HomeMy WebLinkAbout95 Old Cart Way - NACC #295 Small Project - Permits #NACC #295 - 95 OLD CART WAY 6/22/2022 CONSERVATION DEPARTMENT
Community& Economic Development Division
Mr. Thomas Murtha
95 Old Cart Way
North Andover,MA 01845 July 1, 2022
95 Old Cart Way, North Andover
Installation of Two (2) Pergolas
Conservation Conditions of Approval, NACC #295
Pursuant to section 4.4.2 (A) of the North Andover Wetlands Protection Regulations,
Thomas Murtha, filed for a small project for work proposed at 95 Old Cart Way, North Andover.
The work involves one approximately 28-ft x 14-ft x 19-ft x 16-ft with pergola with six (6) 12-foot
high 6"x6" vertical redwood columns, and another 12-ft x 20-ft pergola, supported by six (6) 12-foot
high 6"x6" redwood columns. All columns will be mounted to concrete footings using sonotubes
dug by hand. All sonotube holes will be dug to a depth of 3-feet by hand after removing 1-2 patio
pavers. Proposed work is located approximately just outside of the 50-foot No-Build Zone (NBZ)
to the Bordering Vegetated Wetland (BVW) and is located within a previously disturbed patio area.
During the June 22, 2022 public meeting, the North Andover Conservation Commission (NACC)
found this project to qualify as a Small Project Permit and voted unanimously to approve this
project as proposed under Category"L" subject to compliance with the conditions listed below. The
project is approved only as it relates to the Conservation Commission and any and all other
approvals should be obtained by the applicant/homeowner.
** The applicant, Homeowner and their contractors are advised that NO other work on the property
is allowed under this permit. The NACC has jurisdiction over all of the wetlands and associated
100-Foot buffer zones and 200 Riverfront Area to the Shawsheen River on site and any work
that involves ground disturbance or changing the current conditions in these areas will require
permitting with the NACC. This includes,but are not limited to,house additions,pools,patios,
decks, sheds, fences,garden beds,landscaping and bridge installation, tree or
vegetation cutting/pruning. These activities shall be held to the current standards under the Bylaw
and WPA. but not limited to
All work shall conform to the following_plans and conditions:
RECORD DOCUMENTS: Small Project Filing Including:
Application Checklist,
Written Project Proposal prepared by Thomas Murtha,
As-Built Plan prepared by Sullivan Engineering Group, LLC w/
two (2) pergolas scaled on, dated September 29, 2020
95 Ok1 ay
11,a e, 1 o l`2
The following conditions are hereby mandated:
CONDITIONS:
1. All excess excavated soils shall be taken off site or moved to an area outside of the 100-foot
Buffer Zone.
2. A site visit with Conservation Department shall be scheduled once the project is complete to
verify compliance.
3. This permit shall expire one year from the date of issuance.
Should you have any question or comments regarding the contents of this letter,please do not
hesitate to contact the undersigned at 978.688.9530. Thank you for your anticipated cooperation
with this matter.
Respectfully,
NORTH ANDOVER CONSERVATION DEPARTMENT
Ta 71 or S. Andrews
Conservation Field Inspector
95 (')W ('�arr1, /ay . pia .4� � rarla;a:,n a�, rrain ppaaaaar� `a���a,.a,cary "�."' �ruQ,r��rl,�aa� amp "�vvaa � a:ag�ar4 as