Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 56 CRICKET LANE 8/24/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 56 Cricket Lane MAP: 107.A LOT: 0215 INSTALLER: John T. Shaw – 978-815-7411 DESIGNER: Vladimir Nemchenok / Bill Dufresne – 978-475-3555 PLAN DATE: 04.22.2022 BOH APPROVAL DATE ON PLAN: 06.14.2022 INSPECTIONS TANK INSPECTION: 8.4.2022 S. Casey DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: 8-10-22 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 8/24/2022 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port effluent filter installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum 20 inch diameter Pipe penetrations appear watertight using rubber boots Comments: 8.04.2022 – ok per S. Casey 8-10-22 – Effluent filter not brand and model on plan D. Ottenheimer PUMP CHAMBER (Delete if not present) Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Drain hole in pressure line 20” cover at final grade installed over pump access port Water tightness of tank has been achieved by Visual observation Neoprene boots around inlet & outlet Comments: 08.04.2022 – ok per S. Casey 8-10-22 – Pump and panel not yet wired, pump is per plan. D. Ottenheimer CONTROL PANEL (Delete if not present) Alarm & Pump are on separate circuits Visual & audible alarm works as intended Location of control panel: ___________ Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan (50 x 30) Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) Retaining wall material, location and height if specified on plan Comments: 07.28.2022 S. Casey - pass, sand good, size good, depth good, c- layer present and Scarified FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan – 8.24.2022 S. Casey covers for tank & cover pump to grade Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 100.00 HR = 0.94 HI = 100.94 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Septic Tank IN 4.94 95.67 96.00 Septic Tank OUT 4.77 95.84 95.75 Pump Chamber IN 4.80 95.81 95.70 Pump Chamber OUT Distribution Box IN 1.78 (2”) 98.99 98.85 Distribution Box OUT 1.78 98.83 98.78 Lateral 1 BEGINNING 1.89 98.72 98.70 Lateral 1 END 2.07 98.54 98.50 Lateral 2 BEGINNING 1.89 98.72 98.70 Lateral 2 END 2.07 98.54 98.50 Lateral 3 BEGINNING 1.89 98.72 98.70 Lateral 3 END 2.07 98.54 98.50 Lateral 4 BEGINNING 1.89 98.72 98.70 Lateral 4 END 2.07 98.54 98.50