Loading...
HomeMy WebLinkAbout1987-07-23 Drainage Calculations SPR fl CHANNEL May 11 1987 Ms. Tticia Wrenn To,wn Planner Planning Office, 120 Main Stir t North Andoverl MA 01,845 Re: S ecial Permit Application Eaatprint, Inc, Addition North Andover Busine,55 Park 350 Willow Str t North Andover MA Dear Tricia: Enclosed is a copy of the drainage r-alculat,ion which Chairman Nitzsche reque,5ted at, the hearing on April 27. If you have any questions, do not hasitate to call inc-. Thank you. Sii, rely, je Jain,r--5 Bourgeois, R.A. Vice President Architectural & Engineering Services on behalf of Bianchi Realty Trust and Fastptint, Inc. abs, Enclosures 9M Mahn Stecant 0 P.0. 631D,x5122 9 Andover 0 Mbusanchume,ttoolE310 a 617,47,15*11651 THOU G E. NEVE ASSOCIATES. INC. DATE OJT T: NA§P-■7 SHEET O _ ENTER SUS CATCHMENT a 4 AREA - 3.09 ACRES CN - 89.7 Ic - § MIN VOLUME UNDER THE HYDROGRAP14 - 1 .35 ACRE-FT. PEAK - 27.7 CF5 fEA H DROGR§Pw FOR SUBCATCH wTcur + 4 2 \ \ PERK - 2: . 2 I ]| HHIGERLL - 7 - ln � NMEM R � I � j [ - ]D ! ! 12 !j 14 15 IS I} 18 | § 20 TIME <HGURS, ENTER SU8GATCHMENT # 5 AREA - 3.09 ACRES CN - 90.2 Tc • E MIN LUG UNDER THE HYDROGRAPH = 1 .37 ACRE-FT, PEAK = 28 CFS R¥gROGRRPH FOR SURCPTCHMENT + 5 }\[ LD'4 � PEAK = 28 je[ RRINrALL - 2 @ ff [ | HREH = ] .OB �o CN = 50.2 !q ] � / 12 a � ® r 2 10 | ! 12 12 14 15 15 17 !e |S 22 TIME <HOURS) A hydrologio analysis of Lot 07-A North Andover Business Park was performed F by utt r of flee. 'I'Ile analysis compares the peak rate of runoff of the site Under two different site layout designs With two di f f erci t sets of hydrologic condi- tions. - Master Plan (1983) - Proposed Design (1 8611 The IGO year storm event will be used. The desigr1 point will be the wetlands abm ing the east side and west sidc of the proposed development. The area of the lot involved in the study will be the uplands portion of the lot alori;, with any portion of the wetlands which will be filled or altered; as shown on either plan. Master Plan C N Arf`a impervious Area 98 1.93 Regraded-Lawn 79 .57 Weighted G 89.7 Woods (same wetlands) 73 .59 3.N acres HydralLi is Length = 305' Q 3% Tc = 5 min. - 6 mill. Pcak Runoff f 27.71 c f s t'ra�osed Plan N Area Impervious Area 98 1.91 Itegraded-Lawn 79 .92 Weighted C Woods (some. wetlands) 73 .26 3. 99 acres Hydraulic Lefgth = 300' Cd 3% Te = 5 min. to 6 miry. Peak RL;noff = 28.0 c£s Conclusion: The peak vates of rvrioff for the Alaster Plan Dcsign and Proposed Plat Design were round to be jdentioal. The differeuc�_- of 0.3 cfs is not considered significant..