HomeMy WebLinkAboutSite Plan with wetland, buffers, dewater note 7-12-22 - Plans - 240 ABBOTT STREET 7/12/2022 NOTES
1.SEE TOWN OF NORTH ANDOVER ASSESSORS MAP 38 LOT 158 AND DEED BOOK 17,163
PAGE 349 E.N.D.R.D.FOR SITE
�
Nc e� s YFr oOaERC MAluOlL'EU RERs 2.DATUM BASE IS ASSUMEp_,BENCHMARK IS TOP OF FOUNDATION OF 240 ABBOTT STREET,
ELEVATION=200 3
xr STAKES
3.SEE PLAN OF LAND SHOWING SANITARY SEWER CONNECTION PREPARED BY MERRIMACK
EVAREEM
�D OR METAL
- AT A'o ENGINEERING SERVICES DATED SEPTEMBER 15,2021 FOR DETAILS AND SPECIFICATIONS OF
I VALE G CONSTRUCTION.
SITE
4_WETLANDS DELINEATED BY NORSE ENVIRONMENTAL SERVICES,TYNGSBORO,MA
�. � ���a�Y yvG ��,���
12 MULCH OOCK
LOCUS
NTR CONSTRUCTION NOTES
x
1.EROSION CONTROL STRAW WATTLE SHALL BE INSTALLED AND INSPECTED BY THE
150.93' NACC PRIOR TO ANY WORK ON SITE.
- 2.THE EROSION CONTROL BARRIER SHALL BE INSPECTED AND MAINTAINED THROUGHOUT
669 -e CONSTRUCTION AND UNTIL SITE STABILIZATION OCCURS.
06, 3,ANY SOILS IMPORTED OR EXPORTED SHALL BE PLACES BY END OF EACH WORK DAY
AT
,r - - ALL EXPORTED SOILS SHALL BE LOADED AND REMOVED FROM SITE BY THE END OF
H�'W;- EACH WORK DAY,NO OVERNIGHT STOCKPILING OF SOIL SHALL OCCUR.
' Ting LOT 6A 4 NO DEWATERING IS EXPECTED.IF DEWATERING IS REQUIRED,THE PUMP DISCHARGE SHALL
g-- -- - S.F.) BE APPROVED BY THE DESIGNER AND THE NACC BEFORE THE ACTIVITY BEGINS.
A, - IF DEWATERING IS NECESSARY,A DIRT BAG SEDIMENT AND SILT CONTROL SYSTEM SHALL
BE USED AT THE OUTLET OF PUMP LINE_THE DIRT HAG DEWATERING BAG SHALL BE
t
LAID LEVEL AND LOCATED ON A LAWN AREA OUTSIDE THE HDD FT.BUFFER ZONE,
AW FOR PRODUCT SUPPLY AND QUESTIONS, CALL 1-80D-44B-3636.DIRT BAG SIZING
15 VARIABLE AND SHALL BE SIZED BASED ON PUMP DISCHARGE ACCORDING TO THE
`-1 g MANUFACTURERS RECOMMENDATION.
as co T r avc IS 5.ALL DISTURBED AREAS SHALL BE LOAMED AND SEEDED IMMEDIATELY UPON COMPLETION
RCAE M,rvEW N65c F 00. OF THE WORK
EOAAURA �( E)o1—AECIPR
` 4) 9
a "A'EROSON mry TOOL MULCH IRIK
oa _ aT
NR-LIUH A a z w POECI
N A sLEE-1-
o
MP�auH %
�54331 ET:
P <411
��yE
CONTRACTOR A � �LE
gp�
OTHER RK TO CONFIRM
IN BLICAT IN OF IF,
Ex Sr 2 PVC FORCE MAN e
ON
ETAL GILVERi '�"`
PLAN
ELF-ES SITE PLAN
LAND/N
NORTH ANDOVER, MASSACHUSETTS
PREPARED FOR
CARL, SCHWIRZ
SRO ABBOTT STREET
NORTH ANDOVER,MASSACHUSETTS 01845
DATE MAY 1S 2022 REVISED' JULY 10,2022
Ll SCALE, I-00'
4P`nOIM HE
0' 10' 00' 10' 60'
a "LM0 K vg MERRIMACK ENGINEERING SERVICES
WEND
E g 66 O ER,STREET
1.ficisc�p6' ANDOVER,MASSACHUSETTS 0I810
"'V' a'AH` PHONE (978)475-3555 FAX: (978)175-1448
EMAIL MERRENG®AOL.COM