Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 1230 SALEM STREET 9/8/2022 SETTLED 6ya • North Andover Health Department (ommunity and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1230 Salem St MAP: 106.A LOT: 0041 INSTALLER: Chad Jablonski — permit # 59749 DESIGNER: Erich Nitzsche, P.E. — 978-578-1352 PLAN DATE: final revision date — 05.16.2017 BOH APPROVAL DATE ON PLAN: - 08.22.2017, plan extension date 08.22.2021 INSPECTIONS TANK INSPECTION: 10.25.2021 DATE OF BED BOTTOM INSPECTION: 10/18/2021, re-inspection 10.19.2021 DATE OF FINAL CONSTRUCTION INSPECTION: 11-13-21 DATE OF FINAL GRADE INSPECTION:9/8/2022 S. Casey SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ® Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: 11-13-21 — Bend in building sewer pipe just outside the dwelling. Confirmed presence of cleanout inside basement wall so no need for a cleanout outside. Benchmark set in tree, need memo from design engineer to confirm it is accurate to use this benchmark D. Ottenheimer SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ® 1500 gallon tank has been installed H-20 loading ® Monolithic tank construction ® Watertightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port (effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ® Boots on inlet & outlet Comments: S. Casey 10.25.2021 — 6" + stone in hole, tank location moved to side of house (design called for front of house) Chad Stated engineer ok— verify 11-13-21 —Tank provided is a 2-compartment tank, baffle wall has tees. Tank needs 9" of cover and a manhole to finished grade over the effluent filter. D. Ottenheimer DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ® Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: 11-13-21 — Risers on d-box needed to bring cover within 6" of finished grade. D. Ottenheimer SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ❑ 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header and vented ® Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete /timber/ block) ❑ Final cover as per plan Comments: 10.18.2021 S. Casey —fail large rocks, boulders encroaching on field. 10.19.2021 S.Casey — boulder broken up, 1 overdig only ok, one pocket Ig stones in bed face noted 18' from fare side of field removed. Engineer to return to site today as well. FINAL GRADE ® Loamed ® Seeded ® Cover per plan Comments: DOCUMENTS NEEDED ® Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer ® As-Built Plan BM = 114.00 FIR = 1.65 HI = 115.65 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 6.39 108.93 110.19 Septic Tank IN 6.75 108.57 109.92 Septic Tank OUT 7.05 108.27 109.67 Distribution Box IN 7.95 107.37 107.02 Distribution Box OUT 8.14 107.18 106.85 Lateral 1 BEG 8.22 107.10 106.80 Lateral 1 END 8.63 106.69 106.50 Lateral 2 BEG 8.14 107.18 106.82 Lateral 2 END 8.59 106.73 106.50 Lateral 3 BEG 8.26 107.06 106.80 Lateral 3 END 8.63 106.69 106.50 SKETCH PLAN 11-13-21 - Confirmed soil absorption system is > 100' from wetland flag 6CA5s P-9- 9/8/22,2:49 PM G 20220908_101405.jpg 9 •x ar 7 z :• SY w.. rlp y t ai �Ki' it t i ..A , .3e,.a,rr. https://mail.google.com/mail/u/O/?tab=rm 1#inbox/KtbxLwHPzVFKPCfcggcxngfFxfdmZkhgbq?projector-1&messagePartld=0.1 1/1 9/8/22,2:49 PM 20220908 101408.jpg l .0 ~ t F � wT" 3 5 5 d Y �'f"°"i ,. .�,: .r,.:�:.::�H►'�'"y'" >,'c-- x -, .r.�' � r >� ��� �� i+A�. __{...,..�.e1w,t:as.t https://mail.google.com/mail/u/O/?tab=rm 1#inbox/KtbxLwH PzVFKPCfcggcxngfFxfdmZkhgbq?projector-1&messagePartld=0.1 1/1