Loading...
HomeMy WebLinkAboutConstruction Notes - Septic - Component Repair - Consultant Review - 720 FOSTER STREET 9/1/2022 North Andover Health Department Corer-nunity and Uonamic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 720 Foster Street MAP: 090,A LOT: 0033 INSTALLER: Todd Bateson INSPECTION -#68183 v Replace D-box DISTRIBUTION-BOX ; Installed on stable stone basso N- 0 D-Box Inlet tee (if pumped or >0.08'ffoot) Hydraulic cement around inlet & outlets Ell Even distribution observed [ Schedule 40 PVC Pipe Comments: