HomeMy WebLinkAbout242-1535, 2009 Salem Street COC - Common Drive - Certificate of Compliance - 2001 SALEM STREET 9/14/2022 For Registry of Deeds Use Only
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
242-1535
ILI Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Lauren Zelnick
only the lab key Name
to move your 2005 Salem Street
cursor-do not Mailing Address
use the return
key. North Andover MA 01845
CilylTown Stale Zip Code
VQ 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions or Order of Resource Area Delineation Issued to:
George Haseltine
�+ Name
November 3, 2011 242-1535
Dated DEP File Number
3. The project site is located at:
2009, 2005, 2001 Salem Street(common North Andover
drive servicing Mot subdivision) City/Town
Map 108A Lots 2, 32, 33
Assessors Map/Plat Number Parcel/Lot Number
The final Order of Conditions or Order of Resource Area Delineation was recorded at
the Registry of Deeds for:
Property owner(if different)
Northern Essex 12706 64
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
July 13, 2022 &September 14, 2022
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
wparrmob.doc•rev.5118=20 WPA Form Se,Certificate of compliance•Page 1 of 3
9
Massachusetts Department of Environmental Protection Ir
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1535
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
ILI
B. Certification (cont.)
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed. The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
i
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
""See Attached List of On-Going Conditions'*
❑ Order of Resource Area Delineation: It is hereby certified that the wetland
resource area delineation for the above-referenced Order of Conditions has been
satisfactorily completed
C. Authorization
Issued by:
North Andover 09-14-22
Conservation Commission Date of Issuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office (See
https://www.mass.goviservice-detailstmassdep-regional-offices-by-community).
wpafrmBb doc•rev.5/1812020 wPA Form 8B,Certificate of Compliance•Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number;
WPA Form 8B — Certificate of Compliance 242-1535
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by QE P
C, Authorization (cont.)
Signatures,.
l�A(70[•i
Signature Pri ted Namp
OWJ IAC,VQNJOUWA
Signature >(4A
Pripted Nam A70�
Signature Printed Name I 1
NLIP KAArJ Z i
Sig a Printed Name
Signature Pr ted Name
Signature Printed Name
Signature Printed Name
Signature Printed Name
wpafrm8b.cloc•rev.711I12021 WPA Form 86,Certificate or Compliance•Page 3 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 242-1535
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: ----------------•----------------------------------------------------------------._---------------------
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
2009, 2005, 2001 Salem Street 242-1535
Project location DEP File Number
Has been recorded at the Registry of Deeds of:
Northern Essex
County
for:
Lauren Zelinick
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm8b.doc•rev.5/1 8120 2 0 wf A Form 80,Cerllricafe of Complfance•Page 4 of 3
CONSERVATION DEPARTMENT
Community Development Division
Certificate of Compliance
2009,2005,2001 Salem Street(common drive servicing Vot subdivision)
DEP#242-1535
Perpetual On-Going Conditions
1. A 25-foot No-Disturbance Zone and a 50-foot No-Construction Zone shall be established
from the edge of adjacent wetland resource areas and a 50-foot No-Disturbance Zone
and 75-foot No-Construction Zone to Ephemeral/Vernal Pools. Future work within 100
feet of existing wetland resource areas or 200 feet of mean high water of Boston Brook
(located across Salem Street)will require a separate filing with the North Andover
Conservation Conunission(NACC),The Conservation Administrator and/or other
agents of the NACC do not have the authority to waive these setbacks as established
under the local Bylaw.
2. The edge of the "50-Moot No-Disturbance Zone' to the on-site ephemeral pools shall be
permanently marked with signs or markers spaced evenly every 50 feet incorporating
the following text: "Protected Wetland Resource Area'. This will designate their
sensitivity and assure no further inadvertent encroachment into the wetland. The
homeowners shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the
applicant/homeowner. These markers shall remain posted and be replaced as necessary
in perpetuity.Signs are available from the Conservation Department.
3. Adherence to the attached BMP Maintenance and Inspection Schedule shall be ongoing.
Evidence of maintenance of the stormwater management system elements shall be
provided to the NACC on an annual basis by a Registered Professional Civil Engineer
certifying that the drainage system elements are working as designed and shall include
any maintenance invoices for cleaning and repairs.
4. There shall be no discharge or spillage of fuel,or other pollutants into any wetland
resource area. If there is a spill or discharge of any pollutant during any phase of
construction the NACC shall be notified by the applicant within one (1)business day.
5. No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100)feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Towns Wetland protection Bylaw.
6. Fertilizers utilized for landscaping and lawn care shall be slow release,low-nitrogen
types (<5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection Bylaw and
shall remain in perpetuity.
-R. .. .... v... .r .-... .:. .....t.... 4:'.. ...
September 20,2011
Table 2
BMP Maintenance and Inspection Schedule
(Runoff,Conveyance,and Treatment BMP's)
209 Salem Street Realty Trust
Map 108A,Lot-2
Salem Woods
North Andover,Ma.
IMP BMP Name Recommended Maintenance Recommended
Designation Schedule of
Maintenance
16. Grass-Lined During growth period,inspect grass after Annually and following
Channels rainstorms. Remove accumulated large storm events
sediments. Inspect outlets to prevent
scouring and erosion.
17. Storm Drain Replace clogged filter fabric. Clean Weekly and following
Inlet sediment from stone filters. Do not wash storms
Protection collected sediments into storm drains—
remove to soil stockpile.
18.
Straw Sale Inspect daily during rainy periods. Check for Daily during prolonged
Barrier undercutting,end runs,and damaged bales. rainy periods.
Remove accumulated sediment when one
half the barrier height.
19. Roof Inspect annually. Check for sump debris Annually and following
Drywells accumulations in sump and damaged. large storm events
Remove accumulated sediment.
lie Repair damaged fencing immediately.
Intercept concentrated flows and reroute:
Remove sediment accumulations at 6-
20. Slit Fence inches. Replace deteriorated fencing Weekly and following
material: Properly dispose of used fencing. storms
Infiltration Check to ensure proper functioning after Weekly and following
21. Ditches or rainstorms. Prevent traffic from crossing the storms
Trenches spreader. Repair if damaged.
Merrimack Engineering Services:
=gig:"�;n-
P777
September 20, 2011
Table 3
BMP Maintenance and Inspection Schedule
(Runoff,Conveyance,and Treatment BIVIP's-Long Term)
Homeowners Maintenance Calendar Matrix
Map 764,Wk.1,Lot-4A
Riverdale Pace
North Andover,Ma.
BMP BMP Name Recommended Maintenance Recommended Schedule of
Designation for Homeowner Association Maintenance
Infiltration During growth period, Inspect Inspect semi-annually the first
Ditches or grass after rainstorms. Remove year, and at least once a year
Trenches accumulated sediments. Inspect thereafter. Inspect the
outlets to prevent scouring and grass for growth and the side
erosion. Set the mower blades slopes for signs of erosion and
no lower than 3 to 4 inches formation of rills and gullies. If
above the ground. Mow on an grass growth is impaired by
as-needed basis during the winter road salt or other deicer
growing season use, re-establish the grass In the
so that the grass height does spring. Remove accumulated
not exceed 6 inches, trash and debris prior to mowing.
Check on a yearly basis and
clean as needed. Use hand
methods(I.e., a person with a
shovel)when cleaning to
minimize disturbance to
vegetation and underlying soils..
Sediment build-up in the grass
channel reduces its capacity to
treat and convey the water,
Roof Inspect annually.Check for After every major storm In the
Drywells sump debris accumulations in first few months after
sump and damaged. Remove construction to ensure proper
2. accumulated sediment stabilization
Measure the water depth in the and function. Thereafter, Inspect
observation well at 24 and 48- annually.
hour Intervals after a storm.
Merrimack Engineering Services
L
September 20,2011
Erosion and Sediment Control Inspection Form
Sediment Control
SMP Designation O.K Not O.K. BMP Condition Coyrective Action, General Notes
Storm water Detention
1:.;.:;_`.,:_:•t.;:;= And Monitoring
13MP Maintenance
Inlet Protection
Dust Control
Spill Prevention
Condition of Discharge" Water
Comments:
-5:
I '
,...:•:.,.:.:•--"•:,...,:.. .,.,, , .,.. ............:....:.•�'::'•::.::.�. MerrfmackEn�ineerin5ervioes=
t,
9 9 ;:�..