ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 805 Johnson Street MAP: 107.A LOT: 0067
INSTALLER: James Boraczek — 978-479-5236
DESIGNER: Benjamin Osgood — 978-435-1324
PLAN DATE: 05.04.2022
BOH APPROVAL DATE ON PLAN: 06.29.2022
INSPECTIONS
TANK INSPECTION: 08.02.2022 S.Casey
DATE OF BED BOTTOM INSPECTION: 08.02.2022 S.Casey
DATE OF FINAL CONSTRUCTION INSPECTION: 8-10-22 D. Ottenheimer and
8-16-22 D. Ottenheimer
DATE OF FINAL GRADE INSPECTION-8/24/2022
SITE CONDITIONS
❑ Contractor reports any changes to design plan
® Existing septic tank properly abandoned, if
present
❑ Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments:
SEPTIC TANK
® Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
® Bottom of tank hole has 6" stone base
® Tank size and loading per plan
® Monolithic tank construction
® If monolithic, water tightness of tank has been
achieved by visual testing
❑ If 2-piece,;watertightness of tank has been
achieved by water/vacuum test (circle one)
® Inlet tee installed, centered under access port
® Outlet tee installed, centered under access port
® Gas baffle
❑ If effluent filter, riser to finished grade over filter
® Riser with cover to within 6" of finish grade
installed over one access port
® Manhole and riser minimum 20 inch diameter
® Pipe penetrations appear watertight using
rubber boots
Comments: 08.02.2022 Pass S.Casey
8-10-22 First three or so feet of building sewer remained as old cast iron pipe,
then PVC pipe begins.. D. Ottenheimer
DISTRIBUTION-BOX
® Installed on stable stone base
® H-20 D-Box
❑ Inlet tee (if pumped or >0.08'/foot)
® Hydraulic cement around inlet & outlets
® Even distribution observed
® Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
Bottom of SAS excavated down to specified
soil layer, as provided on plan
® Size of SAS excavated as per plan
® Sand installed, if specified on plan
® Sand displays few fines when handled
® 40 Mil HDPE barrier installed, if specified on
design plan
® Laterals installed and ends capped or
connected to header (and vented if impervious
material above)
❑ Retaining wall material, location and height if
specified on plan
Comments: 08.02.2022 size good, sand good, depth corrected, c-layer visible on
re-inspection (same day) one rock in over-dig near front corner, ok, does not
continue to field.
8-10-22 — Leach stone examined in several locations and found to be coated with
heavy layer of fine sediment. Required to be removed and replaced. D.
Ottenheimer
8-16-22 — Reinspected new leach stone, looks very clean
FINAL GRADE
® Final cover as per plan
® Loamed
® Seeded
® Cover per plan
Comments:
DOCUMENTS NEEDED
® Certification of Installation Form submitted
by designer and signed and dated by
designer and installer
® As-Built Plan by designer
8-10-22
BM = 105.50
HR = 4.85
HI = 110.35
8-16-22
BM = 105.50
HR = 2.57
HI = 108.07
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Benchmark
Building Sewer OUT 6.17 103.85 103.65
Septic Tank IN 6.47 103.55 103.44
Septic Tank OUT 6.73 103.29 103.20
Distribution Box IN 5.27 102.47 102.43
Distribution Box OUT 5.48 102.26 102.26
Lateral 1 BEGINNING 5.56 102.18 102.16
Lateral 1 END 5.74 102.00 102.00
Lateral 2 BEGINNING 5.52 102.22 102.16
Lateral 2 END 5.74 102.90 102.00
Lateral 3 BEGINNING 5.53 102.21" " 102.16
Lateral 3 END 5.76 101.98 102.00
8/11/22,2:53 PM Town of North Andover Mail-805 Johnson Street
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
805 Johnson Street
1 message
Stephen Casey <scasey@northandoverma.gov> Thu, Aug 11, 2022 at 2:46 PM
To: Dan Ottenheimer<dano@millriverconsulting.com>
Cc: Toni Wolfenden <tolfenden@northandoverma.gov>
Hi Dan,
Jim Boraczek just reached out moments ago regarding 805 Johnson Street. He sent me images showing the removed
stone, and new stone being added (I attached the images he sent over). He is ready for another final construction
inspection, and I added his contact information below.
James Boraczek 978-479-5236 installer
Benjamin Osgood 978-435-1324 engineer
Thank you!
Stephen Casey Jr.
Health Inspector
Town of North Andover
2 attachments
805 johnson Leachfield deconstructed.jpg
308K
u
805 Johnson new stone added.jpg
441 K
https://mail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1740891568057045886&simpl=msg-f%3A17408915680... 1/1
8/11/22,2:53 PM 0(1024X768)
Nw
AR
� Fv
r z ,fir^
ary
s°'
r
dill
. .,.,w
https://mai I-attachment.googleusercontent.com/attachment/u/0/?ui=2&ik=aOc6f4e4cf&view=att&th=1828e3a85283537e&attid=0.1&disp=inline&realatti... 1/1
8/11/22,2:53 PM 0(1280X960)
r ,
w
< < .w
f
d
. s z=• ,�f-gin— s - �.. -
'a
d 1 $ as" -
k
https://mail-attachment.googleusercontent.com/attachment/u/0/?u i=2&ik=aOc6f4e4cf&view=att&th=1828e3a85283537e&attid=0.2&disp=inline&realatti
8/11/22,8:41 AM Town of North Andover Mail-805 Johnson Street final construction inspection notes
:47NORT ,OOVER
Massachus40s J Toni Wolfenden <twolfenden@northandoverma.gov>
805 Johnson Street final construction inspection notes
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Aug 11, 2022 at 8:34 AM
To: "Brian Lag rasse (blagrasse@north andoverma.gov)" <blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Attached is report from yesterday's examination of construction at 805 Johnson Street.
The work at the septic tank looked good and he will proceed to backfill the rear yard.
The stone in the front yard at the soil absorption system was found to be coated with fines and the installer was informed
it needed to be removed and replaced. Photos attached.
A new final construction inspection will need to be completed once the stone has been removed and replaced.
Dan
Daniel Ottenheimer, PE
President
Asa
ILK MILL RIVER CONSULTING
t m`.$tive ScAutltm%f4YC Laid Develq)Y wnt
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
https:Hmail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1740868170199837381&simpl=msg-f%3A17408681701... 1/2
8/11/22,8:41 AM Town of North Andover Mail-805 Johnson Street final construction inspection notes
3 attachments
DSCN0719.JPG
989K
�„
' DSCN0717.JPG
955K
Construction Notes -805 Johnson Street.docx
66K
https://mai l.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1740868170199837381&si mpl=msg-f%3A17408681701... 2/2
8/11/22,8:41 AM DSCN0719.JPG
sa
'�"%rw
. - v
lw
n:
y•U�,
JI
,
https://mail.google.com/mail/u/0/#inbox/FMfcgzGgPpkjfGZQXsbMGDxLpMhZXzDr?projector=1&messagePartld=0.2 1/1
8/11122,8:42 AM DSCN0717.JPG
a
�y� 3
nr ,
s
W
https:Hmail.google.com/mail/u/0/#inbox/FMfcgzGgPpkjfGZQXsbMGDxLpMhZXzDr?projector=l&messagePartld=0.3 1/1