, �- Order of Conditions MassDEP Fite# LI Massachusetts Wetlands Protection Act IM.G.L. c. 131, §401 ib O'tra'nsaction# North Andover Cj y[Town E. Signatures "I hit Order its valirl for three years, unless rather wisespedfled as a special condition:pursuant to General Gondifions#4,from the dzite Of is-ouzrice. f- Dato of Issuance �Please indicate the iniurnber of mambers who wiflsign,this,form, IIs T'hiz Order must besigried by a majority of the Conservation Conimission. 2.Namber of Signe�rs I he Ordior nquM be mailed by cedifiarin'taill (return,receipt requested) or hand delivered to the applic-ant. A cop Aso must be mailledor hand dielivered'at the same time to the app,roprlate DepoTtirnent Of Env[ronrnontW Protection Regiona[Office, if nol filing electron[calfy, and the property owner, if different from applicant. mm kA Ar-- .................. Signature Printed Namo-') -1: - Printed Name PAR ............... PriintodNAme ( . PN S�qrra f-Irinted Nan* r) Vk Signa Printed Name I - .......... re�nature ... . .. Prk)ed aaa ............ ........... natwe Printed Nampe -§-ij-naluire Printed Narne El bly hand delivery oin by certified mail, retuirn receipt requested,, on Date Date wpoonmllidoc,.rev 6MW.020 4 Massachusetts Departiment of Environmental Protection Provided ran Form 242-1843 Bureau of Resource Protecfim - Wetlands �EP Filo 9 Order of Conditio c ns WPA 5 Massachusetts Wetlands Protetion Aunt c� �'O t M,GL 131, §40 FPI North Andover# F. Appeals The applicarit, the owner, any person aggrieved by this Order, any owner of land abutting; the land subject to this Order, or any ten, residents of the city of town in which such land is located, are hereby notified of their fight to request [lie appropriate MassDEP1 Regional Office to,issue a SUperseding Order of Conditions, The request imust be made by certified Mali!OF hand delivery to,the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transrnilttad Form, as provided in 310,CMR 10.03,(7) within ten business days from the date of issuance of this Order- A copy of the re!q Uest.shall at the sarne firne be sent by certified mail or handd6liveryto the Conservation, Cornraissiloa and to,the applicant,, it he/she is not the appellant. Any appe!pl'ants seeking to appeal!the Department's Superseditig Order associated with this appeal will be required to demonstrate prior participation in the review of this project,. Previou,5 participation in the pernlit proceeding MiCaInS the SUbmissionof written informiatioill to the.! Conservation Conlimissilori prior to the close,of the public hearing, re,qUestffig a Superseding Order, or providing written information to the, Departirrtent prior to issuance of a Superseding Order, The request shall state cleady and concisely the,objections,to the Order which is being appaaled' and how the Ordeir does, not contribute to the protection, of the interests identified iin the Ma5sachuset'ts Wetlands Protection Act(M..G.L. c. 131, §40), and is inconsistent with the wetian dS Teg dlafi ns (3 10 C fop' 10.GO). To the exton t that the Order is based) on a rn u nicipa I ordinance or bylaw, and not,on the Massachusetts Wetlands IProtootion Act.or regu[ationls, the Department has no appellate jurisdiction- L"O-5d1&Mo Page 12013 4 Ma,ss,acjiusetts, Department of Environmental Protection Provided by f0assDEP: Bureau Of ReSOUrce ProtectJon - Wetlands 242-1843 WPA Form 5 - Order ofConditions I Ie MassachLlSettS Wetllands Protection Act M.G.L., c., 131, §40 North Andover n ............. G. Recording Information Prior to commencement of work, tbis Order of Condilions must be recorded in the Registry of Deeds or the La.nd Court for flie district in which the land is loicatied, within the chain of tithe of the affected proparty. In thie case of recorded land, the Final i shall alsio be,noted! in the Regis,try:'s Grantor Index under the name of the owner of the land subject to the Order. In the case of registered lanid, this Order,phalli a[so be noted on the Land Court Certificate of Tifle of the owner of the hand st,ibject to the Order of Conditions, "I"he recording information on this page shall] be subnAtted to the,Conservation Coirnmission listed below, North Andover Conservatilaii Detach on dotted Brie, have stamped by the Registry of Deeds and'submit to flie Conservation Co,miryii88ioin. --------------------------------------------------I----------------------------------------------- To: North;Andover Conseirwatioin CornrMsbiuiri Please be advised that the Order of Coflditions� for the Project at, "1761 Salern Street 242-1843 Pwjeul Masi;DEP File Number Has been recorded at the Registry of Dii of: Northern Essex umy Book Page! Jose Viera, TG—P-0rt n-e-ir and has been noted in the chain of title of the affected property ift'. 16e482 263 Book Page hij accordance With the,Order of Conditions, issued tort: June 2T 2022 .................. Date If recorded land, the instrument nuiraber identifying this transaction is,: iutiur-i"ie'm N'un-ib-w .............. If registered librid, the d0CUrnent MEmber ildenfifyfng ffiis transaction 1"S',, Documant Number ........... ....... Signature of Applicant m,jj,sft,qm5 dick,-rev5IBMM Page 134-��Q Salcin 1761 Street - DEP FJ1,E 4:242 - 1843 Fin(jjll-g� of Fq,C_t CUrrent rroject Site Conditions., Th:, 52-acre project,site}, consists, of an existing sing le- 611,011Y housu constructed in '1981, associated septic system, driveway that crosses Bositotl I I Brook (a pereni-dal stream), utilities, lawn,Jai;ut,5caj,]JngF woudc.d arid wetland areas. . ! areas, reflected on The NACCagrees,with theidelineation of the following Wetbil"Id M801-11TE, the approved, p4a.].-I, which was ro.viewc,d and adjusted in the- field by 1.1-ke Conservation Hold Inspector. The applicant has, not aLternpled (c), ove-rcorne tf-W j-WC%UT'1'1jJ1tion of significance of these resource areas to the idontifie'd interests ir) the Act and Bylaw. a. Bordering Vegetated Wetland (B,VW) - Wetlari,d Flog Series Al - A20 b Isolated Ve eta,4xi WLALand (IV W) - Wetland Flag Series B1 - B1 9 . 2 c, 1010-1�,00t Buffer Zone, to z IVW d. Boston Brook Meiin Aunua I, I Hgji Water Flag Series - MA1 - MA c, 20(.)-F(-),(-)t Riverfront Area associated with Boston Brook MAH.W f. "The project site does lie within NHF,',3P Pri(i,rity 1-labitat g. The project does not lie, Within 1001 feet of potential or certified, vernal puu,15, In f h e p rojec t site lies within the 1 00-year flood pla i n. - F11(,,v a ti ori 101,8 NG V D29 PT..�o octura 11 istoj.5.-��otice of Intent, DEP File #242,-1843. On April 1-1, 2022, ti'lo N(,)rth Andover Conservation Conunissiort(NACC) roc(�Jved a Notice of Intent, and associated altad-u-nerits zuW' sitc plorts, ff),.r proposed work, at 176:1 Salem Street., The NACC field. th(�, p ubl i c hea r ing at its A Aril 27, 2022, May 1-1, 2022, 25, 2022, j u ri,e 8, 2022 and j u ne 22.P 2022, meetings. Prior to the Apri 127, 2022tueeting, the Conservation Field hisp,e(b,)Tr pvrforrne�d 11 site inspection to review the wetland. &-linootiori and general site conditions. At fhaL time,, he ob,..'vTV(:,d carport tents/equiprnent being stored on Harold Parker State Forest proIrwily between the 25" rqE)Z & 5,0' NB�Z to the wettand, ("Witlerice of vehicles,/equipment being stored within the 25' NT)7,, witi,iin the gravel driveway within the 25' 1 1T)Z and 501" NT3Z, one tree rernmiral within the 25' NDZ, evidence of equij)i-ric;nt use between the '1001" BZ, & 2001 Riverfront Area. R was a1sul ubsen,,ed t[lat HIC, fill in the area at the Nackyard contains a Significant arnount of tra-di and staff was, told that the ha1rn.(-.,own(,!r has T"OT11,0VIng tl'ash, from the soil in this area left: by fhe 1nrevifuixs honwowne.r. The,,se findings were reported to the NACC zit the April 21nth rnc,C fin.g. After ClUe diSCUssion with the applicant',s, "Fethuul consultant, the NACC voted to issue an Enlbr(;-Cment Ordci ffiat reqUire'd the following corrective actions., stop ,K]]I w()rk on ffie property, move all stored malerizds niore than 50 foot frorn the wetland no later than MaY 11., 2022, submit an N01 plan ffiat is coinprehensivie in scope, and depicts proji(m!(j NDZ rnon u nientat ion as, prescribed b,, t heColiruniss i on. Thi.^ directives, of this EO were met and the EO was lifted at tfic May Tl, 2022 rneeting, At the Maas l-111, niecting, an, abUtter to the project at 50 Can,1pbell Roo(] raised conicerns a"c"to, whether debris was being stockpiled on Ids property as a result of the applicant"s, activities. .................. . .......... Snleni 1761 Street - DE1.3 FILE 14 242 - 1.8,43 "I'lie NACC required that: the applicant stake out the property bounclax), shared by 50 Campbell Road in the field in tt) dotornifile if du.bris was located thereon. Two woody debris piles were determined to lie, on 50,Campbell Road in the, ou.ter reaches of tine BZ arld, 200,' Riverfront and tfieirrernovat j�i� llorc,:nrl, At the,May 25., 2022,meeting, staff informed. the NACC ttiat au, old Orclor of C(,,,)ndition,;, DEP File #242-111 g(�),verniri,g flie constructi(,),n of the house was found on record. This O0,Chad not bf--en closed OdUt with an Certificate of Compliarice. The NACC voted to,furt-fier the liearing in f.avoruf allowing the appfici-u'it h'), aPply fOv a Certificate of C( pliance to properly close tine OUtstanding 00C prior to the Conuiiission rendering an decision cram ffie current NOL The Certificate of Conaphauce, was jssuc,d aIt 01(! JIM0 8Y 2022 nieeting, and after discussilon with ffic, applicant's engineier regarding, proposed siones alole.g the edge of the, driveway, the NACC voted to further continue to, allow tlae applicant ta,p,rovido addiborial dk-�taihi on fl-iis clornent, The stoiaes-were efin-driated fruni, the plan ai-ul thw, revisod jfl,ari wwi subvnitted and reviewed a time June 22, 20222 inc-c-ting. The NACC recognizes that workrelaled. to driveway rehabilitation will occur within the 25' NDZ, with no, pr()posed expau-,,Joi�i (�)f ft)otf.)-rint, this activit), is, allowable bases (1111 pvev I ious Ifi nit of workafliawed under #242-1.11. After d Lie diSCUSsion and con,sideration, the NAC-Cvoted x-�3,r to close ffieheaTing and j�,sille a decision in 21 days. Later, Hiza ov( ning, tht,,-- NACCreviewed and ainerided a draft decision ajjyd V(-)tCd X_yr to i's's ue fl-[j,' : 00�C., -tat:tlhe nditio ns a re necessary, in accorda nce Thcrt�.ftn,o, the NACChereby ffiids tl followin g co with the Performance Standards, set:forth in tlae StateRegulations, ffic loc°zd ByLaw and R(.agu,lztions, to fliose iritcrests noted ab(-.)ve. The NA CC' orders that all woxk shall be performed in accordance with avid conditions and with the Notice of intent/approved 13[aris referenced below. To the extent ffiat t1w n'todify or differ from the .......... fie-ations or other proposals submitted with the Notice of Intent, the conditions, shall control. GENERAL CONDITIONS ............... 2-1, The proposed w1ork incluldias. install an upgraded leaching field and septic system. to, replace the CUrrent systern that failed aat Title 5 runs ectiloin, as a v081,11t (-)f as cloggcdsofl Basiod on ,;oil testing, moving the sYstein OUtSide of the 200' Riverfronot Area was not feasible,, due to the depth of ledge, The prq)osed k,aiclling, facilit), is a Pre last Enviro-Septic piping system. One (1) 6" diameter,Oak withirt the lawn area is proposedfear renioval. NHE9P has determilned, ffie project, as propowd to be exernptfrfalTi, MFSA vcwiew 'Hie existing gravol driveway Lind island will be rehabilitated within the same footprint. The driveway will bes,r1-.iuo,fi-ied and put flofc�s filled without changing die oxistirig gracto so as, to not trigger comp ansatory flood sto,ral v roqUirements. Wetland markers, as requir°ed by the NACC will be installed as Salern 1761 Street - DEP FILE ft 242 - 1843 noted on the approved plan. Debris piles will be rer.tlaved. All, prol'.)o"sed %W.,)rk will (.:)ccur wit[di'l ("'Xisting T"I'lairlitairled lawn Or Previou.sly disttirbed/developed areas. 22. 11-te ,work shall conform to the following (except as,noted in. Hie YeTaiaiildcr ()f 01,is (IOCUITWIIt VVII(III(I 111VIS11c)IIS 1,1U.",ly be roqtfired): Notice of Interitfiled b Jos(�h Vicvl 1761 Soleln Street North. An(kn� er, MA 018,45 Project Fu gi u eer & M!fl a i,-ild C()i-vsu 141 rl t- Williams � parages, LLC 189 North Main Stweet M i d d leton, M A 01949, Site Fjau�; • "Septic System Repair Plai-.i.", prepared by Williams & Spiiraf,,es, sigi-led by Peter fflaisdeflf PF, -icalel"=20', final revision dated jLine 9, 2022; • NHFSP loft(��r finding N'o, Adverse lnipact, dated April '17, 2022; • North Andover Board of Fleal th-Septic Systerna App�ro v a I Lettorl d�i ted I. 9-021 1 23. 'Tlne, term "Applica nit"" as used irl, fl-lis Ordcr of refer to the owner, any stlecc-scar in interest or Successor in control of the properly referenced in the Notice of Intent, supporting docurnents and fl-tis 0,1,(fex, of(A)TI(IfitiOrK The N ACC s,11 a H, lee nc)tificd ill Writing within 30, daYs of all transfers of title of any portion of property that takes place prior to the issuanceofa Certificate of Curnpliancv, 24,. The conditions of this decision shall apply to, and be binding upoll, the applicaut, owner �, % n � i rl rftcl,cst or clontroll. These its, employees arid. aft and 'i "sig s i P , offli&.Itions s"hall be expressied in covenants in all deeds to succeeding owner's of portions of the property. 25, VII&EITe to coin ply with all conditionssialed herein, and with all Felab-.1d 5t'atIItC5 and other regulat-ory measun N',, shall bi,- deci-vit--d ('rwse to, revoke,or modify this Order. 216. TI-us Order dues not grant any property riglits or mly it does not ailt1wrize any injitiry to private piroperty or invasion of property rights. However, the NACC, agent of the,NACC cn., the Deparhi.-lei-it of Environmental Protection (I.)EP) r p - - and inspect the propert y at all reasonable ti�me�s until a r(sorves toe, ight t() ente-j� Certificate! of Compliance is issued, to 'evaluate conilitiana, witti this Ordler of Condibous, t[w. Act(410 CNIR 10,00), tfic N orth Andover Wetland Bylaw a-nd RegUlatiorts, and may require, Lanny infoirnation,measururlwnts, photqgr�al'Ais, Sallein 1.761 Street- DEPFILE It 242 1- 1843 observations, and/or, materials, ar may require the subinlittal of an),, dala or i 11 f on't I ZA h()I'l C 1001 W'i ed 11 ecv.ssa t'y Ii,)y th t, N A CC for t 1)at c.,%�a 11 ini ti on. F u rtf u,r, wo rk s hia I I be halted oil the site if [lie NACC, agent or DiEP determines that any of the work is not iii with this 01rdvri of Col-Ations, Wark .9hall niot resurne until tf`[(-- NACC- is satisfied, that the work will comply and has,so notified the applicant in writing. 27A."his Order do,esnot relieve the peri-nittele or atiy ether person of the necessity of complying wAiiith all other applicable federal, state or local stat-utes, ordfilarices, b)'71.aws, or 28. The work aul.thorized ho r(al I'll d(:.l.,"i Within tfir(!V,yi qrs fMVVI the di ate. Of this order. 29, "FEN is (I)rder inay be extet)ded by the issuitie, authority for one but not tiiorie than two periods of up to, one year each -upon application to the, issuing authol.rity at least thirty Irior far the,.., xj,�JrIatj()p ofate () this 01%I ( fie i- tf) Sei 83) oOhe Nbrith AyydavOr Welland Regulations). 30. The NACC reserves the, ri, it to aniend. this Order of Conditic),lis after, as legally (.,) ditions ad V i h sic,d ut)hc 11('aUJT'ilg if 1)'IaJTIS car` Ch'(31111841TIC08 are ("I'lang. ed i if riew C n P or inforination sic) waTrant., 3.1 1. Whiere the Departnietit of Environmental Protection (DEIJ) is requested to make a de t eri-nina(ion and to issue, as Sul-)erseding 01(h-Tr, the Co,ns e ry a ti on C'uniinlissi on S ha II be 11 Party to Lill ageticy Prioce.edings and heariltigs beifo.re than .Department. 32, 11w NACC fiuds that th(,� filterlsive usit-,. o)f tht.1.1plarld areals" and btlffen, zot)e propo.sod oil this site,will cause further alteration of the welland res0l areas. In order to prewent any alteration (4 wetland ar(-as as twe.1-14y, fiV(,'I :f()(,)t i).N)- Disturbaiiicie Zr-ge and. a fifty foot (.-50i') No-Construction Zone- -,hall be establislied from the edge of the adjacent wetland resource area. Tile Conservation Adraillish"ator arld/or other as of the N ACCdo not have the authority tc) waive flaese setbacks as established Linder the local bylaw., No disturbance of existing grade, soils or w"!gUtaltioll is Pern-litted in, t4c zomc, (SeeSecith),ii 134 &Appetuftx Vq Hit!, '3 f lo'cal R"e-gulaholls). 33. This document shall be included in all construction contracts, subcont-racts, and spi,xiFicatioiris dc ling with the woi{k prl::)Ix)sud arid ,iJitall supeirsedc, arly cc rlflicting contract reqUirenients. TI-Le applicant i assure that,all contractors, suilocointracLors, al-n(JoAhcr Personnic,''11 pvrforniiing tile po.rrn wo ittitig irka. re� fully awa,r o e f thc pernlits terms and conditi.olls. Therelafter, the contractor will be held Jointly liable for any violation of this Order Tesuftfi-lg from fzdil.m- t,a:),conq.fly with, it-S C10111(litiOTIS, Salieni 1761. Strect - DE P FILE # 242 - ][841 34, 111(1 Ownt.11"S of the their i succ(,114',ior.,�, ill titki, agrec, that tine order does not in. itself inipoisei Upon. tine"row n any resp,onsibility to maintain the proposed drain,-age systici!x1,11 and, I shlll not IiiIIAC. f0l' iMy daynage iri the event of failtAre. By acceptance of this, Order, tine owner, agree to indemnify and hold harrnle,,ss to, the Town an.d ate, residents for any diaiui,ag ii.ltbl bu ta 1"Ac to a ttera ti orls u ndit,rta L-,n on dais Property PLII-F.Lrant to, the Order . lss.L➢ance of fine se, Conditions does not in any way imply or certify that the site or doiw.nstreairn areas will not bealjlrjcct to,fk:)o,di1-qjr, LAIDYTTI daill-wge or any other forryi of water claniage. Maintonance ,of the drainage system, if accepted by [he Town as part of a public way, becornies the respol-11sitiflitY of the Town. 3 1 5. Issuance of these Conditions does,not in any way imply oil., cel,'fify tha t thif.: SitC. OV doww;itreanl areas will r1ot he "subject to floc')ding, storin datnage or any other,forni of water damage. ......... ............. �'ki'6k-i'qCONSTRUCTION 36. No,work, shall be Undertaken Until all administrative appeal periods .from this Oricter hove elapse or, if such an appeal has beeil fitcdl, 3,iuhl all, procc.vidings before the., Departn'lent or Coort havie been conipleted., 17, T],iis Or der shall Eyc recorded, in its entirety, by the applicant at the Registry of Deed, inunediaLely after the expiration of all aj--�peal periods. No work shall be uridertaken. i i ii 6,1 the Fir-i a I Ord er fi as In:,oi i T-ce c)rd.t,cl i i i t h c, Reg is,try of Deeds or than e I a nd Co L�rt for the district in which time land is located, will-Lin the chain of title of the affected property. In the case iof recurcled, JaTid, fl-ic Fh-uil, Order, shall also be rliote-d in, the Reg,istry'si Grarutor I nclex undier the name of tine owner of the].and LLPOI-I which the proposed work. is to be iJ.one- In the case of'register eid. laud, the Fina I, Order sh�,ll I ahio bU TIOt.C'Cl Otl this Land Colli,t Certificate of'Title of the owner of the land upon which the proposed work is to bei done. The recording information shall be submitted to the North Antfowll-COTILIKIT,VaItioTl on the. forral at the end of this, Ordcr prior to con-imencenient of the work. Any Order noLrecorded by the applicant before work. conu.nences may be recorded by the NAC"Cat Hie i.1,I)p4ica Tit"s expensci, 38. A check payable to the Town of North Andover shall be provided in tlie,� amount of Y 0"1",t Own COLInsel, "Fown Treasurer, and the NACC, and shall be! Posted with the NortI.I. tlrri�),ugh thc, NAC( I)ef ore co tn rrtenceni e i i t of°w ork. Sa id deposit of money shall be coinditioned on tine completion of all conditions herecif, shall besiglined by a p,arty or partie satisfac".t011y to the N ACC'� and ,Tow Counsel, arld Shall be released. after i completion of the protect, provided that pirovisiorks, satisfactory to the NACC, have been irtade for perforl-TIOncC, of arly con(fitioils whk'".h arit, of C.(�)rii ti till in nature. "pine appiliciant rnay prop,o,.,;Q as ii-tonetary release schedUle keyed to completion 76 `�k N DE,P?.�,h "242,19'13 N�,A C K Pu:Eii��m� L" L.— - Saleni 1,761 Street - DEP FILE 9 242 - 1843 of specific portions of the protect for, the NACC's review and approval. This condition is issued under th,e authonly of the loc.aJ Bylaw. 39. A sign., visitfle from [he street/ shall be d1splayed' art the site iaot lass thui, two squar(-.!, fe'Ot o'tr n1ore thal') three square feet insjzc� bearing the words "Massachusetts DEF, File NUniber 242-1843."' 40. The applicant shall renlove U.-le Piles of Woody deb,]'is that are located can tlue a,butter's property at 50,Canipbell Road. T'hese areas will be insPected at the pre-constrUCti011 meeting with the Conservation Administrator. 41., As, noted on the approved plan, the trash and debris pile located off the southeast side of the house shall b(,a renloved alld dispo'sed properly, 42. Prior to construction, zurid in coordinatio.1-i witla the Conservation Deparhnent, the. edge of flie NI)Z/WUtIIaTid IXI.SIOILITCO as r1oted op t e, ILJ�I 'C' 11,1041LInIon'ted h q�0-P�jgrl Shall b with 20 ivetland markers to be placed oii weather resistant monurnents (Le. 4x4 of mull treate�d P,C)Sts). Said i'i�i�arkcrs shall be ov(11"lly rolighly Ewery 30 fa slia.11 incorporate the following text on.their upland side. "Protected Wetland Resource Area". This will designate their sensitivity ancl assure no further inadvertent ertcroac 11 rnc�lit into the wetland. Said niarkers are available for,purch'ase ill the Conservation.Department at Town Hall. The applicant shall instruct all. agents, Lo 0.1 4;/lesset's/11)n d sca pers �a n d a I I perso rts t ,I ftig, ov �,r t XPI�IiTl these. nu.irkon; to buycv a ( C property from the applicant. These markers shall remain posted and be rephced as I'U'cVS5W"Y in jvrpchlity' 43. Does the Conarnission want to require perman.e.rit niaa'king in the field of the property boUndary, between 50 Campbell and the SUbject site - wanly that part of the property line which falls within the Con Com jurisdiction shall be marked. 44. No changes to the approved plan shall be iniplemenfed in the field until written approval has been granted �h the NACC. Any changes in the subinitted plans caused by 1-1-Le, a p plicant, arto ther Board's decision or resulting from this Order of Condi t ions rntist tx, subrriiitted to the NACC" fiar pr,ic)r to in°ipl[CTY[ell ta Iti OTI, If tFa, NA1("-'C'. finds said changes to be significant, the NACC will call for another public hearing, fat the expense of the applicanf). Within 2-1 (lays (.4 the cios(-! ,of sad, public, he,alxlng thv NACC will issue an ainerided or, new (),rder of Conditions,. Any errors, fOLInd in, the plans or infori-nalion su.bni.itted by fhe applicarit shall be cons',idered' as Changes. 45. it is the responsibility uf tine applicant, owner, to ensure. that all conditions of this O,rdej- of onditions are cc)tnplied with. "I"he proje.,ct etigineer and irs are to be r po:vided it wh.a �copy of this Order of Conditions and referenced. contrLcLo of 17'(Pll FH PY, ,,o�, 17 k'6 3 ",,"A� Salem 1761 Street - DEP FILE -9 242 - 1843 46, Wetland flagging be clii,eckod prk,-ir to start of con,struction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the ap,prov'cd plal)(S) tht-OUgIlOtAt ChO fift..' of the Project i'ou-1, urifil a Certificate Of Corn pharice is issuedso that erosion curttrol measures can be properly placed and %Votlzu-id inipol(rt's czu-i ho., I-Tioniturc.d" Liuch harviors shall [)e ch("(Jq'.d ancl, n"I".1lacc"Cl as' necessary 'Lind. shall be maintained until. all constrUCtiOn is complete., 47, At an minirnuni, as row of stakoci 12" 111U.1ch sock a Filtrexx:S',iIt'S'oxx or equivalent), shall be properly installed between all construction.areas and ,,vetlands as shown on the plansapproved ancl i%,,feroricc.-d herein and shall be insf),ectod' oricl al)proved byti-10 NACU, or its, agent prior to the start of construction and shall remain intact until all dist-urtxxl awas have be(,,ri p(,!riiiariently stat)flizod t(.,) P"T"-C'vvnt crosiori, All ackliti(yi-iad erosion prevetition and sedimentation protection measures found necessary during cu,nst-rucbun shall be implernerited a[ die direction of the N.ACC or its agent. The N A( C rc�scrw� tho ri additio nal conditions on p ortions of this project to ght to inipti.w., L mi tigate al inip ac t s new could re s cult from site erosion, or any no ticeable degill-d ar tion, (.If'sl.i rfau wat'er (II.Tality discharging from 01"o site" FOT� (,XO'T:I"I I-)I v/ installation of erosion control meas tires may be required in areas, not showrL on the I-j,l,a.n(s) referenced in flats Order of Conditions'. Should such installation. be required by the NACC, the yshall be installed within 48 hours of flie Cominission's reqUest. 48, The applicant/ 11 ha ve. ciii hand Lit the start of aT,,iy soil d isturba nce, .removal or stockpiling, additional 50 fee( of inulch sock and sufficient stakes for -fly for Ov s'takhi'l-r cow��red the oleji-iieuts, �,-nid bo usk,!d oT, J emergency erosion problems and shall not be used for the normal control of erosion., 49. The erosit',)n controls Sha 11 'sarve as the I in'lit of work. Workers should be h'if ori-ned that no use of machinery, storage of machinery or niatexials, sbockpilirig of soil, or caristruction ac-tivity is to ocx-tir tx,.yorid thi.,; time at arly thric., 50' 'I'lle applicantstiall (Je,sigl-llatc as W(atjan'd 'Sc kn-ltist ((.)I' (.)'tfw�r asapproved by the MACC or its ,a, as, an "Erosion C-ontrol Monitor" to oversee any emergency placenaenL of controls and regular inspectiorl or replacennenL of control, devices. Proof of the retaine.d ni.cpriitor must ire subtnitted. to the Conservation Department orn letterhead by the retained consulting firm. The name aAT'Id 1,)hc i,,! mnurr'rrl;rcrr' of tho cl.Tosiori c.outrol triun1tor must provided to t[Nol NA(I-C' in the event fliat this person has to be contacted, due to an emergency at tine site, during any 2471101U PCII(XI, fi-Itcludiii;g week(nids. This person shall be given the aiuthurit'y to stop construction fear the purposes of correcting problems,with erosion control,. The Envi ronm enta I Prof ess ion a I mill immed iate I y notify the Conse rvati on agent ofa ny Inatter Chat requir-c"', attentionlay the Cornniis,sion or the wage nt, 'I"he tn co ion control monitor will be required to inspect all such.devices and oversee cleaning and the PJC)Per (jiSPf,),I,'�j1 ()f NA,'aJSte PI.-Oducts, Cle'�Iinilug"hall o-lh'ocp ��d P( silt. 7,,5d 'Pc""'Iofl Pi oc 7,""4 -.2a — : - ............. Salcin. 1761 Strect- DEP VILE # 242 - 18,43 51, At feast once during e, ach wc.,el< in coristracliolN aicfiviti('M OC-C.111N aura-Sit(" OTICI fill, as long thereafter as grou.nd, reinains unslabilized, the applicant shall submit a written re.port with Pllotcpgraphs ft'orrli the Corihol Mouffor" to, fl-w Na` CC ccilifying �2 that, to [lie best olf his/leer knowledge and belief biased oil as caref Ul site Inspection, all mn'�l' is 1)(,iylg jwrf()rrlw(I ill, With t-his Order of Condilions and that- approved setbacks, Lire being adhered to,. 'I'he erosioticontrol rnonitior alust visually inspect all s,edirrientabon/erosion control n-teasures and assume responsibility for their inaintenance on as Nvelekly basis and that thc.y are fUT`I1('fiOrliT'Ig, Hs inturulux], In addition, ,all wetland resource areas niust be visually inspected for siltation, turbidity, and/or othie.r water qtu,'il'ity irri,pilict'N' Tho Frosi(I.,ni 0.)nh`ot M, ,�.Mritor shall be on site (,hil'ing and/or following as inajor storm event. of 1/2" inch of rain or greater (2411our event) to min aarnMc that soi Is and erosion controls are, adequate and secure. 52. Prior to any work corru-nencing oll-175ite, the applicant shall submit to the,NACC. or its Adrninistrato:r for rc.view and c(MVITu"'.71t, �i dicwtailed worl� of constrUction. 53. 1.1'rior to any work cit-.)rninenicing on site, it is the., responsibility of tha:n al-,q),lica lit to procure all other applicable federal', state and local pernails, and apprfavals,required for this project, and no work -within the Conimission's jurisdiction shall cornincrice Until all other state or local. perinits, approvals, and variances have been obtained. This is to ensure that impact t0jUrisdictional areas Lire avoided in, the, case that any such pe�rmit i s clei.�ie or wiffihield for any period of tulle, thereby maintaining the grit of the resource area or' buffer ,one until such th"ne all appvovals are granted. Note: The Building Permit"shall have been applied for at (lie tinie of as pre- Co It al�v(j' Col�lsurvzltion nstruction Ineeting With the Cor'11101"W Itioll I Department. sign off will not be granted Until pre-const r tic tion conditions are satisfied. 54. 717he, applicant and/or the legal oivner of that portion of land upon which these Orders Of Cundiltions have been placed sliall provide to the NACC prior Lo, transferring, fix assip,11 i n g a 11 Y, P Orti C)t I of sa i d I a i W to a t'l other, pa rty, ,,;u bJec t to so,i d, Or t�r,- of Conditions, the "Compliance Certification Form Affidavil" attached via "Appendix A" siepl,ed uridcr th(' l"nul'IS, �'Iruj of pe°rjury' "Aatb-ij; that sakl applicant andjor owner has read these Orders of Conditions and is in coin pliance wit'll each and every (:uruhtion. This cl rcuurnnauant slaalll apply to each of the conditions referenced herein and shall be provided to the Conservation DePar,ti,nertt at least five (5) business days prior to, the closing of said land transaction. tfile 55. nce t h esc, a bove tri en tio ned pre-co ri S ti-u(,,,ti oT I rut:TTIIA�n'lt'q a I'v c applicant shall contact the Conservation Office prior, to site preparation or can Is h"I'l(I ti(),1-1, rcnrllGl, shall al'y"'aT190 with an.NACC representative, the contractor', erosion control monitor and the a.p.plicat-it to ensure that all (.-)f the ded in all (.1,nditions faf this 03-cfer are This Order,shall be inclu Sideni 1761 Street - T)EPTILIF 9 2,42 - 1 41 corlstructiotl c('111,1tvack" subcoritra('L'i, and spec!ificatimi.s dealhl,g, with. the. vvovk P proposed and shall supersede any co�rdlicting contract requirements. The applicu-it s-Itall assu've that Lill c('),ntractors, arld OthOr j')ff"i0T11'1C'1 the permit I ed work are fully aware oT the permi I's terms, and condi Lions. Thereafter, the coritnActor Will lx:� 4old joJT1111y liable for any viola1ion (.,)f fl-lis Ord( r of Conditions resulting from, failure to comply with its conditions. "I"he applicant err contractor shall notify the NA(.7C in wrifing of the ideritity of the on-site construchon supervisor 111ired to coordit)ate conistructio,ii and to ensure co,niphatice with. this Order. A reasonible period of time shall be pro:vided as,notice of the pre-construction meeting, (e.g. 72 JISTORMWATER MA.NAGEMENT CONDITIONS 56., There shall be no increase, in the post development discharges from the storm drainage systerti or ii;ny otht,11- .1, '-1 de-velopnient watershed boundaries as CUrrently depicted in the Notice of Intent and ap,proved by this Order af Condiffou-S, ride specifically approved in wflfili.ig by to conmlissioti, 57. Waiter quality in dowrr gradierit Bvw's ,.,;[Iall 11ot differ sigi-lificanfly followirig, completion of (lie, project frorn the Pre-development conditions., There shall be no, illtO Wk,t4arrds or watc-7r bodi(s froni disc harge 1, leaving the site., . .. ........... ............... . ... ............................. ............ DURIN ' CONS'I'RUCTION .................................. 58, Ul)()TI 111(T�,Jl'nling w,(�)vk, the applic°ant sfu,,fll aiiibrriit Writt("ni" vc.lx)rts evel'y month detailing what work has been done in or near resource, areas, and what work is, an tici pa ted to be done o ver the rtex t peri od. 'Phis w i I I u.pda te th!c consh-u.c fi un sequence a nd ca ii be as part of the Nveekiy erosion control reports. 59, Ariy fill used fi coimelction with this projeetsti"�.111 be dean fill, contoitlirle, no, trosh, refuse, r Ubbish or, debris, ifiCl LE di ng }curt not I imi Led to loom ber, bricks, plaster, wire, llaffi, paper/ ca:rdboax(f, Pipe, glass.J proc ',Hicd glass aggregate, cul,-Icretef recycled concrete aggregate, fires,, ashes, refrigerators, motor vehicles or parts on any of the faT.,egoing. Any .fill irnported. to di,esite must be accompanied by as certificate of oT,.j "A or an analysis certifyhig cleanliness - whichever is most as pplicable as determined by the Conservation Commission gT its staff 60. All exposetl soil finish gade surfaces shall be inuned.i.alely lariciscaped. and Stabilized, or loamed, seeded artid mulched, with a layer of tnul(�-J-t hay- All, diStUrbed area's, n-1U,.,-,t be graded, loarned and seeded prior to Novernber lsu of each year. Outside of the JL 11 1 k, 21 7, N F I wJ & -'qp ctn I I: 4 .......... Salem 1761 Street - DEP FILE 4 242 - 1814.3 gxowing season, exposed soil fini'sfi' egi'ack- wiffl'ar layer of mulch hay until clirnat-e- conditions allow for seeding., During, CCjnStrUCtiC)n,, arty ar'ea. of exposed soils ffiat will be left idte-: for 11-lore tfian 30, ckiyi shall be stabilizect With as hiyer of rnulch hay or offier means approved by the NACC. 61. Associated pavement and roadways shall be swept at least weekly or as directed by flu, Erosion Corib'ol nionitor, thc Site 5-ul.-,)ervisor, Project Manager, or Conservation staff for as long as the site rernains exp(-sed and If TM1t(-r411 i,"", hraAcked 1-m"!'Yolad the ("Onsbalction entrance onto the adjacent roadway, it will be swept Up daily. 62. The construction access for the project shall besivept daily to remove seditment deposited by V(I'Niclos acces'sil-ig doom rite and. avoid tracking on to public right of way. 63. The constrLlCti011 a,CCe,';S alid all aroil" lis tfle cml'te.] reaches of the 200' Riverfront and. OLI[Side the 100-Foot Buffer Zone. At no tini,e shall be stockPiling o'f 81�)fl any otfu'.r matei,hiIs occur on the wedand side of the erosion. controls., 6 . Storage of construction vefi.icle and any associated antl acfivitil(!15 shall be uutsid:e of the 1010-foot buffer zoiae. 65. All. waste generated by, or associated with, the construction activity ,shall be contained wiffiin the Iiriiit of vvofl.�, andaiway fi.,om auy wetland resource area., There shall.be no burying ,of spent cons Lr uction materials or disposal of waste on thvsite. by any offlur at the 1 . '111'e applicants fioll ni�ain,tain ctuml-,)sters (or ot-her suitable means) site 111,104"1 Till, for thestorage and removal of siucli ,.spent construction rriater4fls c")ff-situ, Howevel, no tuTara In JPSJ'ej.°� Will be, allowed wi thin 5,0 feet of the edge of W. 66. If used, cement trucks shall no[ be washed out in any wetland resource or buffell MA10. arc.-a, Any dePosit of comont or con�(.-T'.,cte Products into, a buffer zone or wetland resource area shall be,removed by hand. 67. Accepted engim,erillg, Mld C(.)I'lS 1711.1("ti Oil S ta n d a rd s a pruced ures shall be followed in .1 the completion of the Project. 68. During and after work on this Project,there s'I'lall bt, no cli�;dlmj'e of fuld" (.,)T art-her pofluta.nt,-s irito any wetland resource area. If there is as spill or discharge of any pollutant durinp any pliase of construction tho N ACC wlrarll tn" TIC")0f."i"Ied by the applicant withirk one, (1) business day. No coinstruclion vehicles are to be stored within 100, feet of wetland resource. urea'~, and no Vehicle ro.filding' cauluriilnannuyrnt tubricatio'n, or i-naint-enance is to be donewilhin 100,feet of as resource area., 7,d 7 ' I� �3 1�31 F u k" Salem 1761 Street - DEP FII,F 4:242 - 1843 AF,'I'EIR 'ON S'I A UCTION permitting by the Conservation Conum-iission. '70. NO Under grO Lind storage Of f Liel oils shall be allowed on any lot within one-hUndred (100) feet of any wetland. ar e a. This, coll.difion shall SUT'Vilve this 01.1"(Ier of Conditions anidshall run with the title Of the, property. "'I"his clotidition is issued Under I e authority o h , fi:heTown"s, Wet-landl:)rotectioi-LB),,I.aw., 71., Fertilizers Litilized for landscaping and lawn care shall be slow release, low-nitrogen tyPes < 5%), mid shal I iwt be use(II wfthiu, 25, ft,.'et c)f a res,uur('( aaucara. R!stickie,,s and herbicid'es shall not be us�--,d within 100 feet of a wetlarid resource area. This, condition sh,all ,survive this Order of Condi6ons and shall run with the title of the property. This conditioll is issued undc.-11, the atallority of ti'le 'Fawn's Wetland I-It-ote..c.tion Bylaw and shall remain in perpeLLIRY. '72. Nosodhurt,-based, products shall be used for control of ice or snow wltl-iin 1.00 feet of the wetland. 73. There shall be no dun-iping of leaves, grass clippirigs, brush, or other deli-:fis into a we.tlarEcl areas or thic, 25-foot No-Disturb zonic'.. 'I'I'lis, conditiOn' shall vernaii) in perpetuity. '74., Uport completion of constrUCtion and grading, all diStUrb,ed areas located, outside resumve areas 911all be, stabilize,d perni,auu ently agairist-erosion. This shall be done by Loarningand seedii,)g according to NRCS ,;tandards. 14tabifizatilon will be co,nsi.iderect comple te once full v ege ta Ii:v e co:N7 er has been.achieved. 751. Upoui approved site sta.0ilizatiork b), tine crosion. c-urth.,ols shall be renioved and. properly disposed of and all expi(-,�s,ed unvegetated. areas shall be seeded. 76. U pon coni plet ion of the proj ec t the ap p I ica nt shall s u bm i t the fol lowing to the Conservation Commission as part oaf request for a Certificale ofCompliance: a. WPA Fo r,m 8A - "Request for a Certificate Of Cliotnpfianu��,." b. A letter from the, applicarif requestin.g a Certificate of Compliance. . I' ti c- c- natne and address of the current lanclown(n],. d., Signed statements,from the individual property owners shall be submit Led with ffie. request for a Cerfifiicata of Con'ipfiance inclicatir,tEr, that Owy read and understood the recorded Order of Conditions prior to purchasing their property., el, "Flu.. I'lonu, orld mjdreq"i of tfle imfividtukj/ttvllst or coivp(�,Wuafiorl to, "41oul thc! cornphance is to be granted. f. The sft(,,ct addteSS Tylap/parcol," 1".11.11mber for Oie ject, P 11 76d ',�aocrvi Fff V U, I Ho.0 t" cmd�0""'j15 Satent 1.761 Street - DEP FII,E 9 242 - INU he DEP file flUmber., fi;. A ",rittvii stahnnc;!i-it frc):M: an Plegistered Professional Civil Engineer (and/or Registered Professional Land .Sw-Veyor) of the C.Oftif Y in,e,-,thalt OIL' W07'k Ix"V. T1 condlucted as sh.own on tI.-Le plan(s) and documents referenced above-, and as conditioned bY tlx.- C.1 0 I'll tIIIISISI 041,. L Check, payable I-o the Town.of North Andover, for Certificate of Compliance filing, fee, (inquire,witf-E Cnnserwitit),n Doparhrric.nt for fee rat-e). An "As-Built" plan prepared and signed and staniped L�jr a 'Registered Prc)fessiona] (OMJ/or Registered Profc,,ssif.>nal Land; ur;rveyor;° of the Commonwealth, for the p u bi ic record. 11i i s p I a n will' ne.I ud'(1: "As-Built" post-developtnent elevations ref all (IT-ililla'j"c' & stornlwatur management,s,LTuctures constructed witi-Lin 1010 feet of any wetlarid. resource "'As-BLIM" posi-development elevations and grades (.,)f all filled Dral'tered, wetland T-(80311"CC including the encompassing buffer zone which is, regulated. as a rcsou rce area redeem thie, local Wettand Protoctk)n By4ivw,, > Distarices from structures ter wetland resource areas. StrL[CtUres ifICILIde (but are not linifte-d to) septic SYSU'1118, a:11(11(11MOTV% fcj-ic(s, sbk!ds, stoiae walls, pools, retaining walls, subsurf ace, Utilities and decks. A I i i ie s ll o wi ng, tfle I i i i i i t of w ork a Tii(,I t1i c ex tvii t of existing erosion c oj,.Itrol devices. "Work" includes, any distUrbartce of soils ic)rvcgletaflon. 87 The following special condition liall survive the. issuance Of a C'('rtificate of Col'upfiance (COC), fox this project: 25' No-Dislurbance Zone and a 50' No-Construction one. FUtUre work witilin ,100, of exis tin g woklru] rcN,(�)urce Will require an separate filing with the NACC of the Regulations for perforinance standardswiffiin those zories) TFic C(�),nst�.rvafic)ri Adrnini,shator and,/far futtie'].- agents of the NACC do not have the aUthority to waive these setbacks as esta,blis[ied under t1lie. local Bylaw (Candition. 432); Resource Area Marker,s, onclition It Discharge or spillage of pollutants (Condition #68); °'FFl e. existing grave] drivu",q I not I'le pave.d witt'llout 17roper revlew,V al-I'd pern-dffing by the,Conservation Commission (Condition 9),; Prohibition of ondergrouirid Fuels (Condition #70); Linihations on the Use of fertilizers, herbicides, sodittill based de-icing, 11100111ds alu] pesticides ((...onditions #71 & 7'); >� No dumping of leaves, grass clippings, brush, or other debris into a wetland I'(11801,111IC-c areas or the 25400t No-Disftir'b Zone (Condition.#73)� S nip SU,c,d DEP FJ,, ` Salem 1761 Street - DE11' FILE 4 242 - 1843 APPENDIX A - AFFIDAVIT ............— on oath dii h�ereby depose and state�: (buth(mized agent apl%anl a0lor current owner) 0 1 EA S E CH ECK A 7-LEAST ONE BL OCK), L, lani Lhe-.— auf ( POAHMVWHh appucaQ (applicant Tiame or COUIPaU37 name) the applicant upon m4mm Coder of Cmkhhmm have been placed upon by (DEP ar NACC,nuniber) the North Andover COTISerVatiOn(.'OTT1TI1 iSsio;n, &hn' 2., 1 ani the of (Position With Owner) (9W]WI,name) the owner upon whose land girder of CondhOvs- have been placed Up by O)HP nr PDX7 number) the Noxth Andover Conservation ContEniss.,i4ml- 3. 1 hemby allkmond acknowledge that I hove imadved Ad 01rdier of Conditions ............ and have re&d the smou-,and urm lerstam I each (DEP File fl, and every condition which hias heel set forth in said Order of Cbndifions,- 4. 1 heret3iyaffirm and a&n.owledge IS= this; day of........I I in.spechmi wid Property to ether with any and a.11 iniprovetitents, which firavu! bean TI-tiic:4• to teas:samm and hexelk)y cerffy 1haL eacIt and every conclificm Net RM inOrdcr of Conditions __ — .... are presently in coniphamce, (DEP File N), 5. Ihmebyaffirn�iai�idacktiowldgeMmtfiiisd�ti,c!uTliiit!i-tt%villb(ATl(',l,l(',dliponb,), Li.ic, North 2uidover Comervatkni(2unirnissicni as mt as my InotentiaJ Nypers cof ,said PropeqY which is subject tu➢said Ord('°r of Coilditions PIED FHc 0) Signed under the pains and pena Mks of pe jury this,.—,stay of .®.......... 19 (Si gnat-ure- autharized agent of applicant or owner) "16' SjJen� "�neua DI F I;m 0242 IN I; !qAQnHn?U9S& SPAI LW ARMS