HomeMy WebLinkAboutConstruction Notes - Consultant Review - 1 SCOTT CIRCLE 8/9/2022 4 . North Andover Health Department (ommunity and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1 Scott Circle MAP: 105.D LOT: 0068 INSTALLER: Peter Breen — 978-687-7774 DESIGNER: V. Nemchenok /Bill Dufresne- Merrimack Engineering 978-475-3555 x 20 PLAN DATE: 04.08.2022 BOH APPROVAL DATE ON PLAN: 04.28.2022 INSPECTIONS Permit # 67548 TANK INSPECTION: 07.19.2022 S. Casey DATE OF BED BOTTOM INSPECTION: 07.19.2022 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 7/26/22 D. Ottenheimer DATE OF FINAL GRADE INSPECTION-7/28/2022 S. Casey SITE CONDITIONS ❑ Contractor reports any changes to design plan ® Existing septic tank properly abandoned, if present ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: 7/26/22 — Contractor reports all onsite system elevations needed to be lowered due to building sewer invert not being the elevation on the design plan and this was cleared with designer who reports adequate water table separation still exists. D. Ottenheimer SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ® Bottom of tank hole has 6" stone base ® Tank size and loading per plan ® Monolithic tank construction ® If monolithic, water tightness of tank has been achieved by visual testing ❑ If 2-piece, water tightness of tank has been achieved by water/vacuum test (circle one) ® Inlet tee installed, centered under access port ❑ Outlet tee installed, centered under access port ® Gas baffle installed ❑ If effluent filter, riser to finished grade over filter ❑ Riser with cover to within 6" of finish grade installed over one access port ❑ Manhole and riser minimum inch diameter ® Pipe penetrations appear watertight using rubber boots Comments: 7/26/22 — Original building sewer remains for about 6' off house due to exterior features preventing access. Outlet tee not located within opening on tank - Instructed installer to correct this. D. Ottenheimer DISTRIBUTION-BOX ® Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Even distribution observed ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to specified soil layer, as provided on plan ® Size of SAS excavated as per plan ® Sand installed, if specified on plan ® Sand displays few fines when handled ❑ 40 Mil HDPE barrier installed, if specified on design plan ® Laterals installed and ends capped or connected to header (and vented if impervious material above) ❑ Retaining wall material, location and height if specified on plan Comments: 07.19.2022 size good, sand good, depth good, c-layer visible 7/26/22 — Design plan calls for SAS to be 13' from dwelling. Field measurements show it is 13.5'-14.0' from dwelling. This might compromise the 10' lot line setback on opposite side of SAS. Installer to work with designer and investigate. D. Ottenheimer FINAL GRADE ® Final cover as per plan ® Loamed ® Seeded ❑ Cover per plan N/A Comments: DOCUMENTS NEEDED ❑ Certification of Installation Form submitted by designer and signed and dated by designer and installer ❑ As-Built Plan by designer BM = 100.00 HR = 1.64 HI = 101.64 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 4.75 96.56 Septic Tank IN 4.84 96.47 96.80 Septic Tank OUT 5.15 96.16 96.55 Distribution Box IN 5.40 95.91 96.30 Distribution Box OUT 5.52 95.79 96.13 Lateral 1 BEGINNING 5.58 95.73 96.07 Lateral 1 END 5.70 95.61 95.80 Lateral 2 BEGINNING 5.58 95.73 96.07 Lateral 2 END 5.70 95.61 95.80 Lateral 3 BEGINNING 5.59 95.72 96.07 Lateral 3 END 5.70 95.61 95.80 Lateral 4 BEGINNING 5.60 95.71 96.07 Lateral 4 END 5.69 95.62 95.80 Lateral 5 BEGINNING 5.59 95.72 96.07 Lateral 5 END 5.70 95.61 95.80 Lateral 6 BEGINNING 5.58 95.73 96.07 Lateral 6 END 5.70 95.61 95.80 SKETCH PLAN 7/28/22,7:42 AM Town of North Andover Mail-1 Scott Circle Construction Inspection NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 1 Scott Circle Construction Inspection 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Jul 27, 2022 at 12:28 PM To: "Brian Lagrasse(blagrasse@north andoverma.gov)" <b lag rasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Brian, Steve, Toni— Attached is inspection report for this site. Three issues to call to your attention: 1.The installer reports the building sewer pipe was lower than on the design plan so the system components needed to drop in elevation. I believe he said by about 4" but do not quote me on that. He reports he discussed this with the designer and that the required water table offset to the soil absorption system remains acceptable. I'd suggest getting the designer to make that clear on the as-built plan for the files 2.The outlet tee was not placed beneath the opening in the tank. The installer was instructed to adjust this so it was located beneath the opening and to demonstrate this was in compliance (side note- I believe this is not the first time this issue has been observed with this installer) 3. It is possible the soil absorption system is less than 10'to the lot line. The design plan shows it being built 10' off the lot line with the other side of it being 13' off the house. I measured 13.5'-14.0'from the house to the soil absorption system in that location which would imply that the SAS is less than 10'to the side lot line. I instructed the installer to review this with the designer and for them to work up a conclusive finding. I assume they will be in touch with you about this but if I can help in any way please do let me know. Any questions do not be shy. Dan Daniel Ottenheimer, PE President AN `TLL RIVER CONSULTING Cmative Solutions for L rid fkvclopment hUps://mail.google.com/mai I/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3Al 739523967858871093&si mpl=msg-f%3A17395239678... 1/2 7/28/22,7:42 AM Town of North Andover Mail-1 Scott Circle Construction Inspection 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com Construction Notes -1 Scott Circle.docx 64 K https://mail.goog le.com/mail/u/0/?i k=aOc6f4e4cf&view=pt&search=a I I&permth id=th read-f%3A l 739523967858871093&si m p l=m sg-f%3A17395239678... 2/2 7/28/22, 10:34 AM IMG_6266.jpg r y �.. -..i...: „ eWkW_ .:, v -. ��y .. .wow"` ,. •. 1II r https://mail.google.com/mail/u/O/?tab=rml#inbox/KtbxLxGcCbgGWzwsrcmRbGBXTxJKSLIMXq?projector=1&messagePartld=0.1 1/1 72ze2z210:&AM NG-9S&g Hps:/� k:m».co m_ik/Oz bb=m1#inbx/K tb aGc c wzws mRb GpTx JKS LIMA+Ge_1&message a+&1 �a 7/28/22, 10:34 AM IMG_6265.jpg p.. i https://mail.google.com/maiVu/O/?tab=rm 1#inbox/KtbxLxGcCbgGWzwsrcmRbGBXTxJKSLIMXq?projector=1&messagePartld=0.1 1/1