Loading...
HomeMy WebLinkAbout2000-02-24 Engineer Review (2) C.'-.'J"0L -ERI Z C'J"OL ANTnNIO EINGINEERO ANOSCIPEN I IFS F F5 Novernbt�r 5, J 9919 Heidi Gl-iffiTl PhInniTIg Board 15 School Street North A ndover, MA 0 184 5 RF- Fingi-rieerin,g Review Lo.9 Willmx Strect Proposed OffiCe SUbdivision Dew-Ms, Gyri ffin., .In response to your request, Coler & C ohmitonio, In:c. has reviewed the subm..11tal I-xickage for theabove rtferenced site, In mkbfiioll�, we have visAed the- sjge lo obs'erviv; field c,olidilions ()Ti Oo,,oher 25, 19991, The project hliN I)eun revieweld Nm, to, the llecjuireryllcnt� of the "Zoning By-Law f0l' Site Ph.M Review and Special 111crniit" in Noilli Andover as well as standard enginceiing pi-actice., I"he subiiiittal package inCILtClect the followi rig in forniation: Ph,ms Entitled:: "Propo-sed, Site Development, Willow Streo, Nur[h An(h,wet" location IP described as Map 98D-1 AA 52 coTISiMing ol'ten �.;,hccls dated 10115/19,9, Prepared by MHF Design Consultants, ]Tic. Reports,Entitled "S I o un w al er Maiiiage men t R epoi-1 foi-Pi-i i�po,�ed 0 ffi ce B u 11 d 1 n g, Pi-oJec L Wffllov, trcct, North An:dover, NIA", date0l, 10/14/99, Prcparccl by MILL Design Consultatits, Inc.- The site k locwed wil hin the N(,m-,t.fT Andovei-Bminess Park, More ",,,pecl Flea]ly it is located on r o,uthwesls,iide of Willow Stre�ct, identified by the'"Fown Ass,cssor's, Maps, as, Lot 52 on Map 98D. 'nic proposcid site is currently undevelopcull and contains approximately 2 acres, The proposed development includes a 2-story office building with a gross floor area of 7,344 sf, andassocialed drivieway/parking area, laii&s,a~iping, fighifiig, utiblies and dl-ainag� racilifies, We o ff'6-the fol I owi n g co rn,mcT i ts'. 777777777=77 =7 7=7 7777 10 1 Amoirdl Park Drive 781-982-5400 Norwe I I, MA 02,061-1 85 Fax". 781-982-5490 ZONING BYLAW 1, Section 6a.I it is unclear if any new signs have been proposed. 2. Section 7,I),l Tt is uncicar if the properly is ,,uhject to the C:o€itigtiow, Buildable Area (CI A) cnitoiia. The by-law states at least sevc€ity five (75) percent of tlic minimum Iot arca rcquired for zo nirig shall be conti gip ous land other t11an land Ioca(ed within a lime i(en€ified a� wetlynd resource, arews in accot-dance with the Wetlands T'rotec#ioji -Bylaw- 1 Section 7-3) 11 is our understandirng a vzat ia€acc was granted from the rC-quircd 50' Fi-o nt sctback. The propowd st t€aack is 0', 4- Section 7k) The Required Lot sectioTi of the; Application for Site Flan review should he modificd. The Floor Area Rado should i-ead 0.50:1- Tt cLn-rently reads 5 Sect€o€-3 8.3)5-)c- The puns aivc clot si gut!d by the: Pi-Ofessl0€naI Engiueen-- I i6, Section 8,3)5.)e.)iv.) Ilo legal tmumhi-a€ices as they may ITZ!late to the sites phyMcal devclopment have been listed. j7. Scction 8, } ,)e, v-} The, pi-oposed 238 4�:owour on thu- west side of the delen[10V basin has bn !e-n clmwn incoi-meetly. The grade -*oij1d be shown as a closed loop, 8, -cEio on S.3)5)c. vj. It is Lim:Ieal, iF Nigrns air- proposed fm- the site. No I information has been kjbmiILed for i'cvie , 9. Section 8.3)5-}e.}vii,} S1'C)RMWA'FFR DRATNAGE Sce al-ai€cage cc i �xrers�s h lc� v. 10 Section 8-3)5.)c.)ix.) Ext(-,rioi- buikhng elevations Dave not bet-Ti .ubmitted with this review ackage, } 1 I Section 8.3) i-) The,wctl and line is sliow-fl ov tho pia€ , Wetland flag nunibers should lac labeled an the plan€;, A Notice of Intent Applic:Llion s}non€ld lac fiIt-d in conjunction with this application. It should also be noIt! i that Mosquito Brook is a river front area as hown pan tiic North A€ dove-We11ands Rcgulations ivcrfront Area Maps (Figure 1 of 3). It appeals that the site rnaybc su ect to The Rinfers Act. This may have a significant iwpa(:t oll the site design. 12. Section S.3)5)c)x ij. It is unclear if a sign is proposed for thv site, If a sign is proposed, the iocadon ,hould €ae shown on the prams with sign di€r1esisionS 13. Section 8-3)5.)c.)xiii.)Dist�inces to ill tho noaivst roadways and/or cui-h cuts shall be she} n for both sides of any stFeet which is ad-j ace nt I the i-ite- 4. Section 8.3 S. e.)xiv,)Tt is uncIear it outdoor storagelclisplay areas ave proposed. i1-these areas are proposed, they shouId be shown curl the plans. }5- Section 8,3)5,)e-)xvi,)I'lic location and detail oI-refuse areas shollId be 'Jlow n on the plans. All vcfusc areas musl be fully enclosed. 16, Section 5.3)5.)e.) Q-) The lighting fixtures have been ,khown and detailed. The, proposed ill u inatiora dincction and degree of illrtrr7ination have not been shove n 17, ectlon 8,3)5.)e.)xvii,) Drainage Bali n Study See drainage crrmmuts below 18. Section 8.3)5.)e. xix.) A traFI-ic uudy in ay be s,=qu fired by the PIar njng Board, 19. Section 8.3)5-)e,.)xxi-)A chininey connec lion detail should Inc added I the detai sheets foi- the s�we- conection iDIQ the uxisIiTIg 8" SC%Ver I-Mlin i11 WiI10W S(I'cct. The invert labeled for the sewer invert appears to be prior to the chimney (xn Flee(ion. 'Phis sh old d be cIanI'led. 2.0- Section 8.3 . e.}xxii-) A fiscal impact study may he re.clucs(cd by the PIfmping Board. 21. Section 8.3)5.)c).x xi A,) A curnmLmity i mpact study mnt y be reclueqcd by the PIanning Board. 23. Section 8.3)6-)a.)ii.)f.) The grading, drainage and erosion control p4m �lhould snr>u+ talc location of control iiacasm-cs and a cdesQdp ic>n c 1 trtosc 171�aSk3I'CS. Dl-airfa {C1171FIZBZ1iS The,cxisting site appear, tip he w ithin a FLMA FJoo d Zone A On past 1)tMews hicluding the Stop & Shop and 74U'1_umpike, the 100-}scar floors elevaticrTr at Lhe south side, «F Turnpi€ce Stm-,t was determine l to be elevation 238 based tin local observations. The Stop & Shop project is located downstri t!mn fiuom Willow ti-eet 1i-om this site and 740 Tkimpike, Stmct is downstream �Icrws Turnpike Street from Stop & Shop- Typically as one, goes upslrt,-ayn, the Hood elevation increases. 3 The I00-year flood clevation on-site is likely above cIcvation 238. Bast-d can this el ovation t1}c flood water l"vom Mosc,gaito Brook may resiplt in backwater impaeis into the detention basin causing possiNc flood problems can and ofI-sile- Compensatory flood stoi-age rttay be rcquired to imp lemrent the flan, This issuc should be addres,,ed- ThiI vainage ca]cuIations use the uutlet s#nwtuve adjacent to Willow ,Sti-eet as a dle'ign paint in (lie hydrologic inude,], The dralnagc avcas should be mudified Lo reflect the existing topography 4nd riot be limited by the propeny iiiie- It is unclear how the exisiing condition curve nut7 Nv% were oc;tahli shed. Based upon ou site visit, the woods appeu to Dave a cover dcseii bed as good. The ood.,� air- mostly located xithin (he wetlands and the curve number documented jn anar-ndments t,T -55 is 79 1or wood wetlands, The, brush is desci7bed as faii- condition and located in wetlands in the calculations- The, hi-rjsh appears to be in flair etmdition, 11O cvcr, this area is tip)4nd- Tiro cxishng condition calculations should be i-evised to reflect €ht- Qon-ect euii vc n uinbeis. The Cw-ve nkimher dcscribing the brush/wetland cover typo for proposed condifions rs 48, The curve nuinbf r fog- a sirnilai•cover type foi- existing con diI ions is listed as 70, The props>�ed conditions cui,ve number should be me defiled consistent with exiting condi11ovs for unaIton-A areeas. The`l'imc of Concen#ralioil c ale ulatIon for existing conditions cites not appcar rcfIcct field condiIium, The €lo w path s h ow n on the N-e-Developrrront Hydrology plan appears (o be longcr than 450 feet. The, existing ditch should also be inQ]ijdl-d in time TirTIC of COtICc�Itratio1i ealclllaliODS- The hydrology niodcl appew-s to repute subcatchrjjcnt 5 illtu the slVtent 0T1 basin. Based upon the Poet-De�ve;loprncnt Hydi-oiogy Plan, 5 does not appear to flow into the detention basin. The roof drain pipe appffars to have app rox i in ately .5 feet of cover- Documentatxtu should he suhmittcd on the pipe to assure the pipe has adequate strength for this dcpth of cover. This pipe may be suhje-a to 1-mst Heaves in the parking lot and be a long teri main#enarice c or3com, The Stormwater Iv 4nagerment Report states the BI €V's will Ternnve: approx iinately 80 of the TSS. It is uncle;ai- how this is determined. The applicable `)~SS remuval spreadsheet should be submittu-d. The rep)rt states the sediment forebay ale,,rgn is ineIudcd in Appendix E. This ini-OT-MatlOn has not been ijlcludi Cd. The s;cdimcnt forcbay should be de�igrje;d M accovdaiiec with the DEP loi-m ,rater Management Policy, 4 Tt Is uncleav if#lic dcfcntion ba in has the rf'quli-ed watci- quahty volume below the. i1ivc11 out. 1fie recl4lired water duality volunic and the volujne providiM shr kdd be submitted. Based can test pit number 3, mottling occurs at approxima#ely 40" below the surface- The �uvface,cicvation is approxi3natelp 217,5, The elevatiot3 of Ngh water is approxirciatcIy 234. , The ei lfimalt!d high ground watcr labeled oil the plans is 233.67. Docuknentation suppoi-ting the 233.67 water clevation should be submitted. if the ground water is higher than that labcIcd, the water duality volume within the cle€ention pond may be affected. The inm-t into tho detention basin appears to be Iow and is actually beIO v the invert elevation out of the detenLion ba.mT1. This will cause a hack water affecI.on the dmivage pipe- Calculations foi- the proposed 15" oudet pipe and 18" drain pipe on Willow Street should be sip bmiIted, It is unclear•i l-tlio pipes have, adequate, capaci(y for the 100 - year,,;Wi -n event- The. calculations should include, flows upgmikmt of tile, propc3se.d manhole. Tailwatcr inipac#s should ako be included i11 the caleulati011S. A new inanhele is proposed For the Willow Street dvainage system. The pipe inverts should be modiFied such that pipe cmwiis snatch. The sl4ge{stt>rageldic�chai-ge table shoixld be modified. The vol tjme cif storage below the estimatcd water elevation should be �,,ero the impact of adjacent flood levels should he cansiderod for the sl orms modeled. Additional Co><nmejits The ,�edjinent conwoI fbncc detail should iu<ci de hayhales as de,,;ci-shed jn ti c Stormwatev Manageirient eport- P is unL:le'cr whe-e the undcrdrain !s lccatiM. There is a cietf iI of the undez-di-ai>n but it is not Shown Oil tile, plans. The proposed WiIding is adjacent to the detention basin. Thal ! foundaIioB w 01 appears to he a reAai>nin g w a I for the basin. A portion of the wall appeai:s to be, subrrrcvcd iascd on the aproxi mate fter e}eva#ic}n- This reign shot}id is z vicwcd by tile, building ins pec(or, S We appvteciatu ttic 0VP051unity to assl"t dIC A Iilntrig Board can tilis pi-ojet~t and hope that this i11fonnadon is sip fI'lcient for Youi, nccds. We wou[d he p]cased to mect with the Board or the design enginc r to discuss thE,, project at your convenien-:c. if you have any questions please tics not hesitute to contact rjs. eTry IT-Lily yours, OLBR & C OLAI TONTO, INC. -/ hn C. Chessia, P.E. cc. Mark 8- Gross, P,F:- Jim Rand 6