Date: March 13, 1985
To M No. Andover Planning Board
From: Fire Chief Dolan
e Water TreatmenL F'1' ar7t
. x
I a:m'ka sure that the Board of Public Works will contact us
relative to ar'n; ' underground sLoraqe in the water shed of
fuels or flammable8 .
tTr d� c,,r MC'.'�L Chapter 148 SeMion 26G this building must:_ bc
fully sprOklered.
The fire protection and Ci.eLechion system must also be
connected ho the municipal fire alarm y8te .
kill am Drylan''. , W77
" S NA)K t: II.w _ E( I t' ORS V' '�/E S
� .
I
ILIK� `!� �
A BOARD OF HEALTH
120 MAIN SI2E2I
; Am+
« NORTH ANDOVER, MASS, 0'1945 TEL. 640
Merch 14 , 1985
Planning Board
No .Andover Re : Proposed Water Treatmemt Plant
Mas. Gentlemen :
Isis Board has reviewed yoef plans
for the proposed water treatment plant of the Lake .
We believe some consideration
should be gives to whether or not this new building
will have adequate room to accomo4ate a sub surface
disposal System should it be necessary to provide
same i£ the connection to Town severa&e is not available .
State a-nd local regulations moist be adhered to in the
event of Such a possibility,
Very bray yours ,
A
��k@1 Graf , a.a .
ma;mj
OFFR�'ES Town of
BU
th Andover
IL DING era -- .ORT A DOVE CONSERVATION
�
P'J., R CT
PLANNING & COMMUNITY DEVELOPM
MEMORANDUMA111111, �°..�:�fl
TO Paul Niman, NorthAndover Division of Public Works
Dons Kane, Lally ,ociat,
Tim Wheeler, Barletta Construction
HalLurie, Weston & Sampson
FROM : icha r Doucette, Conservation Admini tr for
I E : Water Treatment Plant
I inspected the Water Treatment Plant site an June 20th. Please
address the following issues
1 . The ditch at the base of the excavation spoils one the
southwest portion of the site has been filled in. The purpose of
this ditch is to divert runoff and trap sediment from this fill
material . The ditch must be maintained.
Overflow rom the sedimentation pond nearest the treatment
plaarnt, is, seeping under the silt fence in one location. Pease.
bury the silt fence deeper if necessary.
� a
" u
Director
BUILDING �Jp,a'CONSERVATION
�'� d
PLANNING
PLANNING & COMMUNITY DFVEI,0'PMENT
REU
PAD I r T d' ', MAIN "T°E T I iNU LOP M,. TFIR W(VT E-R 'T HETT°W FIIEN11° Pt—i()Tv1'E.
ON OREAT POND RUM),, I HAVE CoNISLA.-TED (1141) EX(V111.1NED 'MU- PREfl
WITH THE HEAD ELECTRICIAN f-114D FIND NO, VIOLATIONS AF 11AI
T 1 ME. o
J J T i 1
K. Nelson, i r. e
a
p.
L
N'
7
y�
9
01
R
e M
Piprdor
NORTH ANDOVER
(508), 8 - 48,3
BUILDING
CONSERVATION +ci LEI V 11SIGN OF
TES TO: A NE KASPRZ,Y,Kf CONSERVATIONADMINISTRATOR,' ,
FROM: ERT NI ET`"`T' ," BUILDING INSPECTOR
.
RE: , PLAN /VOT'I E F" INTENTr WATER TREATMENT PLANT
DATE: AUGUST 5, I � I
PLEASE USE THIS MEMO TO PRESENT' INFORMATION TO THE CONSERVA—
TION COMMISSION AS FOLLOWS:
AN ERROR WAS FOUND IN THE' FLANS PREPARED BY LALLY ASSOCIATES
WHICH WERE SUBMITTED WITH "THE NOTICE OF INTENT" ." . THE LATEST
SUBMITTAL OF PLANS REFLECT ACTUAL FINDINGS OF THE LAKE
'COCHICHEWICK CONTOURS IN FRONT OF THE 1 TER TREATMENT PL ,1 T
WE AWAIT YOUR APPROVAL T" THESE DRAWINGSFILED IN PLACEOF THE
DRN,GB
T k
liAt L'q fi_f'. NELSUN Town of- V 120 Mzii s �r��s., 018,15
NORTH ANDOVER
PLANNING PLANNING & COMMUNITY DEVELOPMENT
ENT
MEMORANDUM
TO: D. Robert Kicetta, Building inspector
FROM: Arne Kasprzyk, Acting Conservation Administrator
DATE: October- 9, 1991
SUBJECT: Water Treatment Plant, DEP File # 4 -421
1 inspected the site on September 27 , 1991 regarding the punch-
list of wor to be done as noted in ray memo dated September 9.
my findings are as follows:
1. The area adjacent to the building at the end of the
stone drainage way is still, sparse. As you noted in our
conversation on October 8 , 1991, placement of
additional stone in this location would be acceptable.
2 . Two inch stone or suitable material has not yet been
placed at the washout area adjacent to the rip-rap
associated, with the backwash outlet. This area rust be
stabilized to prevent further erosion.
3 . The silt boom may be removed after the area adjacent to
the backwash outlet has been stabilized (see #2 above) .
4 . After the ground is somewhat frozen, the silt which has
accunulated in the lake adjacent to the backwash outlet
must be removed. A silt boor must be in place at that
time. The existing silt boom may be inspected and
naintained to this end or, if preferred, the existing
silt boom may be removed after #2 above is accompli8hed
and a new boom emplaced upon the initiation of silt
removal..
cc: Mark Thifault, Weston & SaiTLpgon
DirectorKAREN
NORTH
ANDOVER
(508) 8 -64S3
Memorandum
orarndu
TO, Bobi etta
FROM : Richard Doucette Q .; l w.
DAM * January 7, 1992
Water Treatment 'Plant
Today I inspected ,inn Water Treatment Plant as requested este and have
a following recommendations:
ns:
I• Install another ridge of stuns to act as a baffle within the
stone-lined Swale near the boat ramp, This baffle should be
placed just downgradient of the channel again where it ant rs the
stone-lined Swale, Road sand is accumulating in the channel
drain and will be caught by this new baffle,.
. Remove the silt fence from the boat ramp to the culvert
outlet.
., Monitor the exposed soil that has been covered with day
mulch. This, area should be seeded with grass and at in the
spring if necessary. once grassis growing, remove the hay.
4 . Remove the silk accumulated at the silt forma next to the
culvert outlet at the, lake shore.
,. Keep the silt fence in place from the culvert outlet to the
westerly ro rt boundary. This is particularlyimportant where
a small erosion gualll ► has formed- The gilt fence should be
rewired as it is falling down. I have some concerns as to
whether this area is permanently sfa ilized. The area should be
monitored closely during the spring rains.,
. Next Spring, a strip of vegetation ('as wide as possible)
should remain unmowed next to the 'lake to filter and slow runoff
leaving the site. This should be discussed with whomever is in
is charge of groundskeeping for the site.