Loading...
HomeMy WebLinkAboutSite Plan with wetland, buffers, dewater note 7-12-22 - Plans - 240 ABBOTT STREET 7/12/2022 NOTES 1.SEE TOWN OF NORTH ANDOVER ASSESSORS MAP 38 LOT 158 AND DEED BOOK 17,163 PAGE 349 E.N.D.R.D.FOR SITE � Nc e� s YFr oOaERC MAluOlL'EU RERs 2.DATUM BASE IS ASSUMEp_,BENCHMARK IS TOP OF FOUNDATION OF 240 ABBOTT STREET, ELEVATION=200 3 xr STAKES 3.SEE PLAN OF LAND SHOWING SANITARY SEWER CONNECTION PREPARED BY MERRIMACK EVAREEM �D OR METAL - AT A'o ENGINEERING SERVICES DATED SEPTEMBER 15,2021 FOR DETAILS AND SPECIFICATIONS OF I VALE G CONSTRUCTION. SITE 4_WETLANDS DELINEATED BY NORSE ENVIRONMENTAL SERVICES,TYNGSBORO,MA �. � ���a�Y yvG ��,��� 12 MULCH OOCK LOCUS NTR CONSTRUCTION NOTES x 1.EROSION CONTROL STRAW WATTLE SHALL BE INSTALLED AND INSPECTED BY THE 150.93' NACC PRIOR TO ANY WORK ON SITE. - 2.THE EROSION CONTROL BARRIER SHALL BE INSPECTED AND MAINTAINED THROUGHOUT 669 -e CONSTRUCTION AND UNTIL SITE STABILIZATION OCCURS. 06, 3,ANY SOILS IMPORTED OR EXPORTED SHALL BE PLACES BY END OF EACH WORK DAY AT ,r - - ALL EXPORTED SOILS SHALL BE LOADED AND REMOVED FROM SITE BY THE END OF H�'W;- EACH WORK DAY,NO OVERNIGHT STOCKPILING OF SOIL SHALL OCCUR. ' Ting LOT 6A 4 NO DEWATERING IS EXPECTED.IF DEWATERING IS REQUIRED,THE PUMP DISCHARGE SHALL g-- -- - S.F.) BE APPROVED BY THE DESIGNER AND THE NACC BEFORE THE ACTIVITY BEGINS. A, - IF DEWATERING IS NECESSARY,A DIRT BAG SEDIMENT AND SILT CONTROL SYSTEM SHALL BE USED AT THE OUTLET OF PUMP LINE_THE DIRT HAG DEWATERING BAG SHALL BE t LAID LEVEL AND LOCATED ON A LAWN AREA OUTSIDE THE HDD FT.BUFFER ZONE, AW FOR PRODUCT SUPPLY AND QUESTIONS, CALL 1-80D-44B-3636.DIRT BAG SIZING 15 VARIABLE AND SHALL BE SIZED BASED ON PUMP DISCHARGE ACCORDING TO THE `-1 g MANUFACTURERS RECOMMENDATION. as co T r avc IS 5.ALL DISTURBED AREAS SHALL BE LOAMED AND SEEDED IMMEDIATELY UPON COMPLETION RCAE M,rvEW N65c F 00. OF THE WORK EOAAURA �( E)o1—AECIPR ` 4) 9 a "A'EROSON mry TOOL MULCH IRIK oa _ aT NR-LIUH A a z w POECI N A sLEE-1- o MP�auH % �54331 ET: P <411 ��yE CONTRACTOR A � �LE gp� OTHER RK TO CONFIRM IN BLICAT IN OF IF, Ex Sr 2 PVC FORCE MAN e ON ETAL GILVERi '�"` PLAN ELF-ES SITE PLAN LAND/N NORTH ANDOVER, MASSACHUSETTS PREPARED FOR CARL, SCHWIRZ SRO ABBOTT STREET NORTH ANDOVER,MASSACHUSETTS 01845 DATE MAY 1S 2022 REVISED' JULY 10,2022 Ll SCALE, I-00' 4P`nOIM HE 0' 10' 00' 10' 60' a "LM0 K vg MERRIMACK ENGINEERING SERVICES WEND E g 66 O ER,STREET 1.ficisc�p6' ANDOVER,MASSACHUSETTS 0I810 "'V' a'AH` PHONE (978)475-3555 FAX: (978)175-1448 EMAIL MERRENG®AOL.COM