Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Septic - Full Repair - Correspondence - 250 ABBOTT STREET 8/24/2022
8/24/22,1:�.,29 PM Town of North Andover Mail-250 Abbott Street-Septic Install NQRRi ANDOVER Massach Stephen Casey<scasey@northandoverma.gov> 250 Abbott Street - Septic Install 6 messages Will Schkuta<will@morin came ron.com> Thu,Aug 18, 2022 at 10:21 AM To: Stephen Casey<scasey@northandoverma.gov> Cc: Jim Heider<jimheider@hotmail.com>, John Morin<john@morincameron.com> Hi Steve, We have performed our inspection for the septic install at 250 Abbott and are all set with everything(except the vent to be re-routed). After seeing the high vent installed and discussing with the owner,we would like to install a bypass vent instead. The bypass vent will be run from the d-box back to the septic tank. I have attached the detail from the Presby manual for reference. Can you please confirm this is acceptable? The location will be noted on the as-built plan. We plan on performing an inspection of the vent on Monday/Tuesday when we can get onsite. Also,the bypass vent will be completed by early next week and the system will be ready for your inspection. Can you please coordinate a time for an inspection with Jim Heider(he is cc'd on this email)? If you have any questions please let me know. Thanks, Will Schkuta, PE Senior Project Manager THE MORIN-CAMERON GROUP, INC. 66 Elm Street, Danvers, MA 01923 DANVERS, MA HAVERHILL, MA 66 Elm Street, Danvers, MA 01923 25 Kenoza Avenue, Haverhill, MA 01830 P:978-777-8586 P:978-373-0310 www.morincameron.com This communication,including attachments,is for the exclusive use of the addressee and may contain proprietary,confidential and/or privileged information.I f you are not the intended recipient any use,copying disclosure,dissemination or distribution is strictly prohibited. If you are not the intended recipient,please notify the sender immediately by return e-mail,delete this communication and destroy all copies. An Bypass Vent.pdf 369K https://mai l.google.com/mail/u/0/?ik=fb8Oa9478f&view=pt&search=all&permth id=thread-f%3Al 741509090879807837&simpl=msg-f%3A17415090908... 1/3 8/24/22, 12:29 PM Town of North Andover Mail-250 Abbott Street-Septic Install Stephen Casey<scasey@northandoverma.gov> Tue,Aug 23, 2022 at 9:19 AM To:Will Schkuta <will@morincameron.com> Cc:Jim Heider<jimheider@hotmail.com>,John Morin<john@morincameron.com> Hi Will, Apologies as I was out of the office when I got your email. Let me take a look at this and get back to you asap.What inspection would Jim need from me? I believe this would be checked as part of the final inspection process. Best, Steve [Quoted text hidden] Stephen Casey Jr. Health Inspector Town of North Andover Will Schkuta<will@morincameron.com> Tue,Aug 23,2022 at 9:39 AM To: Stephen Casey<scasey@northandoverma.gov> Cc:Jim Heider<jimheider@hotmail.com>,John Morin<john@morincameron.com> Correct,the system will be ready for a final inspection pending the modifications to the vent. Let me know once you have a chance to review. Reach out if you have any questions. [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Stephen Casey<scasey@northandoverma.gov> Wed, Aug 24,2022 at 11:56 AM To:Will Schkuta <will@morincameron.com> Cc:Jim Heider<jimheider@hotmail.com>,John Morin<john@morincameron.com> Hi Will, I am fine with the use of the by-pass vent. One thing I will ask is that you submit a sketch of what the installer is to do to comply with what the presby design manual calls for.This way we have it for our records in case any questions arise.You can draw this out and email it to me if that's easiest. Thank you, Steve [Quoted text hidden] Will Schkuta<will@morincameron.com> Wed,Aug 24, 2022 at 12:19 PM To: Stephen Casey<scasey@northandoverma.gov> Cc:Jim Heider<jimheider@hotmail.com>,John Morin<john@morincameron.com> Steve, I spoke to Jim about this already and the installation shall be compliant with the detail shown in the manual(re-attached for reference). Instead of re-drawing the detail does a summary of the critical points work? The installation shall adhere to the By-pass venting detail shown and shall include the following: • Invert of vent line shall be a minimum of 2"above the distribution box before sloping back towards the tank. This can be accomplished with a"gooseneck"connection where the vent it connected to the distribution box. • The bypass vent shall slope back towards the septic tank • The bypass vent shall enter an un-used outlet of the existing septic tank https://mai l.google.com/mail/u/0/?ik=fb8Oa9478f&view=pt&search=all&permth id=thread-f%3Al 741509090879807837&simpl=msg-f%3A17415090908... 2/3 8/24/22, 12�29 PM Town of North Andover Mail-250 Abbott Street-Septic Install y - • The invert of the bypass vent at the septic tank must be above the top of septic tank. Is this sufficient? Thanks, Will Schkuta, PE Senior Project Manager THE MORIN-CAMERON GROUP, INC. P:978-777-8586 x205 [Quoted text hidden] Bypass Vent.pdf 369K Stephen Casey<scasey@northandoverma.gov> Wed,Aug 24,2022 at 12:29 PM To:Will Schkuta <will@morincameron.com> Cc:Jim Heider<jimheider@hotmail.com>,John Morin<john@morincameron.com> Hi Will, As long as you have spoken with Jim about this and he has installed it per the manufacturer's manual, I am fine with the summary provided.Thanks for clarifying. Best, Steve [Quoted text hidden] https://mai I.google.com/mail/u/0/?ik=fb80a9478f&view=pt&search=all&permthid=th read-f%3Al 741509090879807837&simpl=msg-f%3A17415090908... 3/3 $/23/22,9:17 AM Town of North Andover Mail-250 Abbott Street-Septic Install NORTH ANDOVER Massachusetts Stephen Casey<scasey@northandoverma.gov> 250 Abbott Street - Septic Install 1 message Will Schkuta<will@morin came ron.com> Thu,Aug 18,2022 at 10:21 AM To: Stephen Casey<scasey@northandoverma.gov> Cc:Jim Heider<jimheider@hotmail.com>, John Morin<john@morincameron.com> Hi Steve, We have performed our inspection for the septic install at 250 Abbott and are all set with everything(except the vent to be re-routed). After seeing the high vent installed and discussing with the owner,we would like to install a bypass vent instead. The bypass vent will be run from the d-box back to the septic tank. I have attached the detail from the Presby manual for reference. Can you please confirm this is acceptable? The location will be noted on the as-built plan. We plan on performing an inspection of the vent on Monday/Tuesday when we can get onsite. Also,the bypass vent will be completed by early next week and the system will be ready for your inspection. Can you please coordinate a time for an inspection with Jim Heider(he is cc'd on this email)? If you have any questions please let me know. Thanks, Will Schkuta, PE Senior Project Manager THE MORIN-CAMERON GROUP, INC. 66 Elm Street, Danvers, MA 01923 DANVERS,MA HAVERHILL,MA 66 Elm Street, Danvers, MA 01923 25 Kenoza Avenue, Haverhill, MA 01830 P:978-777-8586 P:978-373-0310 www.morincameron.com This communication,including attachments,is for the exclusive use of the addressee and may contain proprietary,confidential and/or privileged information.I f you are not the intended recipient,any use,copying disclosure,dissemination or distribution is strictly prohibited. If you are not the intended recipient,please notify the sender immediately by return e-mail,delete this communication and destroy all copies. Bypass Vent.pdf 369K https://mai 1.google.com/mai 1/u/0/?ik=fb8Oa9478f&view=pt&search=all&permth id=thread-f%3A1741509090879807837&simpl=msg-f%3A17415090908... 112 Venting Requirements, Continued Vent manifolds A vent manifold can be incorporated to connect the ends of a number of sections or lines of ES pipe to a single vent opening. One 4 in vent is required for every 1,000 ft. of pipe. A 6 in. manifold and vent stack may vent up to 3,000 ft.of pipe. 0 J LL LU W ZQ N Z � F W N N W IL Z 0 > FQF ti D W m w m N LL U � o O e a Remote vent Remote vent piping should slope piping slope downward toward the system to prevent moisture from collecting in REMOTE VEN the piping and blocking air passage. If site conditions do not D-BOX OR END OF allow the pipe to the vent to slope ERIAL BED,SECTION OR LINE back toward the system,the low DRILL HOLES AT LOW POINT Y TO DRAIN CONDENSATION point of the connecting pipe FINAL GRADE should be drilled to allow drainage provided that the connecting pipe invert is above the highest point of the D-box and all of the ES lines. CONNECTING PIPE INVERT MUST BE ABOVE TOP OF D-BOX OR HIGHEST ENVIROSEPTIC LINE By-Pass By-Pass venting is used to eliminate the need for a High vent at the field and can also replace Venting the need for a pump chamber vent.There must be at least 10 ft.of elevation between the roof stack and low vent openings. II WHEN USING BY-PASS VENTING THE ROOF VENT I I REPLACES THE"HIGH"VENT AND PUMP CHAMBER II I VENT(IF REQ'D).THE OPENING OF ROOF VENT MUST I I BE AT LEAST 10 FT.ABOVE OPENING OF LOW VENT I I II II II 10'MIN I BY-PASS VENTING REPLACES BOTH II I IW THE HIGH VENT AND PUMP CHAMBER IN LOW VENT IS AIR ;ENT(IF REQUIRED) INTAKE III II- w 3' II ATTACH BY-PASS VENT TO I I FINISH GRADE PUMPCHAMBERORUNUSED OPENING IN SEPTIC TANK 11 PRESBV FIELD I ..NO EFFLUENT FILTER;: NOTES: 1.NOT TO BE USED WITH GRAVITY SYSTEMS. SEPTIC TANK WITH PUMP SANITARY TEE BAFFLES CHAMBER 2.INVERTOF PIPE EXITING D-BOX MUST RISE 2"MINIMUM ABOVE D-BOX. OPTIONAL CONFIGURATION 3.USE 4"SCH.40 PVC OR EQUAL FOR BY-PASS PUMP CHAMBER BY-PASS (IF EFFLUENT FILTER USED VENTING. VENT HIGHER THAN INLET A TOD-BOX B ABOVETOP OFTANK SEPTIC TANK 4.GLUE ALL PVC JOINTS OR EQUAL. SEPTIC TANK 00 O O VIEW A-A PUMP BOX (ROTATED 90°) A ADD PUMP CHAMBER BV-PASS VENT IF EFFLUENT FILTER IS USED ON SEPTIC TANK OUTLET BAFFLE ©Presby Environmental, Inc., Massachusetts Enviro-Septic®D&I Manual, September 2019 Edition -27- 8/10/22,9:32 AM IMG_4165.jpg NORTHEAST 1 SAND & GRAVEL 17 OLD NASHUA ROAD, SUITE 14 AMHERST, NH 03031 Phone 603-878-0035 sales@nesand.co CUSTOMER { ' DATE t JOB ' TRUCK PIT f' ilk x BANK SAND YDS PROCESSED GRAVEL TO TITLE V SAND C33 SAND � TOi BANK GRAVEL TONS STONE -3/4 1-1/2 TONS { CRUSHED GRAVEL 3/4 1-112 TONS CRUSHED STONE 3/4 1-1/2 TONS RECEIVED BY WHEN SIGNING THIS INVOICE THE BUYER ACCEPTS THE QUANTITY OF MATERIALS SHIPPED. QUALITY AND CA1,ABRlDGE r https://maiI.google.com/mail/u/O/?tab=rm 1#inbox/KtbxLrjGRBwvmHPGTHJDXXnnRSSDPdQggq?projector-1&messagePartId=0.1 1/1 NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> —,00000 FW: Initial Plan Review - 250 Abbott Street, North Andover 2 messages Daniel Ottenheimer<dano@millriverconsulting.com> Fri, Aug 27, 2021 at 12:36 PM To: "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, "Brian Lagrasse (blagrasse@northandoverma.gov)" <blagrasse@northandoverma.gov> Brian, Steve, Toni- Plan review completed for 250 Abbott Street. Very small items were found to need adjustment and it did not warrant a whole review letter so I sent the email below to the designer. Overall it was excellent work. Please let me know if you have any questions. Dan Daniel Ottenheimer, PE President V%LL RIVER CONSULTING C trative 4ohttisms for Laid Develcq ment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com From: Daniel Ottenheimer Sent: Friday, August 27, 2021 12:34 PM To: 'John Morin' Subject: Initial Plan Review -250 Abbott Street, North Andover Good afternoon John. The design completed for this address was stellar. You should be proud. There are a few small items we identified which need attention but it does not warrant the crafting of a formal review letter so I am sending this email: • The plan indicates to install an effluent filter in the existing tank if that component is still in acceptable condition. It should also indicate to put a manhole to finished grade if an effluent filter is going to be inserted • The desired location of inspection port(s) should be identified • A Best Feasible Replacement area needs to be depicted • Lastly, I did not see DEP Forms 11 & 12. Perhaps they were submitted and not sent along to me, or perhaps they were not provided yet to the Town? Please provide them to the Town if not already submitted Have a nice weekend. Dan Daniel Ottenheimer, PE President V: tLL RIVER CONSULTING Cat-atiw Solutions for l:utd Mvelopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com Toni Wolfenden <tolfenden@northandoverma.gov> Mon, Aug 30, 2021 at 7:58 AM To: Daniel Ottenheimer<dano@millriverconsulting.com> Cc: Stephen Casey<scasey@northandoverma.gov>, 'Brian Lagrasse (baagrasse@northandoverma.gov)" <blag rasse@northandoverma.gov> Thank you very much Dan! Toni Toni K. Wolfenden Health Department Assistant 978-688-9540 (,�cid:image002.jpg@01 CD02A1.85A49B40 [Quoted text hidden] a image001.jpg 4K