Loading...
HomeMy WebLinkAbout1998-07-09 Decision SPR I - A own of North, Andover ��RT COMMUNITY DEV1 LOPMENTAND SERVICES OFTY11 OF �CD 7— of 40 Director NOTICE OF DECISION " r a. Any appeal shall be filled " , ry within ( g days after the ruym "w , date of filling this Notice in the Office of, the Town Clerk. rk. 'Date Juiy 9, 19,98 g 717 9 v Date! t�f Ih'�e,ar�ir� ... Petition of Sccurj;t Real ty Trust Premises, affected 33 Walker Road Referring to thile above petition for a special permit from the requirements, of the North, Andover Zoning Bylaw Section 8.3 o as to allow to cnnstruct a 6,91010 SF 2 fluor wood fi7a e off lee lai.kildin ,* After a, public hearing given on the above date, the Planning Board! voted t P'P'ROVE this pedal Fenn it - Site Plan Revifaw based upon the following onditi n : CC Director of Public Works k Richard ' b i o en. Chairman Building Inspector Natural Resource/Land Use Planner Alison Lescarbeau, V. Chairman Health Sanitarian Assessors John Simons, Mr Police Chief Fire Chief' Richard N rid lli Applicant ant Engineer Joseph V. MahoneV. Towns Outside Consultant File Planning, Bard Interested Parties CONSERVATION-t9718) "did �� 04 * HK«hLTH �(M)6B#-9540 0 PLuNNIN -(97 ) �11UIUJINGOFFU- 4`9' k 6&9-9 5 0 *N: i*ING BOAR OF APPEALS.,(97 )688-9 1 . *146n MA IN N'["R ET +A V al oNorth Andover � y14R TFr � OFFICE OF COMMUNITY DEVELOPMENT AND SE RVICES 30 Sc11001 Street V,+€I.l,�.4I+!J. CCFI North Andover, assa�h��sctts 01845 Dira:crar .luny 9, 1998 s, Joyce Bradshaw Town Clerk 120 Main Street Novi Andover, h A 01845 Re, Site Flan Review -33 Walker Road Dvear Ms. Bradshaw, The Noilh A€idover Planrj rig Board field a pubic hean'Rg on Tuesday cverlijig JLily 7, 199 8 at 7;30 p.m. in tht Depanment of Public Works, upon the appiIoation of Security Realty Trust, 33 Walker Road, North Andover, 11AA 01845 requesting a special perFnit and er Section 8.3 Site Plan Review ef~the North Andover Zoning Bylaw. The legal notice was properly advef.ised in the North Andover Citizen on June f 7& June 24, 1998 and all parties of interest were duly noti#:ed. The. following members were present, Richard Ro en, Chahmian, John Simons, Clerk, Joseph V. Mahoney, and Alberto Angles, Associate Member. The petitioner was requesting a special permit to obtain approval to construct a 6,900 SF 2 floor wood franie office building- The premises at'lected is larkd numbered 3 3 Walkcr Road in the (GB) Zoning DisI&t. Ben Osgood Jr. of New England Engineering was present to repm;ent Security fealty Tnr st located off Rt. 1 5- Mr. Osgood stated that presently there is two office br�ildings and they are proposlrig a 6,780 SF office building- M. f. Osgood stated that he has located all existing parking and proposed parking on the plan. The whole site will be on the same drainage and proposing a new service into in the building. Mr. Osgood stated that basically they are add Ing a new budding to an existing site. Mr- Osgood stated that the in rease of volume is about 800 cubic feet, Mr. Osgood stated that MT. Ohessla stated that the impact was very sinall- -- Osgood stated that D.P-W. wrote a letter stating that there Ss no problem with the drainage. Mr. Osgood stated that presently there is no landscape on the property but, they are proposing landscaping around the property, fir. Osgood stated that there is two proposed lights at the two entry ways- Mr. Osgood stated that there is an existirkg sign can the property and there might be signs on the doors. Mr. BOARD OFt3.gi'EiUi 688-9541 FtUILDT , 6R3-95e* CONSERVATION G8E-9534 I AJ:r}f 6S9-9540 PLANN:FG 68s-{)535 i I I Osgood went over the design of the building with the Board. Mr. Mahoney asked ,ghat the r amber of proposed o ffices there would be- Mr. Osgood shied that there will be 4 offices- Mr. Rowen asked if it is tiny going to be office space. Ms. Colwell stated that the old parking spaces don't meet present. requirements but, the new spaces do m ct the requirements. r- Simons asked what the Boor ratio is. Mr. Osgood stated that it. is 33%, Mr, Bowen asked what the building height is- Mr. Osgood stated that it is 3 ', Mr- Rowen asked if there was any new drainage. Ms. Colwell statedt'hat there wasn't. M1% Angles asked if there were any external HVAC units, Mr- Osgood stated that they will probably be put along the side of the building with screening. Nfi-- Osgood stated that the existing buildings have electric heat and is very The applicant would like to use propane but, will screen the tank with trees. r1{ir, i o erx asked if they will require a Fence around the tank. Ms. Colwell stated that what ever the Fire Departrnient requires they will have to do. 'the attorney £or condoiTijiiums next stove stated that Walker Toad is a private i-oad and needs to be upgraded and would like to discuss that with the develops �. Mr. Osgood stated that with regards to the rnaintenam;e of the road these buildings are part of a condo and does not know if they can do that. On a motion by Illy. Mahoney, seconded by IMT. Angi es, the Board voted unani mou sdy to close the PublicHearing- On a motion by Mr. Angle , seconded by Mr- Simons, the 13aard voted unanimously to approve the draft decision for 33 Walker Road a; arnen&l I. Attached are the conditions. Sincerely, Richard S. Bowen, Chidrnian North Andover Planning Board i i 33Walker Road Site P[an Review - Special Permit The Phuining Board herein approves the, Special PcnTWSite Plan Review for (lie, construction of 6900 SF office building located in the General Business (GB) Zoili ig Di-strict. This Special Permit was requested by Security Realty Trust, 33 Walker Road, North Andover, MA 01845 on land owned by F. Scott FoIlabsbee— TMs application was filed with the Planning Board on May 20, 1998. The Planning Board makes the following find}ngs as requited by the North Andover Zoning; Bylaws Section 8.3 and 10.3: FINDINGS OF FACT. 1. The specific site is an appropriate location for the project as it is adjacent to an existing office building; The use as developed will not adversely affect the neighborhood as suffleitmt Wfft!r have been provided; 3. There, will he no nuisance or serious hazard to vehicles or pedestrians; 4. The landscaping approved as a part of this plan meets the requirements of Section 8.4 of the Forth Andover Zoning Bylaw; S. The site drainage systvTn is designed n7 accordance with the Town Bylaw requirements and has been reviewed by the Depamient of Public Works; 6. The applicant has rnet the requirements of the Town for Site Phin Review as stated in Section. 8.3 of the Zoning Bylaw; 7. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. Finally the Planning Board finds that this project generally complies with the 'l'o n of North Andover Zoning Bylaw requirements as listed in Section 8.35 but requires conditions in order to be fully in compliance. The PLuming Board hereby grants an approval to the a►pplicauit provided the following conditions are met, PEAL NBUIO S: l. Prior to tine e n domcm en of the plans by the Plan aiag Boa rd, the apP]ieant must comply with the following conditions: a) The propane tank location and design mist be reviewed and approved b I i the NAM b) The fine plan must be reviewed and approved by the drainage consultant, DPW and the Town Planner and subsequently endorsedi by the Planning board. The final plans must be subnm ttcd for review withirt ninety days of wing the decision with the Town Clerk. t c) A bond in the amount of five (housand dollars ( 5,000) shall be posted for the purpose ofinsufiug that a Enal as-built plan showing the location of all on-site utilities, structures, curb cuts, pau•Uig spaces dnd drainage facilities is subrnitted. The bond is also in place to insure that the site is constructed in accordance with tllc approved plaB. Tl�s bond shall be in the form of check made out to the Town of North Andover. This check will then be deposited into an interest bearing escrow account. . Prior to the start of eoastruction: a) A construction schedute shall be submitted to the Planning Staff for the purpose of tracking the construction amd infi)nung the public of anticipated activities on the site. b) All erosion control must be installed as shown the approved and endorsed pi uIS. 3. Prior to FORM U verification (13uildtng Permit Issuance): a) The final site plan mylars rest be endorsed and three (3) copies of the signed plums must be delivered to the Planinirzg l partmtmt. b) A certified copy of the recorded decision roust be submitted to the Planting Department. 4. Prior to verification of the Certificate of Occupancy. a) The applicant roust submit a fetter from the w6iitect or eugineer of the projmt stating that the bi"ffir& signs, land.scVing, fighting and site layout substantially comply with the ping referenced at the end of this decision as endorsed by the Planning Board. b Tlbe li&,htnig for the new building must match the existing lighting on the site. c) The landscaping; must be planted as shown on the approved and endorsed plans. i d) The Planning St fI shall approve all artificial lighting used to illwuinate the site. A_ll lighting shall Nave imdergro td wiring and shall lie so arranged that all direct rays froin such lighbug falls entirely wit!hin the site amd shall be shielded or recessed so as not to shine upon abutting properties or streets. TIe Planning Staff shall review the site. Arty cha rgcs to the approved lighting plan as rmy be reasonably required by the Planning Stall' shall be made at lbe ovmer`s expense. e) The buRding must have com merciul fire sprinklers installed in accordance- with the Noffli Andover Fire Department. 5. Prior to the final release of security: a) The Planning Staff shall review the site. Any scrceaing as may be reasonably requircd by the Planning Staff will be added at the applicant's expense. b A fnal as-built plan slowing Enal topography, the locatiotY ofall on- site utilities, stracturcs, curb cuts, parking spaces and drainage facilities gust be submitted to and reviewed by the Planning Staltand the,Division of Public Works, 6. Any stockpiling of materials (dirt, wood, cc�nsiructiork leri�tl, etc.) must be shown on a plan and reviewed and approved by the Planning Stall: Any approved piles must remain covered at all limes to Ftiufuruze any dust problcsns that may occur with adjacent properties. Any sto& piles to remain for longer than On,- week must be fenced off and covered. 7. In an effort to reduce m)ise levels, the applicant shall keep in optirnum working order, through regular maintenance, any and all equipuacnt that shall ein.,aroate souuds from the structures or site. if. All site lighting shalt provide, a�cuilty for the site and structtnes however it roust not create miy glare or project any light onto adjacera residential properties. 9. Any giants, trees or Awkiiss that have been incorporated into the Landscape Plan approved in this decision that die withiii.one year from the date of planting �diall be replaced by the owner. 10, The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 11. Gas, Telephone, Cable and Electric utilities shall he installed underground as specified by the respective utility companics. 11 No open burning shall bo done,except as is permitted during burning season under the Fie J DcpaEtment regulations. 13. No imdergrotuad fuel storage shall be imlalled except as may be allowed by Towrl Regulations. 14. ne provisions of this conditional approval shall apply to arid be binding upon the applicant, its employees and all successors and assigns in interest or control. 15. Any action by a Town Board, Commission, or Department that m.quires Ohanges in the plawi or design of the building as presented to the 1 Lum ng Hoard, may be wbject to modification by the Planning Board. 16, Any revisions shall be subrriittcd to the Town Planner for review. if these revisions are deeriied substantial, the applicant must submit revised plans to the Phmning 'Board for approval. 17. This Spec' Perinit approval shall be dceroed try have lapsed after „m (two years I�orn the date permit granted) unless subktandal use or construction has commenecd. Substantial use or construction will be determined by a majority vote of the Phum7mg Board. 18. The following inforrriation shall bf, deerned part of the decision: a) Booklet titled: Applieation far Site Plan Review Special Permit Brookmeadow Office Park Phase III Dated: May 20, 199 Prepared by: New England Engineering Services Inc. 33 Walkcr road, Suite 2.3 North Andover, IAA. 01845 b) Plantitled: Site flan Brook Meadow Office Puk 33 Walker Road North Andover, Masswhusetts 01845 Prepared for: Security Realty Trust 33 Walker Road North Andover, lassachuse" 01 45 Pmpared by: New England Engineedng Services, Inc. 33 Walker Road Suite 23 I oTth Andover, Massachusetts 01845 Dated: April 28, 1997 Sleets: 1 through 3 4 i CC. Director of Public Works Buiiduig Inspector Health Admini trator Assessors Conr nervation Administrator Pknrting Board Police Chief Fie Chief Applicant Ragxneer File 33 WAer Road - Sile Flan Review