HomeMy WebLinkAboutSeptic - Full Repair - Consultant Review - 328 CAMPBELL ROAD 9/26/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 328 Campbell Road MAP: 106.D LOT: 0024 INSTALLER: Mark Finn - Permit # 66541 DESIGNER: Charlie Wear PLAN DATE: 8/24/21 BOH APPROVAL DATE ON PLAN: 05.19.2022 INSPECTIONS TANK INSPECTION: 06.02.2022 S.Casey DATE OF BED BOTTOM INSPECTION: 06.10.2022 S.Casey DATE OF FINAL CONSTRUCTION INSPECTION: 6-28-22 DATE OF FINAL GRADE INSPECTION: 8/3/2022 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 6/28/22 D. Ottenheimer – existing cesspool pumped of contents but not yet filled in, contractor will do so SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots Comments:6/28/22 D. Ottenheimer – Informed installer of need for at least one riser with manhole cover to within 6” of finished grade DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) Retaining wall material, location and height if specified on plan Comments: 6.8.2022 S.Casey – re-scarify front right corner to remove B-layer in one spot. Reinspect to check sand at 9 am 6.10.2022 - bottom of bed good, sand good (Bentley Warren) FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM =129.10 (door sill) HR = 0.61 HI = 129.81 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 3.50 125.98 125.88 Septic Tank IN 3.82 125.66 125.54 Septic Tank OUT 4.10 125.38 125.29 Distribution Box IN 4.46 125.02 124.81 Distribution Box OUT 4.62 124.86 124.64 Lateral 1 BEGINNING 4.72 125.28 124.56 Lateral 1 END 4.98 124.50 124.40 Lateral 2 BEGINNING 4.72 125.28 124.56 Lateral 2 END 4.98 124.50 124.40 Lateral 3 BEGINNING 4.72 125.28 124.56 Lateral 3 END 4.98 124.50 124.40