HomeMy WebLinkAbout2008-12-18 Engineer Certification - Anne Bradstreet Early Childhood Center Robert .f. 111o, AIA, NSPE
15 6-A -N,oir(h Donnervi I I e Road, I v Ile, PA 17 114
717-285-7004 f- 717-NS-7197 ciiiaik ill
July 27, 2009
Camille McNeil, NojectManagef
Tfii,Emph Modular
194 Ayer Road
Litticton, MA 0 14 60
RE. North Andover Pre-School
a+ei Project# 09.059
Dear Camille:
'Ais letter i-s to verfify that the building, landscaping, lighting and site layout for the North Andow,]-
Pre-School subsWntally complies with the drawings and p]ain s awd for lhl�projt,-a9
Please don't hcsitatc to contact me should you have any questions, or need any-thing hulhtr.
Thank you, A*A_A64�
J�{) Q'is,
jiljL�FPIT J,
1L,.O
Nfk;W107142 ClViL
kobc,ft I Illo, AIA, PE
Principal
Enolosure
hLsPeUd011 SU'ViCCS I-or rust dui�iat_. emnirwrcial.. ilidustri8l public pi-opertiE5
i -
w°"� OFFICE OF BUILDING INSPECTOR
TOWN OF NORTH ANDOVER
.w
CONSTRUCTION CONTROL
PROJECT NUMBER 61 , 051
PROJECT TITLE:
PROJECT LOCATION: A A 0<3�A 10
NAME OF BUILDING � �C (,I
NATURE OF PROJECT' Mel o" �
ICE ACCORDANCE WITH ARTiC 116 OF THE 11 S ACHUSETTS STATE BUILDINGC>�M
I'— ..,t 3I ,,. , .. —REGISTRATION NO,
BEING A REGWERED PROFESSIONAL ENGI NEEWARCHI-FECH HEREBY CERTIFY THAT
HAVE PREPARED OR DIRECTLY SUPF=kVt ED THE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND P IFI ATIONS' ONCE INN:
I+ITIRE PROJECT ARCHITECTURAL
� TRUCTURALA3-ME HANIC41,
FLRE f"ROTECTI +E ELECTRICAL X10THER (SPECIFY)
FOR THE ABOVE LAMED PROJECT AND THAT,TO THE BEST OF MY KNQWLEGF-SUCH PLANS,
COMPIJTAT#ONS AND SPECIFICATIONS MEET THE APPLICABLE PROMS€ON OF THE MA SACHUSE`n
STATE BUILDING CODE, ALLACCEPTA$LE E CINEERIC PRATICES.
AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I ttAI L PERFORM THE NECESSARY PROFESSIONAL ISERVICES AND B
EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND'PERIODIC RASIS TO DETERMWE THAT
THE WORK IS PROCEEEOING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDN
PERMIT AND$HALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
t. Review. for conformance to the design concept, shop drmvings. semples and otl er sub €tfals
v►M-_h 3xm submitted by the contractor In accordance requirerrt"of tha ixnetruabon
docurneneta
- Review aW approval of the quEdit5'caratroi procedures for all code-rqu€red conlrafled rnal ;' AR :t
Be �Jose
3. pre.sept at intemLVs appropriWe to the slge of condg fiun to l ace, cpeneraI fam I
yr th t o progress and duality of the work and to derlermine, in genera#, If the vmrk Is bets 14a,ao7#2 {
performed in a manner consistent with the consftcHun documerass. �
{
PURSUANT TO SECTION t 16.2.2 l SHALL SUBMIT WEEKLY, A PROGRESS RE RT
TOGETHER WITH PERTMENT CCUMENTS TO THE NORTH ANDME;R BUILDING IN PEC [� `
OPON COMPLETION OF THE WORK, I SHALL'SUBMIT A FINAL DEPORT AS TO THE
SATISFACTORY COMPLETION AND READINES THE PROJECT FOR 059,JS�Ndy ,
tr
SUBSCRIBED AND SWORN TO DEFORE ME TINS 0 DAY OF 53 raATURE f/
TARY PUBLIC SAY COMMISSION EXPIRE
Commonweaflbof 1219nnsvIvarda
NOTARIAL SEAL
JAMES I. HAHN, Notary Public
Fast He Twp,t LanGaslerCounty
My Cxrrmission Expires Aug, 151 2olo