Loading...
HomeMy WebLinkAbout1986-02-04 Correspondence SPR S ITF. ...... LC FORM A-1. REFERRAL-FORM SITE PLAN REVIEW Nortl Andover , MA ny Highway Surveyor Supt . of Public Works Conservation Commission_ Building Inspector Fi re Chi of Police Tree Wacden HeaLth Inspector Planning Board The attached Site Plan was submitted to the Planning Board for distribution on A PubLic Hearing has been scheduled for On May we have your comments and recommendations concerning, this development no later Man KindLy return thin Form with your-comi6ifE -i6d- recommendatLans ., Than% you, C JLam.W-k PE RUM 6/ L985 67' w�°��, "! arrk, Atu uo r February 27, 1986 i�re't -Pu3arc hicuu�tia Associates, s, Re: Water Quality :er�tifi.cationu 185 New Boston Street DEQF File No. 242-271 Woburn, MA 01801 Fill, Compensate North Andover r Lear Mr. Carlson: in response to your requuest, in your petition dated February 5, 1986 this Division has reviewed your application for a Wc°5A.ter Quality Certifi,catiott on ;behalf of Elm Square Builders to place fill within s 3,000 square foot area of bordering vegetated wetlands for access to an upland site located. off the -alem Turnpike We. 114) , North Andover. Also pareapns& is the filling of as manmade drainage sw ale: for building and parking inng areas. A total f 6,500 square feet of compensatory waetlands, will he provided in the south- west corner of the site. Erosion control devices shall be placed betwenn the, wetlands ds and construction sites,. In accordance with the provisions of Section 401 of the Federal Water Pollution Control Act as amended (Public Law 95-217) , this Division hereb certifies that,, based on information and investigations, there is reasonable assurance that than proposed osed activity will be conducted in a manner which will not. violate applicable eater gpality standards adopted by this Division under authority of Section 27 (5) of Chapter 21 of the Massachusetts General. Laws, as codified in 314 CMR 4,0 , should any violation of the water quality standards or the terms of p:his. certification occur as a result of they; proposed activity, the Division will direct that the; condition be corrected, Ne,r-a_con'ru l,i.4auuce on the dart of the permittee will be, causct for this Division to recommend the revocation of the permit(s) issued therefor or to taper such other action as is auth oriz r1 by the General Lawns of the colmar),nu1wjealth. This certificat:ionu, does not relieve the applicant of the duty to u..orrpl.y with any other statute and regulation. fiery truly yours, Thomas. C. McMahon TCM/DB wpa Director C; william ,awrless, Chief, Permits Branch, Corps of Engineers Richard Cronin, Director, Division of Fisheries & Wildlife I i RT I-1- W °....... w� � Ir'� DEPARTMENT r . rtrt ��.. mm ........ ��� .ww�www��� �w, .--------�. �. �.,.����� - N M,YYuuu a� m � �� �irian n NorVh Aridoveir, Ma 01845 MUMS u._o; S V. OOP..M4 TeL 1 6814012 Cho oumpm"Wild T Karen Nelson, Town Planner From: Chief Bolen Date ; February 2 , 1986 n February 25 , 1986, at 23 : 47 hours , we :responded to an alarm at the Elm Square Builders office building site on Route 114 . Upon our arrival, we found three piles of gush burning. I spoke with Elm Square Builders and they stated that the fire was barely burning when they left the site. They were sited for illegal burning and l advised them that they would :not be able to build for two weeks . Usually, the Fire Department requests, in the order or conditien8 that the builder contact the department for permission to burn at the site; but since I did not have the opportunity of reviewing the site plane a second tine , I did not issue the Murder of conditions . copy of my letter to your dated NOvember 13, 1985 is attached. I would hope in the future, that the planning board would delay action until all the information is reviewed; prier to issuing the under of conditions . William V. Dolan, Chief NORTH ANDOVER FIRE DEPARTMENT CENTRAL Fill 14EADQ ARTERS -�;�... 1 4 Main sir9M t . L it i 4,%m V. DOLAN - -�Jr%le $ 7 �1t>•sfF t •� r. . i ,afl�lOfF� To: Karen Nelson, Town Planner From: Fire Chief Dolan ate: site plan - Route 114 Of f icas Elm Square Builders Date : November 13, 1985 I any requesting that the heaping on this proposal be deferred until, further information is received. According to the site pla&ly-law "Plan Requirements" , the arrangement degign and appearance of the proposal-structures are to be shown on the plans submitted. I cannot make comment witbout knowing those ,building features which would affect fire prgfection. Having served on your By-law Committee and having been a supporhnT- of this by-law, i felt that one of the intents was to have a cansistant policy and set of criteria for developers to meet. Thesc submitted plans fall short of that} criteria. � William V. Dolan, Fire MD.- 4- 1 ` S •i/4a a iaiii •W i��#�JW to JL i. ii 1 . -1.