HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 240 FARNUM STREET 8/9/2022 I
M
�IIlllll I
North, Andover Health Department
ununuulaulty usu al ftommic Daavulanpnauuen!11ivisiwi
A anp_;USt 9, 2022
Sean Downey
240, Far nomad SUCCI
North Andover, MA, 0184
Re Subsurface Sewage Disposal System la;n for 240 Famu rm Streat a 107 Lot 100
Dt! ar Mr. Downey..,
The proposed o nsite wvastewu.alea system alesip;ra plan for the aal ove site dated 4/1 022 with as f'innaul
revisiaail abate (af 7/30/22 has been approved fear" issurarna e of a 1 ispa7.sul Sysuml Construction
Permit DSCP),. Once issued, a DS,CT %viII authorize the of the omite wastewater
system per the plan rc;f rcma~.ed taho,ve and as al owed under"Title 5 of the Massachusetts
Environmental metal Code (310 CM. . 15.000). You will need inn olve n°aernt li-om the Of"the
aarnsite %Vustewater systeann throughout uat the innstallatiom pn•oce-,is say you slaaaaulal be sure to, coord'irnatc
with 1:lneana.
' he design has heen appi•ovetl liar use in the a onstr°uaction of an uala,gr add on-sit ' a !stevwpauter
system liar as 3-bedroom.home utilizing the c istivap scptic Link with as proposed effluucrnt filter,th"C
existir.hg pump tannic Land a standard stone-land-pupae soil aab a)rpatio n syostcrnn as indicated on the
design plan.
1"he g,oaal I;;br syw,q.ennu upgrades is to achieve fulls co nn.plladaunce, wvitla sWle aaatiwl larcaul aurnsite wastewater
rteguilaati nns. In this ianstaanncc Mall a onuufnli once was meat a Qhievvd because the design includes
n:eapuucsts;for L caal t.lp graulc A p1nptov;rals Seel<ii'ug to Vary fi°om the stand aards of fuall conip Iiaaaace
"I'his letter~serves to, elan=Daum-u�n( (lie euncioxsennuenvt of these Local Upgrade Approvals by time Nora
undeve° team th l eparinit� Tat.
This design plan appr gal is valid for 2 yeaaa w Ci'uatiati the uuN.) e dame. During this time, a liccrrscd
septic sy,stcrnn irn;stallcr sh uuld obtain as pert'auit and co nnplete this work, and a Certificate of
. ................. .......
_._......_. .........
.........................
Page I of 3
Nu,rah Aruwla.wver l 11u"aaltl,n .i�a p"���r��tmnaa�u�nt�, "kavon H.rll, 12110 Main n treell.
North Andover. MA 01845 P`1-o,auane: 978.68 95.,B40 l'°rix: 978.68,K 954
Cumpliance be enctorsed by the installer, designer, an(I the To"m of"North Andover. If these
activiGes a,,re not conipleted within this time period then it is possible ua new design plan NO], need
to be conipleted and M1131111-Ated IC)r review., In the event an ininiinera health problern such as
sewage backup into tlie (Evelling is occutririg tile North Andover Board of Health may reduce the
time period for which this phin is wilid,
Tbis alipn)val is subjul to the following Conditions• pleusle be saffe to 1'evi'Cw these with the
designer and jnstutller-
Th r0tigj lout the pro
a. If site conditiaiiis are tbund fil 111e lielid to be diffierent from those indicated on the
design plan, installation of the onsite waa,aewater, iyestem shall stop,and the
designer and this, office notified within 24 hours
b, Tile hi-Laid and model of cfflue,nt filter specified un the design plan is to be
utilize(J. The ins(Aller is to detno nst rate these have been made part offlie onsite
Wastewater system
c. Manhole oo-vers to finished grade are to be provided over the effluotit filter and
PUMJ)� if not already present
d., Wglroundwatei- is present at the bottoin poifian of the exc ivution Ibir the said
absorption sy,,tern �SAS) [tic excavation is to be dewatered prior to the plaQenl&nL
of any fill- No fill is to be phiced for the SAS during rai,n or snow storms. Prior to
placement of any needed fill in thieSAS, IlNe botlurn is to besearified and
i-etatively dry and the fill material is to lie stockpiled.Lit the edge of the excavation
and filled in gradually
e. Inspeclions are tt.�) be p,erfornied by the designer of the onsitewa,4e%Aeater' sy:'itern
a's needed to pTopelly ovcrsee and. doeurnent constniction- At a mininium. these
are: the filitial excavation, Vrioi- to backt-illing, and during back filling as well as
,.any other compoiltem of the: COINIVIUCtiOn which the designer wishes to examine
f Inspections, are to be conipleted by the 'Towri ol'"North Andover at a inininiuni as
rollows':
i. Bed bottom
i i, Tank bottorn
iii, Final ill'st al lati oil, u fconiponents, confirniation of proper componielit
selection,,examina(ion of,C(MlStrLldi,Gn methodology, and system operrltloll
iv., Final grade
v, Sand fill wwrill be collected from at ltaist a,ne liocation and analyzed for
con(iphance with, specifications in Title 5
g., No eonlponenk al-e In ire covered until a final eomp onent inspection.Nis-, been
completed
h. No excavation for or work u,isso,ciated with elonstruction of the sioilabsorption
systeni is to occur from November, 30 W Apri I I
After constrlif,1,1031:.
Confirm if tile h"Istallati(ni wvork wits cuin,pleted in compliance with the design.plan
...................................................................................... ....... .. . ........ .............................
Page 2 of 3
North An.dovt,-,r Reahh Hall,, 12() N,hain. Street,
North, Andover, l ,[A 01845 Phone: 978.688.9540 Fax: 978,688, 9542
referenced in the DS,CP and w%iltli Title 5 aid it shall certify this on a
Celli ficate, of Cowl L'Ill itulce Lira-tu
j, IfFullangpi bavte Macau nuide to the approved plans then preparation of an a ,-bLdlt
plan is required to be ownpleted by the designer. If rto changus have been ri-Lade,
to the approwd plans then the apl)rovc-d plan shall be rmrcmrpiipia ap by tl-Le drsignt�r to,
show the distances ffimn a known '4rucl Lire to Ole systl)eJl'l Cklillponellf.,&
k. or ;emrage shLill be dischargmi to, tile onsile wastewater syslem unfil a Certificate
ol'Com.pliaiwehas been issued by this office
III acid Lion, you should 1wc am re* of tile lorvg-telll�l amp ei-r.,ttiowl guidelines of an onsite wastewater
system (thesc are not part offfic DSCP but are men fioni��d helow asinforniatioia f6r the property
ONV11CO",
L Ationsite wastewater systern can ftine-fioti as an it'itegi-al part of'(he infi-aslmo,uve of
the property if it is ;,m-operly opet-ated alld rm aairmtaainvdc This, is the responsibility of the
owner of the property and M gen,erally not sptoifiied by regulaflon. You are
to Qonlluct as was:tewater system pil III Perlservice jprovi&r to,partrifor %vith
you to implement steps, needed to assure the longevity of the unsite Wastewater
system. being installed at this locafior'i
2. The&,Sigll IlhATI Sp,eClfie'i the iime ofm effluetIl 111ter inside the tank. 'I'llis Component
is requii-ed to be examinedat least amulally and cleaned as needed
The issuance of a DSCII, does nol c,onstrw. and/ot, finply cumpliance: with any permits, approvals
or ficerisics which might be llevded firmil Other agencies such ,as the Conservation Commission,
7olill,rig Board, Planning Bo.,ird,, .Btiilditig .Liispc;,ctoi-, Plunibing Inspector and/or Flettrical
Tnspeum
P I case fee 11 free to c on Lac I. the o['I i ct- witli any q ties tions yo u niay have. W e look f6ma i-d to
wmicing wi fli you to oblain as wastemiter treatinent and dispers,at systenI which 'will he ill
com.pliance: with all regulations and assure protection, of public health. and (lie erkvironnnewill of
North And"Ovel"
Sincerely:,
Stephen Casey, Jr."
Public Health IIISPOU01,
F1,101, histallers list
M Vladii.nir NenIchenoki RE,
File
Page, 3 oT3
North Anthwer llealth DeP�:irtnient.l Tmvn Hall, 120 Nlain
N'u,rflh Andover, MA, 01845 Pho,lie 9,78,68&9540 Fax- 978,688, 9542